The document outlines the adoption of the South Central Railway Unified Standard Schedule of Rates (SCR USSOR) 2019 and the CPWD Delhi Schedule of Rates (DSR) 2018 for various civil engineering works effective from March 1, 2020. It specifies that the SCR USSOR 2019 will be used for estimates and tenders related to formation, bridge, and P.Way works, while the CPWD DSR 2018 will apply to building, road, and horticulture works. Additionally, it requests the submission of last accepted rates for tenders finalized under these schedules.

Uploaded by

dycecntvc2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views7 pages

1605079719546-Enclosure To HQ Letter DT 04.11.2020 Communicating Adoption of Escalation Factor On CPWD DSR Rates.

The document outlines the adoption of the South Central Railway Unified Standard Schedule of Rates (SCR USSOR) 2019 and the CPWD Delhi Schedule of Rates (DSR) 2018 for various civil engineering works effective from March 1, 2020. It specifies that the SCR USSOR 2019 will be used for estimates and tenders related to formation, bridge, and P.Way works, while the CPWD DSR 2018 will apply to building, road, and horticulture works. Additionally, it requests the submission of last accepted rates for tenders finalized under these schedules.

Uploaded by

dycecntvc2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

1

239108/2020/O/o Dy CE/WORKS/SCR
File No.SCR-HQ0ENGG(SOR)/18/2019-Dy CE/WORKS/SCR

‘ͯ¢Ž˜Ú™šȯ ›ȯ
SOUTH CENTRAL RAILWAY
Ĥ˜
Ǖ ˜É
Ǖ ™^ǔۇ“Ȣš€™ȡ[›™/ PCE͛s Office
€ȡ™[žȡȡ / Works Branch
šȯ ›Ǔ“›™˜ / Rail Nilayam Ph.No. 040-27822326
ͧ €Ȳ‘šȡ–ȡ‘ / Secunderabad
Rly: 070- 88461
email:[email protected]
Ǒ‘“ȡȲ€ /Date.26.02.2020

Chief Administrative Officer/Construction,


Sr.DEN/Co-ord/SC, GTL, BZA, HYB, GNT, NED
Dy.CE/EWS/LGD & Dy.CE/LGDS

Sub: Adoption of SCR USSOR ʹ 2019 and CPWD Delhi Schedule of Rates ʹ
2018 on S.C.Railway ʹ Reg.
Ref: (i) Railway Board letter No. 2019/CE-I/USSOR/W&M/I dt 26.11.2019.
(ii) Engineering Standing Order (ESO) - 84 dt 26.02.2020.
* * *
1. Railway Board vide letter under reference (i) advised Zonal Railways to adopt

a. CPWD Delhi Schedule of Rates 2018 (DSR Vol.1, DSR Vol.2), DSR ʹHorticulture and
Landscaping), Analysis of Rates for DSR (AOR-Vol.1, AOR Vol.2) and CPWD specifications
Vol.1, Vol.2 for execution of all civil engineering works related to Building Work, Road
Works and Horticulture works etc.
and
b. Indian Railways Unified Standard Schedule of Rates (IR USSOR ʹ 2019) for Bridge works,
Formation works and P.Way works with Indian Railways Unified standard Specifications
(Earthwork in Cutting and Embankment, Bridge Works and P.Way Works, IRUSS ʹ 2019).
2. CPWD Delhi Schedule of Rates 02018 (DSR-2018), DSR ʹHorticulture & Landscaping and
CPWD Specifications are uploaded by Railway Board in Civil Engineering Directorate webpage
of Railway Board Website. These documents shall be adopted for works related to Building
Work, Road Works and Horticulture works. Web link is:
http://indianrailways.gov.in/railwayboard/view_section.jsp?lang=0&id=0,1,304,366,526,2240
3. South Central Railway USSOR ʹ 2019 for Railway Formation works, Bridge works and P.Way
Works is uploaded on S.C.Railway Website https://scr.indianrailways.gov.in in Engineering OL
page. SCR USSOR ʹ 2019 shall be used for all Estimates and Tenders pertaining to Formation
works, Bridge works and P.Way Works.
4. DSR ʹ 2018 rates shall be modified with a Moderation Factor. Building Cost Index for
calculating Moderation Factor applicable to different divisions shall be uploaded in
S.C.Railway website time to time. Guidelines on adoption of CPWD Delhi Schedule of Rates -
2018 on S.C.Railway were issued vide ESO 84 dt 26.02.2020.

1
2
239108/2020/O/o Dy CE/WORKS/SCR
File No.SCR-HQ0ENGG(SOR)/18/2019-Dy CE/WORKS/SCR

5. No modifying factor is to be applied on SCR USSOR-2019 rates while preparing estimates /


Tender Schedules.

6. NS items presently in use for which suitable items are available in SCR USSOR-2019 and CPWD
DSR-2018, either individually or combination of more than one item, should not be used after
issue of SCR USSOR-2019.
7. Printing of USSOR -2019 is in progress and shall be supplied shortly. Till such time, USSOR
books are supplied, soft copy uploaded on SCR web site should be used.
8. CPWD DSR-2018, DSR-Horticulture & Landscaping and CPWD Specifications ʹ 2019 shall be
purchased in desired number by the divisions / units for distribution.
9. SCR USSOR ʹ 2019 and CPWD DSR-2018 with IR Unified Specifications ʹ 2019 and CPWD
Specifications ʹ 2019 shall come into force for all new estimates and tenders w.e.f
01.03.2020.

Signature valid
Digitally signed by ARUN KUMAR
CHAUDHARY
Date: 2020.02.26 21:01:01 IST
Reason: Approved
Chief Engineer / Works

CC:
PCE, PFA/SC, SDGM/SC, CPD/BW DRM/SC, BZA, GTL, HYB, GNT & NED
CTE, CBE, CGE, CE/Wks, CE/TP, CE/P&D, CE/TM, CE/RSW, CE/BRH & CE/SD.

2
File No.SCR-HQ0ENGG(SOR)/18/2019-Dy CE/WORKS/SCR



    
 
   
    
   
       
  

 ! "%     " &


 ' ( &)*+&,!&-.&)*&
' +)/ '+)

0  !"#!$ % &'()


*+ &" -&.) /
 01"2!"(3# 45%6&'7
1""2+'7


 &(5%5'&5&%'!"(3# 45%6&'7&9+&'7
-!5""'-&(:'!&''!; )*+5&'((!& <:"=-"'!&>5&?&#'5@&
A$" "/(' B%5#& #$ &/>5&?&#'5& "#&< '"C5'"6"("((!& <$ &
" &" -&.-<("':':
'!"(##D"'"(&6"('!&'
* '!-(:&'(&'5($("/ 9*+(!& <5&5-"'! 9*+5&'(
-"'!$'& ."/&.>5&?&#'5"-"'!&'&55&'(% 9*+D %$5'!5
&6"#
 ?56& $&%'5(D("#&%  "& &" -&.("(&-B5#"(D
"6"("($"'(:&.#("5'! &(' ##' &'(%&E&#'$"'(%5(":" &5-5F(
($3#"' (-"'! %55&" -&.-5F(&5&6&" &< 

!"("(($(-"'!'!6G/%&I$&5'5(?"&#&&56& %



Signature valid
Digitally signed by ARUN KUMAR
CHAUDHARY  1  
Date: 2020.03.04 18:30:10 IST
Reason: Approved

0D? DJ>DAD >DAK DJ DADJ L 


DADJDF(DDLD>D DA L
File No.SCR-HQ0ENGG(SOR)/18/2019-Dy CE/WORKS/SCR

दकक्षिणमध्यरर लवर
SOUTH CENTRAL RAILWAY
प्रममुखममु्य्यनक्जिननररकरर्य्याल्य/PCE’s Office
रकरर्य्याश्यख्य/रकरर / Works Branch Ph.No. 040-27822004
Rly: 070- 86365
रर लकनल्यम / Rail Nilayam email:[email protected]
कसिरकररकदर्यब्यद / Secunderabad
ददन्यकरकरर /Date:18.09.2020.

Chief Administrative Officer/Construction,


Sr.DEN/Co-ord/SC, GTL, BZA, HYB, GNT, NED
Dy.CE/EWS/LGD & Sr.DEN/LGDS

Sub: Adoption of SCR USSOR – 2019 and CPWD Delhi Schedule of Rates – 2018 on
South Central Railway – Reg
Ref: This office letter No.SCR-HQ0ENGG(SOR)/18/2019-Dy CE/WORKS/SCR
Dated.26.02.2020.

* * *

In connection with the above subject, it was advised vide this office letter dated 26.02.2020
under above reference, to adopt SCR USSOR – 2019 for all Estimates and Tenders pertaining to
Formation works, Bridge works and P.Way Works and CPWD Delhi Schedule of Rates – 2018 for
works related to Building Work, Road Works and Horticulture works with effect from 01.03.2020 and
uploaded the same on IREPS Module.

In this regard, it is requested that the details of Last Accepted Rates of all the tenders called
and finalized using the above Schedule of Rates may be furnished in the following format.

Schedule
LOA/ Schedule;
Sl Division Name Schedule LAR
Agreement USSOR or Remarks
No /Unit Name (e.g. Description as %
Number DSR
A, B,C etc)
1

It is also requested to send the copies of ‘Letters of Acceptance’ in support of the above data.

The copy of letter with above information along with LOAs may also be sent by email to
[email protected].

(J.S.V.Rama Rao)
Dy.Chief Engineer/Works