0% found this document useful (0 votes)
45 views19 pages

Vasl ST MJB 33+996

The document outlines the design and construction details for a major bridge at chainage 33+996 as part of a highway development project in Madhya Pradesh, India. It includes specifications for the bridge structure, dimensions, materials, and involved parties such as the client, contractors, and consultants. The project aims to enhance the existing two-lane highway to a four-lane configuration under the Bharatmala Pariyojana Economic Corridor initiative.

Uploaded by

ytgamer2122
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views19 pages

Vasl ST MJB 33+996

The document outlines the design and construction details for a major bridge at chainage 33+996 as part of a highway development project in Madhya Pradesh, India. It includes specifications for the bridge structure, dimensions, materials, and involved parties such as the client, contractors, and consultants. The project aims to enhance the existing two-lane highway to a four-lane configuration under the Bharatmala Pariyojana Economic Corridor initiative.

Uploaded by

ytgamer2122
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

STRUCTURE CATEGORY MAJOR BRIDGE

SCHEDULE DESIGN CH. 34+010


PROPOSED DESIGN CH. 33+996
PROPOSAL NEW CONSTRUCTION
SIZE/SPAN 1x45m+5x42m+1x45m

KEY PLAN

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: KEY PLAN OF MAJOR BRIDGE AT CH. 33+996 DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
R1 21-07-2023 A.E. COMMENTS INCORPORATED IRIS TECH PARK, SHEET:
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-KP-001
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R1
A1 P1 P2
OF EXP. GAP OF BRG./PIER/FDN OF EXP. GAP/PIER/FDN
OF BRG./ABUTMENT/FDN OF BRG.
45000 42000 42000
3500 750 750 750
(APPROACH SLAB) CRASH BARRIER 50mm THK. WEARING COAT
220mm THK. DECK SLAB

PSC GIRDER PSC GIRDER PSC GIRDER

WALL TYPE ABUTMENT


SHAFT (TYP.)
FDN LVL (TYP.) (TYP.)
6000 2000
GABION WALL
FDN LVL
RETAINING STRUCTURE
2000
7000 FDN LVL
(AS PER SITE)

5000

LONGITUDINAL ELEVATION

FRL @ CENTERLINE (M) 339.361 339.361 339.361


OGL BELOW PCL 333.549 331.142 328.301
OGL @8M OFFSET (LEFT) 334.317 332.205 328.488
OGL @8M OFFSET (RIGHT) 332.916 329.960 328.190
FOUNDATION LEVEL 331.400 328.450 326.650
CHAINAGE (KM) 33+846.000 33+891.000 33+933.000

A1 P1 P2
OF EXP. GAP OF BRG./PIER/FDN OF EXP. GAP/PIER/FDN
OF BRG./ABUTMENT/FDN OF BRG.
45000 42000 42000
SLOPE 1:2

750
750 750
RCC CRASH BARRIER
450
3500
(APPROACH SLAB)

10100 OF CARRIAGEWAY

450
DRAINAGE SPOUT
SLOPE 1:2

RCC CRASH BARRIER @5000 C/C TYP.

MATCH LINE-1
CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: GENERAL ARRANGEMENT DRAWING OF MAJOR BRIDGE AT CH. 33+996 DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
R1 21-07-2023 A.E. COMMENTS INCORPORATED IRIS TECH PARK, SHEET: (01 OF 06)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-GAD-001
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R1
P3 P4 P5 P6
OF BRG./PIER/FDN OF BRG./PIER/FDN OF EXP. GAP/PIER/FDN
OF BRG./PIER/FDN
OF BRG.
42000 42000 42000
750 750

PSC GIRDER PSC GIRDER PSC GIRDER

(TYP.) (TYP.) (TYP.) (TYP.)

HFL=329.574m 2000
FDN LVL
DIAPHRAGM WALL
5500 6000 7000
8500
FDN LVL FDN LVL
5000 5000
FDN LVL

7000
LONGITUDINAL ELEVATION

339.361 339.361 339.361 339.361


324.728 321.614 324.458 329.123
324.672 321.595 324.335 331.086
324.757 321.688 324.559 329.528
323.150 320.000 322.800 327.600
33+975.000 33+996.000 34+017.000 34+059.000 34+101.000

P3 P4 P5 P6
OF BRG./PIER/FDN OF BRG./PIER/FDN OF EXP. GAP/PIER/FDN
OF BRG./PIER/FDN

42000 42000 42000

5000 5000 5000

7000 5000 7000

MATCH LINE-2
MATCH LINE-1

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: GENERAL ARRANGEMENT DRAWING OF MAJOR BRIDGE AT CH. 33+996 DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
R1 21-07-2023 A.E. COMMENTS INCORPORATED IRIS TECH PARK, SHEET: (02 OF 06)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-GAD-001
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R1
P6 A2 NOTES:-
OF EXP. GAP 1. ALL DIMENSIONS ARE IN mm.AND LEVELS ARE IN METER UNLESS OTHERWISE
OF BRG./PIER/FDN MENTIONED.
OF BRG./ABUTMENT/FDN 2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED NO DIMENSION IS TO BE
SCALED.
45000
3500 3. STRUCTURE LOCATION REFER TO THE CHAINAGE AND LEVELS AT STRUCTURE
750
(APPROACH SLAB) CENTER.
4. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH RELEVANT HIGHWAY
DRAWING. FRL & CAMBER/SUPER ELEVATION AT PARTICULAR LOCATION SHALL
BE VERIFIED WITH THE HIGHWAY DRAWING. DISCREPANCY IF ANY, IS TO BE
PSC GIRDER IMMEDIATELY BROUGHT TO THE NOTICE OF ENGINEER FOR NECESSARY
MODIFICATIONS IN THE DRAWING.
5. THE FOLLOWING LOADS HAVE BEEN CONSIDERED IN THE DESIGN HIGH LEVEL
WALL TYPE ABUTMENT PRODUCES WORST EFFECT.
SHAFT (TYP.) a. 3 LANE OF CLASS A.
b. 1 LANE OF CLASS 70R+ 1LANE OF CLASS A.
(TYP.) FDN LVL c. 1 LANE OF SV LOADING.
6000 6. SEISMIC ZONE =III AS PER IS 1893-2002 HAS BEEN CONSIDERED.
2000 7. GRADE OF CONCRETE:-
FDN LVL a. DECK SLAB -M35
b. SUB STRUCTURE AND FOUNDATION -M35
7000 c. PEDESTAL AND CRASH BARRIER -M40
d. LEVELING COURSE -M15
8. CLEAR COVER TO OUTER STEEL SHALL BE AS FOLLOWS:-
a. DECK SLAB -50MM
b. WALL VERTICAL FACE IN CONTACT WITH EARTH -75MM
c. WALL VERTICAL FACE IN CONTACT WITHOUT EARTH -50MM
d. RCC CRASH BARRIER -50MM
LONGITUDINAL ELEVATION e. FOUNDATION -75MM
9. GRADE OF REINFORCING STEEL SHALL BE Fe-550D CONFORMING TO IS :1786.
10. PS STRIP SEAL TYPE EXPANSION JOINTS SHALL BE PROVIDED AS PER MORTH
SPECIFICATION.
11. THE BACKFILL MATERIAL BEHIND RCC BOX SHALL HAVE FOLLOWING

12. GEO COMPOSITE DRAIN SHALL BE PROVIDED BEHIND THE ABUTMENT AS PER
MORTH SPECIFICATION.
339.361 339.377 13. PEDESTAL HEIGHT SHALL BE ADJUSTED TO MAINTAIN TRANSVERSE DECK
329.123 334.791 SLOPE.
14. ABUTMENT /PIER CAP TOP LEVEL MAY MARGINALLY BE VERIFIED TO SUIT
331.086 335.579 BEARING HEIGHT (SUBJECT TO APPROVAL OF ENGINEER).
329.528 334.911 15. FOUNDATION & GROUND LEVELS SHOWN IN THE DRAWINGS ARE TO BE
VERIFIED AT SITE AND ANY SIGNIFICANT CHANGE IN THOSE SHALL BE
327.600 333.250 BROUGHT IN TO NOTICE OF DESIGNER BEFORE EXECUTION.
34+101.000 34+146.000 16. NO WORK SHOULD BE TAKEN UP IN HAND TILL DESIGN DRAWING ARE
APPROVED BY AUTHORITY.
17. FOR APPROACH SLAB, DRAINAGE SPOUT, CRASH BARRIER, BEARINGS DETAIL
REFER RELEVANT SEPARATE MISC. DRG.
18. THE REQUIRED SAFE BEARING CAPACITY AT ABUTMENT IS 50T/M 2 & AT PIER
IT IS 70T/M2.
19. TYPE OF STRUCTURE CONSIDERED IN DESIGN IS:
(*) FOUNDATION -OPEN
(*) SUPERSTRUCTURE -PRECAST PSC GIRDER
(*) WEARING COAT -50MM THICK
(*) BEARINGS -ELASTOMERIC BEARING & PIN/GUIDE BEARING
P6 A2
OF BRG./PIER/FDN
OF EXP. GAP ABBREVIATIONS:-
OF BRG./ABUTMENT/FDN FRL : FINISHED ROAD LVL
GL : GROUND LVL
45000 LVL : LVL
:

SLOPE 1:2
750 FX FIX
FR : FREE
PCC. : PLAIN CEMENT CONCRETE
BRG. : BEARING
EXP. : EXPENSION GAP
FDN. : FOUNDATION
THK. : THICK
11000
5000

7000
SLOPE 1:2

6000
MATCH LINE-2

GABION WALL
RETAINING STRUCTURE
(AS PER SITE)

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: GENERAL ARRANGEMENT DRAWING OF MAJOR BRIDGE AT CH. 33+996 DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
R1 21-07-2023 A.E. COMMENTS INCORPORATED IRIS TECH PARK, SHEET: (03 OF 06)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-GAD-001
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R1
NOTES:-

333.250
A1 / A2 ℄OF DECK
11000 1. ALL DIMENSIONS ARE IN mm.AND LEVELS ARE IN METER UNLESS
℄OF EXP. JT. 450 10100 450 OTHERWISE MENTIONED.
℄OF BRG. 2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED NO DIMENSION IS TO
750 50mm THK.WEARING COAT BE SCALED.
RCC CRASH 220 THK. DECK SLAB 3. MINIMUM HEIGHT OF BEARING + PEDESTAL IS 350mm

336.302
BARRIER (TYP.) -2.5% SLOPE PEDESTAL SIZE (L*T) - 800x800(mm).
-2.5% SLOPE
DRAINAGE MIN.Ht. - 150mm.
SPOUT MAX.Ht. - 500mm
575 2750 2750 2750 575
DIRT WALL LEVEL DETAILS OF ABUTMENT:-

339.377
ABUTMENT FRL ABUT. CAP ABUT. BOTTOM
TOP LVL FOUNDATION LVL
A1 339.361 336.286 331.400
ABUT. CAP TOP LVL 650 850
3700 1800 1800 3700
1000 02
WEEP HOLES 4/7 ℄ OF BRG. ℄ OF GUIDE ℄OF BRG. TRANSVERSE SEISMIC
A2

BRG. RESTRAINER 750x800 (TYP.) TRANSVERSE SEISMIC STOPPER


CAST IN SITU END DIAPHRAGM CAST IN SITU RCC DIAPHRAGM
01
WALL TYPE 15MM THICK NEOPRENE PAD
WALL TYPE 4/7
1000 1000
ABUTMENT SHAFT ABUTMENT SHAFT (TYP.)
150
(TYP.)
DIRT WALL
GROUND LEVEL GROUND LEVEL

650 150
ABUTMENT CAP TOP LEVEL 750 50
600 600
1200 1200
600 FOUNDATION LEVEL 600 FOUNDATION LEVEL

3000 1200 1800 11000


GABION WALL 6000 100 THK. PCC M-15 ABUTMENT CAP
RETAINING LEVELING COURSE
STRUCTURE (AS
LONGITUDINAL SECTION A1-A1 AT ABUTMENT TRANSVERSE SECTION A2-A2 AT ABUTMENT
PER SITE) 1 : 80 1 : 80 DETAIL
02 1 : 35

A1 / A2 A1 / A2
℄OF EXP. JT. ℄OF EXP. JT.
℄OF BRG./SHAFT ℄OF BRG.
/FOUNDATION 1675
A2 325 750 600
A1 / A2
RCC CRASH BARRIER
750 ℄OF EXP. JT. 220mm THK. DECK SLAB
50 mm EXP. GAP 750
℄OF BRG. PSC GIRDER

2400 3700

100 THK. PCC ℄ OF JACK


550
M-15 LEVELING ℄ OF BRG. 300
COURSE DIRT WALL
300
1800 APPROACH SLAB 300mm THK. 300
℄ OF JACK
A1 11000 A1 550 150 THK. PCC M-15 150
℄ OF CARRIAGEWAY ℄OF CARRIAGEWAY/ ℄ OF GUIDE BRG. LEVELING COURSE
/FOUNDATION ABUTMENT CAP 550 11000
℄ OF JACK
GEO COMPOSITE DRAIN 600
1800

℄ OF BRG.
550 DIRT WALL
℄ OF JACK
END DIAPHARGM
SEISMIC RESTRAINER 500
2400 3700 ELASTOMERIC BEARING
PEDESTAL 800x800 300 775 600
475 1000 200
WALL TYPE
750 ABUTMENT SHAFT (TYP.)

6000 TRANSVERSE SEISMIC


RESTRAINER 750x800 (TYP.)
A2 DETAIL
PLAN AT ABUTMENT FOUNDATION PLAN AT ABUTMENT CAP 01 1 : 50
1 : 80 1 : 80
CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS & M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) CONSULTANTS PVT. LTD M/s. Skylark Infra Engineering Pvt Ltd (Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways) 301,OMAXE HEIGHTS, OMAXE CITY, DesignCh. 63+321, Village-Alamgarh (Chirapatla), Tehsil-Chicholi, District – Betul, M.P. – 460 330 CHECKED: A.K Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Contact No.: +91 80538 05321,
Email – [email protected]
TITLE: GENERAL ARRANGEMENT DRAWING OF MAJOR BRIDGE DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B AT CH. 33+996
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
IRIS TECH PARK, VASL INFRA CONSULTANT LLP. SHEET: (04 OF 07)
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P)
23, Sector 48, Gurugram, Haryana-122018
"FINDING REAL WORLD SOLUTION"
DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-GAD-001
REV DATE DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
FORMAT: REV
Email ID:- [email protected] A2 R1
NOTES:-
1. ALL DIMENSIONS ARE IN mm.AND LEVELS ARE IN METER UNLESS
P1 / P4 / P6 ℄OF DECK OTHERWISE MENTIONED.
11000 2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED NO DIMENSION IS TO
℄OF BRG./PIER/FDN 450 10100 450 BE SCALED.
50mm THK. WEARING COAT 3. MINIMUM HEIGHT OF BEARING + PEDESTAL IS 350mm
PEDESTAL SIZE (L*T) - 800x800(mm).
RCC CRASH BARRIER (TYP.) 220 THK. DECK SLAB
MIN.Ht. - 150mm.
-2.5% SLOPE MAX.Ht. - 500mm
-2.5% SLOPE
LEVEL DETAILS OF PIER:-
PIER FRL PIER CAP PIER BOTTOM
DRAINAGE
TOP LVL FOUNDATION LVL
SPOUT 575 2750 2750 2750 575
P1 339.361 336.286 328.450
P4 339.361 336.286 320.000
PIER CAP TOP LEVEL CAST IN SITU END DIAPHRAGM
P6 339.361 336.286 327.600
LONGITUDINAL SEISMIC
800 RESTRAINER 800x1000 (TYP.)
℄OF BRG. ℄OF PIN BRG. ℄OF BRG. 15MM THICK NEOPRENE PAD DETAILS OF DIAPHRAGM WALL:-
2925 3600 2925 LONGITUDINAL SEISMIC STOPPER PIER DIAPHRAGM DIAPHRAGM DIAPHRAGM
04 9450
CAST IN SITU RCC DIAPHRAGM LENGTH HEIGHT THK.
5/7
03 P1 2360 2000 300
1200 DIA. PIER SHAFT 5/7 1200 DIA. PIER SHAFT
P4 2360 8500 300
150
300 THK. DIAPHRAGM WALL 300 THK. DIAPHRAGM WALL P6 2360 2000 300

GROUND LEVEL GROUND LEVEL 150 850


PIER CAP TOP LEVEL 50 1000
100 100

600 600
1400 1400 800
800 FOUNDATION LEVEL 800 FOUNDATION LEVEL

2900 1200 2900 5000


7000 100 THK. PCC M-15 PIER CAP
LEVELING COURSE
LONGITUDINAL SECTION B1-B1 AT PIER TRANSVERSE SECTION B2-B2 AT PIER
1 : 80 1 : 80
DETAIL
04 1 : 35

P1 / P4 / P6
RCC CRASH BARRIER
℄ OF BRG./PIER/FDN P1 / P4 / P6 220mm THK. DECK SLAB
P1 / P4 / P6 2500 ℄ OF BRG./PIER/FDN PSC GIRDER
1250 1250

℄ OF BRG./PIER/FDN 1075

B2 1000 2925

300 ℄ OF JACK
550 800
100 THK. PCC ℄ OF BRG.
M-15 LEVELING
150 150
COURSE
1800
B1 B1
℄ OF JACK
℄OF CARRIAGEWAY ℄ OF PIER CAP 550 9450 OF PIN BRG.

/FOUNDATION 5000 /FOUNDATION 550
℄ OF JACK
1800
END DIAPHARGM LONGITUDINAL SEISMIC
℄ OF BRG. ELASTOMERIC BEARING 1250 1250 RESTRAINER 800x1000 (TYP.)
550
℄ OF JACK PEDESTAL 800x800 2500 800
300
B2 LONGITUDINAL SEISMIC 1000 2925 650 1200 650
7000 RESTRAINER 800x1000 (TYP.) 800 1200 DIA. PIER SHAFT
1075

FOUNDATION PLAN AT PIER - P1 DETAIL


PLAN AT PIER CAP 03 1 : 50
1 : 80 1 : 80

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS & M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) CONSULTANTS PVT. LTD M/s. Skylark Infra Engineering Pvt Ltd (Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways) 301,OMAXE HEIGHTS, OMAXE CITY, DesignCh. 63+321, Village-Alamgarh (Chirapatla), Tehsil-Chicholi, District – Betul, M.P. – 460 330 CHECKED: A.K Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Contact No.: +91 80538 05321,
Email – [email protected]
TITLE: GENERAL ARRANGEMENT DRAWING OF MAJOR BRIDGE DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B AT CH. 33+996
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
R1 21-07-2023 A.E. COMMENTS INCORPORATED IRIS TECH PARK, SHEET: (05 OF 07)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL VASL INFRA CONSULTANT LLP.
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P)
23, Sector 48, Gurugram, Haryana-122018
"FINDING REAL WORLD SOLUTION"
DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-GAD-001
REV DATE DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
FORMAT: REV
Email ID:- [email protected] A2 R1
NOTES:-
P2 / P5 1. ALL DIMENSIONS ARE IN mm.AND LEVELS ARE IN METER UNLESS
℄ OF DECK OTHERWISE MENTIONED.
℄OF EXP. GAP/PIER/FDN 11000 2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED NO DIMENSION IS TO
℄OF BRG. ℄OF BRG. 450 10100 450 BE SCALED.
3. MINIMUM HEIGHT OF BEARING + PEDESTAL IS 350mm
50mm THK. WEARING COAT
PEDESTAL SIZE (L*T) - 800x800(mm).
RCC CRASH BARRIER (TYP.) 220 THK. DECK SLAB MIN.Ht. - 150mm.
-2.5% SLOPE MAX.Ht. - 500mm
-2.5% SLOPE
LEVEL DETAILS OF PIER:-
DRAINAGE 575 2750 2750 2750 575 PIER FRL PIER CAP PIER BOTTOM
SPOUT TOP LVL FOUNDATION LVL
P2 339.361 336.286 326.650
P5 339.361 336.286 322.800
PIER CAP TOP LEVEL CAST IN SITU END DIAPHRAGM CAST IN SITU RCC DIAPHRAGM
LONGITUDINAL SEISMIC LONGITUDINAL SEISMIC STOPPER DETAILS OF DIAPHRAGM WALL:-
℄OF BRG. ℄OF PIN BRG. ℄OF BRG. 800 RESTRAINER 800x1000 (TYP.) 15MM THICK NEOPRENE PAD PIER DIAPHRAGM DIAPHRAGM DIAPHRAGM
06 2925 3600 2925 LENGTH HEIGHT THK.
6/7 9450
P2 2360 2000 300
05. 1200 DIA. PIER SHAFT P5 2360 6000 300
6/7 150
1200 DIA. PIER SHAFT

300 THK. DIAPHRAGM WALL 300 THK. DIAPHRAGM WALL 150 850
GROUND LEVEL GROUND LEVEL PIER CAP TOP LEVEL 50 1000

100 100

600 600 800


1400 1400
800 FOUNDATION LEVEL 800 FOUNDATION LEVEL

1900 1200 1900 5000


PIER CAP
5000 100 THK. PCC M-15
LEVELING COURSE

LONGITUDINAL SECTION C1-C1 AT PIER TRANSVERSE SECTION C2-C2 AT PIER DETAIL


1 : 80 1 : 80 06 1 : 35

P2 / P5 P2 / P5
℄OF EXP. GAP/PIER/FDN ℄ OF EXP. GAP/PIER/FDN RCC CRASH BARRIER
℄OF BRG. ℄OF BRG. 50 mm EXP. GAP
220mm THK. DECK SLAB
P2 / P5 3800 ℄ OF BRG. ℄ OF BRG. PSC GIRDER
1150 1500 1150 750 750

℄ OF BRG./PIER/FDN 1075

C2 1000 2925

300 ℄OF JACK


550
100 THK. PCC ℄OF BRG. 600 600
M-15 LEVELING
COURSE 150 150
1800
℄OF JACK
C1 C1
℄ OF CARRIAGEWAY ℄ OF PIER CAP 550 9450 ℄ OF PIN BRG.
/FOUNDATION
/FOUNDATION 5000 550 ℄OF JACK
1800

℄OF BRG. END DIAPHARGM LONGITUDINAL SEISMIC


550 ℄OF JACK ELASTOMERIC BEARING RESTRAINER 800x1000 (TYP.)
300 PEDESTAL 800x800 3800 800
C2 LONGITUDINAL SEISMIC 1000 2925
1300 1200 1300
5000 RESTRAINER 800x1000 (TYP.)
800
1075 1200 DIA. PIER SHAFT

FOUNDATION PLAN AT PIER PLAN AT PIER CAP


1 : 80 1 : 80 DETAIL
05. 1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS & M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) CONSULTANTS PVT. LTD M/s. Skylark Infra Engineering Pvt Ltd (Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways) 301,OMAXE HEIGHTS, OMAXE CITY, DesignCh. 63+321, Village-Alamgarh (Chirapatla), Tehsil-Chicholi, District – Betul, M.P. – 460 330 CHECKED: A.K Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Contact No.: +91 80538 05321,
Email – [email protected]
TITLE: GENERAL ARRANGEMENT DRAWING OF MAJOR BRIDGE DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B AT CH. 33+996
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
R1 21-07-2023 A.E. COMMENTS INCORPORATED IRIS TECH PARK, SHEET: (06 OF 07)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL VASL INFRA CONSULTANT LLP.
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P)
23, Sector 48, Gurugram, Haryana-122018
"FINDING REAL WORLD SOLUTION"
DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-GAD-001
REV DATE DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
FORMAT: REV
Email ID:- [email protected] A2 R1
NOTES:-
P3 ℄ OF DECK 1. ALL DIMENSIONS ARE IN mm.AND LEVELS ARE IN METER UNLESS
℄OF BRG./PIER/FDN 11000 OTHERWISE MENTIONED.
450 10100 450 2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED NO DIMENSION IS TO
BE SCALED.
50mm THK. WEARING COAT 3. MINIMUM HEIGHT OF BEARING + PEDESTAL IS 350mm
RCC CRASH BARRIER (TYP.) 220 THK. DECK SLAB PEDESTAL SIZE (L*T) - 800x800(mm).
-2.5% SLOPE MIN.Ht. - 150mm.
-2.5% SLOPE
MAX.Ht. - 500mm
LEVEL DETAILS OF PIER:-
DRAINAGE PIER FRL PIER CAP PIER BOTTOM
SPOUT 575 2750 2750 2750 575 TOP LVL FOUNDATION LVL
P3 339.361 336.286 323.150

PIER CAP TOP LEVEL CAST IN SITU END DIAPHRAGM DETAILS OF DIAPHRAGM WALL:-
LONGITUDINAL SEISMIC
PIER DIAPHRAGM DIAPHRAGM DIAPHRAGM
800 RESTRAINER 800x1000 (TYP.)
℄OF BRG. ℄OF PIN BRG. ℄OF BRG. LENGTH HEIGHT THK.
2925 3600 2925 15MM THICK NEOPRENE PAD P3 2360 5500 300
08 9450
07 7/7
LONGITUDINAL SEISMIC STOPPER
7/7 CAST IN SITU RCC DIAPHRAGM
1200 DIA. PIER SHAFT 1200 DIA. PIER SHAFT

300 THK. DIAPHRAGM WALL 300 THK. DIAPHRAGM WALL 150


GROUND LEVEL GROUND LEVEL
150 850
100 100
PIER CAP TOP LEVEL 50 1000
600 600
1400 1400
800 FOUNDATION LEVEL 800 FOUNDATION LEVEL
800
1900 1200 1900 5000
5000 100 THK. PCC M-15
LEVELING COURSE PIER CAP
LONGITUDINAL SECTION D1-D1 AT PIER TRANSVERSE SECTION D2-D2 AT PIER
1 : 80 1 : 80 DETAIL
08 1 : 35
P3
℄ OF BRG./PIER/FDN
2500
1250 1250 P3 RCC CRASH BARRIER

P3 ℄ OF BRG./PIER/FDN 220mm THK. DECK SLAB


1075 PSC GIRDER

℄ OF BRG./PIER/FDN
1000 2925

300 ℄ OF JACK
D2 550
℄ OF BRG.
100 THK. PCC 1800
M-15 LEVELING ℄ OF JACK 800
COURSE ℄ OF PIER CAP 550 9450 OF PIN BRG.
℄ 150 150
/FOUNDATION 550
D1 D1 ℄ OF JACK
℄OF CARRIAGEWAY 1800
/FOUNDATION
℄ OF BRG.
550
℄ OF JACK
300
END DIAPHARGM LONGITUDINAL SEISMIC
LONGITUDINAL SEISMIC 1000 2925 ELASTOMERIC BEARING RESTRAINER 800x1000 (TYP.)
PEDESTAL 800x800 1250 1250
RESTRAINER 800x1000 (TYP.) 800
800 2500
D2 1075
650 1200 650
1200 DIA. PIER SHAFT

FOUNDATION PLAN AT PIER PLAN AT PIER CAP


1 : 80 1 : 80 DETAIL
07 1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS & M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) CONSULTANTS PVT. LTD M/s. Skylark Infra Engineering Pvt Ltd (Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways) 301,OMAXE HEIGHTS, OMAXE CITY, DesignCh. 63+321, Village-Alamgarh (Chirapatla), Tehsil-Chicholi, District – Betul, M.P. – 460 330 CHECKED: A.K Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Contact No.: +91 80538 05321,
Email – [email protected]
TITLE: GENERAL ARRANGEMENT DRAWING OF MAJOR BRIDGE DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd.
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B AT CH. 33+996
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
R1 21-07-2023 A.E. COMMENTS INCORPORATED IRIS TECH PARK, SHEET: (07 OF 07)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL VASL INFRA CONSULTANT LLP.
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P)
23, Sector 48, Gurugram, Haryana-122018
"FINDING REAL WORLD SOLUTION"
DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-GAD-001
REV DATE DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
FORMAT: REV
Email ID:- [email protected] A2 R1
OF DECK
REINFORCEMENT DETAIL OF SHAFT & FOUNDATION
(FOR A1 & A2):-
BAR DESCRIPTION SHAPE CODE REMARKS
OF BRG. MARK

f1 500 500

(MIN.)
(MIN.)

300
300
3E

f2
500 500
9944

f3 500 500

3E

FOUNDATION
f4 500 500
EARTHEN FACE 3E
2000

C C f5 500 500
EACH FACE

3E

f6 300 300
EACH FACE

Ld f7 L-LxT-T
(STAGGERED)
99T02
300
s1

23 300
300
s2
ABUTMENT SHAFT (LONGITUDINAL VIEW) ABUTMENT SHAFT (TRANSVERSE VIEW)
26 300
1 : 70 1 : 70 OF BRG./SHAFT s3

SHAFT
/FOUNDATION 700 700

OF EXP. GAP 3E

s4 700 700

3E

s5 300 300

3E

s6 L-LxT-T
(STAGGERED)
99T07

OF BRG.

SECTION AT C-C (ABUTMENT SHAFT CROSS SECTION) OF CARRIAGEWAY


REFER TO ABUTMENT REINFORCEMENT 1 : 70 /FOUNDATION

OF BRG.

REFER TO ABUTMENT REINFORCEMENT

SECTION AT A-A (LONGITUDINAL VIEW) SECTION AT B-B (ABUTMENT FOUNDATION CROSS SECTION-TRANSVERSE DIRECTION) ABUTMENT FOUNDATION PLAN
1 : 70 1 : 70 1 : 70

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) CONSULTANTS PVT. LTD
M/s. Skylark Infra Engineering Pvt Ltd
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF ABUTMENT A1 & A2 DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. FOUNDATION AND SHAFT FOR MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (01 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-001
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF ABUTMENT CAP
(FOR A1 &A2):-
BAR DESCRIPTION SHAPE CODE REMARKS
DETAIL-X MARK

c1 500 500

3E

c2 500 500

3E

c3 1350 1350 EACH FACE

ABUTMENT CAP
3E

c4 1350 1350 EACH FACE


3E

c5 2 LAGGED
99S01
100
d1
21 300
100
d2
23 300

DIRT WALL
d3 EACH FACE
ELEVATION SHOWING REINFORCEMENT OF ABUTMENT CAP 100 100

3E
1 : 50
d4 300
300
29

b1
00

b2

BRACKET
9931

b3 450
150 2 LAGGED
3 LAYER
SECTION AT D-D DETAIL - X 99S01

1 : 25 1 : 25
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
700 300 OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED.
3. L-L REPRESENTS LONGITUDINAL AXIS OF THE BRIDGE.T-T REPRESENTS
TRANSVERSE AXIS OF THE BRIDGE.

70(TYP.)

70(TYP.)
4. THE REINFORCEMENT SHALL BE HYSD. BARS (GRADE DESIGNATION Fe-550D)

700

700
CONFORMING TO IS:1786-2008. HAVING MIN. ELONGATION OF 16% AS PER
PLAN SHOWING REINFORCEMENT OF ABUTMENT CAP TABLE:18.1 OF IRC:112-2020.
1 : 50 5. FOLLOWING DESIGN MIX CONCRETE GRADES SHALL BE USED:-
(i) ABUTMENT (CAP,SHAFT & FOUNDATION) -M35
70(TYP.) 75(TYP.) (ii) LEVELING COURSE -M15
6. CLEAR COVER FOR REINF.
(i) EARTHERN FACE -75mm
(ii) NON-EARTHERN FACE -50mm
(UNDER BEARING LOCATION TWO LAYERS ONE AT (UNDER JACK LOCATION TWO
20MM & ANOTHER AT 80MM FROM BOTTOM) LAYERS ONE AT 20MM & ANOTHER SCHEDULE OF LAP LENGTH FOR REINFORCEMENT
1 : 20 AT 80MM FROM BOTTOM) CONCRETE
1 : 20 GRADE %OF FAVORABLE BOND UNFAVORABLE BOND
LAPPED BAR
M35 M40 M45 M35 M40 M45
<25%
OF EXP. GAP 25-33%
M1 M2 M1 M2 M1 M2 M1 33-50%
>50%
OF BRG. FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

SCHEDULE OF DEVELOPMENT LENGTH FOR REINFORCEMENT


DESCRIPTION FAVORABLE BOND UNFAVORABLE BOND
CONCRETE GRADE M35 M40 M45 M35 M40 M45
ANCHOR LENGTH
MESH LOCATION - ABUTMENT CAP FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
1 : 50 CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

REFERENCE DRAWING :-
a. GAD -VASL-ST-MJB-33+996-GAD-001
LINK STIRRUP b. ABUTMENT SHAFT & FDN -VASL-ST-MJB-33+996-SUB-001 (01 OF 02)

TYPICAL DETAIL OF BAR

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF ABUTMENT A1 & A2 CAP, DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. DIRT WALL AND BRACKET FOR MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (02 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-001
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF SHAFT & FOUNDATION
(FOR P4):-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

Ld Ld Ld f1 500 500

3E

50

50

50
f2 500 500

3E
D D D
f2a
500 500
3E

f3
500 500

FOUNDATION
9944

f4 500 500
EACH FACE

3E

f5 300 300
EACH FACE

f6 L-LxT-T
(STAGGERED)
99T02
C C C f7

99S01

1800
300
s1 2 BAR BUNDLED

23 300

SHAFT
s2 SPIRAL
100

50

50
50

Ld Ld Ld s3 SPIRAL
150
X

d1

DIAPHRAGM
ELEVATION SHOWING REINFORCEMENT OF
3A
DIAPHRAGM WALL

WALL
REINFORCEMENT OF PIER (LONGITUDINAL VIEW) d2
REINFORCEMENT OF PIER (TRANSVERSE VIEW) 1 : 50
1 : 50 1 : 50 3A

REFER TO PIER REINFORCEMENT REFER TO PIER


REINFORCEMENT

SECTION C-C
1 : 25

SECTION AT A-A (LONGITUDINAL VIEW) SECTION AT B-B (TRANSVERSE VIEW) PLAN SHOWING REINFORCEMENT OF FOUNDATION SECTION D-D
1 : 50 (LINK NOT SHOWN FOR CLARITY (LINK NOT SHOWN FOR CLARITY 1 : 25
1 : 50 1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF PIER P4 FOUNDATION AND DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. SHAFT FOR MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (01 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-002
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF PIER CAP
(FOR P1,P4,P6):-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

c1 500 500

3E

c2
300(min.)

500 500

3E

c3 EACH FACE

PIER CAP
1350 1350

3E

c4 2 LAGGED
99S01

c5 6 LAGGED
99S01

c6 6 LAGGED
(3 LAYER)
ELEVATION SHOWING REINFORCEMENT OF PIER CAP SECTION C-C 99S01

1 : 50 1 : 35
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED.
3. L-L REPRESENTS LONGITUDINAL AXIS OF THE BRIDGE.T-T REPRESENTS
TRANSVERSE AXIS OF THE BRIDGE.
4. THE REINFORCEMENT SHALL BE HYSD. BARS (GRADE DESIGNATION Fe-550D)
CONFORMING TO IS:1786-2008. HAVING MIN. ELONGATION OF 16% AS PER
TABLE:18.1 OF IRC:112-2020.
5. FOLLOWING DESIGN MIX CONCRETE GRADES SHALL BE USED:-
CL OF PIER

700 (i) ABUTMENT (CAP,SHAFT & FOUNDATION) -M35


75(TYP.) (ii) LEVELING COURSE -M15
6. CLEAR COVER FOR REINF.
(i) EARTHERN FACE -75mm
300(min.)

(ii) NON-EARTHERN FACE -50mm

70(TYP.)
700
SCHEDULE OF LAP LENGTH FOR REINFORCEMENT

700
CONCRETE
GRADE %OF FAVORABLE BOND UNFAVORABLE BOND
LAPPED BAR
M35 M40 M45 M35 M40 M45
70(TYP.)
<25%
300 25-33%
33-50%
>50%
PLAN SHOWING REINFORCEMENT OF PIER CAP FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
1 : 50 (UNDER BEARING LOCATION TWO LAYERS ONE AT (UNDER JACK LOCATION TWO CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.
20MM & ANOTHER AT 80MM FROM BOTTOM) LAYERS ONE AT 20MM & ANOTHER
1 : 20 AT 80MM FROM BOTTOM) SCHEDULE OF DEVELOPMENT LENGTH FOR REINFORCEMENT
1 : 20
DESCRIPTION FAVORABLE BOND UNFAVORABLE BOND
CONCRETE GRADE M35 M40 M45 M35 M40 M45
ANCHOR LENGTH
FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND

10
xD
CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

IA

A
DI
REFERENCE DRAWING :-

5x
a. GAD -VASL-ST-MJB-33+996-GAD-001
b. PIER SHAFT & FDN -VASL-ST-MJB-33+996-SUB-002 (01 OF 02)
CL OF PIER

M2 M1 M2 M1 M2 M1 M2

10xDIA

LINK STIRRUP
MESH LOCATION - PIER CAP TYPICAL DETAIL OF BAR
1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF PIER P1,P3,P4,P6 CAP FOR DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (02 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-002
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF SHAFT & FOUNDATION
(FOR P1,P6):-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

Ld Ld Ld f1 500 500

3E

50

50

50
f2 500 500

3E
D D D
f2a
500 500
3E

f3
500 500

FOUNDATION
9944

f4 500 500
EACH FACE

3E

f5 300 300
EACH FACE

f6 L-LxT-T
(STAGGERED)
99T02
C C C f7

99S01

1800
300
s1

23 300

SHAFT
s2 SPIRAL
100

50

50
50

Ld Ld Ld s3 SPIRAL
150
X

d1

DIAPHRAGM
ELEVATION SHOWING REINFORCEMENT OF
3A
DIAPHRAGM WALL

WALL
REINFORCEMENT OF PIER (LONGITUDINAL VIEW) d2
REINFORCEMENT OF PIER (TRANSVERSE VIEW) 1 : 50
1 : 50 1 : 50 3A

REFER TO PIER REINFORCEMENT REFER TO PIER


REINFORCEMENT

SECTION C-C
1 : 25

SECTION AT A-A (LONGITUDINAL VIEW) SECTION AT B-B (TRANSVERSE VIEW) PLAN SHOWING REINFORCEMENT OF FOUNDATION SECTION D-D
1 : 50 (LINK NOT SHOWN FOR CLARITY (LINK NOT SHOWN FOR CLARITY 1 : 25
1 : 50 1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF PIER P1,P6 FOUNDATION DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. AND SHAFT FOR MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (01 OF 01)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-003
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF SHAFT & FOUNDATION
(FOR P3):-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

f1 500 500
Ld Ld Ld
3E

f2 500 500

50

50
50
3E

f3
500 500
D D D
9944

FOUNDATION
f4 500 500
EACH FACE

3E

f5 300 300
EACH FACE

f6 L-LxT-T
(STAGGERED)
99T02

f7

99S01
300
C C C s1

23 300

SHAFT
s2 SPIRAL
100
X

s3 SPIRAL
150
X
50

50

50
d1

DIAPHRAGM
Ld Ld Ld
3A

WALL
d2
3A

REINFORCEMENT OF PIER (LONGITUDINAL VIEW) REINFORCEMENT OF PIER (TRANSVERSE VIEW) ELEVATION SHOWING REINFORCEMENT OF
1 : 50 1 : 50 DIAPHRAGM WALL
1 : 50

REFER TO PIER REINFORCEMENT REFER TO PIER


REINFORCEMENT

SECTION C-C
1 : 25

SECTION AT A-A (LONGITUDINAL VIEW) SECTION AT B-B (TRANSVERSE VIEW) PLAN SHOWING REINFORCEMENT OF FOUNDATION SECTION D-D
(LINK NOT SHOWN FOR CLARITY 1 : 25
1 : 50 (LINK NOT SHOWN FOR CLARITY
1 : 50 1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF PIER P3 FOUNDATION AND DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. SHAFT FOR FOR MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (01 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-004
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF PIER CAP
(FOR P3):-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

c1 500 500

3E

c2
300(min.)

500 500

3E

c3 1350 1350 EACH FACE

PIER CAP
3E

c4 2 LAGGED
99S01

c5 6 LAGGED
99S01

c6 6 LAGGED
(3 LAYER)
ELEVATION SHOWING REINFORCEMENT OF PIER CAP SECTION C-C 99S01

1 : 50 1 : 35
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED.
3. L-L REPRESENTS LONGITUDINAL AXIS OF THE BRIDGE.T-T REPRESENTS
TRANSVERSE AXIS OF THE BRIDGE.
4. THE REINFORCEMENT SHALL BE HYSD. BARS (GRADE DESIGNATION Fe-550D)
CONFORMING TO IS:1786-2008. HAVING MIN. ELONGATION OF 16% AS PER
TABLE:18.1 OF IRC:112-2020.
5. FOLLOWING DESIGN MIX CONCRETE GRADES SHALL BE USED:-
CL OF PIER

700 (i) ABUTMENT (CAP,SHAFT & FOUNDATION) -M35


75(TYP.) (ii) LEVELING COURSE -M15
6. CLEAR COVER FOR REINF.
(i) EARTHERN FACE -75mm
300(min.)

(ii) NON-EARTHERN FACE -50mm

70(TYP.)
700
SCHEDULE OF LAP LENGTH FOR REINFORCEMENT

700
CONCRETE
GRADE %OF FAVORABLE BOND UNFAVORABLE BOND
LAPPED BAR
M35 M40 M45 M35 M40 M45
70(TYP.)
<25%
300 25-33%
33-50%
>50%
PLAN SHOWING REINFORCEMENT OF PIER CAP FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
1 : 50 (UNDER BEARING LOCATION TWO LAYERS ONE AT (UNDER JACK LOCATION TWO CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.
20MM & ANOTHER AT 80MM FROM BOTTOM) LAYERS ONE AT 20MM & ANOTHER
1 : 20 AT 80MM FROM BOTTOM) SCHEDULE OF DEVELOPMENT LENGTH FOR REINFORCEMENT
1 : 20
DESCRIPTION FAVORABLE BOND UNFAVORABLE BOND
CONCRETE GRADE M35 M40 M45 M35 M40 M45
ANCHOR LENGTH
FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND

10
xD
CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

IA

A
DI
REFERENCE DRAWING :-

5x
a. GAD -VASL-ST-MJB-33+996-GAD-001
b. PIER SHAFT & FDN -VASL-ST-MJB-33+996-SUB-004 (01 OF 02)
CL OF PIER

M2 M1 M2 M1 M2 M1 M2

10xDIA

LINK STIRRUP
MESH LOCATION - PIER CAP TYPICAL DETAIL OF BAR
1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF PIER P3 CAP FOR MAJOR DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (02 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-004
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF SHAFT & FOUNDATION
(FOR P2,P5):-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

f1 500 500
Ld Ld Ld
3E

f2 500 500

50

50

50
3E

f3
500 500
9944

D D D f4 500 500
EACH FACE

3E

f5 300 300
EACH FACE

FOUNDATION
f6 L-LxT-T
(STAGGERED)
99T02

f7

C C C 99S01
300
s1

1800
23 300
s2 SPIRAL
100

SHAFT
X

s3 SPIRAL
50

50

50
150
X
Ld Ld Ld
d1

DIAPHRAGM
3A

WALL
d2
3A
REINFORCEMENT OF PIER (LONGITUDINAL VIEW) REINFORCEMENT OF PIER (TRANSVERSE VIEW) ELEVATION SHOWING REINFORCEMENT OF
1 : 50 1 : 50 DIAPHRAGM WALL
1 : 50

REFER TO PIER REINFORCEMENT REFER TO PIER


REINFORCEMENT

SECTION C-C
1 : 25

SECTION AT A-A (LONGITUDINAL VIEW) SECTION AT B-B (TRANSVERSE VIEW) PLAN SHOWING REINFORCEMENT OF FOUNDATION SECTION D-D
1 : 50 (LINK NOT SHOWN FOR CLARITY (LINK NOT SHOWN FOR CLARITY 1 : 25
1 : 50 1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF PIER P2,P5 FOUNDATION DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. AND SHAFT FOR MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (01 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-005
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT DETAIL OF PIER CAP
(FOR P2,P5):-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

c1 500 500

3E

c2
300(min.)

500 500

3E

c3 1350 1350 EACH FACE


3E

PIER CAP
c4 2 LAGGED
99S01

c5 8 LAGGED
99S01

c6 6 LAGGED
(3 LAYER)
ELEVATION SHOWING REINFORCEMENT OF PIER CAP SECTION C-C 99S01

1 : 50 1 : 35
NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED.
3. L-L REPRESENTS LONGITUDINAL AXIS OF THE BRIDGE.T-T REPRESENTS
TRANSVERSE AXIS OF THE BRIDGE.
4. THE REINFORCEMENT SHALL BE HYSD. BARS (GRADE DESIGNATION Fe-550D)
CONFORMING TO IS:1786-2008. HAVING MIN. ELONGATION OF 16% AS PER
CL OF BRG.

TABLE:18.1 OF IRC:112-2020.
5. FOLLOWING DESIGN MIX CONCRETE GRADES SHALL BE USED:-
(i) ABUTMENT (CAP,SHAFT & FOUNDATION) -M35
CL OF PIER

(ii) LEVELING COURSE -M15


6. CLEAR COVER FOR REINF.
700 (i) EARTHERN FACE -75mm
(ii) NON-EARTHERN FACE -50mm
CL OF BRG.

75(TYP.)

300(min.)
SCHEDULE OF LAP LENGTH FOR REINFORCEMENT

70(TYP.)
CONCRETE
GRADE %OF FAVORABLE BOND UNFAVORABLE BOND

700

70(TYP.)
LAPPED BAR
M35 M40 M45 M35 M40 M45

700
<25%
25-33%
33-50%
70(TYP.) >50%
300 FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

PLAN SHOWING REINFORCEMENT OF PIER CAP SCHEDULE OF DEVELOPMENT LENGTH FOR REINFORCEMENT
1 : 50 (UNDER BEARING LOCATION TWO LAYERS ONE AT (UNDER JACK LOCATION TWO
LAYERS ONE AT 20MM & ANOTHER DESCRIPTION FAVORABLE BOND UNFAVORABLE BOND
20MM & ANOTHER AT 80MM FROM BOTTOM)
1 : 20 AT 80MM FROM BOTTOM) CONCRETE GRADE M35 M40 M45 M35 M40 M45
1 : 20 ANCHOR LENGTH
FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

REFERENCE DRAWING :-
-VASL-ST-MJB-59+996-GAD-001
CL OF BRG.

a. GAD
M2 M2 M2 M2
10

M1 M1 M1 -VASL-ST-MJB-33+996-SUB-005 (01 OF 02)


PIER SHAFT & FDN
xD

b.
IA

IA
D
5x
CL OF PIER
CL OF BRG.

M2 M1 M2 M1 M2 M1 M2

10xDIA

LINK STIRRUP
MESH LOCATION - PIER CAP TYPICAL DETAIL OF BAR
1 : 50

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) M/s. Skylark Infra Engineering Pvt Ltd
CONSULTANTS PVT. LTD
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF PIER P2,P5 CAP FOR DATE: 21-June-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. MAJOR BRIDGE AT CH. 33+996
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (02 OF 02)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SUB-005
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT OF ABUTMENT & PIER PEDESTAL:-
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

ELASTOMERIC BEARING PEDESTAL


01
44 300 300

02
44 300 300

03 2 LAGGED
99S01

04 2 LAGGED
99S01
05 2 LAGGED
99S01
06

PIN BEARING PEDESTAL


44 300 300

06a
3D 300
07
44 300 300

07a
PLAN PLAN PLAN 3D 300

PEDESTAL FOR ELASTOMERIC BEARING PEDESTAL FOR PIN BEARING PEDESTAL FOR GUIDE BEARING 08 2 LAGGED
1 : 15 1 : 15 1 : 15 99S01
09 2 LAGGED
99S01

09a 2 LAGGED
99S01
10

GUIDE BEARING PEDESTAL


44 300 300

11
44 300 300

12 2 LAGGED
99S01

13 2 LAGGED
99S01

13a 2 LAGGED
99S01

NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE MENTIONED.
2. DIMENSIONS ARE NOT TO BE SCALED, ONLY WRITTEN DIMENSIONS SHALL BE
FOLLOWED.
SECTION A-A SECTION B-B SECTION C-C 3. FOLLOWING DESIGN MIX CONCRETE GRADES SHALL BE USED:-
1 : 15 1 : 15 1 : 15 (i) PEDESTAL -M40.
4. CLEAR COVER TO ANY REINFORCEMENT SHALL BE 50MM.
5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS (GRADE DESIGNATION Fe
550D) CONFORMING TO TABLE 18.1 OF IRC: 112-2020.
6. MODERATE CONDITION OF EXPOSURE ARE CONSIDERED OR STRUCTURE.
7. FOR SCHEDULE OF DEVELOPMENT LENGTH PLEASE FOLLOW :

SCHEDULE OF DEVELOPMENT LENGTH FOR REINFORCEMENT

DESCRIPTION FAVORABLE BOND UNFAVORABLE BOND


CONCRETE GRADE M35 M40 M45 M35 M40 M45
ANCHOR LENGTH
FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

REFERENCE DRAWING :-
a. GAD -VASL-ST-MJB-33+996-GAD-001

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) CONSULTANTS PVT. LTD
M/s. Skylark Infra Engineering Pvt Ltd
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF RCC PEDESTAL FOR DATE: 21-May-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. MAJOR BRIDGE
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (01 OF 01)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-PS-001
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0
REINFORCEMENT OF ABUTMENT & PIER RESTRAINER:-
1000
BAR DESCRIPTION SHAPE CODE REMARKS
MARK

300
25MM THICK 01
ELASTOMERIC PAD
3E 300
300
02
3E 300
750
02a

ABUTMENT RESTRAINER
3D 300
300
03
25MM THICK
3E 300
ELASTOMERIC PAD
04 2 LAGGED
99S01

05 2 LAGGED
99S01

06 2 LAGGED
99S01
300

300(min.)
07
3E 300
300
08
3E 300

08a
3D 300
300
ABUTMENT CAP PIER CAP 09
3E 300
10 2 LAGGED
SECTION A-A SECTION B-B 99S01

PIER RESTRAINER
1 : 15 11
1 : 15 2 LAGGED
99S01

12 2 LAGGED
99S01
300
CONTACT FACE 13
3E 300
13a
3D 300

NOTES:-

TRAFFIC DIRECTION
TRAFFIC DIRECTION

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE MENTIONED.

CONTACT FACE
CONTACT FACE

2. DIMENSIONS ARE NOT TO BE SCALED, ONLY WRITTEN DIMENSIONS SHALL BE


FOLLOWED.
3. FOLLOWING DESIGN MIX CONCRETE GRADES SHALL BE USED:-
(i) SEISMIC RESTRAINER -M40.
4. CLEAR COVER TO ANY REINFORCEMENT SHALL BE 50MM.
5. REINFORCING STEEL SHALL BE HYSD (TMT) BARS (GRADE DESIGNATION Fe
550D) CONFORMING TO TABLE 18.1 OF IRC: 112-2020.
6. MODERATE CONDITION OF EXPOSURE ARE CONSIDERED OR STRUCTURE.
7. FOR SCHEDULE OF DEVELOPMENT LENGTH PLEASE FOLLOW :

SCHEDULE OF DEVELOPMENT LENGTH FOR REINFORCEMENT

DESCRIPTION FAVORABLE BOND UNFAVORABLE BOND


PLAN PLAN CONCRETE GRADE M35 M40 M45 M35 M40 M45
RESTRAINER AT ABUTMENT RESTRAINER AT PIER ANCHOR LENGTH
1 : 15 FOR DETAILS FAVORABLE BOND AND UNFAVORABLE BOND
1 : 15 CONDITION REFER CLAUSE 15.2.3. OF IRC:112-2020.

REFERENCE DRAWING :-
a. GAD -VASL-ST-MJB-33+996-GAD-001

CLIENT: PROOF CHECK CONSULTANT: CONTRACTOR: S&P-SIEPL (JV) APPROVED: D.S PROJECT: Development of two lane with paved shoulder/Four lane from Design Chainage 30+000
NATIONAL HIGHWAY M/S SYNOMOSIYA ENGINEERS &
M/s. S&P Infrastructre Developers (P) Ltd & (Existing Km. 180.500) near (Temagaon) to Design Chainage 80+952 (Existing Km. 235.800)
AUTHORITY OF INDIA (NHAI) CONSULTANTS PVT. LTD
M/s. Skylark Infra Engineering Pvt Ltd
301,OMAXE HEIGHTS, OMAXE CITY,
(Chicholi) of Harda - Betul section of NH-47 in the State of Madhya Pradesh under
(Ministry of Shipping, Road Transport & Highways)
Contact No.: +91 80538 05321, CHECKED: A.K
G-5 & 6, Sector 10, Dwaraka, New DeIhi. PALWAL-121102. Bharatmala Pariyojana Economic Corridor (Phase-I) on EPC Mode (Package-2).
TITLE: REINFORCEMENT DETAIL DRAWING OF SEISMIC RESTRAINER FOR DATE: 21-May-2023
AUTHORITY ENGINEER: SAFETY CONSULTANT: DESIGN CONSULTANT :- BESHTECH INFRASTRUCTURE Pvt.Ltd. MAJOR BRIDGE
415B,Fourth Floor, Arcadia Universal Tower, Sector 49, Gurugram DESIGNED: I.B
TTL ENGINEERING Pvt. Ltd. Email- [email protected]
SCALE: NTS
L.N.M INFRA PROJECTS GROUP PVT. LTD. OFFICE NO. 103, FIRST FLOOR, Web. www.beshtechinfra.com
IRIS TECH PARK, SHEET: (01 OF 01)
T-10, 3RD FLOOR, CITY CENTRE, PLOT NO.1, ABOVE VISHAL
23, Sector 48, Gurugram, Haryana-122018 VASL INFRA CONSULTANT LLP. DRAWN: N.V DRAWING NO. VASL-ST-MJB-33+996-SR-002
MEGA MART, ZONE-I,M.P.NAGAR, BHOPAL (M.P) "FINDING REAL WORLD SOLUTION"
REV. DATE FORMAT: REV
DESCRIPTION #1328, SECTOR 31-32A, GURUGRAM, HARYANA
Email ID:- [email protected] A2 R0

You might also like