P&ID Fuel Gas Treatment Reformer Sector. Rev-3
P&ID Fuel Gas Treatment Reformer Sector. Rev-3
Notes
A (1) change the entrance nozzle of natural gas line to be above the A
½"
8"
entrance nozzle of treated fuel gas line at fuel gas drum 34-D-3.
(2) drains shall be located at the lowest points, while vents shall
4"
4"
be located at the highest points.
To Flare Header
½" Note (7)
(3)Lines Design Pressure = 8.2 kg/cm².g while lines Design
B
8"
8"
Temperature = 75ᵒC. B
8"
- Gate valve (closed)
In-Line Mixer
2" ½" 2" ½" E
E Fuel gases from old header 8" 8"
8" De-mister
½"
¾" ½" Existing
Inlet Diverter
¾" 2"
Inlet Diverter 8" ½" 34-D-1 New
8" 8" 8" PG
8"
Inlet Diverter 1"
8"
F In-Line Mixer F
½"
2"
24"
1" ½"
M.H
¾" ½"
LG LG
G 24" G
LLHH 4100 mm
24" M.H
J J
2"
Fresh Soda To Quench drum
3 20/08/2024 Issued for approval
2"*3"
2 12/08/2024 Issued for approval
Notice
THIS DRAWING HAS NOT BEEN PUBLISHED. IT IS THE SOLE PROPERTY OF CORC. IT IS LENT TO THE RECIPIENT FOR HIS CONFIDENTIAL USE ONLY, AND UPON THE
CONDITIONS AND AGREEMENTS FOLLOWING IN CONSIDERATION OF THE LOAN OF THIS DRAWING. THE RECIPIENT PROMISES AND AGREE TO RETURN IT UPON
REQUEST AND THAT IT SHALL NOT BE REPRODUCED, COPIED, LENT, OR OTHERWISE DISPOSED OF DIRECTLY OR INDIRECTLY WITHOUT CORC WRITTEN CONSENT, NOR
3" 3" BE USED IN ANY WAY DETRIMENTAL TO THE INTERESTS OF CORC.
PG PG Project Title
L
Fuel Gas Treatment Unit (U-34) L
Reforming Sector
1 2 3 4 5 6 7 8 9 10 11 12 13 16 15