CVT 22015 DSR 0346 20250502 Out

The daily site report for the V1TER B+G+3P+22+R residential building project on February 5, 2025, highlights major activities including plaster works, screed work, and waterproofing on various floors. The report details manpower on site, ongoing tasks, and planned activities for the next day, emphasizing the importance of safety measures and adherence to approved designs. Additionally, it notes the receipt of major materials and outlines areas of concern regarding quality control and compliance with regulations.

Uploaded by

nawabzada512147
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views8 pages

CVT 22015 DSR 0346 20250502 Out

The daily site report for the V1TER B+G+3P+22+R residential building project on February 5, 2025, highlights major activities including plaster works, screed work, and waterproofing on various floors. The report details manpower on site, ongoing tasks, and planned activities for the next day, emphasizing the importance of safety measures and adherence to approved designs. Additionally, it notes the receipt of major materials and outlines areas of concern regarding quality control and compliance with regulations.

Uploaded by

nawabzada512147
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

, ~ Tl~E~INE~i ii

PROJECT TITLE: V1TER B+G+3P+22+R RESIDENTIAL BUILDING W/ RETAIL @ GROUND


I DAILY SITE REPORT Day: Friday
THE EMPLOYER: THE DEVELOPMENT MANAGER: Accidents: Humidity / Rains Temp at 8 am = °C
Date:
Cumulative Man-hours w/o Accidents Wind /Sandstorms
Object 1
Real EstateDevelopment l.L.C.
Object 1
RealEstateOe·1elopment LL.C.
Temp at 1 pm = °C
02-05-2025

Major Achievements / Activities of the Day Manpower at Site Engineer's Comments


* Shutter and steel fixing for Verticals Upper Roof Slab
Manpower (as applicable)
- Contractor is responsible for any deviation between the DSR and the
* Preparation for Plaster Elevation 3,1,4 Project Manager 1
* plaster works for elevation 1,3,4
Construction Manager
actual site condition observed in the future.
* Plaster works 11th &14th floor 1
* Plaster preparation works 15th floor
Planning Engineer
- Dimensions, coordinates, layouts, levels and details to be as per IFC
* Screed work in progress 11th & 12th floor
* Waterproof work in progress in 12th Floor
QA/QC Engineers 1 Drawing.
* Block work , 19th , 20th floor floor
* floor and wall tile 9th & 10th floor Safety Engineer 1 - Enhance safety measures& general housekeeping, risk assessment and
* false ceiling in progress
* Chiller pipe trench in progress/ entrance, drive way area Project Engineers 2 HSE Plan
* Manhole work for entrance drive way area
* Curing for-casted items. Foreman 4 to be followed.
MEP:
Surveyor 1 -Contractor to follow authorities’ requirements and rules.
1) 17th & 18th floor first fix.
2) light wiring at 11th , 12th and 14th floor Draftsmen -Old concrete and rust on steel to be treated properly and brushed prior to
3) Plumbing work on 11th 12th and 13th floor
4) Podium 2 riser duct insulation Storekeeper 1 concrete
Work in Progress / Planned for the Next Day Site Secretary /DC 1 - De-shuttering to be as per Approved design.
Office Boys 1 - All Materials to be stored properly. o
* Casting Vertical and CW for Upper Roof and Machine Room
Drivers 1 - Curing process to be as per standards.
Date: Signature:
* Shutter and steel fixing for Verticals Upper Roof Slab
* Preparation for Plaster Elevation 3,1,4
* plaster works for elevation 1,3,4 Sub-Total-1 15 - MAR 02/05/2025
Approval must be Obtained for All materials before use.
* Plaster works 11th &14th floor
* Plaster preparation works 15th floor
- MVR Plant and must
Approval Machinery
be obtained forQty Working
All materials Breakdown/
before use.
* Screed work in progress 11th & 12th floor
* Waterproof work in progress in 12th Floor - All shop (asdrawing
applicable)
must be approved before startHours Idle
related activity.
* Block work , 19th , 20th floor floor
* floor and wall tile 9th & 10th floor Charge hand 3 -Roller
BlockCompactor
work Method of Statement to be0 followed.
* false ceiling in progress
* Chiller pipe trench in progress/ entrance, drive way area Watchman 2 -Plate Compactor
Plaster work Method of Statement to be 1 followed.
* Manhole work for entrance drive way area
* Curing for casted items. Operator 4 -Vibrator + Shaft Method of Statement to 2be followed.
Spray Plaster
MEP:
1) 17th & 18th floor first fix Plumber 1 -Drill
BlockMachine
work Completion RFI to be submitted
6 prior plaster preparation.
2) Plumbing work on 11th 12th and 13th floor
3) Podium 2 riser duct insulation Masons 35 -Grinder
MEP Clearance to be Submitted Prior 5starting any activity.
4) 19th floor riser drainage piping
5) 8th Floor telephone room trunking Carpenters 35 -Hilti/Jack hammer
All Required NOC's to be available at5site.
Areas of Concern Steel Fixers 37 -Block / Stone to
Contractor Grinding Machines
make sure 1
all finished activity are approved prior to start the
Electricians 3 Jig Saw
next activity. 4
Chainmen/Rigger 6 -Air Blower to follow to the quality control
Contractor 1 procedure.
Helpers 40 Air Compressor 1
Others 40 Pick Ups 1
Shovel
Sub-Total-2 191 Excavators/Bobcat/forklift 2
Sub-Contractors Tower Cranes/Mobile crane 2
Site laboratory Roller Machine 0
Third Party Inspection Dumpers
Anti-termite Treatment Bar Bending Machines 2
MEP Works 118 Bar Shearing Machine/Cutting 2
Major Materials Received on Site Aluminum Welding Machine
Joinery Car
Marble Works Bus 1
Tiling Works 19 Cutting Set
Painting 8 Concrete Mixer
Lifts Table Saw 1
Miscellaneous 30 Bench Saw
Tipper/Traila 1
Sub-Total-3 179 Electrical hand saw 4
Digital Thermometers
Prepared by: Projects Manager: Surveying Equipment 2
Form No.: CVT/DSR/R01/01/2024 Total Manpower 415
Eng.Mansour Ali IEng.Samer Rayes I