NA1 Air Circuit Breaker Catalog
NA1 Air Circuit Breaker Catalog
Europe
Italy West Asia & Africa
CHINT Italia Investment S.r.l.
U.A.E
Add: Via A. Pacinotti 28, 30033 Noale (VE)
Tel: +39 041 446614 CHINT MIDDLE EAST AND AFRICA DMCC
Fax: +39 041 5845900 E-mail: [email protected] Add: Unit No: 2101, Jumeirah business center 1 , Jumeirah Lakes Towers ,
Dubai UAE
Czech Republic Tel: +97145571532
P.O BOX :337555
NOARK Electric Europe s.r.o. Email: [email protected]
Add: Sezemická 2757/2, 193 00 Prague 9
Tel: +420 226 203 120 Email: [email protected] Egypt
CHINT Electrics (Egypt) Co., Ltd.
Turkey
Chint Turca Elektrik Sanayi VE Ticaret Anonim Sirketi Add: Chint office, Smart village, October 6th,Giza, Egypt
Tel: +20 1097173769
Add: Zumrutevler Mahallesi Ural Sokak No. 22/18 NAS PLAZA B Block P.O BOX : 00202
KAT 1, Maltepe, Istanbul Email: [email protected]
Tel: +90216 621 00 55 Fax:+90216 621 00 50
E-mail: [email protected]
Mexico India
CHINT SOLAR MEXICO S DE RL DE CV CHINT India Energy Solution Private limited
Add: Av. Paseo de la Reforma 296, Piso 37, Oficina 123 Discovery Tower Plot No. A-17 Ground Floor Industrial Area
Juárez, Ciudad de México, 06600 Sector: – 62 Noida -201301
Tel: +52 1-55-8881-6127 India Hotline: - 18002707977
E-mail: [email protected] Company: - +91 1202975057
Solutions and Services for Customers Optimization for Manufacturing and Supply Chain
Focusing on energy system of supply, storage, transmission, distribution and consumption, CHINT
has core businesses of clean energy, energy distribution, big data and energy value-added services. CHINT CLOUD CHINT EIoT CHINT IIoT
Furthermore, CHINT pillar businesses include photovoltaic equipment, energy storage, power
transmission & distribution, low-voltage apparatuses, intelligent terminals, software development Being the carrier of smart technology and Being a user-centric multi-energy comple- Being a smar t manufacturing system
and control automation. With developing into a platform enterprise, CHINT provides a package of data applications, CHINT Cloud connects mentary smart energy system, CHINT EIoT based on corporate digital transforma-
corporate in-house manufacturing with provides a package of energy solutions tion, CHINT IIoT constitutes a flexible,
energy solutions for public institutions, industrial & commercial users and end users, by building a operation and management data, realizing for governments, industrial & commercial high-efficiency and intelligent industrial
regional smart energy operation ecosphere. digital applications and services internally users and end users system.
and externally.
Founded in 1984, CHINT has developed business network in over 140 countries and regions with
more than 30,000 employees. CHINT has reached annual sales of 10.5 billion USD, ranking Top 50
Asian Listed Companies and Top 100 China Private Enterprises.
ABOUT CHINT ONE CLOUD & TWO NETS STRATEGY
Solutions and Services for Customers Optimization for Manufacturing and Supply Chain
Focusing on energy system of supply, storage, transmission, distribution and consumption, CHINT
has core businesses of clean energy, energy distribution, big data and energy value-added services. CHINT CLOUD CHINT EIoT CHINT IIoT
Furthermore, CHINT pillar businesses include photovoltaic equipment, energy storage, power
transmission & distribution, low-voltage apparatuses, intelligent terminals, software development Being the carrier of smart technology and Being a user-centric multi-energy comple- Being a smar t manufacturing system
and control automation. With developing into a platform enterprise, CHINT provides a package of data applications, CHINT Cloud connects mentary smart energy system, CHINT EIoT based on corporate digital transforma-
corporate in-house manufacturing with provides a package of energy solutions tion, CHINT IIoT constitutes a flexible,
energy solutions for public institutions, industrial & commercial users and end users, by building a operation and management data, realizing for governments, industrial & commercial high-efficiency and intelligent industrial
regional smart energy operation ecosphere. digital applications and services internally users and end users system.
and externally.
Founded in 1984, CHINT has developed business network in over 140 countries and regions with
more than 30,000 employees. CHINT has reached annual sales of 10.5 billion USD, ranking Top 50
Asian Listed Companies and Top 100 China Private Enterprises.
RELIABLE QUALITY, BEST-SELLING WORLDWIDE CHINT HONORS
2016, national intellectual property demonstration enterprise 2017, credit management demonstration enterprise of Zhejiang
Prague
Spain Venice
North America
Madrid
Europe
Turkey
US 2016, group member of China Intellectual Property Society Province
Los Angeles
Dubai Jiuquan
Xianyang 2016, member of Global Energy Interconnection Development 2018, the 10th “China Charity Award” of the Ministry of Civil
Jinan
Dubai Hangzhou Shanghai
Jiaxing
Mexico and Cooperation Organization Affairs
Wenzhou
Western Asia
and Africa India Thailand Asia Pacific
Vietnam
Xianyang
Singapore
Latin America
Peru
Brazil
QUALIFICATION CERTIFICATION
Sao Paulo
Heilongjiang Office
VDE and TÜV of Germany, EAC of Russia, KEMA of Nether-
lands, RCM of Australia, RCC of South Africa and other interna-
tional product certifications.
Xinjiang Office
Liaoning Office
Beijing
Beijing Office
Jiangsu Office
Zhejiang
Hunan Office Office Wenzhou
Taiwan
Island
Hong Kong
Macao Dongsha Islands
Hainan Island
Yunnan
Guangdong Office Xiasha Islands
Yongxing Island
Office Zhongsha Islands
Huangyan Island
Guangxi Office
S ea
h in a
ds
C
an
Is l
South
ha
ns
Na
James Shoal
Spratly Islands
RELIABLE QUALITY, BEST-SELLING WORLDWIDE CHINT HONORS
2016, national intellectual property demonstration enterprise 2017, credit management demonstration enterprise of Zhejiang
Prague
Spain Venice
North America
Madrid
Europe
Turkey
US 2016, group member of China Intellectual Property Society Province
Los Angeles
Dubai Jiuquan
Xianyang 2016, member of Global Energy Interconnection Development 2018, the 10th “China Charity Award” of the Ministry of Civil
Jinan
Dubai Hangzhou Shanghai
Jiaxing
Mexico and Cooperation Organization Affairs
Wenzhou
Western Asia
and Africa India Thailand Asia Pacific
Vietnam
Xianyang
Singapore
Latin America
Peru
Brazil
QUALIFICATION CERTIFICATION
Sao Paulo
Heilongjiang Office
VDE and TÜV of Germany, EAC of Russia, KEMA of Nether-
lands, RCM of Australia, RCC of South Africa and other interna-
tional product certifications.
Xinjiang Office
Liaoning Office
Beijing
Beijing Office
Jiangsu Office
Zhejiang
Hunan Office Office Wenzhou
Taiwan
Island
Hong Kong
Macao Dongsha Islands
Hainan Island
Yunnan
Guangdong Office Xiasha Islands
Yongxing Island
Office Zhongsha Islands
Huangyan Island
Guangxi Office
S ea
h in a
ds
C
an
Is l
South
ha
ns
Na
James Shoal
Spratly Islands
CRAFTSMANSHIP FORGES HIGH-QUALITY CHINT KUNLUN SERIES
PRODUCTS
Craftsmanship Forges High-quality Products Air Circuit Breaker Moulded Case Terminal Distribution Motor Control
Circuit Breaker Apparatus and Protection
CHINT Electrics, a core controlled company belonging to CHINT 140 countries and regions, and has become one of world famous
Group, it focuses on R&D, design, manufacturing and sales of low-voltage apparatus brand operators. Built-in busbar temperature Fine shell-frame division ; Clear contact window ; Suitable for large voltage
low-voltage apparatus products and provides system solutions CHINT will continuously satisfy the increasing market demand sensor ; Line protection ; Small size and high current ; fluctuation ;
for building, power supply, hoisting, HVAC, telecommunication through technical and innovative services advancing with the Fine shell-frame division ; Double insulation ; More current specification Humane design ;
and other industrial customers. For over 30 years since its found- times, and will provide safer, more reliable products and create Man-machine Man-machine options ; Fine current specification ;
ing, CHINT has provided reliable products and services for over more secure and comfortable living environment. interconnection ; interconnection ; Abundant accessories ; More standard auxiliary contacts ;
Strong environmental Strong environmental Strong environmental Strong environmental
adaptability. adaptability. adaptability. adaptability.
NA1
Page P-001
P-001 Air Circuit Breaker NA1
NA1-1000X
200A to 1000A
NA1-2000X,NA1-2000XN,NA1-2000XH
630A to 2000A
Summary
5 basic frame sizes
For your various requirements, the Air Circuit Breaker NA1
includes 5 basic frame sizes as followed.
NA1-3200X,NA1-3200XN,NA1-4000X
2000A to 4000A
NA1-6300X,NA1-6300XN
4000A to 6300A
NA1 Air Circuit Breaker P-002
-5℃~40℃; the average value within 24h shall not exceed 4:4-pole
1000A
630A
800A
1000A
2000A
1250A
1600A
2000A
2000A
3200A 2500A
3200A
4000A 4000A
4000A
6300A 5000A
6300A
Breaking capacity:
X
XN
XH
Frame size rated current:
1000,2000,3200,4000,6300
Design sequence number
ACB
Company code
P-003 Air Circuit Breaker NA1
11
7
12 8
13
14
15
3
5
NA1 Air Circuit Breaker P-004
1 Drawout type
2 Fixed type
3 Intelligent controller
4 Operating mechanism
5 Auxiliary contact
9
6 Locking-device
10 7 Arcing chamber
11 Shunt release
12 Closing electromagnet
13 Under-voltage release
15 Rotary handle
16 Mounting plate
2
16
6
P-005 Air Circuit Breaker NA1
3. Structure
+ =
Auxiliary contact
Motor-driven energy
Structure for in storage mechanism
and out Locking device
Rotary handle
Rotate out
Rotate in Intelligent controller
NA1 Air Circuit Breaker P-006
Type NA1-1000X
AC400V 42
Rated ultimate short circuit breaking capacity (Icu)
AC690V 25
AC400V 30
Rated service short circuit breaking capacity (Ics)
AC690V 20
AC400V 30
Rated short-time withstand current (Icw.1s)
AC690V 20
Rated current In (A) 200 400 630 800 1000
Number of poles 3, 4
Rated voltage Ue (V) AC 400, AC 690
Rated insulation voltage Ui (V) 800
Rated current of N-pole In (A) 100%In
Fixed disconnection time (ms) 23~32
AC400V 80 50 65
Rated ultimate short circuit breaking capacity (Icu) AC415V 50 40 50
AC690V 50 40 50
AC400V 65 50 65
Rated service short circuit breaking capacity (Ics) AC415V 40 40 40
AC690V 40 40 40
AC400V 50 50 50
Rated short-time withstand (Icw.1s) AC415V 40 40 40
AC690V 40 40 40
AC400V 42 42 42
Rated short-time withstand (Icw.3s)
AC415V 42 42 42
Rated current In (A) 630 800 1000 1250 1600 2000
Number of poles 3, 4
Rated voltage Ue (V) AC400, AC415, AC690
Rated insulation voltage Ui (V) 1000
Rated current of N-pole In (A) 100%In
Fixed disconnection time (ms) 23~32
AC400V 80 65 80
Rated ultimate short circuit breaking capacity (Icu) AC415V 65 50 —
AC690V 65 50 65
AC400V 65 65 65
Rated service short circuit breaking capacity (Ics) AC415V 65 50 —
AC690V 65 50 65
AC400V 65 65 65
Rated short-time withstand (Icw.1s) AC415V 50 50 —
AC690V 50 50 50
AC400V 45 45 —
Rated short-time withstand (Icw.3s)
AC415V 45 45 —
Motor operational Drawout 3P/4P 90.5 / 116 90.5 / 116 103 / 130 132
standard configuration
weight (kg) Fixed 3P/4P 55 / 68 55 / 68 56.5 / 71 72 / -
P-009 Air Circuit Breaker NA1
Standard configuration: M type intelligent controller; Under-voltage release; Shunt release; Motor-driven energy-storage mechanism; Closeing electromagnet.
NA1 Air Circuit Breaker P-010
268
N 226
H
362
8×Φ4
101.5
316
304
358
Installation panel
3
91.5 16
Disconnected
L1 57 position Installation hole on right side
158 59 4
L
A 310 65
N 27 Connected position
70 70 70
12
200,400A n×Φ13
35
NA1-1000 L1 L
12
15
35 194 308
3P
18
630,800,
1000A In(A) A(mm) n(3P/4P) H(mm)
2×Φ9 200, 400 30.5 3/4 6
158
630 48 6/8 8
2-11.5×9
800, 1000 48 6/8 10
L1(3P)
L1(4P)
NA1-1000X Fixed-type
268
H
N 226
315
259
101.5
8×Φ4
312
270
Installation panel
46.5
216 15 A 9
N 230
3
15
35 53
n×Φ10.5
12
18
630,800,
NA1-1000 L1 L In(A) A(mm) N(3P/4P) H(mm)
1000A
12
L1
L
P-011 Air Circuit Breaker NA1
NA1-2000X/NA1-2000XN/NA1-2000XH Drawout-type
45(Disconnected position)
448(4P) C
8×Φ13
C a 353(3P) 60
N pole 28
Right & outer side of
insulation panel
30.5
a
14
D
Right & outer side of
breaker
95 95 95 92.5 15
112
258
439
horizontal connection(Default Configuration)
42.5
37
92
C 16×Φ13
30 60
70
N pole
14
10 97 175
23
60
202.5 insulation panel
391
30
292
465
405(3P)
95 95 95 92.5
500(4P) horizontal connection Lengthen busbar
D
146.5
294
267
Φ11
370
360(4P)
265(3P)
N pole
2×11×17 115
40
Φ14
Installation panel 17
11xΦ4
32×Φ13 28
70
4×Φ13
28
60
258
439
122.5
42.5
95.5
70
10
37
10 97 175 202.5
14
292
48 405(3P)
391
500(4P)
146.5
In A a mm
294
267
Φ11 630 10
370
800~1600 15
360(4P)
265(3P)
2000 20
2×11×17
Φ14
Installation panel C
11xΦ4
N pole a
70
448(4P)
45(Disconnected position) 353(3P)
C
258
439
122.5
42.5
95.5
37
70
202.5
10 97 175 292
405(3P)
391 500(4P)
In A a mm
630 10
146.5
800~1600 15
294
267
2000 20
Φ11
370
360(4P)
265(3P)
C
2×11×17 Right & outer side of
60 insulation panel
Φ14
14
11xΦ4 Installation panel N pole 28 8×Φ13
48
70
10
33 Right & outer side of
95 95 95 92.5 15 breaker
Right & outer side of breaker Opening hole on panel
NA1-2000X/NA1-2000XN/NA1-2000XH Fixed-type
413(4P)
Zero arcing covering 18min
C
ferreous material 318(3P)
8×Φ13
292 28 60
N pole
C
42
a
17
D
115
402
95 95 95 86
a
112
258
C C
16×Φ13
55
N pole 30 60 8×Φ13
14
28 60
21
N pole
60
50 150 69.5
60
11 11
32
b
30
13
290 181
359 340(3P)
95 95 95 86 95 95 95 86
435(4P)
horizontal connection Lengthen busbar horizontal connection shortened busbar
D
172.5
In A a mm b mm
311.2
630 10 17
269
4×Φ12 N pole
115
300 800~1600 15 17
40
2000 20 18.5
17
28.5
150
Installation 32×Φ13 28
panel 60
8×Φ4
340(3P) 95 95 95
Installation hole 2 Installation hole
on Right & outer side 345 on Right & outer side
435(4P)
of breaker of breaker L type vertical connection
Opening hole on panel
P-013 Air Circuit Breaker NA1
NA1-3200x/NA1-3200xN Drawout-type
C
16×Φ13
100
25
528(4P) N Pole 50 Right & outer side of
45(Disconnected position) insulation panel
100
413(3P)
C
a
50
Right & outer side of
breaker
120 125 125 92.5 15
a
258
horizontal connection(Default Configuration)
439
D
112
42.5
C
37
100
92
16×Φ13
70
75 25
14
Right & outer side of
232.5 insulation panel
23
10 97 175
30.5
352
391
465(3P)
536
Right & outer side of
580(4P) breaker
115 125 125 92.5 15
362
303
273
Φ11
379
440(4P)
325(3P)
16
2×11×17 In A a mm
48
N Pole
Φ14
115
2000~2500 20
40
202.5
17
3200 30
70
11×Φ4
20
Installation panel
175 232.5
33 40
Right & outer 32×Φ13
Right & outer side of breaker 405 100
side of breaker
120 125 125
Opening hole on panel
L type vertical connection
528(4P)
45(Disconnected position)
413(3P)
C
8×Φ13
50
258
439
126
42.5
100
100
70
37
10 97 175 20 232.5
40 352
465(3P)
94
391 580(4P)
In A a mm
2000~2500 20
3200 30
155.5
362
303
273
Φ11 N pole C
379
440(4P)
a
325(3P)
16
2×11×17
104
48
202.5
70
11×Φ4
20
Installation panel
175 232.5 Right & outer side of
33 breaker
Right & outer 115 115 115 102.5 15
Right & outer side of breaker 405 side of breaker
528(4P)
45(Disconnected position)
413(3P)
C
258
439
112
42.5
107.5
70
37
10 97 175
232.5
352
391 465(3P)
580(4P)
In A a mm
155.5
2000~2500 20
362
3200 30
303
273
Φ11
379
440(4P)
325(3P)
16
2×11×17 C
48
Φ14
20
20
100
40
N pole 50 Right & outer side of
11×Φ4 202.5
insulation panel
70
Installation panel 94
104
175 232.5
33 Right & outer
405 side of breaker
Right & outer side of breaker Right & outer side of
16×Φ13
breaker
Opening hole on panel 115 125 125 92.5 15
NA1-3200x/NA1-3200xN Fixed-type
352 N pole 40
C
72
a
40
D
115
258
C 12×Φ13
86
55
18.5
N pole 50
21
32
60
50 150 69.5
11 11
13
N pole In A a mm
115
2000~2500 20
40
311
269
4×Φ12 3200 30
15
362
32×Φ13 40
28.5
86
150
C
C
120 12×Φ13
134
15
30 40
134
402
258
40
112
189.5 189.5 79
21
Base point 4×Φ12 Horizontal
55
11 11
150 69.5
13
211
290 515
4×Φ12
311
269
362
150
28.5
45(Disconnected position)
528
C
30
258
439
112
42.5
92
70
37
10 97 175
232.5
391 352
580
C
155.5
20
Φ11 362
303
40
103
insulation panel
379
440
16
12×Φ13
2×11×17
48
Φ14 50
140
11×Φ4 202.5 Right & outer side of
20
Installation panel
70
breaker
175 232.5 197.5 197.5 77.5 15
33 Right & outer
405 side of breaker
Right & outer side of breaker
798(3P)
30
258
439
42.5
112
37
70
92
232.5
10 97 175 352
843(3P)
391
958(4P)
insulation panel
362
303
273
N Pole C
379
20
28×Φ15
703(3P)
16
103
40
48
2×11×17
Φ14
Installation panel
breaker
70
45(Disconnected position)
903
C
30
258
439
112
42.5
37
92
70
10 97 175
232.5
391 352
958
C
155.5
Φ11 362
180 260
20
303
273
103
insulation panel
40
818
16
24×Φ15 80
Φ14 breaker
316.5 323.5 140 15
11×Φ4 202.5
20
Installation panel
70
175 232.5
33 Right & outer
405 side of breaker
Right & outer side of breaker
6.1 NA1-1000X
Standard type, type (M/3M)
3 5 7 9 19 21 23 25 27 29 31 33 35 37 39 XT
FU
Intelligent Q F X M
controller
Power of
DF1 DF2 DF3 control circuit
DF4
SA
TA
FU
1 2 4 6 8 18 20 22 24 26 28 30 32 34 36 38 40 XT
Note:
Dashed is to be connected by users.
P-019 Air Circuit Breaker NA1
L1
FU
N
PE
Profibus-DP ~ ~
AC 220V PSU-1
HL3
ST-DP DC 24V
Device + -
Intelligent Q F X M
controller
TA
1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 XT
3 5 7 9 14 15 17 19 21 23 25 27 29 31 33 35 37 39 XT
FU
Q F X M
Intelligent Power of
controller control circuit
DF5 DF6 DF1 DF2 DF3
DF4
SA
TA
FU
1 2 4 6 8 10 11 12 13 16 18 20 22 24 26 28 30 32 34 36 38 40 XT
Note:
Six pairs change-over contacts , without any additional function.
Dashed is to be connected by users.
P-021 Air Circuit Breaker NA1
6.2 NA1-2000X~6300X
The secondary circuit wiring for NA1-2000X~6300X with standard type (M) intelligent controller and instantaneous under-voltage release
Emergency
Main circuit Over-current release Motor-driven Motor-driven Auxiliary contact
break break make
SB2
3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 36 38 40 42 44 46 48 50
FU
Q F X M
AX
Power
SA
Processing
unit
Intelligent Controller
FU
1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 37 39 41 43 45 47 49 51
Open Close
_ 110V
~
_ 220V
~ Intelligent release power ("1" connect positive pole, and "2" connect negative pole for direct current)
~380V
# #
29 ,30 : Shunt release
31#,32#: Closing release
33#,34#: Energy storage indicator
34#,35#: Energy storage motor
36#,51#: Auxiliary contact
The secondary circuit wiring for NA1-2000X~6300X with type (3M) intelligent controller and instantaneous under-voltage release
L1 1 2
N
PE
Highest-voltage of AC400V
to the incoming-line side
PE Un U1 U2 U3 SB2 SB1 SB3
Transformer
connected
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50
Q F X SA
AX
M
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51
Energy-
Fault OpenClose
storage
The auxiliary contact modes for customer use SB1: Shunt button
SB2: Under-voltage button
ⅠFour pairs change-over contacts Ⅱ Five pairs change-over contacts
SB3: Making button
36 38 40 42 44 46 36 38 40 42 44 46 48 50 Q: Under-voltage release
F: Shunt release
X: Closing release
M: Energy storage motor
XT: connection terminal
SA: Position switch
1#, 2#: Intelligent controller power input
37 39 41 43 45 47 37 39 41 43 45 47 49
Note: When the power supply of the intelligent controller
is AC power, the 1#~2# connects to the AC power directly.
When the power supply is DC power, forbid connecting the
1#~2# to the DC power directly. Add a DC power supply
module, then the DC power connect to the input terminal
of the DC power supply module, and the 1#~2# connect to
3#,4#,5#: Fault trip contact output(4#common terminal) the output terminal of the DC power supply module,
6#,7#,8#,9#: Auxiliary contact(normal open) or else the intelligent controller will be damaged.
10#~11#: empty
12#~19#: The programmable output terminal. The normal products without these terminals,
but if the customer special ordered, the cost extra added.
16#,17#: Self-diagnose alarm; 18#,19#: Fault trip; 20#: PE line; 21#~24#: Display the voltage of the signal input.
The normal products without these terminals,
if the customer special ordered the function meter, the cost extra added.
#
21 : N phase input terminal
# # #
22 ,23 ,24 : A, B, C three phase power input terminal (note the sequence)(highest-voltage of AC 400V)
# #
25 ,26 : Connect to the N phase current transformer or the input terminal of the current leakage transformer.
The normal products without these terminals, if the customer special ordered, the cost extra added.
27 ,28 : Under-voltage release(Connected to the main circuit); 29 ,30 : Shunt release; 31 ,32 : Closing release;
# # # # # #
# # # # # #
33 ,34 : Energy storage indicator; 34 ,35 : Energy storage motor; 36 ~51 : Auxiliary contact
Note:
a. Red colored part is to be connected by users
b. When the power system is three phase three wire, directly connect the Un to U2.
( If the voltage exceeds 400V, special explanation when ordered)
P-023 Air Circuit Breaker NA1
The secondary circuit wiring for NA1-2000X~6300X with type (3H) intelligent controller and instantaneous under-voltage release
1 2
L1
N
PE
To TO3 busbar
~ ~
AC 220V PSU-1
Profibus
24V
ST-DP NC DC 24V
GND + -
D+ D-
Q F X SA
AX
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51
Fault Energy
storage Open Close
The auxiliary contact modes for customer use SB1: Shunt button; SB2: Under-voltage button
SB3: Making button; Q: Under-voltage release
Ⅰ Four pairs change-over contacts Ⅱ Five pairs change-over contacts
F: Shunt release; X: Closing release
36 38 40 42 44 46 36 38 40 42 44 46 48 50 M: Energy storage motor; XT: connection terminal
SA: Position switch
1#, 2#: Intelligent controller power input
Note: When the power supply of the intelligent controller
is AC power, the 1#~2# connects to the AC power directly.
When the power supply is DC power, forbid connecting the
1#~2# to the DC power directly. Add a DC power supply
37 39 41 43 45 47 37 39 41 43 45 47 49
module, then the DC power connect to the input terminal
of the DC power supply module, and the 1#~2# connect to
# # # #
3 ,4 ,5 : Fault trip contact output(4 common terminal) the output terminal of the DC power supply module,
# # # #
6 ,7 ,8 ,9 : Auxiliary contact(normal open) or else the intelligent controller will be damaged.
# #
10 ~11 : communication output
# # # #
12 ,13 : Signal alarm of load 1 output; 14 ,15 : Signal alarm of load2 output
# # # #
16 ,17 :Breaking signal output; 18 ,19 :Making signal output
# #
20 : PE line; 21 : N phase input terminal
# # #
22 ,23 ,24 : A, B, C three phase power input terminal (note the sequence)(highest-voltage of AC 400V)
# #
25 26 : Connect to the N phase current transformer or the input terminal of the current leakage transformer.
The normal products without these terminals, if the customer special ordered, the cost extra added.
ST~DP: DP protocol module. There is no need for the ST-DP protocol module,
if the communication protocol is Modbus-RTV. But when the communication protocol is Profibus-DP,
the ST-DP protocol module is necessary, but the cost extra added.
ST power module IV: power converter (optional components)
ST201: Magnify the signal capacity of the controller. ( optional components) If the customer special ordered,
the cost extra added.
27 ,28 : Under-voltage release(Connected to the main circuit); 29 ,30 : Shunt release
# # # #
# # # #
31 ,32 : Closing release; 33 ,34 : Energy storage indicator
# # # #
34 ,35 : Energy storage motor; 36 ~51 : Auxiliary contact
Note:
a. Red colored part is to be connected by users
b. When the power system is three phase three wire, directly connect the Un to U2.
(If the voltage exceeds 400V, special explanation when ordered)
NA1 Air Circuit Breaker P-024
The secondary circuit wiring for NA1-2000X~6300X with standard type (M) intelligent controller and time-delay under-voltage release
Motor Motor
Main Emergency Motor driven Under-voltage
circuit Over-current release disconnection driven driven energy time-delay Auxiliary switch
break close storage release
Energy
SB2 SB1 SB3 storage
Failure Under-voltage
time-delay controller
3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 36 38 40 42 44 46 48 50
FU
AX
Power
Processing
unit
Intelligent controller
FU
1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 37 39 41 43 45 47 49 51
Open Close
~_ 110V
Intelligent release power("1” connect positive pole, and “2” connect negative pole for direct current)
~_ 220V
~380V
39 41 43 45 47 49
The secondary circuit wiring for NA1-2000X~6300X with type (3M) intelligent controller and time-delay under-voltage release
L1 1 2
N
PE
Transformer
Under-voltage
connected time-delay controller
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50
F X SA Q
AX
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51
Energy
Fault
storage Open Close
# # # # # # # #
3 ,4 ,5 : Fault trip contact output(4 common terminal); 6 ,7 ,8 ,9 : Auxiliary contact(normal open)
# # # #
10 ~11 : empty; 12 ~19 are the programmable output terminal. The normal products without these terminals,
but if the customer special ordered, the cost extra added.
25#,26# Connect to the N phase current transformer or the input terminal of the current leakage transformer.
The normal products without these terminals, if the customer special ordered, the cost extra added.
27#,28#: Under-voltage release(Connected to the main circuit); 29#,30#: Shunt release
31#,32#: Closing release; 33#,34#: Energy storage indicator
34#,35#: Energy storage motor; 36#,37#: Under-voltage time delay release
38#~51#: Auxiliary contact
Note:
a. Red colored part is to be connected by users
b. When the power system is three phase three wire, directly connect the Un to U2. (If the voltage exceeds 400V,
special explanation when ordered)
NA1 Air Circuit Breaker P-026
The secondary circuit wiring for NA1-2000X~6300X with type (3H) intelligent controller and time-delay under-voltage release
1 2
L1
N
PE
To TO3 busbar
~ ~
AC 220V PSU-1
Profibus
24V DC 24V
+ -
ST-DP NC
GND
D+ D-
+ - DI0 DI1 DI2 DI3 DI4
Transformer
D+ D- Under-voltage
connected
Red Green time-delay controller
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50
F X SA Q
AX
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51
Fault Energy
storage Open Close
The auxiliary contact modes for customer use SB1: Shunt button; SB2: Under-voltage button
SB3: Making button; Q: Under-voltage release
Ⅰ Four pairs change-over contacts
F: Shunt release; X: Closing release
38 40 42 44 46 48 50 M: Energy storage motor; XT: Connection terminal
SA: Position switch
1#, 2#: Intelligent controller power input
Note: When the power supply of the intelligent controller
is AC power, the 1#~2# connects to the AC power directly.
When the power supply is DC power, forbid connecting the
1#~2# to the DC power directly. Add a DC power supply
39 41 43 45 47 49 module, then the DC power connect to the input terminal
of the DC power supply module, and the 1#~2# connect to
the output terminal of the DC power supply module,
3#,4#,5#: Fault trip contact output(4# common terminal) or else the intelligent controller will be damaged.
6#,7#,8#,9#: Auxiliary contact(normal open)
10#~11#: Communication output; 12#,13#: Signal alarm of load 1 output
14#,15# : Signal alarm of load 2 output; 16#,17#: Breaking signal output; 18#,19#: Closing signal output
20#: PE line; 21#: N phase input terminal
22#,23#,24#: A, B, C three phase power input terminal (note the sequence)(highest-voltage of AC400V)
25#,26# Connect to the N phase current transformer or the input terminal of the current leakage transformer.
The normal products without these terminals, if the customer special ordered, the cost extra added.
ST~DP: DP protocol module. There is no need for the ST-DP protocol module,
if the communication protocol is Modbus-RTV. But when the communication protocol is Profibus-DP,
the ST-DP protocol module is necessary, but the cost extra added.
ST power module IV: power converter (optional components)
ST201: Magnify the signal capacity of the controller. ( optional components)
If the customer special ordered, the cost extra added.
27#,28#: Under-voltage release(Connected to the main circuit); 29#,30#: Shunt release
31#,32#: Closing release; 33#,34#: Energy storage indicator
34#,35#: Energy storage motor; 36#,37#: Under-voltage time delay release
38#~51#: Auxiliary contact
Note:
a. Red colored part is to be connected by users
b. When the power system is three phase three wire, directly connect the Un to U2.
(If the voltage exceeds 400V, special explanation when ordered)
P-027 Air Circuit Breaker NA1
7. Installation
7.1 Installation
7.1.1 Unload the breaker from the soleplate of package. When the guide rod points to separated position and handle
If it is drawout type, firstly pull out the handle under can't be rotated any longer, pull out the handle and firmly
the drawer-base of breaker, and plug it into the hole grasp the aluminum handle on drawer-base, pull out the
on central part of plastic cover under the drawer-base breaker body and remove it form the base, then move the
crossbeam, anticlockwise turns the handle, the body base from the sole plate and clean up the dirty things inside
will slowly slide along the outside of drawer-base. the drawer-base.
Possible positions
7.1.2 Check the insulation resistance with a 500V megger, 7.1.3 Power supply
resistance should not be less than 20MΩ when NA1 devices can be supplied either from the top or
ambient temperature is 20℃±5℃ and relative from the bottom without reduction in performance,
humidity is 50%~70%. Otherwise dry it. in order to facilitate connection when installed in a
switchboard.
7.1.4 Put the breaker (fixed-type) or drawer-base (drawout-type) Mounting the circuit-breaker
into the installation-bracket, and make it fixed, directly It is important to distribute the weight of the device
connect the cable wire of main circuit to the bus wire of uniformly over a rigid mounting surface such as rails
fixed-type circuit breaker. Alternatively put breaker body or a base plate.
onto the slideway of drawer-base. Plug the handle into This mounting plane should be perfectly flat (tolerance
installation hole, clockwise turns it until the under-part of on support flatness: 2 mm).This eliminates any risk of
drawer-base points at the connection position and ”click” deformation which could interfere with correct
sound is heard. It indicates that breaker body has been operation of the circuit breaker.
connected to its place, then connect the cable of main NA1 devices can also be mounted on a vertical plane
circuit to drawer-base. using the special brackets.
NA1 Air Circuit Breaker P-028
7.1.5 Partitions
A:non magnetic material
Sufficient openings must be provided in partitions to ensure
good air circulation around the circuit breaker;
Any partition between upstream and downstream connections
of the device must be made of nonmagnetic material.
For high-currents, of 2500 A and upwards, the metal supports
or barriers in the immediate vicinity of a conductor ;Metal
barriers through which a conductor passes must not form
a magnetic loop.
Busbars
The mechanical connection must be exclude the possibility
non magnetic material
of formation of a magnetic loop around a conductor.
B C
B
A
A
A
P-029 Air Circuit Breaker NA1
min18 min18
7.1.8 Clamping
1 2 3 4
Correct clamping of busbars depends on the tightening
torques used for the nuts and bolts,etc. Over-tightening
may have the same consequences as under-tightening.
For connecting busbars to the circuit breaker, the tightening 1 breaker terminal
2 busbar
torques to be used are shown in the table below. These
3 bolt
values are for use with copper busbars and steel nuts and 4 washer
bolts, class ≥8.8. 5 nut
6 spring washer
6 5
Examples
In(A) 200 400 630 800 1000 630 800 1000 1250 1600 2000 2000 2500 3200 4000/3P 4000/4P 4000 5000 6300
Thickness(mm) 5 5 5 6 8 5 6 8 10 12 10 8 10 10 10 - 10 10 10
Busbar Width(mm) 30 30 40 50 50 60 60 60 60 60 60 100 100 100 120 - 100 100 100
Number 1 2 2 2 2 2 2 2 2 2 3 2 2 4 4 - 5 7 8
Note: the specifications in the table is obtained as the ambient temperature of air circuit breaker is 40℃, with open installation; this is in
compliance with the specification of copper busbars adopted under the heating conditions regulated in IEC/EN60947-2.
9. Power loss
In(A) 200 400 630 800 1000 630 800 1000 1250 1600 2000 2000 2500 3200 4000/3P 4000/4P 4000 5000 6300
Power Drawer type 40 101 123 110 171 70 110 172 268 440 530 384 600 737 921 - 575 898 1426
loss (W) Fixed type 33 85 107 94 146 34.4 50 78 122 200 262 200 312 307 450 - - - -
I2t(A2s×106)
460
320
200
190
180
170
160
150
140
130
120
110
100
90
80
70
60
50
40
30
20
10
20 40 60 80 100 120 Is(kA)
40℃ 200 400 630 800 1000 630 800 1000 1250 1600 2000 2000 2500 3200 4000 4000 5000 6300
45℃ 200 395 623 800 985 630 800 1000 1250 1600 2000 2000 2500 3200 3800 4000 5000 6000
50℃ 200 384 605 800 960 630 800 1000 1250 1600 2000 2000 2500 3200 3600 4000 5000 5600
IEC/EN60947-2 55℃ 200 328 584 800 924 630 800 1000 1250 1500 1900 2000 2300 3000 3400 4000 4800 5400
60℃ 200 248 548 800 870 610 800 1000 1250 1300 1800 2000 2200 2800 3200 4000 4800 5200
65℃ 192 192 500 800 810 610 800 1000 1250 1300 1650 2000 2200 2600 3000 4000 4600 5100
70℃ 170 170 473 750 750 473 800 1000 1200 1200 1400 2000 2000 2200 2520 4000 4000 4200
NA1 Air Circuit Breaker P-032
Note: The ACB is to calibrated at 40℃, special application please refer to the table above and the curve below.
1100 4200
1000 4000
900 3800
800 3600
In=200A 3400
700
3200 In=2000A
600 In=400A
3000 In=2500A
500 In=630A
2800 In=3200A
400 In=800A
2600 In=4000A
300 In=1000A
2400
200 2200
100 2000
0 1800
40 45 50 55 60 65 70 40 45 50 55 60 65 70
Ambient temperature(℃) Ambient temperature(℃)
NA1-1000X NA1-3200X/NA1-3200XN/NA1-4000X
2000 6400
1900 6200
1800
6000
1700
1600 5800
Rated current (A)
1×250 360 9 9
2×250 360 9 9
1×500 722 18 18
2×500 722 18 18
1×1000 1444 24 24
2×1000 1444 24 24
1×1250 1805 30 30
2×1250 1805 30 30
1×2500 3608 60 60
2×2500 3608 60 60
NA1-1000X-400 9
NA1-1000X-400 27.5
NA1-1000X-630 11.4
NA1-1000X-630 34.1
NA1-1000X-630 14.4
NA1-1000X-630 43.2
NA1-1000X-800 18
NA1-1000X-800 54.1
NA1-1000X-1000 22.7
NA1-2000X-1000 67.2
NA1-2000X-1250 19.3
NA1-2000X-1250 57.8
NA1-2000X-1600 24
NA1-2000X-1600 72.1
NA1-2000X-2000 30
NA1-2000X-2000 90.1
NA1-3200X-2500 36.5
NA1-3200X-2500 109.5
NA1-3200X-3200 48.2
NA1-6300X-4000 60
4×(10×120) NA1, NM8
NA1-6300X-4000 120
NA1-6300X-5000 75.8
7×(10×100) NA1, NM8
NA1-6300X-5000 151.6
P-035 Air Circuit Breaker NA1
Rated
630 800 1000 1250
current (A)
Delayed tripping
0.1, 0.2, 0.3, 0.4
time (s)
Rated
630 800 1000 1250
current (A)
Delayed tripping
0.1, 0.2, 0.3, 0.4
time (s)
10 13.8~15 13.8~18.75
1000 12(motor)
NM8-1250 16.56~18.75
NM8S-1250 17.25~18.75
12.5
1250 15.0(motor)
NA1 Air Circuit Breaker P-038
Rated
630 800 1000 1250
current (A)
Delayed tripping
0.1, 0.2, 0.3, 0.4
time (s)
NA1-3200X 2500 30
3200 38.4
3200 38.4
NA1-4000X 4000 48
4000 48
5000 60
NA1-6300X
6300 75
Note: It can satisfy the selective protection if only the short time-delay setting value of the superior breaker 1.32 times more than the
subordinate breaker, when the instantaneous setting value is adjustive.
NA1 Air Circuit Breaker P-040
Note: Method of 3M/3H controller application please refer to 3M/3H controller instruction.
14.2 3M/3H controller default interface and menu structure 3M/3H controller default interface
The corresponding LED lamp will flash to indicate the fault type after tripping.
25
The LED lamps are always on when the system is normal.
There are four states, default state, setting state, query state and tripping state.
① Default state: default state is also called measuring state. All fault indicating lamps are off and maximum phase current is displayed.
In this state, if “▲” or “▼” button is pressed, L1,L2,L3(LN),Lg current can be displayed in turn.
Example is shown below:
②Setting state: press “Set” button in default interface to enter into setting interface. Current protection parameters, overload pre-alarm
value, earthing alarm threshold value and delay time can be queried or changed in setting state. Tripping can be simulated by software. In
this state, “▲” or “▼” button can be pressed to add or subtract value when “SET” indicating lamp is flickering. Don’t forget to
press “Enter” button to save data after setting.
Example 1 of changing long delay time is shown below:
3 times
long
press
NA1 Air Circuit Breaker P-044
Long press
③Query state: press “Check” button in default interface to enter into query interface. Last 8 fault records, last 8 alarm records, breaker
operation times, life record and thermal capacity can be queried in query state.
Example4 of querying second fault record is shown below:
P-045 Air Circuit Breaker NA1
Example6 of querying breaker operation times and life record is shown below:
NA1 Air Circuit Breaker P-046
④Tripping state: “Reset” button should be press to return default interface after tripping at fault.
TRIP
L1
RUN
KA s A s
L2 L2
M type H type
1 over-current protection (overload, short delay, instantaneous, earthing); 1 over-current protection (overload, short delay, instantaneous, earthing);
vector sum grounding mode. vector sum grounding mode.
2 Neutral line protection 2 Neutral line protection
3 Current measurement 3 Current measurement
4 two test functions: 4 two test functions:
(1)Instantaneous trip test simulated by mechanical button (1)Instantaneous trip test simulated by mechanical button
(2)Other trip tests simulated by software (2)Other trip tests simulated by software
5 Ten fault records 5 Ten fault records
6 Ten alarm records 6 Ten alarm records
7 MCR protection 7 MCR protection
8 operation times records 8 operation times records
9 thermal capacity 9 thermal capacity
10 overload pre-alarm 10 overload pre-alarm
11 communication function: MODBUS protocol
12 four DO function (optional)
3M type 3H type
1 all functions of M-type controller are included 1 all functions of 3M-type controller are included
2 HMI:128*64 LCD 2 voltage measurement and protection
3 frequency measurement and protection
4 power measurement and protection
5 electric energy, power-factor, harmonic measurement
6 communication function: MODBUS protocol
7 DI/DO function
Ir=(0.4~1)In
1000 tr=(15~480)s
100
10
T(s)
Isd=(1.5~15)Ir(max40/50kA)
I2t ON
1 I2t OFF
0.4
0.3
0.2
0.1 0.1
Ii=(1.5~20)In
(max65/75kA)
0.01
0.5 5 3 30
I(xIr) I(xIn)
NA1 Air Circuit Breaker P-048
Note: a. When the intelligent controller is FrameⅡ (Inm=3200A、4000A), Isd shouldn’t be more than 40KA.
b. When the intelligent controller is FrameⅢ (Inm=6300), Isd shouldn’t be more than 50KA.
c. When tsd is 0.1s or 0.2s, time permissible error is ±0.040s.
Current Ratings
tolerance Current Time tolerance
Range(Ii)
Note: a. When the intelligent controller is FrameⅠ (Inm=2000A), Ii shouldn’t be more than 50KA.
b. When the intelligent controller is FrameⅡ (Inm=3200A、4000A), Ii shouldn’t be more than 65KA.
c. When the intelligent controller is FrameⅢ (Inm=6300), Ii shouldn’t be more than 75KA.
P-049 Air Circuit Breaker NA1
Ig=(0.2~0.8)In,
min100A,max1200A
1000
或500A~1200A
100
10
T(s)
0.4
0.3
0.2
0.1 0.1
0.01
0.1 1 10
I(xIn)
Single-phase protection is usually used in neutral-point solid ground system. Controller has two different protection modes, being
vector sum mode and external transformer mode.
In three-phase three-wire system using 3-pole breaker without external transformer, earthing fault signal comes from three- phase current
vector sum. Operating characteristic is definite time protection.
3PT mode
Contr
-oller
NA1 Air Circuit Breaker P-050
In three-phase four-wire system using 4-pole breaker without external transformer , earthing fault signal comes from three- phase current
and N-Pole current vector sum. Operating characteristic is definite time protection.
4PT mode
Contr
-oller
C
In three-phase four-wire system using 3-pole breaker with external N-pole transformer, earthing fault signal comes from three- phase and
N-Pole current vector sum. Operating characteristic is definite time protection.
(3P+N)T mode
Contr
-oller
Note:
① External N-pole transformer (connected to 6#, 7# terminal for NA1-1000, connected to 25#, 26# terminal for NA1-2000-6300) is a special product. Default lead wire is
2 meters long.
② Earthing protection in 3PT mode can only be used in balance load. It should be turned off or set value above allowable unbalance current when the load is unbalance or
the controller may operate.
③ The distance between external transformer and breaker should be less than 5m in (3P+N)T mode. When lead wire of external transformer needs to be longer than 2 meters,
special requirement should be noted when ordering.
15. Accessories
15.1 Under-voltage release
Without power supply, under-voltage release can't close.
It is classified into instantaneous and time-delay type.
Delay time 1s, 3s, 5s, 7s are fixed for NA1-1000; 1s, 3s, 5s are fixed for NA1-2000, 3200, 4000, 6300.
Within 1/2 time-delay range, circuit breaker does not trip when power voltage recovers and exceeds 85%Ue.
Characteristic
Optional configure: Auto suction type under-voltage release, and this device can substitute normal one, it can prevent mechanism form
misoperation.
Make sure there is power supply on the under-voltage release, before making the circuit breaker.
P-051 Air Circuit Breaker NA1
Forbid making the power for long time to avoid the shunt release being damaged.
Forbid making the power for long time to avoid the closing release being damaged.
Characteristic
Characteristic
NA1-1000X NA1-2000X/NA1-2000XN/NA1-2000XH/NA1-3200X/NA1-3200XN/NA1-4000X/NA1-6300X/NA1-6300XN
+ +
lock washer key
2. Installation sequence:
1. Boring here, and 2. Put the washer into 3. Install the 4. Push the red button “ON”, and take
polish the hole the hole lock here the key out, then install the cover.
make it smooth
1.5m(max)
Circuit diagram Available running manner
1QF 2QF
0 0
1QF 2QF
0 1
1 0
Notes: a. when the steel cable needs to be bent, enough transition arc should be reserved to guarantee flexible movement of steel cable;
b. check the steel cable and make sure there is enough lubricant in the steel cable to guarantee flexible movement of steel cable.
NA1 Air Circuit Breaker P-054
1QF 2QF
50
0 0
52 60 1QF 2QF
175 0 1
40
190
1 0
0.9m(max)
50
52 60
175
40
190
P-055 Air Circuit Breaker NA1
Safety Precautions
The following operations must be executed in turn before conducting the maintenance or overhaul of circuit breakers:
a. Circuit breaker opening operation to ensure the circuit breaker is in an opening state;
b. Disconnecting the upper-level knife switch (if any) to ensure the main circuit and secondary circuit are uncharged;
c. Circuit breaker discharging, opening operation to ensure the circuit breaker is in a discharging and opening state;
d. The components which the personnel might contact must be uncharged. Keep Safe
The air should be always kept Every six months Once per year Confirming to IEC60947-2
clean and dry. There is no corrosive gas. (every six months for more Requirement for general
The temperature is in between -5℃~+40℃ than 3 years of mounting environmental conditions.
General environment
The humidity should conform to Specification period)
1.3 Operating Conditions c Requirement for
extreme atmosphere conditions.
Low temperature -5℃~-40℃ or high Every three months Every six months
temperature 40℃~65℃ or humidity≥90% (every three months for
Severe environment more than 3 years of
mounting period)
Places with more dust and corrosive gases Every month Every three months
OFF ON OFF ON
ON
OFF Charged
Charged
OFF ON OFF ON
OFF ON
Discharged Discharged
NA1 Air Circuit Breaker P-056
It is proposed to refer to the following requirement for the torsional forces of main circuit and secondary circuit.
· Remove four bolts of circuit breaker fixed panel and take off the face shield.
· 1. Press the “Set” button to enter the parameter setting interface “Pro”.
· 2. Press the “Enter” button to enter the protective parameter setting and
query interface.
· 3. Press the “▲” or “▼” button to in turn select the display of protective
parameter setting details.
· 4. Press the “Reset” button to return to the upper-level menu or exit from
the interface.
· Press the orange “Reset” button on the face shield to return to normal state.
16.2.4.4 Drawer set inspection (conduct the test after removing the body, taking NA1-2000X as an example)
There are no foreign objects inside.
· Observe whether there are foreign objects inside the draw-out socket, like
screws, wire leads, scrap iron; please clear same if any.
P-059 Air Circuit Breaker NA1
The flash barrier opening or closing is normal, and the spacing contact has no deformation or oxidization.
· Remove the fixing bolts · Take out the arc chamber. · Check chamber conditions.
NA1 Air Circuit Breaker P-060
· Conduct manual closing operation, and observe the main contact over-travel.
Note: Please replace the contact if it reaches the position shown.
· Close the product and main contact is at the shown position. Observe any dust,
particle burnt objects and oxidized corrosion layer of dynamic and static
contacts. If any, please promptly clear same.
Note: The shunt release should be first dismantled before replacing the NA1-2000
undervoltage release.
P-061 Air Circuit Breaker NA1
Note: The shunt release should be first dismantled before replacing the NA1-2000
undervoltage release.
Begin
Manual opening Shunt release UVT opening Drawer set is The controller
Energy-storage
opening failure failure rotated in position is reset or not
failure or not or not
Inspect the Inspect the Inspect the Inspect the The drawer set is The controller reset
mechanism shnnt release UVT moto rotated in position button is reset
Inspect items:
requirement or not.
3、The components are damaged or not. Inspect the Inspect the UVT
Inspect the
shunt release and closed
please replace the damaged components mechanism
commection electromagnet
NA1 Air Circuit Breaker P-062
1. Check the breaking current value and operation time of intelligent release.
Over load tripping 2. Analyze the load and electric network, exclude the overload if it happens.
(Ir indicator flashing) 3. Match the actual operating current with long time-delay current setting value.
4. Press the reset button to reclose the breaker
1. Check the breaking current value and operation time of intelligent release.
2. Exclude the short circuit fault if it happens
Short circuit tripping
3. Check the setting value of intelligent release
(“Isd”or“Ii”indicator flashing)
4. Check the normal state of breaker
Tripping of 5. Press the reset button to reclose the breaker
circuit breaker
1. Check the breaking current value and acting time of intelligent release.
Earthing fault tripping 2. Exclude the earthing fault if that happens.
(IG indicator flashing) 3. Match the fault current setting value with the actual protection.
4. Press the reset button to reclose the breaker.
Mechanical interlock acting Check the working state of two circuit breakers fixed with mechanical interlock
Mechanical interlock acting Check the working state of two circuit breakers
leads to locking of breaker fixed with mechanical interlock
The breaker Closing electromagnet:
can't be 1.Rated control voltage is 1. Power voltage of closing electromagnet
closed less than 85%Us; shouldn't less than 85%Us.
2.Closing electromagnet 2. Replace the electromagnet.
is damaged
Tripping immediately: 1. Check the breaking current value and operation time of intelligent release;
Tripping after
1. Short circuit current is closed 2. Exclude the short circuit fault if it happens;
closing the
2.Delay tripping because of 3. Exclude overload fault
circuit breaker
transient current is high 4. Check the normal state of breaker
(Fault indicator
when closing; 5. Modify the current setting value of intelligent release
flashing)
3. Overload current is closed 6. Press the reset button to reclose the breaker
Drawerout-type
1. Handle isn't pulled out
breaker can't be drawn 1. Pull out the handle
2. Breaker is not totally at the
out at the "opening" 2. Keep the circuit breaker totally at “opening” position
“opening" position
position
Installation mode □ Drawout type □Fixed type (Note: no fixed type when In> 4000A)
Number of poles □ Three poles □Four poles
Ir long delay current setting range: (0.4 to 1) In ! Conventional factory tuning: overload long delay 1.0In
Overload 1.5Ir action time setting range: 15,30,60 ...... 480s ! Conventional factory tuning: overload 1.5Ir; action 15s
release (default
configuration) □ Instantaneous □ delay, s; □ Resistance capacity loss release delay (1,3,5) s, and optional non-adjustable (Optional)
Key lock: □1 lock 1 key □2 locks 1 key □3 locks 1 key □ 3 locks 2 keys □5 locks 3 keys □Special custom__lock__ key
Special requirements
Module: □ PSU-1 Power module □RU-1 relay module □ST-DP protocol converting module
Note: The casing current, rated current and auxiliary control voltage must be specified when ordering!
Note: 1) Please mark “√” or fill figure in the relative ”□” if no mark, we will provide according to conventional.
Note: 2) The operational fuction of the intellgent controller and special requirements require additional costs.
Tel.:0577-62877777-6213 Fax :0577-62877777-6288
Configuration instructions
b. Manual: b. Manual:
Under-voltage instantaneous release; Under-voltage instantaneous release;
4 suits of transform contact; 4 normal open and 4 normal close auxiliary
M-type Intelligent Controller; contacts;
Horizontal wiring of main circuit; M-type Intelligent Controller;
Doorcase; Horizontal wiring of main circuit;
Element of main circuit; Closing and breaking push button lock;
Operating instructions of M-type Intelligent Doorcase;
Controller Element of main circuit;
Operating instructions of Air Circuit Breaker; Operating instructions of Air Circuit Breaker;
Packing box; Packing box;
Drawer seat(Drawout type) Drawer seat(Drawout type)
4. NA1-1000X operational configuration (additional
3. NA1-2000X~6300X operational configuration
costs)
(additional costs)
Under voltage delayed release; wire-cable
Nonadjustable under voltage delayed release (1s, 3s, 5s);
mechanical interlock;
Connecting-rod type mechanical interlock (for drawout
key lock; External current transformer earthing
type);
protection;
Wire-cable mechanical interlock; Button lock; Key lock;
Vertical busbar; 6 groups changeover contacts;
Door interlock'Locking device;
H type intelligent controller; Phases barrier, position
External current transformer earthing protection;
signal
Vertical busbar;
Rotating busbar (IN≤3200);
3NO (normal open) and 3NC (normal close) contacts;
4NO and 4NC contacts; 5 groups changeover contacts;
3 groups changeover contacts; H type intelligent
controller;
Position signal; Counter; Protecting cover (NA1-2000);
Double power controller.