ATT Work

This document outlines the checklist for anti-termite treatment for civil works at a 400 KLPD ethanol plant in Naidupeta, AP, contracted by KSR Constructions for Nayara Energy. It includes sections on preparation, application, and safety measures to ensure proper treatment of the area. The checklist also records details such as the area treated and the amount of chemical consumed.

Uploaded by

Venugopalrao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

ATT Work

This document outlines the checklist for anti-termite treatment for civil works at a 400 KLPD ethanol plant in Naidupeta, AP, contracted by KSR Constructions for Nayara Energy. It includes sections on preparation, application, and safety measures to ensure proper treatment of the area. The checklist also records details such as the area treated and the amount of chemical consumed.

Uploaded by

Venugopalrao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KSR CONSTRUCTIONS

CHECKL l FOR ANTI TERMITE


IST TREATMENT

Project Name :-
Civil works for Boundary W all and Area Grading
works for 400 KLPD Ethanol Plant, Naidupeta, AP
DATE:

Client :- NAYARA ENERGY

CONTRACTOR :- KSR CONSTRUCTIONS

Block Level Grid Reference

Location:
Flat Surface Along the periphery of the
Name of the Sub Agency
building
ATT For
Earth retaining Structure Others(please specify)
Name of the Chemical Used

Sl No. DESCRIPTION Remark


Yes No NA

Preparation

1 Check for the area to be treated is demarked


Checked the level and confirmed that no ultration is required in the
2 prepared surface after treatment.

3 Checked for the surface is well cleaned.

Confirm that the earth is not wet due subsoil/seepage/rain


Check for the provision of rod holes as per treatment location and method
4 statement/IS.

Application

1 Checked for the Chemical Used

2 Checked for the Dilution of Chemical (1: )

3 Checked for the application rate ( ltrs/sqm)

Safety
Hand gloves and Mask is provided to avoid direct contact with
1 chemical.

2 safety instructions of manufacturer is followed

3 Sufficient ventilation should be available at place of work.

SI.No Description Details Remarks

1 Area Treated (in Sq m)

2 Chemical Consumed (In Ltrs)

YES NO
3 Chemical soaked in earth before next activity

Contractor Engineer(KSR): For Client: