Resume
Name :- Praveen Sharma
Father’s Name :- Mr. Naresh Kumar
Date of Birth :- 05th JULY 1996
Nationality :- Indian
Contact No. :- +91-9813299586
E-mail Id :-
[email protected]Qualification :- I.T.I. in Draughtsman Civil from brij I.T.I.
Kosi kalan,Mathura,Uttar Pradesh (2022)
Address :- Gali No.-1, Hans Enclave Sec-33 Gurugram,
Hr. 122022
Software Knowlwdge:
Autocad, Excel, Ms office.
Key Qualifications / Experiences:
6+ years experience as Bridge Structural Draughtsman of other Structures
projects with all construction activities).
Detailed Tasks assigned:
Employer - ECSTATIC ENGINEERING CONSULTANTS PVT.
LTD. (GURUGRAM, HARYANA)
Position - Draftsman.
Period - March 2020 to Till Today
description of duties - drafting and detailing of bridge structure.
Detail Design Projects
1. PROPOSED PEDESTRIAN SUBWAY NEAR SHANKAR CHOWK, UDYOG VIHAR,
GURUGRAM AT KM 24+760 OF NH48.
2. UPGRADATION OF GURAGAON-PATAUDI-REWARI SECTION OF NH-352W FOUR
LANING SECTION FROM DWARKA EXPRESSWAY TO REWARI (NH-71 JN.)
(KM.0.00 TO KM. 43.87) AND SIX LANING SECTION FROM HERO HONDA CHOWK
TO UMANG BHARDWAJ CHOWK (KM. 0.000 TO 2.240) (DESIGN LENGTH 46.11KM.)
AS FEEDER ROUTE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA ON EPC MODE.
3. CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM SARDAR PATEL RING
ROAD TO SINDHREJ VILLAGE TO AHMEDABAD DISTRICT (CH. 0+000 TO 22+000)
SECTION OF AHMEDABAD-DHOLERA GREENFIELD ALIGNMENT (NH-751) ON EPC
MODE UNDER BHARATMALA PARIYOJANA IN THE STATE OF GUJARAT.
4. CONSTRUCTION OF FOUR LANE EXPRESSWAY FROM SINDHREJ VILLAGE TO
VEJALKA VILLAGE OF AHMEDABAD DISTRICT (CH. 22+000 TO 48+540 SECTION
OF AHMEDABAD-DHOLERA GREENFIELD ALIGNMENT (NH-751) ON EPC MODE
UNDER BHARATMALA PARIYOJANA IN THE STATE OF GUJARAT.
5. DEVELOPMENT OF SIX-LANE ACCESS CONTROLLED IN DELHI PORTION OF
DELHI SAHARANPUR HIGHWAY FROM AKSHARDHAM NH-9 (OLD NH-24)
JUNCTION TO DELHI-UP BORDER (CH. 0+000 TO CH. 14.750) IN THE STATE OF
DELHI ON EPC MODE UNDEER ECONOMIC CORRIDOR IN PHASE-1 OF
BHARATMALA PARIYOJANA).
6. CONSTRUCTION OF 4 LANE DIVIDED CARRIAGEWAY WITH PAVED
SHOULDER FROM KM 0+000 TO KM 41+210 (BALAGHAT-GONDIA SECTION)
OF NH 543 (DESIGN LENGTH 41.210 KM) UNDER BHARATMALA PARIYOJANA
IN THE STATE OF MADHYA PRADESH AND MAHARASHTRA ON EPC MODE.
7. 4-LANING OF BHIWANI - HANSI ROAD SECTION OF NH 148B (DESIGN
LENGTH 42.934 KM) UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA ON HYBRID ANNUITY MODE.
8. REHABILITATION, UP-GRADATION AND CONSTRUCTION OF TWO LANE WITH
PAVED SHOULDER OF SELECTED ROAD STRETCHES FROM BAKAUR TO
PARSARMA SECTION-I NH-527A, PARSARMA TO BARIYAHI SECTION-II NH-
327E, BANGAON BYPASS SECTION -III & MAHISHI SPUR ROAD SECTION-IV
TOTAL LENGTH OF 39.183 KM UNDER BRT SCHEME BHARATMALA PARIYOJNA
PHASE-I IN THE STATE OF BIHAR.
9. CONSTRUCTION OF FOUR LANE CHAMPA – KORBA –KATGHORA SECTION OF
NH-149B FROM DESIGN CH. 0+000 TO CH. 38+200, (FROM NH- 49 NEAR
SARAGAON VILLAGE TO BHAISMA VILLAGE) UNDER NH (O) IN THE STATE
OF CHHATTISGARH ON HYBRID ANNUITY MODE.
10.CONSTRUCTION OF FOUR-LANE GREENFIELD DELHI-AMRITSAR-KATRA
EXPRESSWAY FROM JUNCTION WITH PATIALA-SAMANA-PATRAN ROAD (SH-
10) NEAR GHAGGA VILLAGE TO JUNCTION WITH PATIALA-BATHINDA ROAD
(NH-7) NEAR BHAWANIGARH (KM 157+920 TO KM 188+830) ON EPC MODE
UNDER BHARATMALA PARIYOJANA IN THE STATE OF PUNJAB.
11. DEVELOPMENT AND UPGRADATION UP TO FOUR LANE ACCESS CONTROL
EXPRESSWAY FROM DESIGN CHAINAGE KM 530.000 TO KM 545.300
(SIDHRA TO BAN VILLAGE SECTION OF NH-44) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE UT OF J&K. (PHASE II-PACKAGE XVIII).
12. 4-LANING OF DEWAS UJJAIN SECTION OF OLD SH18 FROM DESIGN CH.
0+000 TO 19+733, CONSTRUCTION OF 4-LANE UJJAIN BYPASS FROM
DESIGN CH. 19+733 TO 26+900 (PART-1) AND CONSTRUCTION OF 4-LANE
DEWAS BYPASS FROM DESIGN CH. 0+000 TO 14+520 (PART-2) HAVING
TOTAL DESIGN LENGTH: 41.42 KM IN THE STATE OF MADHYA PRADESH ON
HAM MODE.
13. DEVELOPMENT OF AN ACCESS CONTROLLED SIX LANE (EXPANDABLE TO
EIGHT LANES) GREENFIELD "GANGA EXPRESSWAY" (GROUP IV, FROM KM
445+000 TO KM 601+847) IN THE STATE OF UTTAR PRADESH ON DBFOT
(Toll) BASIS.
14. REHABILITATION AND UPGRADATION TO TWO- LANE CONFIGURATION OF
KALWAHN-MANDI SECTION (KM.208.950 TO 250.592) OF NH-70 IN THE
STATE OF HIMACHAL PRADESH UNDER GREEN NATIONAL HIGHWAY
CORRIDOR PROJECT (GNHCP) WITH THE LOAN ASSISTANCE OF WORLD
BANK ON EPC MODE.
15. CONSTRUCTION OF ADDITIONAL 3 LANE WITH PAVED SHOULDER (DESIGN
LENGTH 8.87 KM)AS REALIGNMENET OF BAKANER GHAT (BETWEEN INDORE
TO KHALAGHAT SECTION FROM EXISTING KM 59+190 TO KM 66+120) NH-
52 (OLD NH-3) ON EPC MODE IN STATE OG MADHYA PRADESH.
16. RECTIFICATION OF MORTH IDENTIFIED BLACKSPOT AT 07 LOCATIONS ON
JAIPUR-REENGUS -SIKAR SECTION OF NH-52 IN THE STATE OF RAJASTHAN
ON ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) MODE.
17. REHABILITATION AND UPGRADING OF EXISTING 2 LANE TO 4 LANE FROM
BHANGBAR (NEAR RANITAL) TO KANGRA BYPASS SECTION OF NH-88 (NEW
NH-205) UP TO INTERSECTION WITH NH-154 (DESIGN CHAINAGE - KM
175+270 TO KM 193+400, DESIGN LENGTH-18.130 KM) IN THE STATE OF
HIMACHAL PRADESH UNDER NH (O) ON HAM MODE (PACKAGE-VB).
18. IMPROVEMENT & UP-GRADATION OF NH-734 SECTION OF MORADABAD &
KASHIPUR BYPASSES ON EPC BASIS IN THE STATE OF UTTAR PRADESH &
UTTARAKHAND: ''PACKAGE-I: MORADABAD BYPASS'' (LENGTH= 33.724KM),
START FROM CH. 0+00 (KM. 144+381 OF NH-24) AND ENDS AT CH. 33+724
(167+790 OF NH -24).
19. CONSTRUCTION OF EIGHT LANE VADODARA KIM EXPRESSWAY FROM KM
254.430 TO KM 279.000 (KIM TO ANKLESHWAR SECTION OF VADODARA
MUMBAI EXPRESSWAY)IN THE STATE OF GUJARAT UNDER NHDP PHASE - VI
ON HYBRID ANNUITY MODE(PHASE IA-PACKAGE V).
20. CONSTRUCTION OF SIX-LANE ACCESS CONTROLLED HIGHWAY (NH-152D)
STARTING FROM JUNCTION WITH NH-9 (ROHTAK-JIND SECTION) NEAR
KHARKARA TO JUNCTION WITH NH-334B (CHARKHI DADRI-JHAJJAR
SECTION) NEAR CHARKHI DADRI [CH. 131+000 TO 165+000; LENGTH 34
KM] ON EPC MODE UNDER BHARATMALA PARIYOJANA IN THE STATE OF
HARYANA.
Responsibilities: -
COMPLETING WORK AS PER THE DRAWING AND SPECIFICATION
INVOLVED IN THE PREPARATION OF CIVIL DATA SHEETS/DRAWINGS
& SKETCHES FOR:-
PREPARATION OF GENERAL ARRANGEMENT DRAWINGS AND DETAILED
DRAWINGS OF BRIDGE, CULVERTS AND OTHER STRUCTURE.
RCC STRUCTURE & REINFORCEMENT DETAILING. GENERAL
ARRANGEMENT AND DETAILED DRAWINGS OF FOUNDATION, SUB
STRUCTURE, SUPER STRUCTURE & MISC. DRAWINGS ETC.
EXPLAIN DRAWINGS TO PRODUCTION OR CONSTRUCTION TEAMS AND
PROVIDE ADJUSTMENTS AS NECESSARY AND COORDINATION WITH
SERVICES DRAWINGS
CLASH CHECK ALL STRUCTURE WITH OTHER DISCIPLINES.
CERTIFICATION
I, THE UNDERSIGNED, CERTIFY THAT TO THE BEST OF MY KNOWLEDGE AND
BELIEF, THIS RESUME CORRECTLY DESCRIBES MY QUALIFICATION, MY
EXPERIENCES AND MYSELF.
Date –
Place - (PRAVEEN SHARMA)