0% found this document useful (0 votes)
61 views3 pages

Pd-Stp-Angke Restaurant Pik2-200er

The document contains proposal drawings for a sewage treatment plant project at Angke Restaurant PIK2, prepared by PT. Biosant Tirta Lestari. It includes three sheets detailing the schematic diagram and structural layout with a capacity of 200 M3/day and a recovery rate of 3 M3/hr. The drawings are approved and checked by designated personnel, with the latest date being April 1, 2024.

Uploaded by

muhamad taufik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views3 pages

Pd-Stp-Angke Restaurant Pik2-200er

The document contains proposal drawings for a sewage treatment plant project at Angke Restaurant PIK2, prepared by PT. Biosant Tirta Lestari. It includes three sheets detailing the schematic diagram and structural layout with a capacity of 200 M3/day and a recovery rate of 3 M3/hr. The drawings are approved and checked by designated personnel, with the latest date being April 1, 2024.

Uploaded by

muhamad taufik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

F F

G G

CONTRACTOR : STATUS : PROJECT : NAME DATE SIGN


PROPOSAL DRAWING DRAWN RM 04-01-2024
ANGKE RESTAURANT PIK2 CHECKED HR 04-01-2024

TITLE :
SEWAGE TREATMENT PLANT APPROVED DEDE M. 04-01-2024

H PT. BIOSANT TIRTA LESTARI STP : 200 M3/DAY DRAWING NO. SHEET 01 OF 03 H
SCHEMATIC DIAGRAM REC : 3 M3/HRS REV SCALE
WATER & WASTE WATER SPECIALIST - PD-STP-01-ARPIKS
R-0 NTS A3
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

G G

CONTRACTOR : STATUS : PROJECT : NAME DATE SIGN


PROPOSAL DRAWING DRAWN RM 04-01-2024
ANGKE RESTAURANT PIK2 CHECKED HR 04-01-2024

TITLE :
SEWAGE TREATMENT PLANT APPROVED DM 04-01-2024

H PT. BIOSANT TIRTA LESTARI STP : 200 M3/DAY DRAWING NO. SHEET 02 OF 03 H
STRUCTURE LAYOUT REC : 3 M3/HR
REV SCALE
WATER & WASTE WATER SPECIALIST
TOP PLAN & BASE PLAN PD-STP-02-ARPIK2
R-0 1 : 125 A3
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

E E

G G

CONTRACTOR : STATUS : PROJECT : NAME DATE SIGN


PROPOSAL DRAWING DRAWN RM 04-01-2024
ANGKE RESTAURANT PIK2 CHECKED HR 04-01-2024

TITLE :
SEWAGE TREATMENT PLANT APPROVED DM 04-01-2024

H PT. BIOSANT TIRTA LESTARI STP : 200 M3/DAY DRAWING NO. SHEET 03 OF 03 H
STRUCTURE LAYOUT REC : 3 M3/HR
REV SCALE
WATER & WASTE WATER SPECIALIST
TOP PLAN & BASE PLAN PD-STP-03-ARPIK2
R-0 1 : 125 A3
1 2 3 4 5 6 7 8 9 10 11 12

You might also like