Balance works at 7 mld isps
Construction of parapet wall over pump room
Internal and external wall plastering
Internal piping work
Suction pit 50mm thick concrete with concrete hardener topping (sl no 408 )
painting for external and internal walls of wet well pump room with acrylic emulsion
and synthetic enamel.
Fixing of rolling shutters .
Fixing of aluminium doors and windows for pump room.
ramp work near pump room entrance.
water proofing for pump room terrace.
fixing of rainwater pipes .
Fixing of mono rail beam , pipe supports .
cage ladder .
Fixing of S S Railings over inlet chamber top.
Fixing of M S Plate .
Balance columns casting over inlet chamber .
Plinth protection work around the inlet chamber and wet-well.
covering of pipe manifold chamber top using perforated sheet.
Fixing of footsteps inside wet well and inlet chamber .
Buffing of inlet chamber wall surface and cleaning of inlet chamber channel.
Road network around wet-well and inlet chamber.
Electro mechanical works.
Admin Building
Wall construction above lintel level
Casting of roof slab
Parapet wall construction
Pcc for floor .
Grade slab concrete over pcc .
Plastering of internal and external walls and ceiling .
Dadooing for toilet walls.
Flooring for toilets .
Painting for internal and external walls .
Fixing of rolling shutters for D G room.
Providing and fixing of doors ,windows and ventilators .
Water proofing for terrace .
Plumbing work for toilets ,sanitary work for toilets ,fixing bathroom fixtures .
Electrical wiring ,fixing of switches,sockets .
Earthing.
Fixing of overhead tank 3000litres capacity with mosquito proof jaly frame.
Fixing of D Gset over strutural steel arrangement.
Transformer yard work with necessary earthing .
Flow meter chamber
Covering of chamber
Fixing of S S manhole cover
Compound wall founadtion work
Fencing with barbed wire
Internal road work with Entry and exit gate
Land scaping work