0% found this document useful (0 votes)
10 views1 page

Fato 02.05.2025

The document provides an operational report for train services on May 2, 2025, detailing no trains lost due to engineering issues and no current unusual events. It includes information on bad cases with specific train numbers, timings, and track clearances, as well as the status of various wagons and their loading positions. Additionally, it mentions caution demands for speed restrictions and provides a summary of train movements in different sections.

Uploaded by

naresh meena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

Fato 02.05.2025

The document provides an operational report for train services on May 2, 2025, detailing no trains lost due to engineering issues and no current unusual events. It includes information on bad cases with specific train numbers, timings, and track clearances, as well as the status of various wagons and their loading positions. Additionally, it mentions caution demands for speed restrictions and provides a summary of train movements in different sections.

Uploaded by

naresh meena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FATO- 02.05.

2025

1.Trains Lost on engg. A/C:- .Nil

2.Current Unusual:-Nil

3.BAD CASES
00:00 TO 06:00
S.No HEAD SECTION Road FROM TO Details/Remark
06:00 TO 12:00
10 CRO GDO-BEHJ SL 10:25 10:48 Train no. 51971, Reported at 10.43 hrs,Track clear 10.57 hrs.
12:00 TO 18:00
14 CRO RBS-BIQ SL 13:52 14:14 Train no. 12948, Reported at 14.02 hrs,Track clear 14.12 hrs.
18:00 TO 24:00
4. BOBYN/DMT & Power Position

DMT/MC. Status PG /PNG


Empty/ Section 16.00 - 00.00 -
(no. of Placement Loaded Unload 08.00 - 16.00 & Time Remark
AT /work 24.00 08.00 D/O
wagon) /Date & time

P-1(17) 01.05.25
MTJ - - - MTJ MTJ MTJ N/Req. Rake at MTJ
(22.05.25) 17.55

P-2(13) 28.4.25 KXM-FAR PG


RNKA 30 - RNKA RNKA RNKA Today planned
(11.05.25) 21.25 DN 8/-

P-3(9) 17.4.25 BIQ-YD LN- PG Today planned(1 BRN fit at BAD will
BIQ - - BIQ BIQ BIQ
(15.5.25) 12.30 2 9.3/- come to BIQ)

SHLK YD-
B-1(18)1st 28.4.25 PG
MTJ - 18 - RDE 4rth RDE RDE Rake will go to AH for loading
15.05.25 19.40 1/-
10.40-12.40

B-2(18)2nd 01.5.25 Rake at MTJ (Under loading)


MTJ 16 2 - MTJ MTJ MTJ N/Req.
(22.5.25) 2:45 Indent:- PRK-MTJ SL

B-3(18) 3rd 01.05.25 Rake at KTRA,(Under loading)


KTRA 16 2 - KTRA KTRA KTRA N/Req.
(24.5.25) 5.10 Indent:-MTJ-YD GOODS

B-4(25) 29.4.25 DHO-JJ PG


AH 25 - AH AH AH Today planned
(28.5.25) 11.35 IIIrd 1/-

MDU
JAB 24.4.25 - - - JAB JAB N/Req. M/C at JAB
(2Unit)

MDU HDL YD PG
HDL 11.4.25 - - HDL HDL HDL M/C at HDL
(3Unit) 3RD,4TH 9/-

5.Caution Demand:- (1) SR 30 KMPH at MURD-YD M/L for switch rep.+welding pt.120 (Permitted)

KSV = 2 UP, 2 DN, AGC(N)= 1 UP,2 DN, AA=1 DN,


6.DFWR Position:-
DHO= 4 UP, 5 DN, IDH=1 L/L, Total= 18

7.PUN/FATO :-

CAUSE DETAILS
Detenti Det- Scheduled Section_
Sr. Train_No Start_Date. Det_Time Remarks
on Type _ Date Code

You might also like