INSPECTION REPORT FOR CABLE TRAY
CLIENT : JONY
RECORD NO. :
PROJECT : MEP WORKS FOR A31
UNIT :
PROJECT NO. : AO0421JD02
PAGE : ___ OF ___ DATE:_____________
PLANT DRAWING NO.: __________________
LOCATION : ___________________________
ACCEPTABLE
ITEM INSPECTION ITEM REMARKS
YES NO
All Cable tray( Ladder Type ) dimensions, routing and
1 Installation done as per the approved drawings
Specifications of cable tray materials comply with the
2
drawing & Contract Specification. IMR is clear.
3 Ensure all cable tray alignment and sharp edge trimming
4 Ensure all joints Tightening coupler plates, bolts and nuts.
5 All Cable tray cover installation
6 All cable tray welding and Touch up paint ( If applicable )
7 Grounding Installed and connected.
Note:
PREPARED BY : __________________ _______________
SUBCONTRACTOR DATE
INSPECTED BY : ______________ _________ WITNESS BY : ______________ __________
CTCI DATE JONY DATE