P I S Nagaraja

The document outlines a project implementation schedule over a period of two years, detailing key activities such as land preparation, project report preparation, and staff appointments. It includes a timeline for obtaining necessary clearances and approvals, as well as the construction of buildings and ordering of machinery. The schedule emphasizes the sequential nature of these tasks to ensure timely project commencement.

Uploaded by

BasavarajBusnur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

P I S Nagaraja

The document outlines a project implementation schedule over a period of two years, detailing key activities such as land preparation, project report preparation, and staff appointments. It includes a timeline for obtaining necessary clearances and approvals, as well as the construction of buildings and ordering of machinery. The schedule emphasizes the sequential nature of these tasks to ensure timely project commencement.

Uploaded by

BasavarajBusnur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT IMPLEMENTATION SCHEDULE

Years
Sl.
Details 6 Month
No
1 2
1 Land
2 Preparation of Project report
3 Application for DLSWCC
clearance
4 Approval
5 Civil Planning and
Construction of Building
6 Order for machinery and
Equipment
7 Appointment of Essential
staff
8 Appointment of Remaining
Staff
9 Receipt of Machinery and
equipment
10 Regular commencement

CE Digitally signed
by C E

NAGAR NAGARAJA
Date:
2025.05.08
AJA 19:24:02 +05'30'