Vie-Pc01-Stn-Dwg-Kc-Str-Ppa-3012 (R1)
Vie-Pc01-Stn-Dwg-Kc-Str-Ppa-3012 (R1)
CL
C B DIRECTION
D A
CL OF ALIGNMENT CL OF ALIGNMENT ℄ OF PIER / CROSS ARM
21085 21085
℄ OF BEARING ℄ OF BEARING
10585 10500 10500 10585
U-GIRDER
4500 2205 2515 2515 2205 4190 950 4190 2205 2515 2515 2205 4500
TRACK CENTRE
TRACK CENTRE
TRACK CENTRE
TRACK CENTRE
2700 RAIL LVL.
+65.300 TOC.
225 225 650 650
(TYP)
150
CL OF BRG. C
L OF BRG. C
L OF BRG. CL OF BRG. CL OF BRG. C
L OF BRG. SHEAR KEY
450*
560 C
L OF BRG. 560 560 C
L OF BRG. 560 PLATFORM PIER CAP
50
(TYP.) 1400 (TYP.) (TYP.) (TYP.) LVL. +64.340 TOC.
1150 275
(TYP.)
PEDESTAL PEDESTAL 1050
1150
(TYP.) (TYP.)
1450
1450
1450
PRECAST PIER ARM
1850
1850
136 136 450 136 136
1850
1800
0
R10
(SCALE 1 : 75)
1960
270(TYP.)
2200
R1 100(TYP.) 2500 100(TYP.)
PIER
D C CL B A SECTION A-A
℄ OF PIER / ALIGNMENT / VIADUCT ℄ OF PIER / ALIGNMENT / VIADUCT
(SCALE 1:40) R1
A B A B
21010 21010 TRAFFIC
10735 10275 10275 10735 DIRECTION
℄ OF PIE GIRDER ℄ OF PIE GIRDER ℄ OF PIE GIRDER ℄ OF PIE GIRDER ℄ OF PIE GIRDER ℄ OF PIE GIRDER ℄ OF PIE GIRDER ℄ OF PIER / CROSS ARM
4500 4186 4190 4500
℄ OF BRG. ℄ OF BRG.
℄ OF BRG. ℄ OF BRG.
4230 980 4230
2205 2205 2700
C
(TYP)
℄ OF SHEAR KEY ℄ OF SHEAR KEY 650 1400 650
150
550 1925 1825 650 650 1825 1925 550
(TYP.)
(TYP.)
365
365
PLATFORM PIER CAP
460 1200 1200
LVL. +64.340 TOC.
525
525
525
525
(TYP.) (TYP.)
(TYP.)
2700
2200
2700
1650
460 SC1 SC1 SC1 SC1 SC1 3 7
50
SC1 SC1 SC1
SC2 (TYP.) SC2 SC2 SC2 PRECAST PIER ARM
(TYP.)
1450
690
(TYP.)
(TYP.)
365
365
475
475
475
475
3025 2825 2825 3025
(TYP.)
2200
x C
550
B B SECTION B-B
A PLATFORM PIER ARM PLAN GRID 3 &7 A (SCALE 1:40)
R1
(SCALE 1 : 75)
TRAFFIC
DIRECTION
R1 ℄ OF PIER / CROSS ARM
CL OF DIAPHRAGM CL OF DIAPHRAGM
125
120
450 1050 450 PLATFORM LVL.
+66.340 TOC.
150
455
CAST-IN-SITU SLAB (TYP.)
275
PRECAST DIAPHRAGM (TYP.)
1675
1550
1400
500 500
2200
1050
CAST-IN-SITU STITCH
FOR PRECAST GIRDER (TYP.)
275
450 450
PLATFORM PIER CAP
250 250 LVL. +64.340 TOC.
455
50 PRECAST PIE GIRDER
PEDESTAL
1150
120
1450
120 280 1400 280 120
LEGEND:- PRECAST PIER ARM
2200 PRE-CAST
R1
1650
(SCALE 1:40)
00
CONSTRUCTION JOINT
SECTION C-C
(TYP.) TYPICAL (SCALE 1:40) R1
R1
JACK LOCATION (TYP.)
NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METER UNLESS OTHERWISE SPECIFIED.
2. DIMENSIONS ARE NOT SCALED. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED.
3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ARCHITECTURAL DRAWING
4. ALL SERVICE CUTOUT ARE AS PER LATEST ARCHITECTURE & SERVICE DRAWINGS FOR
SIZE OF THE CUTOUTS REFER ARCHITECTURAL & SERVICE DRAWING.
5. ANY DISCREPANCIES MUST BE BROUGHT TO THE NOTICE OF THE CONSULTANT BEFORE
EXECUTION OF WORK AT SITE.
गगगगगग
fnYyh EksVªks jsy dkiksZjs'ku fyfeVsM
DELHI METRO RAIL CORPORATION LTD.
CONSULTANT:
Part Design and Construction of Elevated Viaduct, Viaduct connection to Depot including elevated
THIS DRAWING IS THE PROPERTY OF
DELHI METRO RAIL CORPORATION LTD. NAME SIGNATURE DATE NAME SIGNATURE DATE NAME SIGNATURE DATE lajpuk LVs'ku i`"B la[;k 1 OF 1
ACCEPTED BY
in DESIGNATION la'kks/ku REMARKS fnukad DATE gLrk{kj SIGNATURE satyanarayana Digitally signed by satyanarayana murthy
DN: cn=satyanarayana murthy, c=IN, fod`rdrkZ % STRUCTURAL:- STATION SH. NO.
murthy
o=AECOM, Digitally signed by ABHISHEK KUMAR SURESH KUMAR 03.01.2024 fp=kadu 'kh"kZd %
dfu"B vfÒ;ark lehf{kr [email protected]
DN: cn=ABHISHEK KUMAR c=IN l=GHAZIABAD o=Personal [email protected] DRAWN
J.E. (DESIGN) Reviewed
Date: 2024.06.04 10:31:06 +05'30'
Digitally signed by S, Madan Mohan Reason:
fMTkkbZu TITLE : iSekuk AS
lgk;d izca/kd lehf{kr
S, Madan Mohan DN: cn=S, Madan Mohan, ou=INBNG01,
[email protected]
Location:
Date: 2024-01-04 14:13+05:00 VIPLAV THAKUR 03.01.2024 SCALE MARKED
Date: 2024.06.04 15:01:19 +05'30' DESIGNED KHEMNI CHAK STATION DIMENSIONAL DETAILS OF
A.M (DESIGN)/XEN Reviewed
mieq[; vfÒ;ark@jpuk vf/kdZr gLrk{kjdrkZ tkapdrkZ % R1 REVISED AS PER COMMENTS PLAFORM LEVEL CROSS ARM AT GRID 3 7
lehf{kr G
O
N
T
A
R
YISD
E
ZH
U
O
A
T
R
I CHECKED SOUGATA 03.01.2024 03.01.24
DY.CE. (DESIGN) Reviewed S.K. V.T. S.B. M.V.
eq[; vfÒ;ark@jpuk iwzQ psdlZ @ izek.k i= fMtkbu xq.kork vk'oklu + lR;kfir MAHENDER PAL VASHIST
Digitally signed by MAHENDER PAL VASHIST
DN: cn=MAHENDER PAL VASHIST c=IN l=NORTH WEST DELHI o=Personal
[email protected]
Reason: I am approving this document
fLFkfr CRD
CE. (DESIGN) Reviewed & comments as marked on Drawing PROOF CHECKERS'/CERTIFICATE DESIGN QUALITY ASSURANCE VERIFIED Location:
Date: 2024-01-04 14:12+05:00
R0 FOR APPROVAL 15.11.23 STATUS
ifj;kstuk izca/kd THIS DRAWING HAS BEEN PROOF CHECKED WITH THE RESPONSIBILITY OF CONTROL CHECK & VERIFICATION OF ACCURACY THIS DRAWING MUST NOT BE EITHER LOANED COPIED OR OTHERWISE REPRODUCED IN WHOLE S.K. V.T. S.B. M.V.
PROJECT MNGR. OR IN PART OR USED FOR ANY PURPOSE WITHOUT THE PRIOR WRITTEN PERMISSION OF V.I.E.
INDEPENDENT CALCULATION AND FOUND SUITABLE CORRECTNESS COMPLETENESS INTEGRATION & FULL COMPLIANCE OF
la'kks/ku fooj.k fnukad fod`r fMTkkbZu tkap lR;kfir fp=kadu la[;k la'kks/ku
eq[; ifj;kstuk izca/kd Reviewed and no Objection issued with
comments as marked on Drawing
FOR EXECUTION CONTRACT PROVISIONS IN RESPECT OF DESIGN ANALYSIS & DRAWING
RESTS WITH THE DESIGN CONSULTANT AND CONTRACTOR. REV. DESCRIPTION DATE DRN. DGN. CHD. VERIFIED DRAWING NO. VIE-PC01-STN-DWG-KC-STR-PPA-3012 REV.
R1
ENGR./CPM
Size A1