SENIOR CERTIFICATE EXAMINATIONS/
NATIONAL SENIOR CERTIFICATE EXAMINATIONS
2019
MARKS: 200
TIME: 3 hours
REQUIREMENTS:
1. Drawing instruments
2. A non-programmable calculator
3. ANSWER BOOK
9. Make drawings and sketches in pencil, fully dimensioned and neatly finished
off with descriptive titles and notes to conform to the SANS/SABS Code of
Practice for Building Drawings.
10. For the purpose of this question paper, the size of a brick should be taken as
220 mm x 110 mm x 75 mm.
11. Use your own discretion where dimensions and/or details have been omitted.
12. Answer QUESTIONS 2, 3.6, 4.4, 4.6, 5.5, 5.6, 6.4 and 6.6 on the attached
ANSWER SHEETS using drawing instruments where necessary.
14. Drawings in the question paper are NOT to scale due to electronic transfer.
15. Google Images was used as the source for all photographs and pictures.
COLUMN A COLUMN B
1.1.1 Galvanising A keeps freshly cast concrete damp
1.3 Give the angle/ratio at which a ladder should be placed against a wall. (2)
1.4 Explain TWO safety precautions that must be followed when using a builder's
hoist. (2)
1.5 FIGURE 1.5 below shows tools that are used on a construction site.
A B
FIGURE 1.5
1.6 The pictures below illustrate the steps followed when fixing material to a floor
with a fastener.
A B C D
FIGURE 1.3
1.6.2 Describe the steps in A–D above in your ANSWER BOOK. (4)
1.6.3 Justify the use of this fastener to secure the bracket of a heavy
gate to a wall. (1)
[20]
QUESTION 2: GRAPHICS AS MEANS OF COMMUNICATION (GENERIC)
FIGURE 2 on the next page shows an elevation and a ground floor plan that appear on
a building plan. Analyse the drawings and complete the table on ANSWER SHEET 2.
NOTE:
Contractors must verify all
dimensions and levels on site before
1 commencing work. Architects must
be notified of any discrepancies
immediately.
2
The following must be placed at a
long passage or a staircase:
3
8 W1
FIGURE A
SCALE 1 : 100
REVISION DATE DESCRIPTION
220 3 000 110
PRINTED BY: DATE OF PRINT:
QUALITY PRINTERS 2019/06/16
WH
DRAWING TITLE:
SITE PLAN STAND 1445
11 10
9
W1
PROJECT:
PROPOSED NEW DWELLING OF
MR H SMITH ON STAND 1445,
LOUNGE JUPITER STREET, GERMISTON
W2
GR 447-104 337P7
REFERENCE CODE:
QP 2-2019
WINDOW 1 WINDOW 2
14
1 200 2 400
W1 13
220
FIGURE B 15
FIGURE 2 [40]
Copyright reserved Please turn over
Civil Technology: Construction 6 DBE/2019
SC/NSC
3.1 Give the minimum pitch of a roof when concrete tiles are used as roof
covering. (1)
3.2 Give the dimensions of a purlin that is used for corrugated iron sheeting. (2)
3.3 Give the maximum spacing between roof trusses if the roof is covered with
concrete tiles. (1)
3.4 Name the first batten on a roof that is covered with concrete tiles. (1)
3.5 FIGURE 3.5 below is a drawing of a line diagram of a South African (Howe)
roof truss. Identify parts A–E.
A
B
c
D
3.6 Use ANSWER SHEET 3.6 and draw, in good proportion, a neat sketch of
a lean-to roof supported by two walls.
Span
Walls
Wall plate
Rafter
Any TWO labels (8)
3.7 Recommend a suitable depth that wire or galvanised steel straps should be
embedded into the wall for a roof covered with concrete tiles. (1)
3.8 Give ONE word/term for each of the following descriptions by choosing a
word/term from the list below. Write only the word/term next to the question
numbers (3.8.1 to 3.8.5) in the ANSWER BOOK, e.g. 3.8.6 Flight.
3.8.2 A timber board used to cover the floor joist of the landing (1)
3.9 What is the maximum pitch for stairs used by the public? (1)
4.3.2 Describe THREE factors that can cause an excavation to collapse. (3)
4.4 FIGURE 4.4 on ANSWER SHEET 4.4 shows a trench that has been
excavated. Use ANSWER SHEET 4.4 and draw a neat sectional drawing, in
good proportion, of the shuttering for a shallow trench.
Poling boards
Walling boards/Wailing boards
Folding wedge
Struts
Any ONE label (8)
4.6 FIGURE 4.6 on ANSWER SHEET 4.6 shows an incomplete drawing of the
formwork for a concrete beam with an attached floor on the right-hand side.
Use ANSWER SHEET 4.6 and complete the drawing.
4.7 FIGURE 4.7 below shows a plate compactor that is used on a building site.
Study FIGURE 4.7 and answer the questions that follow.
FIGURE 4.7
4.7.2 Explain in your own words how you will take care of the plate
compactor. (1)
4.8 FIGURE 4.8 below shows a construction machine that is used on a building
site.
FIGURE 4.8
4.8.2 Describe TWO ways in which you will take care of this construction
machine. (2)
4.9 Name TWO methods that can be used to pump concrete to higher levels in
a building. (2)
[40]
COLUMN A COLUMN B
5.1.1
5.1.2
B floating of screed
5.1.3
C skim coat
5.1.4
D power floating
5.1.5
F application of plaster
G drying of concrete
(5 x 1) (5)
Copyright reserved Please turn over
Civil Technology: Construction 11 DBE/2019
SC/NSC
5.2 How many wheelbarrows of sand will you use to mix plaster for interior walls
when using ONE bag of cement? (1)
5.3 Recommend THREE areas that can be covered with paving. (3)
5.4 Give ONE reason for using paving instead of concrete. (1)
5.5 ANSWER SHEET 5.5 shows the outlines and a part of the cavity of
each alternative plan course of the dead end of a cavity wall. Use
ANSWER SHEET 5.5 and draw, in good proportion, the two alternative plan
courses of the dead end of a cavity wall. (7)
5.6 Use ANSWER SHEET 5.6 and draw, to scale 1 : 10, a detailed vertical
section through the foot of a roof truss showing the closed (concealed) eaves.
6.1 Various options are given as possible answers to the following questions.
Choose the answer and write only the letter (A–D) next to the question
numbers (6.1.1 to 6.1.5) in the ANSWER BOOK, e.g. 6.1.6 C.
A precast piles.
B steel-tube piles.
C driven in-situ piles.
D All the above-mentioned (1)
A Strip foundation
B Raft foundation
C Pile foundation
D Step foundation (1)
6.1.5 Precast concrete piles are driven into the ground by a … hammer.
A drop
B club
C claw
D sledge (1)
6.2 Draw, by means of a neat freehand sketch, the shape of the bottom part of
a driven in-situ pile.
Steel casing
Shape of the bottom part
Any ONE label (4)
6.3 Explain the purpose of the steel capping on a precast concrete pile. (1)
6.4 FIGURE 6.4 on ANSWER SHEET 6.4 shows the outline of three sides of an
L-shaped concrete column. Use ANSWER SHEET 6.4 and draw a neat
sectional view of an L-shaped reinforced concrete column in good proportion.
L-shaped column
8 main bars
Stirrups/Binders
Minimum concrete cover
Any TWO labels (10)
6.5 FIGURE 6.5 below shows a part of a floor construction. Study FIGURE 6.5
and answer the questions that follow.
FIGURE 6.5
6.5.3 State THREE factors that must be considered when planning this
type of construction in FIGURE 6.5. (3)
3 000
6 000
FIGURE 6.6
SPECIFICATIONS:
Use ANSWER SHEET 6.6 and calculate the volume of concrete needed for
the foundation. Round off your answers to TWO decimal places. (10)
[40]
TOTAL: 200
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
CENTRE NUMBER:
EXAMINATION NUMBER:
ANSWER SHEET 2
3 Identify number 1. 1
4 Identify number 2. 1
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
18 Identify number 8. 1
20 Recommend an alternative
sanitary fitting to replace
1
number 10 that will serve a similar
purpose.
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
TOTAL: 40
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
CENTRE NUMBER:
EXAMINATION NUMBER:
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
CENTRE NUMBER:
EXAMINATION NUMBER:
FIGURE 4.4
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
CENTRE NUMBER:
EXAMINATION NUMBER:
Shuttering board
FIGURE 4.6
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
CENTRE NUMBER:
EXAMINATION NUMBER:
FIRST COURSE
SECOND COURSE
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
CENTRE NUMBER:
EXAMINATION NUMBER:
CENTRE NUMBER:
EXAMINATION NUMBER:
Copyright reserved
Civil Technology: Construction DBE/2019
SC/NSC
CENTRE NUMBER:
EXAMINATION NUMBER:
A B C D
Concrete for foundations
Centre line
2/ ___________ = mm
2/ = mm
Total = mm
Minus 4/ = mm
Total centre line = m
1/ _______
_______
_______ __________
Copyright reserved