The SHE Representative Inspection Form outlines various safety and compliance checks for a construction project, including housekeeping, stacking and storage, access control, PPE usage, excavation safety, emergency preparedness, environmental compliance, and administrative requirements. Each item is to be monitored daily throughout the week, with a section for documenting deviations and recommended control measures. The form emphasizes the importance of maintaining safety standards and proper procedures to ensure a safe working environment.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
14 views3 pages
She Site Inspection
The SHE Representative Inspection Form outlines various safety and compliance checks for a construction project, including housekeeping, stacking and storage, access control, PPE usage, excavation safety, emergency preparedness, environmental compliance, and administrative requirements. Each item is to be monitored daily throughout the week, with a section for documenting deviations and recommended control measures. The form emphasizes the importance of maintaining safety standards and proper procedures to ensure a safe working environment.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
SHE REPRESENTATIVE INSPECTION FORM
PROJECT NAME: WEEK ENDING:
PROJECT VENUE:
ITEMS TO BE CHECKED MON TUE WED THURS FRID SAT
Housekeeping Accumulation of rubble on site Barricading on the accumulated rubble Rubble, off cuts, unused materials removed from the walking and working areas Provision of waste bins for different types of waste on site Rubble disposed of in designated bins Oil spillages on site Stacking and storage Competent stacking supervisor Adequate stacking of materials e.g. not higher than 1 metre Stacked materials stable Stacks on firm level surface/base Adequate storage of materials For flammables, valid fire extinguisher provided and ventilation Storage area neatly packed, not creating hazards Storage area have no excess material Access control and traffic accommodation Signs used to inform the public of upcoming construction work Flag person provided to direct traffic and public when needed The flag person been trained and shown how to direct traffic and the public Adequate access control at the construction site office Security provided at the construction site for public Barricading where needed Open excavations, manholes, uneven surfaces barricaded Sidewalk protection effective Barricading adequate and still visible to public PPE-Personal Protective Equipment Employees provided with PPE and using it Employees exposed to dust provided with dust masks and using it accordingly Hearing protection available for personnel that may be exposed to noise Respiratory protection available to personnel and being used when conditions require Construction vehicles Operators properly trained and authorized Back-up alarms operational Inspection and maintenance performed on a regular schedule Employees prohibited from riding on heavy equipment without a proper seat Equipment clean and free of grease, oil, mud, fluids and other slipping hazards? Mobile plant provided with valid, adequately sized fire extinguishers Mobile plant ergonomically designated, seats with mechanical suspensions
ITEMS TO BE CHECKED MON TUE WED THURS FRID SAT
Excavations Overhead utility lines noted and precautions taken to avoid contact with equipment Utility companies been notified of proposed excavation work All tools, equipment, and shoring materials readily available prior to job start up Spoil pile stored at least two feet from the edge of the excavation Barricades, stop logs, properly placed, if needed Excavation five feet or deeper correctly sloped, benched, shored or is a trench box used Soil classification been made by a competent person Step ladder or other means of egress provided in trenches or excavations 1,5 meter or deeper When used ladders extend three feet above the surface are, they secured Shoring and shielding systems inspected daily by a competent person Trenches backfilled as soon a work is completed/or barricaded Excavation inspected daily or more frequently when conditions could affect the soil From work designed, fabricated, erected, supported, braced and maintained to support vertical and lateral loads Adequate barricade in place in all unsafe open areas Emergency preparedness plan Fire equipment’s available and valid First aid kit available and items still valid Fire extinguisher location accessible and marked Fire extinguishers provided for: Office Storage areas Diesel bund wall (if available) Evacuation plan in place Emergency numbers available for employees Competent first aider appointed and certificate still valid Fire equipment’s available and items still valid Environmental compliance Is there an EMP in place Are there waste bins for proper disposal of different types of waste Are environmental impacts controlled and managed Are there proper control measures for spillage on site Is there proper disposal for contaminated waste Administrative requirements Is there a safety file and is it approved? Is there a valid notification of work as approved by DOL? Is there a valid letter of good standing? Are company policies available, signed, communicated to employees and displayed? Are there competency certificates for all legal appointees? Are all employees on site inducted Are all mobile plant operators medically fit Is there a construction permit required if yes, is it available?
LIST OF DEVIATION AND CONTROL MEASURES
Item: Deviation/Non compliance Recommended control measure Date of implementation
Emergency Response Guidebook: A Guidebook for First Responders during the Initial Phase of a Dangerous Goods/Hazardous Materials Transportation Incident