The document certifies the design calculations and drawings for a bridge widening project, confirming compliance with relevant standards and requirements. It states that the structural consultant is responsible for the correctness of the design, while the contractor is responsible for the soundness and durability of the structure. Additionally, it emphasizes that the drawings and calculations are the property of the Roads and Building Department of the Government of Gujarat and cannot be used without permission.

Uploaded by

Mustafa Shakir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

M1911-SP-DD-11 (R0) P1 - Sheet-4

The document certifies the design calculations and drawings for a bridge widening project, confirming compliance with relevant standards and requirements. It states that the structural consultant is responsible for the correctness of the design, while the contractor is responsible for the soundness and durability of the structure. Additionally, it emphasizes that the drawings and calculations are the property of the Roads and Building Department of the Government of Gujarat and cannot be used without permission.

Uploaded by

Mustafa Shakir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

℄ OF BEARING ℄ OF BEARING THIS IS TO CERTIFY THAT.

℄ OF EJ ℄ OF BEARING
1. EACH AND EVERY DESIGN CALCULATION OF THIS DRAWING AND
VARIES CONCERN DRAWINGS ARE CHECKED AND VERIFIED BY ME.
450 300

350
VARIES 580 VARIES 2. DESIGN AND DRAWING IS DEVELOPED IN CONFORMITY WITH SCOPE OF
300

300
WORK NARRATED IN TENDER AND SATISFIED ALL REQUIREMENT

350
OF LATEST IRC CODAL PROVISIONS.
3. DESIGN AND DRAWING IS CHECKED AND APPROVED BY ME HEREWITH

950
PROPOSED PSC AND CORRECT, SOUND AND ADEQUATE TO ADOPT FOR THE EXECUTION.
VOIDED SLAB

300
300

300
'1'

950

950
300
CONSULTANT:
TOP OF PILE CAP RCC PEDESTAL TOP OF PILE CAP
LS TS BHATOL CONSTRUCTION COMPANY IN ASSOCIATION WITH
SID CONSULTANTS
VARIES VAREIS
THIS IS TO CERTIFY THAT:
1500

1500
PILE CAP PILE CAP
1. THE STRUCTURAL DESIGN PHILOSOPHY, CALCULATION AND THE DRAWING (DRG.
(MIN)

(MIN)
600

600
REFER NOTE (8) REFER NOTE (8) NO. __________________ (R__) DT - ____________) HAVE BEEN SCRUTINIZED BY THIS
CUT OFF LVL. CUT OFF LVL. OFFICE AND ARE GENERALLY FOUND ACCEPTABLE SUBJECT TO COMPLIANCE AND
80mm THK. PCC 80mm THK. PCC OBSERVATIONS CONTAINED IN THIS OFFICE LETTER NO. ____________________ DT.
BOTTOM OF PILE CAP BOTTOM OF PILE CAP
150 _______ WHICH MAY BE APPROVED BY THE CONCERNED "COMPETENT AUTHORITY"
50

50
(MIN)
2. THE STRUCTURAL CONSULTANT SHALL BE RESPONSIBLE FOR CORRECTNESS OF
6mm THK. MS DESIGN & CONTRACTOR SHALL BE RESPONSIBLE FOR SOUNDNESS, DURABILITY &
6mm THK. MS LINER STRENGTH OF THE STRUCTURE.
LINER
10150

10150
3. THE DRAWING AND THE DESIGN CALCULATION OF THE PROJECT SHALL BE THE
PROPERTY OF THE ROADS AND BUILDING DEPARTMENT,GOVT. OF GUJARAT. THE
DRAWING AND DESIGN SHALL NOT BE USED IN ANY WAY WITHOUT THE PRIOR
PERMISSION OF GOVERNMENT OF GUJARAT.

PILE FIXITY LVL. PILE FIXITY LVL.


1000Ø RCC BORED ASSISTANT ENGINEER DEPUTY EXECUTIVE ENGINEER
1000Ø RCC BORED CAST IN SITU PILE UNIT NO.......................... UNIT NO..........................
CAST IN SITU PILE
9850

9850
EXECUTIVE ENGINEER SUPERINTENDING ENGINEER
UNIT NO..........................

PILE TERMINATION LVL PILE TERMINATION LVL NOTES:


*REFER TABLE OF LEVELS *REFER TABLE OF LEVELS
GENERAL:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS
A2
OTHERWISE MENTIONED.
℄ OF JACK ℄ OF BEARING
2. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. NO DRAWING SHALL BE
1025
SECTION A-A SECTION B-B 10 100 TRANSVERSE
SCALED.
3. FOR ALL OTHER NOTES REFER SHEET 1 OF 6
(SCALE-1:60) (SCALE-1:60) GAP SEISMIC
450 450 550 ARRESTOR
(TS) REFERANCE DRAWINGS : (LATEST REVISION)

55
GAP
TO PATAN TO SIDDHPUR

10
1. M1911-SP-GA-01 - GENERAL ARRANGEMENT DRAWING FOR WIDENING OF MNB

280

350
350
TS 2. M1911-SP-DD-11 - NUMERATION & RC DETAILS OF PILE & PILE CAP (SHEET 5 OF 6 & 6
B B OF 6)
LS

450
720

580
℄ OF JACK 3. M1911-SP-DD-01 - NUMERATION DETAILS OF PSC GIRDER FOR CAST IN SITU PSC
℄ OF BEARING GIRDER TYPE SUPERSTRUCTURE
℄ OF BEARING

350

350
280
TS

GAP
℄ ℄
OF EJ OF EJ
LEGENDS

10
450 PILE CAP 1025 450 PILE CAP

55
260 450 550 LONGITUDINAL ℄ - CENTER LINE
SEISMIC EJ - EXPANSION JOINT
758 1141 1875 623 200 100 ARRESTOR (LS)
4397 SK - SKEW
SQ - SQUARE
259 259 182 303
PLAN THK - THICKNESS
305

305

305

305
758 882 1616 623 758 1141 1390 623
DIMENSIONS DETAILS OF SEISMIC TYP - TYPICAL

ARRESTOR ON PILE CAP


623

623

623

623

(SCALE-1:50)
305
577

1141

1141

1141
DIRT WALL
°
.41
88
1286
259
1742

1742
1483

463
A A A TS A
259
1178

5
456

580
LS
2060

2060
1000 Ø RCC 2.5 2.5

25
TS
BORED CAST PEDESTAL

10
TRANSVERSE
1141

1141
124

3
928
1017

IN SITU PILE (* 550 x 1280)

89
882

882

SEISMIC
259

ELASTOMER PAD
ARRESTOR

100

150
UNRESTRAINED

90
882 (90X1000X10)
1553 1922
2633
300
259

25
B LONGITUDINAL
A2 A2 B SEISMIC
5
ARRESTER

PLAN PLAN DETAIL-'1'


(SCALE 1:5)
DIMENSIONS DETAILS OF PILE & PILE CAP DIMENSIONS DETAILS AT BEARING LOCATION ON PILE CAP
(SCALE-1:60) (* TO BE CONFIRMED AS PER FINAL BEARING SIZE)
(SCALE-1:60)
SCHEDULE OF LEVELS
PIER TOP OF BOTTOM OF PILE CUT-OFF PILE FIXITY PILE TERMINATION
LOCATION PILE HEAD PILE HEAD LEVEL LEVEL LEVEL
THIS CONCRETE DIMENSION PERTAINS TO ABUTMENT A2 RHS SIDE A2 +93.458 +91.958 +92.008 +81.808 +71.958

CLIENT: CONSULTANT : PROJECT : TITLE:


DRG. NO. M1911-SP-DD-11
WIDENING OF BRIDGE ON SUJLAM SUFLAM CANAL NUMERATION & RC DETAILS OF PILE & PILE
sid consultants AT CH. 48+900 ON PATAN SIDDHPUR ROAD CAP FOR WIDENING OF MNB REVISION: R0
Road and Building Department IN ASSOCIATION structurally 508, synergy tower, near vodafone house, b/h ymca club,
DATE : NOVEMBER - 2020
R0 25/11/2020 FOR APPROVAL RSS NBG KJM DDP
Government of Gujarat WITH integrated
design
corporate road, prahladnagar, ahmedabad-380015
www.sidconsultants.in
DESIGNED DRAWN CHECKED APPROVED
REV DATE DESCRIPTION DESIGNED DRAWN CHECKED APPROVED
NO. SCALE: AS SHOWN SHEET: 4 OF 6 RSS NBG KJM DDP

You might also like