0% found this document useful (0 votes)
10 views

EMCC-2

The document contains detailed reference drawings and specifications for an electrical system, including components like UPS, transformers, rectifiers, and circuit breakers. It outlines the electrical ratings, types of cables, and various equipment used in the installation at the ONGC Assam plant. Additionally, it includes notes on the project's digitization and review history.

Uploaded by

ai4avnish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

EMCC-2

The document contains detailed reference drawings and specifications for an electrical system, including components like UPS, transformers, rectifiers, and circuit breakers. It outlines the electrical ratings, types of cables, and various equipment used in the installation at the ONGC Assam plant. Additionally, it includes notes on the project's digitization and review history.

Uploaded by

ai4avnish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10 11 12

REFERENCE DRAWINGS / DOCUMENTS

S.NO DOC. / DWG No. DOC. / DWG NAME

A A

GENERAL_NOTES:

INPUT INPUT
INPUT 415V,3PH,3W 415V,3PH,3W
415V,3PH,3W

STATIC VOLTAGE
UPS-1
UPS-2 STABILIZER

XM1 XM21
XM1

B Q1 B
Q1
63A Q(I/P MCCB)
63A
160A

TM1 TM1 TM
ISOLATION
TRANSFORMER

F1-F3 F1-F3

VTT
CONTROLLED SCR SECTION
C CONTROLLED C
RECTIFIER RECTIFIER
CHARGER CHARGER
CONVERTER CONVERTER
L5
VD5 VD5
L5

C7
C7 C8 AUTO
F4-F4A C8 F4-F4A TRANSFORMER

Q2
Q2 100A XM22

TO UPS2 110V BYPASS


BYPASS SOURCE PW AS BYPASS SOURCE
PW FROM SVR SOURCE
INVERTER

PARALLEL
INVERTER
PARALLEL

CONTROL
CONTROL
XM3

D XM3 D
BATTERY

Q4 Q4

TM2 F6 TM2
F6 LEGENDS:
TO COMMON
BATTERY
BATTERY
TRANSFORMER
C9 C25 C9 C25

VT11(STSW) VT12(STSW) VT11(STSW) VT12(STSW)


STATIC SWITCH STATIC SWITCH STATIC SWITCH STATIC SWITCH Q5 AUTO DIODE
TRANSFORMER

C27 C27
INVERTER CONTACTOR
E FAN FAN E

TV F F
TV
Q3 RECTIFIER CIRCUIT
Q3 BREAKER
160A

STATIC FACTOR
SWITCH F

VTT CHARGER
SCR CONVERTER
SECTION

F F
A AMMETER V VOLTMETER

XM4

110V OUTPUT FUSE


(400-ACDB-002) TO LOAD CHOKE
LOC:CONTROL BUILDING UPS ROOM

2P
250A
MCCB
NC
A
NEUTRAL BUS C ISSUED FOR REVIEW 27-11-2024 PS KR MSR
B ISSUED FOR REVIEW 10-10-2024 PS KR MSR
A ISSUED FOR REVIEW 10-06-2024 PS KR MSR
pf V DESCRIPTION DATE DRAWN CHKD APPD
REV
110V AC,250AMP,1Ph,Cu.BUS,10kA FOR 1Sec,(2 hour Backup)
CLIENT:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
G G
OIL AND NATURAL GAS CORPORATION LIMITED

63A 16A 16A 10A 10A 16A 16A 20A 20A 20A 20A 10A 20A 20A 20A 20A 20A 20A 16A 16A 20A 20A 20A 20A
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB AS BUILT AND DIGITIZED BY:
TM

PROJECT:
Digitization of P&IDs and SLDs across ONGC

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


CU/XLPE/SWA/FR PVC CABLE

CU/XLPE/SWA/FR PVC CABLE


ASSET: ASSAM INSTALLATION: LAKWA

PLANT: ASSAM UNIT: GCP-CPP


3Cx2.5Sq.mm

3Cx10Sq.mm
3Cx10Sq.mm

3Cx10Sq.mm
3Cx10Sq.mm

3Cx10Sq.mm
3Cx10Sq.mm

3Cx10Sq.mm
3Cx10Sq.mm

3Cx10Sq.mm
3Cx10Sq.mm

3Cx10Sq.mm

3Cx10Sq.mm
3Cx10Sq.mm

3Cx10Sq.mm
3Cx10Sq.mm

3Cx10Sq.mm
3Cx25Sq.mm

3Cx10Sq.mm
TITLE:
3Cx6Sq.mm

3Cx6Sq.mm
3Cx6Sq.mm
3Cx6Sq.mm
3Cx6Sq.mm

H H
MAIN 110V AC UPS SLD (400-UPS-002) IN LKW-CPP

CLIENT NUMBER PROJECT NUMBER SCALE SHEET SHT.SIZE


ESD-1 DCS SYSTEM+ DCS SYSTEM+ OPERATOR OPERATOR SERVERS 1 GAS CHROMOTOGRAPH LP COMPRESSOR-1 LP COMPRESSOR-2 LP COMPRESSOR-3 MP COMPRESSOR-1 MP COMPRESSOR-2 MP COMPRESSOR-3 HP COMPRESSOR-1 HP COMPRESSOR-2 HP COMPRESSOR-1 HP COMPRESSOR-2 MP-1 MP-2 MP-3 LP-1 LP-2 LP-3 ESD-II
MARSHALLING MARSHALLING STATIONS STATIONS (1.125kVA) AT ANALYSER SHED (1.750kVA) (1.750kVA) (1.750kVA) (1.750kVA) (1.750kVA) (1.750kVA) (1.750kVA) (1.750kVA) (1.750kVA) (1.750kVA) 9030011896 KIP-23017 NTS 02 OF 04 A1
CABINET(1.020kVA) CABINET(1.020kVA) DCS/ESD DCS/ESD (0.37kVA)
(0.570kVA) (0.570kVA) DRAWING NUMBER REV

AA-LKW-GCP CPP-EL-DW-SLD-008 SH 02 C
1 2 3 4 5 6 7 8 9