0% found this document useful (0 votes)
58 views9 pages

9149 - ELCOT - Vishwanathapuram HOSUR-EIA-ToR-EC 7-C - SEIAA Violation Revised-2

The document outlines a proposal for conducting an Environmental Impact Assessment (EIA) study and obtaining Environmental Clearance (EC) for the ELCOSEZ-IT Park in Tamil Nadu, which spans approximately 70.60 hectares and is categorized under violation due to prior initiation without clearance. ABC Techno Labs, an accredited environmental consultancy, will carry out the EIA, including baseline studies, risk assessments, and compliance evaluations, while coordinating with relevant authorities. The proposal also details the methodology, scope of work, and associated costs for the EIA process.

Uploaded by

ercnelcot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views9 pages

9149 - ELCOT - Vishwanathapuram HOSUR-EIA-ToR-EC 7-C - SEIAA Violation Revised-2

The document outlines a proposal for conducting an Environmental Impact Assessment (EIA) study and obtaining Environmental Clearance (EC) for the ELCOSEZ-IT Park in Tamil Nadu, which spans approximately 70.60 hectares and is categorized under violation due to prior initiation without clearance. ABC Techno Labs, an accredited environmental consultancy, will carry out the EIA, including baseline studies, risk assessments, and compliance evaluations, while coordinating with relevant authorities. The proposal also details the methodology, scope of work, and associated costs for the EIA process.

Uploaded by

ercnelcot
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

To

Name of Client M/s. ELCOT Ltd.,


ELCOSEZ – Vishwanathapuram, Hosur, Tamil Nadu.
Proposal No. ABC/ELCOT –ELCOSEZ VISHWANATHAPURAM, HOSUR/2024-25/9149
Conducting Environmental Impact Assessment (EIA) study, EMP,
Terms of Reference (ToR), EIA Report and obtaining Environmental

Proposal for Clearance (EC) under violation category from SEAC-SEIAA, Tamil Nadu
for the ELCOSEZ-IT Park of about 70.60 Hacs located ELCOSEZ,
Vishwanathapuram, Hosur district, Tamil Nadu.

Date 12-02-2025

Submitted by
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

1. INTRODUCTION
This proposal is being submitted to M/s ELCOT Ltd, ELCOSEZ – Vishwanathapuram,
Hosur, Tamil Nadu for conducting Environmental Impact Assessment (EIA) study, EMP,
Terms of Reference (ToR), EIA Report and obtaining Environmental Clearance (EC) under
violation category from SEAC-SEIAA, Tamil Nadu for the ELCOSEZ -IT Park of about 70.60
Hacs located ELCOSEZ, Vishwanathapuram, Hosur district, Tamil Nadu.

n2. ABC TECHNO LABS INDIA PRIVATE LIMITED’S EXPERTISE


ABC Techno Labs formally known as ABC Environ Solutions Pvt Ltd. has been involving in
the development and execution of environmental impact assessment, environmental
related studies and environmental testing services. We have worked on Environmental
Health and Safety (EHS) studies for both private and public institutions, at the national
level and are particularly strong with large infrastructure and industrial projects. We
wish to inform you that as our company is an ISO 9001:2008, ISO14001 2004, OHSAS
18001:2007 certified company has,

 Accredited by National Accreditation Board for Testing


and Calibration Laboratories (NABL), an autonomous body
under the aegis of Department of Science & Technology,
Government of India based on the resources available with
our laboratory division.

 Recognised by Ministry of Environment and Forests
(MoEF) under Environmental (Protection) Act, 1986 based
on the environmental testing facility available with our
laboratory division.

 Accredited with the National Accreditation Board for


Education and Training (NABET), a division of Quality
Council of India (QCI) and it has recognized our organization
as an Environment Consultant Organization to carry out
Environmental Impact Assessment Study and Environmental
Management Plan based on the resources available with our
organization including technical expertise of consultant,
resource persons, their educational background as well as
experience and expertise.

2
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

3. SERVICES

We offer the following services,

Environmental Services
 Environmental Impact Assessment (EIA) & Environmental
Management Plan (EMP) for developemental projects;
 Environmental Monitoring ;
 Consultancy services for CTE & CTO from various State
Pollution Control Boards;
 Risk Assessment & Management Studies;
 Design, Supply, Erection and Commissioning of STP, ETP, RO,
UF and Zero Discharge Plants – Turnkey Basis.
 Operation & Maintenance of Wastewater
Treatment Plant;
 Performance study of ETPs and STPs.

Laboratory Services

 Water and Wastewater Quality – Water Sampling & Analysis,


Water Quality Monitoring;
 Air Pollution – Ambient Air Monitoring & Analysis, Stack
Emission Measurements, Indoor Air Quality Monitoring,
Workplace Environmental Monitoring;
 Soil Analysis
 Noise Monitoring & Mapping;
 Meteorological studies (Weather monitoring)
 Metallurgical testing
 Microbiology - Food & water analysis

Our Major Clients

3
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

4. SECTORS COVERED

List of Sectors accredited by NABET / QCI

1. Mining of minerals including Opencast / Underground mining


2. Offshore and onshore oil and gas exploration, development & production
3. River Valley projects
4. Thermal Power Plants
5. Mineral beneficiation including Pelletisation
6. Metallurgical industries (Ferrous & Non Ferrous)
7. Cement plants
8. Petroleum refining industry
9. Leather/skin/hide processing industry
10. Chemical fertilizers
11. Petro-chemical complexes
12. Petro-chemical based processing
13. Synthetic organic chemical industry
14. Distilleries
15. Integrated paint industry
16. Sugar Industry
17. Oil & gas transportation pipeline, passing through national
parks/sanctuaries/coral reefs/ Ecologically sensitive areas including LNG
Terminal.
18. Airports
19. Industrial Estates/Parks/Complexes/Areas export processing Zones (EPZs),
Special Economic Zones (SEZs), Biotech parks, Leather Complexes.
20. Ports, harbours, jetties, marine terminals, break waters and dredging
21. Highways, railways, transport terminals, mass rapid transport systems
22. Common Effluent Treatment Plants (CETPs)
23. Common Municipal Solid Waste Management Facility (CMSWMF)
24. Building and large construction projects
25. Townships and Area development projects

4
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

5. SCOPE OF WORK

M/s. ELCOT’s ELCOSEZ-IT Park located at Vishwanathapuram, Hosur district, Tamil


Nadu has already been initiated before obtaining EC from SEIAA, Tamil Nadu for the
plot area about 70.60 Hacs it is considered as violation as per the EIA Notification 2006
and its amendments.

It falls under the below mentioned Category ‘B’ under the sector “Industrial estates/
parks/ complexes/ areas, export processing Zones (EPZs), Special Economic Zones
(SEZs), Biotech Parks, Leather Complexes”. Hence, it requires EIA study and the EC
needs to be obtained under the following category.

(A) (B) Conditions if any


Project Activity Building / Construction projects / Area Development
projects and Townships
7(C) Industrial Industrial estates General as well as Special
estates/ parks/ housing at least one conditions shall apply
complexes/ Category B industry
areas, export and area < 500 ha. Note:
processing (i) Industrial Estate of area
Zones (EPZs), Industrial estates of below 500 ha and not
Special area > 500 ha. and housing any industry of
Economic not housing any category ‘A’ or ‘B’ does not
Zones (SEZs), industry belonging require clearance.
Biotech Parks, to Category A or B (ii) If the area is less than
Leather 500 ha but contains
Complexes building and construction
projects >20,000 Sq.mtr.
and or development area
more than 50 ha it will be
treated as activity listed at
serial no 8(a) or 8(b) in the
Schedule, as the case may
be.
Source: EIA Notification 2006 and further amendments of Ministry Of Environment, Forest
and Climate Change.

Hence we wish to inform you that as per the latest Notification from Ministry of
Environment, Forest and Climate Change (MoEF&CC), New Delhi, Government of India,
dated 14th March, 2017 S.O. 804(E) to deal Violation cases under EIA Notification 2006.
An Assessment of ecological damage, remediation plan and natural and community
resource augmentation plan and it shall be prepared as an independent chapter in the
Environment Impact Assessment report.

5
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

The detailed scope of work for EIA study, EMP, Terms of Reference (ToR), EIA Report and
obtaining Environmental Clearance (EC) under violation category from SEAC-SEIAA,
Tamil Nadu as

 Initial site inspection for collection of preliminary information/data related to Environmental


Clearance.
 To prepare EC application in revised Form-1 as per MoEFCC Notification under violation
category
 Formulation of suggested terms of reference and other relevant documents as Required for
Environmental Clearance on the basis of Pre-Feasibility Report.
 Submission of EC application along with Form-1 and other relevant documents at the office of
statutory authority.
 Terms of Reference for the project on assessment of ecological damage, remediation plan and
natural and community resource augmentation plan if any (or) as per the existing SOP.
 To prepare the documents as required for circulation to the members of State Expert
Appraisal Committee (SEAC), SEIAA, Tamil Nadu.
 To deliver the presentation before Expert Appraisal Committee for finalization of TOR at SEIAA,
Tamil Nadu.
 To coordinate at SEAC (State Expert Appraisal Committee) for processing of file as required for
issue of prescribed Terms of Reference (TOR).
 Field visit and Environmental monitoring for collection of Baseline data as per the Prescribed
Terms of Reference for preparation of EIA/EMP Report covering compilation, analysis and
interpretation of the baseline data.
 Preparation of draft EIA/EMP Report in compliance to prescribed TOR and Requirements of
SEIAA, Tamil Nadu.
 Submission draft EIA/EMP Report to the SEAC for processing of the same at PCB for conducting
Public Hearing.
 To coordinate with PCB to obtain the proceedings and preparation of final EIA-EMP report
 To coordinate at SEIAA/SEAC for processing of the documents and enlisting of the Project for
EC presentation.
 Preparation of EC Presentation and other relevant documents such as salient Features of the
project.
 To assist the project proponent in circulation of documents to the members of State Expert
Appraisal Committee (SEAC), Tamil Nadu as required before the presentation for
Environmental Clearance.
 To deliver the final EC presentation before the Expert Appraisal Committee, SEIAA for
Environmental Clearance.
 Addressing the technical queries raised if any and defending the contents of EIA for granting EC
from SEAC-SEIAA, T.N.
 To coordinate at SEAC-SEIAA, Tamil Nadu for granting and issue of Environmental Clearance.
 Follow up with SEAC-SEIAA, Tamil Nadu for granting and issue of Environmental Clearance.
 Obtaining EC from SEAC-SEIAA, Tamil Nadu.

6
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

6. PROPOSED EIA METHODOLOGY

EIA Methodology
Issue Covered item
ABC will include a baseline study as a part of the EIA methodology. The
baseline study will mainly focus on Air, Noise, Water, Land, Socio-Economic
and Biological Components of the environment.
The existing status of ambient air quality will be monitored within impacted
region (10 km from the periphery) of the proposed project site.
Monitoring the site-specific micro - meteorological data, viz. wind speed and
direction, humidity, ambient temperature, rainfall etc.,
Monitoring the present status of noise levels within the impact zone;
Baseline Studies
Baseline status of water quality and quantity;
Geography, physiographic, regional geology and structure of the project area
will be collected from the secondary sources;
Collection of available information on both terrestrial and aquatic flora and
fauna, including rare and endangered species in the project area;
Noise analysis will be carried out for 6 locations and noise mapping will be
done;
Collection of socio-economic data; and
The baseline aspects (such as soil, groundwater etc.,) will also be described
based on existing data, literature and any other secondary source.
Air Emissions
Brief qualitative analysis of expected emissions (i.e. dust, vehicular emission)
for both construction and operational phase of the project. Impact analysis
Air pollution
will be based on compliance evaluation using national and international
emission threshold limit values and Best Available Techniques (BAT) with
regards to the closest sensitive receptors.
Evaluation of Noise
For actual and future noise analysis, the major noise sources and sensitive
receivers to the new Infrastructure development project site and adjacent
Noise areas will be identified for both construction and operation phases of the
project. Noise levels will be assessed using typical noise generation factors
and compared with standards. In cases where the aforementioned standards
are exceeded, mitigation measures will be proposed.
Risks to Soil and Groundwater
A qualitative analysis of potential impacts will include:
Analysis of potential impacts due to contamination by construction activities;
Potential areas or procedures where accidental releases of hazardous
Soil and materials may endanger soil and groundwater quality;
Groundwater Analysis of pollution containment measures;
Analysis of potential impacts due to de-watering; and
Assessment of actual risk of accidental releases.
We will also incorporate in the assessment the results of any soil and
groundwater baseline investigations.

7
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

Wastewater generation
Estimation of wastewater production (mainly sewage and cooling water) in
Wastewater terms of quantity and quality by applying effluent factors (water balance);
Quality Effluent compliance evaluation based on national and international emission
threshold limit values for discharge to sewage system.
Analysis of potential wastewater recycling or reuse.
Waste generation
Estimation of waste generation in terms of quantity and quality by applying
waste factors (Contractor, literature) for both construction and operation
phases;
Analysis of waste production in relation to waste management principles
(prevention, re-use, recycle, treatment and disposal).
Waste handling
Solid Waste
Classification of waste into recyclable and hazardous categories, and analysis
Generation
of whether envisaged waste handling and storage is compliant with
international best practice (BAT).
Final waste treatment & disposal
Analysis of best practices for disposal and treatment of waste streams (e.g.
recycling, correct landfills, etc.);
General analysis of disposal waste versus capacity of non-hazardous and
hazardous waste facilities in the region.
Direct Loss of flora and fauna, and/or habitat
Establish impact by determining what flora, fauna or habitat will or could be
Terrestrial
destroyed during construction of the development;
Ecology
Analysis of potential indirect impacts due to project externalities (i.e.
atmospheric, noise emissions and waste)
Energy
Consumption of electricity and heat/cooling;
Use of natural Evaluation of energy efficiency.
resources Water consumption
Water consumption (ground water, potable water and cooling water);
Evaluation according to water minimization management principles.
Health impacts inside & outside the site will be elaborated on in this section
of the socio-economic assessment (air & noise chapters will also dealt with
health related standards). The analysis will use the results of air quality and
noise assessments and related standards to make inferences concerning
health related impacts from the construction and operational phases of the
Health Impacts
new Infrastructure development project.
To assess impacts for quality of life, ABC will qualitatively assess any positive
or negative impacts that the project will have regarding the access of local
residents to entertainment, education and recreational activities. Nuisance
impacts from noise and waste management will also be revisited with respect
to local residents and visitors to the new development.

8
M/s. ELCOT–ELCOSEZ– Vishwanathapuram, Hosur TN 7(C)–Violation
EIA-EMP-ToR & EC from SEIAA, T.N Proposal. No: 9149

7. COST SUMMARY

We offer our price summary covering the above-mentioned scope of work are as follows for,

S. No. Description of work Cost (Rs)


Conducting Environmental Impact Assessment (EIA) study, EMP, Terms
of Reference (ToR), EIA Report and obtaining Environmental Clearance
1. (EC) under violation category from SEAC-SEIAA, Tamil Nadu for the 19,90,000.00
ELCOSEZ-IT Park of about 70.60 Hacs located ELCOSEZ,
Vishwanathapuram, Hosur district, Tamil Nadu.
Sub total 19,90,000.00
In words Rupees Nineteen lakhs ninety thousand only

Payment Terms for EIA-ToR EMP and obtaining EC from SEAC-SEIAA, Tamil Nadu under
violation category as below:
PHASE Work Activity/Description
1) 10% On submission of ToR application.
2) 30% On submission of draft report for Public Hearing (PH).
3) 20% After submission of final EIA report
4) 30% On presentation before SEAC-SEIAA, Tamil Nadu for EC.
5) 10% On obtaining Environmental Clearance (EC) from SEAC-SEIAA, Tamil Nadu.

Terms & Conditions:

 Kindly note that the above quoted cost is inclusive of all taxes.
 Statutory Charges or any processing fees to be paid to regulatory authorities has to be borne
by M/s. ELCOT Ltd.
 Conducting Public Hearing and other necessary related arrangements, other allied
activities/expenses are under M/s. ELCOT Ltd.
 ABC Techno Labs will provide only technical assistance during Public Hearing on
Environmental aspects only.
 Any additional studies from external institutes, agencies (if any) if recommended by SEAC
Committee/PCB charges will be borne by M/s. ELCOT Ltd.

This being a prestigious project of your esteemed organization, we are deeply committed in
establishing our credentials and involving with you in the project from the initial stages.

Thanking you and assuring our best service.

Yours faithfully,
For ABC Techno Labs India Pvt Ltd.,

Sd/-

Authorised signatory