JP Parekh and Son and Ors Vs Naseem Qureshi and PARA2,6,26,27,29

The High Court of Bombay ruled on a commercial arbitration petition filed by J.P. Parekh & Son against Naseem Qureshi, granting interim relief under Section 9 of the Arbitration and Conciliation Act, 1996, for the payment of Rs. 3,39,76,770 as fees due under their Letters of Appointment. The court found a prima facie case in favor of the petitioners, indicating that the respondents had no defense against the payment and that failure to secure the amount would cause irreparable loss to the petitioners. The petition was allowed, directing the respondents to deposit the amount or provide solvent security until the arbitration proceedings are concluded.

Uploaded by

stpsf7c9qc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views17 pages

JP Parekh and Son and Ors Vs Naseem Qureshi and PARA2,6,26,27,29

The High Court of Bombay ruled on a commercial arbitration petition filed by J.P. Parekh & Son against Naseem Qureshi, granting interim relief under Section 9 of the Arbitration and Conciliation Act, 1996, for the payment of Rs. 3,39,76,770 as fees due under their Letters of Appointment. The court found a prima facie case in favor of the petitioners, indicating that the respondents had no defense against the payment and that failure to secure the amount would cause irreparable loss to the petitioners. The petition was allowed, directing the respondents to deposit the amount or provide solvent security until the arbitration proceedings are concluded.

Uploaded by

stpsf7c9qc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

MANU/MH/4330/2022

IN THE HIGH COURT OF BOMBAY


Commercial Arbitration Petition No. 629 of 2021
Decided On: 08.12.2022
J.P. Parekh & Son and Ors. Vs. Naseem Qureshi and Ors.
Hon'ble Judges/Coram:
Bharati H. Dangre, J.
Counsels:
For Appellant/Petitioner/Plaintiff: J.P. Sen, Senior Advocate, Shanay Shah, M.S. Federal,
Murtuza Federal, Mihir M., Sudarshan Satalkar and Nikhil Jalan
For Respondents/Defendant: Prateek Seksaria, Nishant Chotani, Rohit Agarwal, Dipti
Karadkar i/b Ramiz Shaikh, Aseem Naphade and Shabbir Shora
Case Category:
ARBITRATION MATTERS
Case Note:
Arbitration - Interim relief - Application for - Section 9 of Arbitration and
Conciliation Act, 1996 - Present petition under Section 9 of Arbitration Act
filed to direct respondent Nos. 1 and 2 to forthwith pay to or deposit with
petitioner subject amount as admitted fees payable under Letters of
Appointment in question - Whether case made out to grant relief as prayed for
in Section 9 petition - Held, no defence to payability of amount in question -
Respondent Nos. 1 and 2 already appointed new Developer through whom
work is likely to be carried out - Prima-facie case exist in favour of petitioners
- Balance of convenience also lies in their favour - Irreparable loss would be
caused to them if amount is not secured by directing it to be deposited
towards fees due and payable in terms of Letter of Appointment - Relief as
sought for granted - Petition allowed. [29]
JUDGMENT
Bharati H. Dangre, J.
1. Petitioner No. 1, a partnership firm engaged in rendering comprehensive architectural
services comprising of Petitioner No. 2 as a Partner, has filed this Petition under Section
9 of the Arbitration and Conciliation Act, 1996, in which the following reliefs are
sought:
"(a) This Hon'ble Court be pleased to order and direct Respondent Nos. 1 and 2
to forthwith pay to or deposit with the Petitioner a sum of Rs. 3,39,76,770/-
(Rupees Three Crores Thirty Nine Lakhs Seventy Six Thousand Seven Hundred
Seventy only) as the admitted fees payable under the Letters of Appointment as
per the particulars set out in Exhibit "MM" hereto;
(b) In the alternative to prayer clause (a) this Hon'ble Court be pleased to order
and direct Respondent Nos. 1 and 2 to deposit in this Hon'ble Court or to
furnish solvent security to the satisfaction of this Hon'ble Court in any other
16-04-2025 (Page 1 of 17) www.manupatra.com Amity University
manner that this Hon'ble Court may deem fit, for the sum of Rs. 3,39,76,770/-
(Rupees Three Crores Thirty Nine Lakhs Seventy Six Thousand Seven Hundred
Seventy only) as per the particulars set out in Exhibit "MM" to the present
Petition.
(c) This Hon'ble Court be pleased to stay the effect and implementation of the
purported termination letter dated 15th September, 2021 and to restrain
Respondent Nos. 1 and 2 from acting upon or in furtherance thereof until
payment to the Petitioner of the fees of the Petitioner as set out in the
particulars at Exhibit "MM" hereto;
(d) This Hon'ble Court be pleased to restrain Respondent No. 1 and 2, their
servants, agents or assigns or any other persons claiming by, through or under
them, including but not limited to the new architects Respondent No. 3, from
taking any further steps in respect of redevelopment of the said Plot until
payment of the fees of the Petitioner as set out in the particulars at Exhibit
"MM" hereto."
The aforesaid reliefs are sought on the basis of dispute that has surfaced between the
parties and pending the commencement, hearing and final disposal of the arbitral
proceedings and passing of the Arbitral Award. The Petitioners have sought the above
reliefs by way of interim measures, with insistence that the reliefs so granted, shall
continue to remain in force till arbitration proceedings are culminated.
2. Primordially let the parties to the proceedings be introduced.
Respondent Nos. 1 and 2 the owners of an old tenanted building comprising of ground
plus three floors known as 'Cassinath Building', at Mahim, Mumbai, which was
constructed prior to 1940. The property was acquired by Respondent Nos. 1 and 2 with
an intention to redevelop and they approached the Petitioner-firm with a proposal, to
appoint it as an Architect for the redevelopment project which envisaged inter alia
construction of new building on the existing plot and shifting tenants/occupants from
the existing building to the alternate transit accommodation.
Accordingly, by the first Letter of Appointment issued on 16.02.2015, Petitioner No. 1
came to be appointed as an Architect for the proposed redevelopment work. The Letter
of Appointment highlight the scope of work as well as details of the fees payable by the
Respondents and it also stipulate the timelines within which the fees were to be paid,
being 30 days from the date of receipt of each bill.
The said Letter of Appointment also contain a very specific clause about the Petitioners
being paid the fees in case of decision on the part of Respondents to sell or grant
development rights to any other person and I would make reference to the said clauses
a little while later.
Another Letter of Appointment came to be issued in favour of the Petitioners on
20.03.2018 enlisting the scope of work and clarifying that separate letter will be issued,
detailing professional fees payable alongwith mode of payment and other terms and
conditions agreed between the parties. The said letter also contemplated the manner in
which the Agreement could be terminated and also retained the power to appoint any
Architect after obtaining NOC from the Petitioners.
3 . With the Letter of Appointment being placed in hand and terms and conditions of
engagement of services being crystallized, the Petitioners, as they were supposed to,
16-04-2025 (Page 2 of 17) www.manupatra.com Amity University
applied and secure several permissions and approvals from various statutory authorities
including MCGM, obtained requisite NOC from the Traffic, Fire and Building Proposal
Department and also secured Intimation of Disapproval (IOD) on 28.07.2016.
Permission with respect to the temporary transit structure was secured and even
Commencement Certificate(CC) was also procured on 25.07.2019, setting the stage
ready for the project.
4 . The Petitioners, put forth their case by submitting that their firm rendered
architectural services with respect to Planning, Design and Preparing the Drawings/Plans
etc. as required for the purpose of accomplishment of the project and played a pro-
active role. The Petition contain a specific submission that the Petitioners raised running
account bills bearing Nos. I to X for the services rendered and the same were duly
acknowledged by Respondent Nos. 1 and 2 and periodically, part payments were also
released as against the bills raised. The last running bill was submitted by the Petitioner
on 22.12.2020, but the grievance of the Petitioners pertain to non-clearance of the bills,
despite a specific clause in the Agreement to make payment against each bill, within 30
days of its receipt. The Petitioners allege that Respondent Nos. 1 and 2 consistently
failed to clear the bills within the agreed period, despite repeated requests being made
and communications being exchanged with Mr. Yusuf Mukri, son of Respondent No. 2
who was representing and acting on behalf of Respondents. The correspondence and
communications addressed by the Petitioners in the form of emails, WhatsApp messages
are clearly set out in the Petition.
In the month of December, 2020, the Petitioner No. 2 came across a Public Notice
regarding proposed redevelopment through a Developer, who was ready and willing to
take up the project. The Petitioners raised running bills upon the Respondent Nos. 1 and
2, but the bill amount remained outstanding. In fact, the Petitioners offered several
options to the Respondents for clearing the amount due and payable to them. To draw
curtain on the past transactions, the Petitioners were informed that the proposed
developer did not require the services of the Petitioners, as he had his own team of
Architects and the Developer had asked the Respondents to obtain NOC from the
Petitioners. In turn, Respondent Nos. 1 and 2 offered the Petitioners a sum of Rs. 50
Lakhs towards full and final settlement of the dues payable in three installments and for
no reasons to guess, the Petitioners rejected the said proposal.
5 . Respondent Nos. 1 and 2 called upon the Petitioners to provide details of amounts
paid by it from the beginning of the Project towards the professional services rendered
and the said requirement was responded to by the Petitioners by specifying that an
amount of Rs. 1,03,54,759/- was payable. After the figure was quoted, Respondent Nos.
1 and 2 intimated the Petitioners that the Developer would be paying the amount due
and payable and as directed, the Petitioners forwarded statement of charges for the
additional services. The Petitioners were taken for surprise when the construction
activities commenced on the plot without obtaining their consent and without clearing
the outstanding dues and therefore the Petitioners addressed letter to Municipal
Corporation of Greater Mumbai, appraising it about unauthorized construction
commencing on the plot. The MCGM took cognizance of the complaint and fixed hearing
on the application filed by the Petitioners before the Deputy Chief Engineer, as regards
to the appointment of new Architect and despite the Petitioner's objection, the new
Architect came to be appointed for the project of Respondents.
Not only this, but by communication dated 15.09.2021, the Respondents terminated the
services of Petitioners and this letter was received by the Petitioners on 18.09.2021. The
MCGM passed an order permitting appointment of new Architect as the building was in
16-04-2025 (Page 3 of 17) www.manupatra.com Amity University
dilapidated condition and also granted the proposal for transit camp construction.
The above-mentioned facts are to be seen as the basis for the prayers sought in the
Petition under Section 9, filed by the Petitioner.
6. I have heard Learned senior counsel, Mr. J.P. Sen for the Petitioners and Mr. Prateek
Seksaria for Respondent Nos. 1 and 2.
Respondent No. 3-the newly appointed Architect is represented by Mr. Aseem Naphade.
The learned senior counsel justified the relief sought in the Petition by asserting the
existence of Arbitration Clause in the Letter of Appointment in the form of Clause 16
and he would submit that without settling the claim of the Petitioners, as agreed in the
Letter of Appointment, the Respondents surreptitiously requested change of Architect
before the MCGM and sought its replacement on the ground that the Architect has
demanded unreasonable and ill-legitimate professional fees.
The submission of the learned senior counsel is, Respondent Nos. 1 and 2 have
breached the terms and conditions of the Agreement intentionally and took advantage of
the soft approach of the Petitioners who went to the extent of expressing willingness to
waive interest component if the amount received by them was cleared within the
stipulated period. The learned senior counsel submit that, Respondents with malafide
intent and in futile attempt to evade its obligation to pay the professional fees to the
Petitioners under the Agreement, purported to terminate the appointment itself, with
respect to the proposed redevelopment scheme.
7. Mr. Sen, would further submit that it is always permissible for the court to grant such
relief in exercise of power under Section 9(1)(ii)(b) before institution of the arbitral
proceedings as it is within the power of this Court to permit such interim measures or
direction as may appear to the Court to be just and convenient. He would submit that
interim measures can be for the purpose of amendment, protection, reservation,
improvements of the property which is subject matter of arbitration agreement and it
can also be for the specific purpose of securing the amount in dispute in arbitration.
Ultimately he would submit that, while deciding the Petition under Section 9, the Court
must have due regard to the underlying purpose, which is conferred upon the Court, i.e.
to permit efficacy of Arbitration, as form of dispute resolution.
In support of the relief sought, particularly seeking deposit of the amount or solvent
surety, to that effect, he would submit that prayer is perfectly justified in the present
case since there is technically no defence for payability of the amount and it is in the
interest of justice, to secure the amount, which form part of subject matter of proposed
arbitration, even if no case strictly within the purview of Order XXXVIII Rule 1 and 2 is
made out.
The learned senior counsel place reliance upon the Division Bench Judgment of this
court in the case of Valentine Maritime Ltd. vs. Kreuz Subsea Pte. Limited & Anr.,
MANU/MH/0062/2021 and also another Division Bench decision in the case of Jagdish
Ahuja and Another vs. Cupino Limited MANU/MH/0925/2020 : (2020) 4 Bom CR 1, to
buttress his submission that where there was no defence to the invoices issued and
when the amount due and payable was admitted, there was good chances of succeeding
in arbitral proceedings which justified grant of interim measures pending the arbitration
reference, even if no case was strictly made within the purview of Order XXXVIII, Rule 1
and 2.
16-04-2025 (Page 4 of 17) www.manupatra.com Amity University
8. Per contra, the learned counsel Mr. Seksaria would contest the Petition by posing a
straight question, as to whether relief sought as interim measure, can be granted.
The submission is, the contract between the parties is in the nature of service contract
and claim is in the form of monetary claim and since the contract is determinable, no
Court would grant specific performance and in any case at the end of the proceedings of
Arbitration, the Petitioners may claim damages/compensation. He would place reliance
upon decision of the learned Single Judge of this Court in case of Spice Digital Ltd. vs.
Vistaas Digital Media Pvt. Ltd. MANU/MH/1682/2012, in support of his submission.
He would also place reliance upon the decision of the learned Single Jude of this Court
in the case of Kotak Mahindra Bank Limited vs. Williamson Magor & Co. Ltd. & Anr.
MANU/MH/0658/2021.
9 . The learned counsel wound raise another objection for entertaining the application,
relying upon the decision of the Apex Court in the case of Firm Ashok Traders & Anr. vs.
Gurumukh Das Saluja & Ors. MANU/SC/0026/2004 : (2004) 3 SCC 155, by submitting
that Section 9 permits filing of the application before commencement of the arbitral
proceedings, but it do not give indication of how much before and by relying upon the
decision of the Apex Court, he would submit that the party invoking section 9 may not
have actually commenced the arbitral proceedings, but must be able to satisfy the Court
that the Arbitral proceedings were actually contemplated or manifestly indicated, and
were positively going to commenced within a reasonable time. He would submit that the
law has been crystallized in the decision of Firm Ashok Traders (supra) that the distance
of time must not be such as it would destroy the proximity of relationship of the two
events between which it exists and elapses.
Applying the above principles to the facts in hand, the submission comes from Mr.
Seksaria, that the alleged termination notice is dated 15.09.2021 and Petition under
Section 9 has been filed on 26.10.2021 pending the hearing and final disposal of the
arbitral proceedings, but it is submitted that despite lapse of period of almost a year, no
Arbitration proceedings are instituted and therefore he would question the time lapse by
advancing his submission that there is no material to indicate that the arbitral
proceedings are actually contemplated or manifestly intended, and in these
circumstances, the argument is, the relief under Section 9 must be turned down to such
a party, in such a situation.
The learned counsel for Respondent Nos. 1 and 2 would also oppose the ground of
relief by submitting that in order to be entitled for which relief claimed, being deposit of
amount, the rigors of Order XXXVIII Rule 5, for adjudication before Judgment, must be
strictly complied with, since what is sought by the Petitioner is nothing but an
attachment before judgment and therefore the parameters contemplated for exercising
the said power must be satisfied even before the Court from whom interim measures of
such nature are prayed for.
1 0 . The learned counsel or Respondent No. 3 has adopted the arguments of Mr.
Seksaria and submit that he has nothing more to add.
1 1 . In the wake of contentious arguments, I have perused the copy of Petition
alongwith its accompanying annexures and also the additional Affidavit filed by the
Petitioners.
The onset of the relationship between the Petitioners on one hand and Respondent Nos.
1 and 2 on the other, is the Letter of Appointment dated 16.02.2015, when the
16-04-2025 (Page 5 of 17) www.manupatra.com Amity University
Petitioner came to be engaged as an Architect, to avail his professional services,
relating to architectural work of planning, designing, obtaining various approvals and
for preparation of detailed working drawings and to assist/advise the Respondents on
construction methodology to the Project Management and other consultants to be
appointed for the permissible development of the project.
The Letter of Appointment, stipulate the professional fees to be paid as per the scope of
the work mentioned, depending on the estimated built up area of the project or actual
build up area whichever is higher, which was set out in Para 1, itself in the following
manner:
"a] at Rs. 76.50 per sq. ft. of gross proposed built-up area as defined
hereunder. The gross proposed built-up area (as defined above) of the project
as presently designed is estimated as 1,00,000 sq. ft (approximately)."
Clause 2 of the Letter of Appointment set out the mode of payment of the professional
fees payable, as per clause 1 in accordance with the stages mentioned therein.
On perusal of the chart, it is evident that before submission of the Building Completion
Certificate (B.C.C.) for the occupation of building or part thereof from Municipal
Corporation, 100% of the total fees (less received earlier), shall become payable to the
Petitioners.
12. Certain other important clauses in the Agreement which are relevant for the purpose
of present case are reproduced below:
"9. In addition to your fees as stated above, we agree to pay you professional
fees, for the additional services which may be required to be rendered by you
for obtaining EACH of the remarks, permissions, N.O.Cs. from various
authorities, and if done, shall be paid by us extra, as per the amount indicated
in the "List of Additional Services" annexed with this agreement as Annexure
"A".
13. In the event, if we decide to sell or grant development rights to any other
persons, after your obtaining approval of plans from BMC, (i.e. IOD and/or C.C.
in part or full is obtained), then, you shall be paid full fees as per Clause No. 1,
irrespective of the stage of development and the quantum of services rendered
by you upto that stage and we agree to pay you the same immediately on our
taking the aforesaid decision."
15. This engagement may be terminated at any time by either party [either by
consent referring to arbitration as per clause no. 16] upon prior notice being
given, and provided that as a condition precedent, the fees due to you as per
Clauses (1) to (14) above are paid to you or an amount as directed by the
arbitrator is first deposited with him, and not withstanding anything contained
herein, your termination will not take effect and we shall not appoint any other
Architect for the proposal on the property under reference till such fees are paid
to you or deposited with the arbitrator as the case may be.
16. We confirm and agree that it has been expressly agreed by and between
yourself and ourselves that except for clause no. 15, any dispute or difference
between us as to the terms of your engagement as Architect/s as aforesaid shall
be decided by arbitration of such panel of arbitrators or individual arbitrator
who shall be member or members of "PEATA" and such arbitration proceeding
16-04-2025 (Page 6 of 17) www.manupatra.com Amity University
shall be governed by the provision of the Indian Arbitration Act 1940, or any
statutory modification or re-actment thereof, subject to the observance of the
condition precedent obligation by either parties as per clause 15 above."
The Agreement is accompanied with the schedule of additional services in the form of
Annexure A.
13. For the purpose of obtaining necessary permissions from the Municipal Corporation
of Greater Mumbai, on 28.03.2016, once again an appointment letter is issued in favour
of the Petitioners appointing the Petitioner No. 1 as an Architect, which pitched two
more conditions for appointment:-
"8. A thirty days clear notice in writing is required by either of the parties to
terminate the agreement, during the pendency of which your services shall be
continued to be rendered. However, on termination of the agreement, the fees
shall be paid to you as per agreement entered into with you separately in this
regard.
9. We confirm that we can appoint any other Architect/Licensed Surveyor only
after obtaining your NOC. We will not carry out any further work till the new
architect/Licensed Surveyor is appointed and is accepted by the authorities. In
this event, your NOC will not be withheld unreasonably and will be deemed to
be issued on our paying your dues, or in the event of dispute on the matter
being referred to the arbitration and the detailed terms and conditions
mentioned in our agreement entered into with you in this regard and shall
prevail.
10. In event of any dispute, the matter shall be referred to arbitration as per
our detailed agreement."
14. Now, I shall turn my focus on the actual dispute about payment of architectural
fees, which has surfaced in the Petition.
It is on 25.07.2019 the commencement certificate was issued by the MCGM. The
Petitioners, with reference to the letter of appointment, issued the last running bill, Bill
No. X dated 22.12.2020, comprising of professional services and informed the
Respondents, that an amount of Rs. 1,03,54,759/- is payable towards professional fees,
by calculating the interest on delayed payment. The said statement in the form of Bill at
Exhibit F bifurcate the amount due and payable as per the clauses contemplated in the
Letter of Appointment dated 16.02.2015.
The Petitioners have placed on record communication received from the Respondents
dated 03.05.2018, where the following statement is made.
"Please be rest assured your money is safe and all your dues will be cleared in
full, we only request you for some more grace period. Needless to say all your
dues will be cleared at the earliest."
The Petitioners claim that since Respondents had assured about timely payment and in
the wake of long professional relationship shared between them, the work was
continued, until it was informed about termination of services by letter dated
15.09.2021 by citing the following reasons
"With reference to the subject cited above we would like to inform you that

16-04-2025 (Page 7 of 17) www.manupatra.com Amity University


there is a tremendous pressure from the tenants of the building whose lives are
at a stake, and you have not been cooperating as an Architect of the project, we
do hereby cancel and terminate your appointment as an Architect of the above
mentioned project.
This letter of Cancellation/Termination is being sent to you, as the same was
raised by you, in the meeting called by the Hon. Dy. Chief Engineer in his
chamber yesterday.
Please note that you are no more our architect in the above project and the new
architect Aman & Associates, appointed by us and informed to the Hon. Dy.
Chief Engineer, shall here onwards, apply and obtain all further approvals and
permissions required."
1 5 . The Petitioners submit that instead of paying the amount which was due and
payable, the Respondents chose to terminate services of the Petitioners on the ground
of their alleged non-cooperation as an Architect of the project and this stand is
seriously contested by the Petitioners.
Admittedly, the dispute revolving around the appointment letter is liable to be referred
to the Arbitrator, in light of Clause 16, contained in the Letter of Appointment, but
pending the commencement and hearing of the arbitral proceedings to be instituted, the
Petitioners seek payment of the amount towards professional fees payable to them
under the Letter of Appointment or a direction is sought against Respondent No. 1 and 2
to deposit the said amount in this Court or furnish solvent surety which this Court may
deem fit.
In order to secure this relief, a specific statement is made in the Petition, which read
thus:
"51. From the communications exchanged between the Petitioner and
Respondent No. 1 and 2 and on their behalf by the said Mr. Yusuf Mukri (son of
Respondent No. 2), it is clear that Respondent Nos. 1 and 2 on their own
admission are in the process of dissipating their assets, which may render an
Award in favour of the Petitioner a paper Award. The Respondent No. 1 and 2
have admitted the Petitioner's claim for its professional fees and other charges
under the Letter of Appointment. This is a fit case for an order of
payment/deposit against Respondent Nos. 1 and 21 at this stage itself."
16. The grant of the above relief is opposed on the ground that the claim is in the
nature of money suit and therefore the relief prayed can not be granted as it would
amount to grant of the decree.
Reliance is placed upon decision in the case of Maharashtra Jeevan Pradhikaran & Anr.
vs. Lark Construction Pvt. Ltd. MANU/MH/1036/2004 : 2005 (1) MH.L.J. 953, which
pertains to the power to be exercised by the Civil Court under Order 39 Rule 1 and 2,
where it was categorically held that the grant of final relief in the form of final relief to
pay the amount at the interim stage would not be a permissible mode and what could
have been possibly done was to release part of the money claim involved in the suit.
The learned counsel for the Respondent has also relied upon the decision of the Court in
the case of Spice Digital Ltd. vs. Vistaas Digital Media Pvt. Ltd. (supra), wherein the
issue of grant of relief under Section 9 and 17 of the Act of 1996 arose for
consideration, and it has been specifically held as under in para 15 and 16:-
16-04-2025 (Page 8 of 17) www.manupatra.com Amity University
"15. It is not in dispute that even during the lock in period, the respondent can
terminate the contract if there was material breach of contract. Whether the
contract was rightly terminated or not is the issue which is pending before the
arbitral tribunal and would be decided at the time hearing of the claims made
by the Appellant before the arbitral tribunal. The question that arises for
consideration of this court is that whether interim measures can be granted in a
contract which is determinable.
16. The arbitral tribunal in the impugned order after referring to clause 6.2 as
amended and clause 12.1 of the agreement has recorded prima facie finding
that the agreement by its very nature is determinable even during the lock in
period. It is held that in case other than for material breach, the licensor if it
invokes clause 12 and terminated the agreement, the licensee is entitled to
certain rights which include withholding any license fees that may be due and
payable and also moving the competent court for whatever reliefs the Licensee
would be entitled. In Para 36 of the impugned order the arbitral tribunal has
recorded a finding that the contract by its nature is determinable and interim
relief by way of injunction cannot be granted. In Para 29 of the impugned
order, it is held that if the agreement by its very nature is determinable within
the meaning of section 14(1)(c) of the Specific Relief Act, specific performance
cannot be granted. If specific relief cannot be granted, then in terms of Section
41(e) of the Specific Relief Act no injunction can be granted. It is held that if
the licencee is not entitled to final relief of permanent injunction, then in that
event no interim relief by way of injunction can be granted".
17. The observations made above are to be read in the facts of the case, which reveal
that the Respondents issued termination notice to the Petitioners alleging breaches and
the Petitioners specifically denied such breaches and made a request for continuing
discharge of the obligations under the licensed agreement. The Petition filed by the
Petitioners under Section 9 of the Act sought a relief that the Respondents shall not act
on the basis of termination notice, the dispute being referred to the Sole Arbitrator and
the Arbitrator dismissed the Application filed under Section 17 of the Arbitration Act. It
is, in this background, observations were made in Para 21 to the following effect:-
"21. In my view, the injunction sought by the Appellant under section 17 of the
Arbitration Act, 1996 for the contract which is determinable or is terminated
even according to the appellant, such injunction is statutorily prohibited. In my
view, at the interim stage, the arbitral tribunal while deciding application under
section 17 and the court deciding application under section 9 of the Arbitration
Act, 1996 cannot continue operation of such determinable contract or the same
having been terminated otherwise it would amount to re-writing the contract. In
my view the arbitral tribunal was thus right in refusing to grant injunction
under section 17 of the Arbitration Act, 1996. Even otherwise, the arbitral
tribunal has given a finding of fact after considering the facts, provisions of the
agreement and the provisions of Specific Relief Act and thus no interference is
warranted by this court with such finding of fact recorded by Che arbitral
tribunal at this stage."
1 8 . The power to grant interim measures under Section 9 of the Arbitration and
Conciliation Act is guided by the underlying principles which govern the exercise of
analogous power under the Civil Procedure Code (CPC) and it is settled position of law
that this power cannot be totally independent of those principles. Exercise of the power
under Section 9 cannot be carried out in an uncharted territory ignoring the basic
16-04-2025 (Page 9 of 17) www.manupatra.com Amity University
principles of procedural law contained in the Code, but at the same time, procedural
provisions enumerated in the Code, cannot be invoked to defeat the grant of interim
relief, when the Court would decide Application under Section 9 of the Act.
The existence of an arbitration agreement or arbitral clause is a sine qua non for
contracting parties, to refer their disputes to arbitration and to avail any interim relief in
terms thereof. While exercising this power, the Court will ascertain the manifest
intention on the part of the Applicant to take recourse to the arbitral proceedings at the
time of filing of the Application under Section 9 of the Act and this intention can be
gathered from the surrounding circumstances which may include issuance of notice in a
given case, establishing the manifest intention to refer the dispute to arbitral tribunal.
The Court exercising powers under Section 9 possess wide powers including "the same
power for making orders as it has for the purposes and in relation to any proceeding
before it". Nevertheless discretion will not be exercised lightly and unless the Court is
satisfied that the essential conditions for grant of such relief have been met by the party
seeking it.
19. The time or the stage of invoking jurisdiction of the court under the Section is also
clearly set out by sub-section (1) being a party approaching the Court before or during
the arbitral proceedings or at any time after making of arbitral warrant, but before its
enforcement in accordance with Section 36.
The amendment inserted by Act 3 of 2016 has created an imperative mandate in a
contingency where the Application is preferred for interim measures before
commencement of the arbitral proceedings and the court passed an order in any interim
measure of protection, then arbitral proceedings shall be commenced within a period of
90 days from the date of such order or within such further time, that the Court may
determine.
In any case, an application filed is not a Suit and it is also not necessary that the party
invoking Section 9, must had actually commenced the arbitral proceedings, but suffice
to establish before the Court that the proceedings are actually contemplated or
manifestly intended. The purpose of interim protection to be granted by the court
evidently is to protect the interest of the party seeking such order until its rights are
finally adjudicated by the arbitral tribunal and to ensure that the Award passed by the
Tribunal is capable of enforcement.
What type of measures can be granted in the form of protection for the subject matter
are enumerated in sub-section (1) (ii) of Section 9 and this would cover contingencies
specified in clause (a) to (e). Clause (e) of sub-section (1) vests the Court exercising
power under Section 9, to pass such other interim measure of protection as may appear
to the court to be just and convenient and the Court shall have the same power for
making orders as it has for the purpose of and in relation to, any proceedings before it.
For exercising these powers the Court must derive a conclusion that whatever is
considered necessary for protection of the property in dispute, by way of interim
measure the protection can be granted and definitely this confer wide discretion on the
Court, but it cannot be said to be an unguided discretion, as the guiding factor is the
enumeration of such situations by the legislature, though the legislature did not intend
that the circumstances shall be exhaustive. However, the power conferred upon the
Court in the Section is not unbridled and it is subject to ascertain measures and
restrictions such as, firstly, it can be exercised by the Court to the same extent and in
the same manner as it could be for the purpose or in relation to any proceedings before

16-04-2025 (Page 10 of 17) www.manupatra.com Amity University


it and secondly, exercise of power to make interim arrangements should not militate
against any power which might be vested in arbitral tribunal.
20. One such contingency where the interim measure for protection can be granted is
contemplated by clause (b), for securing the amount in dispute in arbitration. This
contingency prompting the Court to mould the interim relief for securing the amount in
dispute in arbitration is often compared with Order XXXVIII Rule 5 of the CPC and the
position as regards whether the party filing an application under Section 9 would strictly
bound to adhere to Order XXXVIII Rule 5 is no more res integra and has been put to
rest by two Division Benches of this court and also recently by the Hon'ble Apex court
itself in the case of Essar House Private Limited vs. Arcellor Mittal Nippon Steel India
Limited in Civil Appeal (Arising out of SLP (C) No. 3187 of 2021).
21. In the case of Jagdish Ahuja and another vs. Cupino Limited, MANU/MH/0925/2020,
Division Bench of this Court made specific observations while formulating the question
as to whether the Court while granting relief under Section 9 of the Act of 1996 is
strictly bound by the provisions of Order XXXVIII Rule 5 and answered it in Para 6 and
7 as follows:-
"6. As far as Section 9 of the Act is concerned, it cannot be said that this court,
while considering a relief thereunder, is strictly bound by the provisions of
Order 38 Rule 5. As held by our Courts, the scope of Section 9 of the Act is
very broad; the court has a discretion to grant thereunder a wide range of
interim measures of protection "as may appear to the court to be just and
convenient", though such discretion has to be exercised judiciously and not
arbitrarily. The court is, no doubt, guided by the principles which civil courts
ordinarily employ for considering interim relief, particularly, Order 39 Rules 1
and 2 and Order 38 Rule 5; the court, however, is not unduly bound by their
texts. As this court held in Nimbus Communications Limited v. Board of Control
for Cricket in India (Per D.Y. Chandrachud J, as the learned Judge then was),
the court, whilst exercising power under Section 9, "must have due regard to
the underlying purpose of the conferment of the power under the court which is
to promote the efficacy of arbitration as a form of dispute resolution." The
learned Judge further observed as follows:
"Just as on the one hand the exercise of the power under Section 9
cannot be carried out in an uncharted territory ignoring the basic
principles of procedural law contained in the Code of Civil Procedure
1908, the rigors of every procedural provision in the Code of Civil
Procedure 1908 cannot be put into place to defeat the grant of relief
which would subserve the paramount interests of justice. A balance has
to be drawn between the two considerations in the facts of each case."
7. In an appropriate case, where the court is of the view that there is practically
no defence to the payability of the amount and where it is in the interest of
justice to secure the amount which forms part of the subject matter of the
proposed arbitration reference, even if no case strictly within the letter of Order
38 Rule 1 or 2 is made out, though there are serious allegations concerning
such case, it is certainly within the power of the court to order a suitable
interim measure of protection. As we have noted above, the amount is either to
be deposited into the treasury in accordance with the agreement between the
parties or if, for any reason, it is not payable to the revenue towards the
Respondent's tax liability, as is the case of the Appellants here, it is to be paid

16-04-2025 (Page 11 of 17) www.manupatra.com Amity University


to the Respondent Itself as part of the price of debentures. In fact, when these
two options were posed by the learned Single Judge to the Appellants' counsel,
in fairness both conceded that there was no third option."
22. Another Division Bench of this Court in Valentine Maritime Ltd. vs. Kreuz Subsea
Pte. Limited & Another, (supra), derived a similar inference by relying upon the Apex
Court decision in the case of Adhunik Steels Ltd. vs. Orissa Manganese and Minerals (P)
Ltd. MANU/SC/2936/2007 : (2007) 7 SCC 125 and observed as under:-
"95. Insofar as judgment of this Court delivered by the Division Bench of this
court in case of Nimbus Communications Limited v. Board of Control for Cricket
in India Cupra) relied upon by the learned senior counsel for the VML is
concerned, this Court adverted to the judgment of Hon'ble Supreme Court in
case of Adhunik Steels Ltd. v. Orissa Manganese and Minerals (P) Ltd.,
MANU/SC/2936/2007 : (2007) 7 SCC 125 and held that in view of the decision
of the Supreme Court in case of Adhunik Steels Ltd., (supra) the view of the
Division Bench in case of National Shipping Company of Saudi Arabia (supra)
that the exercise of power under section 9(ii)(b) is not controlled by provisions
of the Code of Civil Procedure, 1908 cannot stand. This court in the said
judgment of Nimbus Communications Limited (supra) held that the exercise of
the power under section 9 of the Arbitration Act cannot be totally independent
of the basic principles governing grant of interim injunction by the civil Court,
at the same time, the Court when it decides the petition under section 9, must
have due regard to the underlying purpose of the conferment of the power upon
the Court which is to promote the efficacy of arbitration as a form of dispute
resolution.
96. This court held that just as on the one hand the exercise of the power
under Section 9 cannot be carried out in an uncharted territory ignoring the
basic principles of procedural law contained in the Code of Civil Procedure,
1908 cannot be put into place to defeat the grant of relief which would sub-
serve the paramount interests of justice. A balance has to be drawn between
the two considerations in the facts of each case. The principles laid down in the
Code of Civil Procedure, 1908 for the grant of interlocutory remedies must
furnish a guide to the Court when it determines an application under Section 9
of the Arbitration and Conciliation Act, 1996. The underlying basis of Order 38
Rule 5 therefore has to be borne in mind while deciding an application under
Section 9(ii)(b) of the Arbitration Act."
It was thus held that the arbitral tribunal is also empowered to make an interim Award
and to grant money claim on the basis of admitted claim and or acknowledged liability,
so as to clear the claim which is subject matter of the dispute before the arbitral
tribunal if such case is made out by the Applicant.
2 3 . The Hon'ble Apex Court in the case of Essar House Private Limited vs. Arcellor
Mittal Nippon Steel India Limited (supra) by making a reference to both the above
decisions of the Bombay High Court, has taken the principle ahead and specifically
concluded as under:-
"While it is true that the power under Section 9 of the Arbitration Act should not
ordinarily be exercised ignoring the basic principles of procedural law as laid
down in the CPC, the technicalities of CPC cannot prevent the Court from
securing the ends of justice. It is well settled that procedural safeguards, meant

16-04-2025 (Page 12 of 17) www.manupatra.com Amity University


to advance the cause of justice cannot be interpreted in such manner, as would
defeat justice."
24. Taking cognizance of the decisions from various High Courts, holding that power
under Section 9 of the Arbitration Act is wider than the power under the provisions of
CPC, it reproduced the relevant observation from the decisions of this Court and held as
under:-
"48. Section 9 of the Arbitration Act confers wide power on the Court to pass
orders securing the amount in dispute in arbitration, whether before the
commencement of the arbitral proceedings, during the arbitral proceedings or
at any time after making of the arbitral award, but before its enforcement in
accordance with Section 36 of the Arbitration Act. All that the Court is required
to see is, whether the applicant for interim measure has a good prima facie
case, whether the balance of convenience is in favour of interim relief as prayed
for being granted and whether the applicant has approached the court with
reasonable expedition.
49. If a strong prima facie case is made out and the balance of convenience is
in favour of interim relief being granted, the Court exercising power under
Section 9 of the Arbitration Act should not withhold relief on the mere
technicality of absence of averments, incorporating the grounds for attachment
before judgment under Order 38 Rule 5 of the CPC.
50. Proof of actual attempts to deal with, remove or dispose of the property
with a view to defeat or delay the realisation of an impending Arbitral Award is
not imperative for grant of relief under Section 9 of the Arbitration Act. A strong
possibility of diminution of assets would suffice. To assess the balance of
convenience, the Court is required to examine and weigh the consequences of
refusal of interim relief to the applicant for interim relief in case of success in
the proceedings, against the consequence of grant of the interim relief to the
opponent in case the proceedings should ultimately fail."
25. The position of law thus stands crystallized in the above manner and the inference
which could be gainfully drawn from the authoritative pronouncement, is that the
provisions as contained in Section 9 and 17 of the Arbitration Act, 1996 are meant for
protecting the subject matter of the dispute till the arbitration proceedings culminate
into an Award. The court is also entitled to consider whether denial of such order would
result in great prejudice to the parties seeking such protective order. The obstructive
conduct of the party against whom such direction is sought, is also to be recorded as
material consideration, apart from the most important element whether there is
practically no defence to the payability of the amount, and, therefore, it is only in the
interest of justice to secure the amount, which forms part of the subject matter of the
proposed arbitration reference and in such case, it is certainly within the power of the
Court to order suitable interim measures for its protection.
The apprehension expressed in Para 51, based on the correspondence, exchanged by
Respondent Nos. 1 and 2, is sufficient to secure the claim of the Petitioners by invoking
Order XXXVIII Rule 5 of CPC, particularly in absence of specific denial of the claim and
since now the MCGM has granted substitution of the Petitioner firm by another Architect.
2 6 . I must gainfully refer to another decision of the Hon'ble Apex Court in case of
Sanghi Industries Limited vs. Ravin Cables Ltd. & Anr. (in Civil Appeal No. 6908/2022)
where their Lordships of the Apex court, have made pertinent observations, which I
16-04-2025 (Page 13 of 17) www.manupatra.com Amity University
must reproduce:-
4 . 1 The order(s) which may be passed by the Commercial Court in an
application under Section 9 of the Arbitration Act, 1996 is basically and mainly
by way of interim measure. It may be true that in a given case if all the
conditions of Order XXXVIII Rule 5 of the CPC are satisfied and the Commercial
Court is satisfied on the conduct of the opposite/opponent party that the
opponent party is trying to sell its properties to defeat the award that may be
passed and/or any other conduct on the part of the opposite/opponent party
which may tantamount to any attempt on the part of the opponent/opposite
party to defeat the award that may be passed in the arbitral proceedings, the
Commercial Court may pass an appropriate order including the restrain order
and/or any other appropriate order to secure the interest of the parties.
However, unless and until the conditions mentioned in Order XXXVIII Rule 5 of
the CPC are satisfied such an order could not have been passed by the
Commercial Court which has been passed by the Commercial Court in the
present case, which has been affirmed by the High Court."
The above observations necessarily indicate that while considering the application under
Section 9 of the Arbitration Act for interim measures, the Court would seek strict
compliance of conditions incorporated in Order XXXVIII Rule 5 of the CPC.
However, the aforesaid observations will have to be read in the background of the facts
which were involved and on careful reading of the said Judgment, it can be discerned
that the dispute revolved around three purchase orders and the Appellant claimed the
loss of INR 29.31 Crores, owing to the defective quality of cables supplied. The
Appellant invoked bank guarantees issued by Respondent No. 1 which according to
Respondent No. 1 were performance bank guarantees and thereafter the Appellant
invoked arbitration and immediately on the next date, Respondent no. 1 approached the
Court under Section 9 of the Arbitration Act before the Commercial Court and the
Commercial Court by invoking Section 9(2)(e) of the Act directed the Appellant to
deposit the amount of respective performance bank guarantees, which were already
invoked and for which payments were already made by the bank. The High Court
dismissed the appeal, which resulted into proceedings before the Hon'ble Apex Court.
The observations made in Para 4, therefore, must be read in the background of
paragraph 3 and 4 of the said Judgment and particularly when the Court took note of
the fact that before any order could be passed, the bank had already invoked the bank
guarantee and the amount thereunder was already paid prior to passing of the order by
the Commercial Court.
In any case, the said decision in Sanghi Industries Limited (supra) cannot be said to
unsettle the position of law which has been consistently followed, being laid down by
the Hon'ble Apex Court in the case of Adhunik Steel (supra), where the Apex Court,
issued the guidelines for exercise of power under Section 9, in the following words:-
"The grant of an interim prohibitory or mandatory injunction is governed by
well-known rules and it is difficult to imagine that the legislature while enacting
Section 9 of the Act intended to make a provision which was dehors the
accepted principles that governed the grant of an interim injunction. Same is
the position regarding the appointment of a receiver since Section 9 itself
brings in the concept of "just and convenient" while speaking of passing any
interim measure of protection. The concluding words of Section 9, "and the

16-04-2025 (Page 14 of 17) www.manupatra.com Amity University


court shall have the same power for making orders as it has for the purpose
and in relation to any proceedings before it" also suggest that the normal rules
that govern the court in the grant of interim orders is not sought to be
jettisoned by the provision. Moreover, when a party is given a right to approach
an ordinary court of the country without providing a special procedure or a
special set of rules in that behalf, the ordinary rules followed by that court
would govern the exercise of power conferred by the Act. On that basis also, it
is not possible to keep out the concept of balance of convenience, prima facie
case, irreparable injury and the concept of just and convenient while passing
interim measures under Section 9 of the Act.
The position of law which, therefore emerges is, power under section 9 of the Act is
totally independent of the principles governing grant of injunction that would govern
the Courts in this connection.
27. The reliance upon the decision in the case of Firm Ashok Traders & Another (supra)
is of no support to Mr. Sakseria, representing Respondent Nos. 1 and 2 as the said
decision though have coined the term "proximately contemplated" or "manifestly
intended" have categorically held that if arbitral proceedings are not commenced within
a reasonable time, of an order under Section 9, the relationship between the order and
arbitral proceedings would stand snapped. Even in the said Judgment, after explaining
what would be the reasonable period, while granting relief by way of interim measure,
Applicant was directed to take steps for appointment of Arbitrator(s) without any further
loss of time.
In any case, now when the insertion of sub-section (2) of Section 9 by Act No. 3 of
2016, there is a statutory provision which itself contemplate that where interim
measures of protection are conferred on party, the arbitral proceedings shall be
commenced within a period of 90 days from the date of order or within such time as the
Court may determine.
Hence, the decision in the Firm Ashok Traders and Another (supra) do not take case of
the Respondents any further.
The further decision in the case of Maharashtra Jeevan Pradhikaran & Anr. vs. Lark
Construction Pvt. Ltd., MANU/MH/1036/2004 : 2005 (1) Mh.L.J. 953, is completely
based on different circumstances, dealing with the power to grant interim injunction
under Order XXXIX Rule 1 and 2 read with Section 151 of the CPC. The impugned order
directed the Defendants to release the amount and it was held that it could not have
been done as the suit was in the nature of money decree.
It is now settled position that while exercising power under Section 9 of the Arbitration
Act, the Court shall not be strictly bound by the CPC and since there is specific power
conferred upon the Court to grant such interim measures for protection, reservation of
the subject matter of the arbitration agreement, the decision deserve to be distinguished
as against the power under Section 9 of the Arbitration and Conciliation Act. Similar is
the case relied upon by the learned counsel of the Single Judge of this Court in Spice
Digital Ltd. (supra) when the Court was dealing with the application filed under Section
17 before the Arbitral Tribunal.
28. In the wake of aforesaid legal scenario, I must now examine whether the Petitioner
deserve the relief in terms of prayer clause (a) or (b) by applying the aforesaid
parameters.

16-04-2025 (Page 15 of 17) www.manupatra.com Amity University


When the Letter of Appointment which has been construed by the parties as an
Agreement/MoU reached between them is perused, it is evident that the services of the
Petitioners were engaged as an Architect which included the professional services
related to architectural work of Planning, Designing, Working on Drawings etc. and
professional fees was agreed in terms of the scope of the work on the estimated built
up area or under the actual built up area whichever is higher. The fees to be paid
towards the professional services was to be paid depending upon the stage of the work,
with the specifications being mentioned in the Letter of Appointment itself. Clause 5
clearly stipulated that the bill shall be paid within 30 days on its receipt and not only
this, 15% interest was also agreed upon the dues remaining outstanding, thereafter.
Liberty was also conferred upon the Petitioners to suspend the rendering of the services
if the dues remained unpaid for more than 60 days.
Apart from the prevailing fees agreed, fees towards additional services was separately
carved out in Annexure A.
29. The Letter of Appointment contain a clause in the form of Clause No. 13, where the
Petitioners were assured of the fees in a contingency when Respondents decide to sell
or grant development rights to any other person and the liability to pay full dues was
taken on themselves, irrespective of the stage of development and quantum of services
rendered by the Petitioner.
The case of the Petitioners specifically pleaded in the Petition unequivocally state that
running bills for the services rendered were raised from time to time by the Petitioners
and necessary NOCs as well as IOD was also obtained. A specific statement is made that
the Petitioner rendered architectural services with respect to Planning, Design and
Preparing Drawings/Plans etc. for the purpose of project and raised running account
bills which were duly acknowledged by Respondent Nos. 1 and 2. Part payments were
made pursuant thereto and in the last bill dated 22.12.2020, forwarded alongwith
running account bill, entire details were forwarded to the Respondents. The bills,
however, remained unpaid, despite the Petitioners performing their part of obligation,
under the Letter of Appointment by rendering substantial services to the Project. The
Petitioners raised demand of Rs. 1,03,54,759/- due and payable towards prevailing
services rendered and from the correspondence that has been placed alongwith the
Petition, the Respondent Nos. 1 and 2 informed the Petitioners that the amount of
outstanding fees would be paid by the new Developer and copy of the communications
are placed on record in the form of Exhibit Q and R, but the amount due and payable
did not come to the Petitioner and remain unpaid even till date. Since there is no denial
from the Respondents about the bills raised and despite several concessions offered by
the Petitioner, the payments are not received, either from Respondent Nos. 1 and 2 or
from the newly appointed Developer, as it was intimated to the Petitioners that the
Developer will clear the dues.
Thus, from the pleadings in the Petition, which are not traversed, it is evident that there
is practically no defence to the payability of the amount and since Respondent Nos. 1
and 2 have already appointed new Developer through whom work is likely to be carried
out, and on being satisfied that the prima-facie case exist in favour of the Petitioners
and balance of convenience also lies in their favour and irreparable loss would be
caused to them if the amount is not secured by directing it to be deposited towards the
fees due and payable in terms of the Letter of Appointment, in absence of any denial
that the amount is not payable, I deem it appropriate to grant relief, pending the
commencement of the arbitration proceedings to be initiated within the period of 90
days from today.
16-04-2025 (Page 16 of 17) www.manupatra.com Amity University
As far as prayer clauses (c) and (d) are concerned, I am not intending to stall the
Project of Respondent Nos. 1 and 2 and they may proceed with the Project with the aid
of new Architect being appointed i.e. Respondent No. 3.
Hence, following order:-
ORDER
a] Arbitration Petition is partly allowed.
b] Respondent Nos. 1 and 2 are directed to deposit in this Court, 50% of the
amount mentioned in prayer clause (a) of the Petition, being Rs. 3,39,76,770/-
(Rs. Three Crores Thirty Nine Lakhs Seventy Six Thousand Seven Hundred
Seventy Only) as admitted fees payable under the Letter of Appointment, as per
the particulars set out in the Petition and the remaining 50% of the above
amount, by furnishing solvent surety, to the satisfaction of the Registrar of this
Court.
c] The aforesaid deposit of 50% of the amount claimed in prayer clause (a) and
furnishing of surety for the balance 50% of the amount, shall be made within a
period of 8 weeks from today.
d] The Petitioners are at liberty to seek appropriate relief from the arbitral
tribunal, once the proceedings are initiated as the relief granted by way of
interim measure will have a limited life till the arbitration is invoked.