Naushad
Naushad
DEPARTMENT OF MECHANICAL
ENGINEERING
MICRO PROJECT REPORT
A
Micro Project Report on
“Prepare report of various pneumatric hand tools and its attachment”
“DIPLOMA”
in
Mechanical Engineering.
to
M.S.B.T.E. MUMBAI.
by
Name of Candidates Roll No.
CERTIFICATE
This is to certify that,
have successfully completed theMicro Project work entitled“Prepare report of various pneumatric hand tools and
its attachment” under my supervision, in the partial fulfillment of the requirements for the Diploma in Mechanical
Engineering, and
Date :-
Place:-S.I.T.Poly.
Annexure-IV
Note:-Every course teacher expected to assign marks for group evolution in first 3 columns &
individual Evaluation in 4th columns for each group of students as per rubrics.
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
………………………………………………………………………………………………
Signature………………………………………
Annexure-I A
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………………………………………………………
1…………………………………………………………………………………………………
2…………………………………………………………………………………………………
3…………………………………………………………………………………………………
4…………………………………………………………………………………………………
5…………………………………………………………………………………………………
6…………………………………………………………………………………………………
7…………………………………………………………………………………………………
8…………………………………………………………………………………………………
9…………………………………………………………………………………………………
3.0 Action Plan (Sequence and time required for major activities for 8 Weeks)
Sr. Details of activity Planned Start Planned finish Name of Responsible Team
No date date Members
1
2
3
4
5
6
7
8
9
4.0 Resources Required (major resources such as raw material, some machining facility,
software etc.)
9
Contents of Micro-Project Reports
Title of Micro-Project
1.0 Brief Description(Importance of the project, in about 100 to 200 words)
2.0 Aim of Micro Project ( in about 100 to 200 words)
3.0 Course Outcomes Integrated
(Add to the earlier list more Cos are addressed)
a) ………………………………..
b)………………………………..
c)………………………………..
d)………………………………..
10
6.0 Outputs of the Micro-Projects
(Drawings of the prototype, drawings of survey, presentation of collected data, findings
etc.)
7.0 Skill Developed/ learning out of this Micro-Project(in about 150 to 300 words)