REG No:
A.R. ENGINEERING COLLEGE
CS
Approved by AICTE,New delhi,Affiliated to Anna
University, Chennai E&
vadakuchipalayam,kappiyampuliyur(post),Villupuram
-605601 AI
[email protected]/www.arenggc.com
DS
INTERNAL ASSESMENT TEST -2
Program B.E CSE AND Se VI
me B.TECH AIDS mes
&Branch ter
Course OEE 351- Dat 24.
code & RENEWABLE e 4.2
Name ENERGY SYSTEM 02
5
Maximu 100 Duratio 2 HOURS &
9.45am-
m Marks n and 11.45am
Time
PART-A(Answer ALL questions) (10 X 2 = 20 Marks)
Q.No Questions Blooms CO Mark
Level
1 Why hydrogen is considered as a secondary energy source? BL-3 1 2
2 List the classification of OTEC based on location. BL-2 1 2
3 Compare the fuel cell and battery BL-1 1 2
4 List any four benefits of OTEC BL-5 1 2
5 List any four advantages of wind turbine BL-2 1 2
6 List the various components of wind energy system.
7 Define geothermal gradient.
8 What is biogas? Give the advantages.
9 What is a Draft tube?
10 Define surge tank:
PART-B(Answer ALL questions) (5X13 = 65 Marks)
Q.NO Questions Blooms CO Mark
Level
Explain with the neat sketchMagneto Hydro Dynamic
11 a generation (MHD). BL-3 1 13
(or)
11 b
Compare vertical and horizontal axis wind turbine.
BL-1 1 13
Generalized the factor to be considered for the sitting to
install the wind power plant.
12 a BL-6 1 13
Draw the line diagram of various types of wind mill blades
and write their advantagesand disadvantages.
(or)
BL-3 1 13
12 b What is tidal energy? Explain the working of a tidal power plant
with a neat sketch.
Describe the various components and working of
13 a hydroelectric system.
13 b List some turbines used in hydro electric power plant?
List the classification of dams? BL-1 1 13
14 a Explain any one type of gasifier with neat line
diagram. Mention the merits and demerits of the BL-6 1 13
same.
14 b With the help of neat sketch, explain the
BL-1 1 13
working of floating drum type biogas plant..
15 a What is geothermal energy? Explain the working
principle of a geothermal power plant with the BL-6 1 13
help of a neat sketch.
15 b Elaborate the site selection process for Micro
hydro power plant erection.
BL-1 1 13
PART-C(Answer ALL questions) (1X14 =14 Marks)
Q.NO Questions Blooms CO Mark
Level
16 a Explain the construction and working of fuel cell also
BL-6 1 14
mention its merits and demerits.
(or)
16 b Write on the factors that should be consider while selecting a
BL-3 1 14
site for a hydroelectric plant.