DAILY SCHEDULE MAINTENANCE SERVICE WHEEL MINING
KEMARIN 04/05/2025 KAI-PLT-TMP01-001A Rev 01
MAINTENANCE Total
NO KODE UNIT MODEL HM HM + - LOKASI TIRE START TIME FINISH Status REMARK
TIPE SERVICE DUR BACKLOG DUR FOLLOW UP PAP DUR Σ DUR
Wheel R10
1 KDT052 FMX 400 10769 -231 WS KM11 PS1 2 0 0 02 7.00 AM 9.00 AM DONE
2 KDT087 FMX 400 6550 50 KM23 PS2 2 0 0 02 9.00 AM 11.00 AM RESCHEDULE PROGRES SHIFT 2
F/U PAP RATING C ENGINE - VISCOSITY - 001017-
3 KDT070 FMX 400 8538 38 KM23 PS2 2 0 1 03 11.00 AM 2.00 PM RESCHEDULE PROGRES SHIFT 3
GAM-SKL-11915
4 KDT037 P360 17542 -208 WS KM11 PS2 2 0 0 02 9.30 AM 11.30 AM DONE
5 KDT044 P360 B6X4HZ 8512 -238 WS KM11 PS2 2 P1-V-BELT BROKEN PART KDT044 BELT TENSIONER 250404141 1 0 03 11.30 AM 2.30 PM DONE
Wheel A2B
P2 - PILLOW BLOCK BROKEN (KCP-006) PILLOW BLOCK ,HEXAGONAL NUT 1.F/U PAP RATING C RIGHT VIBRATION BEARING -
240402248 WEAR METAL - 001017-GAM-SKL-11838
1 KCP-006 BW211-D40 16582 82 KM23 PS2 2 1 1 04 9.30 AM 1.30 PM DONE
P2 - STEERING CYLINDER LEAK (KCP-006) KIT, SEAL 240402250 2.F/U PAP RATING C LEFT VIBRATION BEARING -
P2 - SPHERICAL PLAIN BEARING BROKEN (KCP-006) GASKET 240402251 WEAR METAL - 001017-GAM-SKL-11839
HARI INI 05/05/2025
MAINTENANCE Total
NO KODE UNIT MODEL HM (+/-) HM LOKASI TIRE START TIME FINISH Status REMARK
TIPE SERVICE DUR BACKLOG DUR FOLLOW UP PAP DUR Σ DUR
Wheel R10
1 KDT049 FMX 400 9984 -16 WS KM11 PS4 2 REPLACE RUBBER BOOGIE 1 0 03 6.00 AM 9.00 AM SCHEDULE
UNIT WARRANTY
2 KDT081 FMX 400 7269 19 KM23 PS1 2 0 0 02 9.00 AM 11.00 AM SCHEDULE
COMPONEN
3 KDT053 FMX 400 10262 12 KM23 PS1 2 0 0 02 11.00 AM 1.00 PM SCHEDULE
Wheel A2B
1 KCP-005 BW211-D40 15522 22 KM23 PS2 2 0 0 02 6.00 AM 8.00 AM SCHEDULE
2 GDKM021 GD755-5R 11111 -60 KM23 PS1 2 0 0 02 8.00 AM 10.00 AM SCHEDULE
(+/-)HM BERTANDA WARNA MERAH UNIT WAJIB DI TARIK SERVICE > 50 JAM = UNIT OVERDUO HM 50 JAM / LEBIH 50 JAM
NOTE :
(+/-)HM BERTANDA WARNA KUNING UNIT AKAN DI TARIK SERVICE < 50 JAM = OVERDUO BELUM HM 50 JAM
BESOK 06/05/2025
MAINTENANCE Total
NO KODE UNIT MODEL HM (+/-) HM LOKASI TIRE START TIME FINISH Status REMARK
TIPE SERVICE DUR BACKLOG DUR FOLLOW UP PAP DUR Σ DUR
Wheel R10
F/U PAP RATING C ENGINE - VISCOSITY - 001017-
1 KDT070 FMX 400 8538 38 KM23 PS2 2 0 1 03 6.00 AM 9.00 AM SCHEDULE
GAM-SKL-11915
UNIT WARRANTY
2 KDT084 FMX 400 6509 9 KM23 PS2 2 0 0 02 9.00 AM 11.00 AM SCHEDULE
COMPONEN
P2 - PROGRAM MIDLIFE KOMPONEN COOLING SYSTEM (KDT-
3 KDT036 P360 18246 -4 KM23 PS1 2 1 0 03 11.00 AM 2.00 PM SCHEDULE
036)RADIATOR,IDLER ROLLER240415246
UNIT WARRANTY
4 KDT091 FMX 400 6744 -6 KM23 PS1 2 0 0 02 2.00 PM 4.00 PM SCHEDULE
COMPONEN
(+/-)HM BERTANDA WARNA MERAH UNIT WAJIB DI TARIK SERVICE > 50 JAM = UNIT OVERDUO HM 50 JAM / LEBIH 50 JAM
NOTE :
(+/-)HM BERTANDA WARNA KUNING UNIT AKAN DI TARIK SERVICE < 50 JAM = OVERDUO BELUM HM 50 JAM
PREPARED BY, APPROVED BY, ACKNOWLEDGED BY, ACKNOWLEDGED BY,
REVIEW BY,
PUTRA DEDY HENDRI C ENDANG BUDIONO KUKUH YUDIANTO
MACHFUZH A
(SITE PLANNER) (PLANT DEPT HEAD) (PRODUCTION DEPT HEAD) (PROJECT MANAGER)
(SITE SECTION HEAD PLANNING)
PT. Karunia Armada Indonesia
Ganda Alam Makmur – Sangkulirang
Member of Karunia Group
DAILY SCHEDULE WASHING, GREASING & INSPECTION
Date :05 May 2025
CODE TIME HM
NO MODEL UNIT UNIT JOBDESC REMARK
SITE START STOP PLAN ACTUAL
1 FMX 400 KDT073 (WASHING, GREASING & INSPECTION)
2 FMX 400 KDT049 (WASHING, GREASING & INSPECTION)
3 FMX 400 KDT054 (WASHING, GREASING & INSPECTION)
4 FMX 400 KDT067 (WASHING, GREASING & INSPECTION)
5 FMX 400 KDT068 (WASHING, GREASING & INSPECTION)
6 FMX 400 KDT069 (WASHING, GREASING & INSPECTION)
7 FMX 400 KDT072 (WASHING, GREASING & INSPECTION)
8 FMX 400 KDT081 (WASHING, GREASING & INSPECTION)
1.
NAME MECHANIC EKSEKUTOR : 2.
3.
NAME PIC ( GROUP LEADER )
Created By, Diketahui Oleh,
Muhammad zacky hasbullah
Group Leader/Section Head