SPECIFICATIONS
SPECIFICATIONS
• FORMWORK:
• The design and engineering of the formwork as well as construction shall be the responsibility of the
contractor.
• Care shall be taken upon removal of forms to avoid spilling the concrete. No combustible wood forms
will be allowed to remain in place in the completed structure.
• STEEL WORKS:
The work included shall be cutting, bending and placing of all reinforcement which shall conform
accurately in size and position to the requirement of the contract drawings and herein. Reinforcement
shall be free from excessive rust, sca,le or other coating and shall be secured in a position be concrete
blocks.
All structural steel sections shall be made of A36 Steel. Welds shall be E70 electrodes. Reinforcing
bars shall be of Structural Grade.
• SOIL POISONING:
Prior to placing of concrete floor slabs on grounds, drainage fill and other critical parts of the structure,
soil poisoning shall be applied under and around the building with any of the available approved soil
poisoning.
• TILE FINISHES:
The tiles to be used shall conform with the samples approved by the engineer as to color texture and
quality. These tiles shall be free from lamination, serrated edges, chipped of corners, and other
imperfections on affecting their quality, appearance and strength; otherwise damaged tiles shall be
removed and be replaced by the contractor at his expense. The tilework shall be executed in thbest-
approveded manner as in the proper cutting and laying and shall be neatly done throughout.
• TINSMITH:
• Materials: Corrugate G.I. sheet gauge No. 26 and plain G.I. sheet of equal gauge shall be used for all
roofing parts.
• Gutter: Gutter shall be plain G.I. no. 26 installed in accordance with the correct drawings. The gutter
shall be pitched 1/8” per foot to the conductors.
• Conductors shall be properly and neatly soldered and anchored to the gutter. All conductors shall be
provided with a standard wire basket.
• ELECTRICAL:
• Wiring shall be done in accordance with the latest edition of the National Electric Code with the rules
and regulations of the local power company. All electrical work shall be done by experienced
electricians under the supervision of a licensed electrical engineer.
• All wiring shall be in PVC conduits for lines embedded in concrete.
• Convenience outlet shall be installed at 12” vertical height from the finished floor.
• Tumbler switches and convenience outlets shall run diagonally and must be held by clamps firmly.
• Tumbler switches shall be installed at 54” vertical height from the finished floor.
• All conduits shall be concealed in slabs, walls, and ceiling and if called for exposed, no conduits shall
run diagonally and must be held by clamps firmly.
• Ceiling outlets, convenience outlets, panel box, motor, and switches shall be in locations as shown in
the contract drawings.
• PLUMBING:
All work in this division shall comply with the provision of plumbing and sanitary rules in the locality
and the National Plumbing Code of the Philippines.
The work included: The contractor shall furnish all labor and materials, equipment, and other facilities
necessary for satisfactory completion of the plumbing job in accordance with the contract drawings,
including the construction of the septic vault, catch basin, downspouts pipes conductor, installation of
drainage, fixtures installation and waterline facilities.
Prepared by:
________________________
AILYN S. TALENTO, CE
PRC NO. : 100416
PTR :
Place/Date : Tarlac / January 2023