Bonaparte Carbon
Capture and Storage
Carbon capture and storage (CCS) is a proven technology that can avoid carbon dioxide (CO2)
from being emitted into the atmosphere by sequestering it deep underground safely and
permanently. The Bonaparte CCS project could provide the opportunity for a large-scale
multi-user carbon storage hub strategically located on the doorstep of Asia.
Global Importance of CCS to reach Net Zero
CCS is a key emission reduction technology. The International Energy l
Seou
Agency has concluded that achieving net zero by 2050 is simply not km
5,573
possible without large-scale global deployment of CCS.
SE ASIA o
Toky
Regional Importance of the 5,42
9km
e
apor
Bonaparte Basin Sing
3,253km
Australia has suitable basins for geological large-scale
Petrel Sub-basin has
storage of CO2 along the margins of the Australian
considerable CO2
continent. The Bonaparte Basin (including the Petrel storage capacity and Darwin
Sub-basin) offshore northern Australia is considered by has the potential to
AUS
Geoscience Australia (GA) and the Commonwealth host multiple
Scientific and Industrial Research Organisation (CSIRO) hundred million
as one of the most promising settings in Australia for tonne storage
projects.
large-scale CO2 storage.
Bonaparte CCS Assessment Bonaparte
Basin
(GHG Permit G-7-AP)
The Bonaparte CCS Assessment Joint Venture - with
INPEX (as Operator), TotalEnergies and Woodside Energy Bonaparte CCS
- was awarded the greenhouse gas assessment permit Assessment Joint
(G-7-AP block) in the Petrel Sub-basin in 2022. The Venture – INPEX as G-7-AP
approved assessment work program includes a Operator 53%,
Petrel
Sub-basin
Storage site
Darwin
two-well-assessment drilling campaign, new 3D seismic TotalEnergies 26%
and Woodside
and a comprehensive post-well analysis program. The
Energy 21%.
Northern
assessment program aims to demonstrate the suitability Territory
of the saline aquifers of the Petrel Sub-basin for
large-scale CO2 sequestration.
Western
Australia
The Darwin CCS Hub Concept
The CCS Hub proposed on Darwin’s Middle Arm CSIRO is leading an
industry-government
peninsula has potential for CO2 from multiple emitters to collaboration to
be aggregated into a single stream for transportation to develop the business
the Bonaparte CCS offshore injection site. The CCS Hub case for a large-scale
is likely to also include common marine infrastructure for low-emission CCS
the import of CO2 from overseas. Hub.
CO2
IMPORT
Ichthys LNG and Other Emitters TERMINAL
INPEX is actively working to decarbonise its upstream
operations, to provide a stable supply of diverse and
clean energy sources. Key to the planned Ichthys LNG has an
LNG production
decarbonisation of the INPEX-operated Ichthys LNG capacity of 9.3 mtpa
facility is the development of a large-scale CCS facility and supplies ~10% of
close to Darwin. Bonaparte CCS offers Ichthys and other Japan’s entire LNG
emitters in the region the opportunity to decarbonise at import volumes.
scale and become foundation customers via the Darwin
CCS Hub infrastructure.
Middle Arm Sustainable
Development Precinct (MASDP) 2022-23
Australian Federal
The proposed MASDP is being jointly developed
Budget includes
and funded by the Northern Territory Government A $1.5 billion in
and the Australian Government. The precinct is planned equity to
planned to allow development of new sustainable support MASDP.
industries through land allocation and investment
in essential infrastructure and ensuring CO2
emissions can be captured and transported via the
Darwin CCS Hub piping network.
EMITTERS
CO2 Imports CO2
RE
Bonaparte CCS has the potential to provide First CO2 PTU
CA
significant CO2 sequestration opportunities for injection at
Bonaparte CCS is
overseas industrial emitters and help companies targeted around South-East AG
GREG
and countries meet their global net zero 2030. Asia ATE
ambitions. Bonaparte CCS can be an enabler for
the development of the full CCS value chain, from
regional emitters across a range of industries, CO2
capture, aggregation, liquefaction, loading, T ION
shipping, receiving in Darwin, pumping/heating, FAC
UE
LIQ
transportation, and offshore geological storage.
ING
AD
LO
SHI
3,0 PPING
00-
6,0
00k
m
DA
RW
IN
LN
G
Bonaparte Basin Middle Arm
(Petrel Sub-basin) ICH Darwin,
TH
YS
LN
Australia
G
90m
ING
EIV
REC
OF
FSH
OR
E
250 PIPEL
km INE G
N
ATI
HE ING
MP
MA PU
EM SDP
CO ITT
M ERS
PR
ESS
ION
Bat
hur
st I
slan
dG
rou
p
San
dpi
per
CO
2 PLU Frig
ME ate
Sal Plo
ine
Aqu ver
ifer
~2,
000
m
Ma
lita
What is the Bonaparte
CCS Project Schedule?
The key activities leading up to the first CO2
injection into the Bonaparte Basin around
2030 are outlined below:
Storage Site Assessment SEISMIC / WELLS > STUDIES > GHG STORAGE APPROVALS
Commercial MARKET EOI > MOU > CUSTOMER BINDING AGREEMENTS
COMMENCE
FID INJECTION
Project Phases SELECT DEFINE EXECUTE
Timeline 2024 2025 2026 2027 2028 2029 2030