0% found this document useful (0 votes)
20 views101 pages

Movement of RMC Rakes - 2025-26

The document details the movement of various rail and ballast rakes as of April 2, 2025, including their destinations, loading and unloading statuses, and any damages reported. Specific rakes are tracked with timestamps for their movements, loading completion, and unloading progress. The report indicates ongoing operations and issues such as labor shortages affecting unloading schedules.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views101 pages

Movement of RMC Rakes - 2025-26

The document details the movement of various rail and ballast rakes as of April 2, 2025, including their destinations, loading and unloading statuses, and any damages reported. Specific rakes are tracked with timestamps for their movements, loading completion, and unloading progress. The report indicates ongoing operations and issues such as labor shortages affecting unloading schedules.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 101

MOVEMENT OF RMC RAKE AS ON 01.04.

25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(f Status on date
No. (Div) stabled at
rom/date)
10 RP Empty On 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at 09:50 hrs of 21.03.25,
1 NBQ FB Plant
(Rake No-1) run/BSGN and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loading started at 13:20 hrs, completed at 11.00 hrs of
7.3.25 (41 New +19 nos SH). On 10.03.25, Rake checked by TXR at NBQ yard found one loaded BRN damage. Rake re-placed at 00.20 hrs of 12.03.25
20 RP NLP Rail, Rake
3 NLP/RNY NBQ unloading of Panel completed at 13.00 hrs of 13.3.25. (SECRBRN/55140312063 & NWBRN/56110871795) and 2 wagon ROH due. Jt inspection done on
18.03.25. 2 damaged wagon sent to W/Shop at 17:35 hrs of 20.03.25. Estimate prepared and sent to DEN/III/RNY for fund allocation. FAC issued on
27.03.25. Work will start after the wagons placement at designated shop on 01.04.25.
BSPC 20 RP Rake Indented on 04.03.25 for SSE/PW/MRG at LEDO. Loaded on 17.03.25, arrived BIA at 01:05 hrs on 18.03.25.Left BIA 14:22 hrs of 19.03.25, left MLDT at
4 no.1158 (LLO Rail) MRG/TSK TII 08:45 hrs on 24.03.25. Arrived TII at 15:00 hrs on 31.03.25. On 01.04.25- 22 panel unloaded betn DBY-MRG and MRG-LLO.LLO, LLO Yard. Balance=
38 panel.

Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs on 18.03.25. Left BIA 14:22 hrs of 19.3.25, left MLDT at 08:45
on 24.03.25, arrived CGON at 07:10 hrs on 26.03.25. On 26.03.25- 3 panels unloaded in CGON- MRZA U/L. On 27.03.25- Block not granted. On
BSPC 20 RP Rake BIA 28.03.25, 11 panels unloaded. On 29.03.25-14 panels unloaded in CGON- MRZA Up. On 30.03.25- 07 Panels unloaded in CGON-MRZA, CGON- BMGN
5 AZA/RNY JPZ
no.1183 (AZA Rail) 19.03.25 and CGON- BOKO. On 31.03.25 No Labour. On 01.04.25- 4 panel unloaded betn BNGN-NBQ (DL). Balance=21 panel

BSPC 20 RP Rake
6 no.1165 (NTSK Rail) NTSK/TSK Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake arrived BIA at 22:20 hrs
BSPC 20 RP Rake no.13
7 NTSK/TSK Indented on 24.03.25 for SSE/PW/MXN at NTSK. Not yet loaded.
(NTSK Rail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

49 BOBYNs loaded at Pakur 07:30 hrs on 29.03.25 for SSE/PW/S/NJP at MOP. Left MLDT at 17.52 hrs opf 29.3.25, BKRD at 20.55 hrs of 29.3.25.
1 MOP Ballast Ld= 49 PKR MOP/KIR BKRD
Unloading plan KMRJ - SM BCM site. On 30.03.25- No block slot. 31.03.25 and 01.04.25 no plan due to no labour.

51 Nos BOBYN Empty placed at 20.00 hrs on 27.03.2025 for SSE/PW/FLK at DQG. Loading started at 08:00 hrs on 28.03.25, completed at 21.00 hrs
2 DQG Ballast Ld= 51 JOQ DQG/APDJ FKM on 29.03.25. On 30.03.25 - 16 Wagons unloaded in CROA-FKM PQRS site. 31.03.25 No Labour. On 1.4.25- 35 Wagon 100% unloaded betn FKM-
CROA.
53 Nos BOBYN Empty placed at 10.00 hrs on 30.03.2025 for SSE/PW/COB at BXT. Loading started at 11.00 hrs. Loading completed at 3:00 hrs of
3 BXT Ballast Ld= 53 JOQ BXT/APDJ JOQ
01.04.25. To be rebooked to DBB under SSE/PW/TFGN for BCM site (NCB-MRDG).
53 Nos BOBYN Empty placed at 19:05 hrs on 29.03.2025 for SSE/PW/NOQ at JOQ. Loading completed at 0:05 hrs on 30.03.25.Rake drooped at PQZ
4 JOQ Ballast, Ld= 51 BKLE NOQ/APDJ PQZ
at 14:50 hrs of 31.03.25. On 1.4.25=- 51 Wagon100 % unloaded betn NCB-PQZ-SJRR (Dn)
53 BOBYNs placed at 02:20 hrs for SSE/PW/DPU at SKHV. JPO done 06:00- 09:30 hrs. Loading started at 19:00 hrs. of 22.3.25 & completed at 20:10 hrs on
SKHV Ballast NJN
5 SKHV/LMG KHKT 23.03.25. Unloading plan RXR- DSR BCM Site. Rake arrived KHKT at 22:20 hrs on 24.03.25 and dropped. On 25/26/27/28 /29/ 30 /31.03.25, 1/4/25-no
Ld= 53 (24.03.25)
power.

SKHV Ballast NJN 53 BOBYNs placed at 18:30hrs for SSE/PW/DPU at LMG. JPO done 07:00- 09:00 hrs. Loading started at 9:10 hrs Loading completed at 21.00 hrs .of
6 DPU/LMG NJN
Ld= 53 (31.03.25) 31.03.25. Unloading plan on 2.4.25

SKHV/NTSK Ballast 48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake is rebooked to NTSK. Rake left CPQ at 09:40 hrs on 25.03.25, arrived LKG at 12:55 hrs on 26.03.25 &
CPQ
7 Ld= 48 NTSK/TSK FKG dropped. (Re-booking Commercial formalities by Con Processed on 29.3.25). On 30.03.25 not yet moved. On 31.03.25 left LKG at 14.18 hrs.Arrived FKG at
24.03.25
(Con to O/L-TSK) 19.50 hrs. On 1.4.25- 12 wagon unloaded betn FKG-JMI. On 2.4.25- Wagon betn FKG-KXL. Balance= Wagon.

51 BOBYN Empty placed at 5.10 hrs on 26.03.2025 for SSE/PW/NAM at NTSK. Loading completed at 09.55 hrs of 26.03.25. Rake arrived DMGN 3.00 hrs on
8 NTSK Ballast Ld= 51 BKLE NTSK/TSK DMGN 30.03.25. To unload in SPGN-DJG & SFR-LXA PQRS Site. On 30.03.25-No power. On 31.03.25, 15 unloaded betwn SPGN-CGF. On 1.4.25- 22 Wagon
unloaded betn DJG-CGF. 2.4.25- 14 wagon 100% unloaded betn DJG-NHK.Balance=14 Wagon

SPTR 53 BOBYN Empty placed at 06:30 hrs on 31.03.2025 for SSE/PW/W/NLP at NLP. Loading started at 8:00 hrs and completed at 21:45 hrs of 31.03.25.
9 MZS Ballast, Ld=53 MZS/TSK MZS
29.03.25 Unloading plan at PQRS site. 1.4.25- No power
MOVEMENT OF RMC RAKE AS ON 02.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(f Status on date
No. (Div) stabled at
rom/date)
10 RP Empty On 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at 09:50 hrs of 21.03.25,
1 NBQ FB Plant
(Rake No-1) run/BSGN and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loading started at 13:20 hrs, completed at 11.00 hrs of
7.3.25 (41 New +19 nos SH). On 10.03.25, Rake checked by TXR at NBQ yard found one loaded BRN damage. Rake re-placed at 00.20 hrs of 12.03.25
20 RP NLP Rail, Rake
3 NLP/RNY NBQ unloading of Panel completed at 13.00 hrs of 13.3.25. (SECRBRN/55140312063 & NWBRN/56110871795) and 2 wagon ROH due. Jt inspection done on
18.03.25. 2 damaged wagon sent to W/Shop at 17:35 hrs of 20.03.25. Estimate prepared and sent to DEN/III/RNY for fund allocation. FAC issued on
27.03.25. Work will start after the wagons placement at designated shop on 01.04.25.
BSPC 20 RP Rake Indented on 04.03.25 for SSE/PW/MRG at LEDO. Loaded on 17.03.25, arrived BIA at 01:05 hrs on 18.03.25.Left BIA 14:22 hrs of 19.03.25, left MLDT at
no.1158 (LLO Rail) BIA 08:45 hrs on 24.03.25. Arrived TII at 15:00 hrs on 31.03.25. On 01.04.25- 22 panel unloaded betn DBY-MRG and MRG-LLO.LLO, LLO Yard. On
4 MRG/TSK MRG
19.03.25 02.04.25- 23 panel unloaded betn DBY-MRG including MRG Yard. Balance= 15 panels.

Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs on 18.03.25. Left BIA 14:22 hrs of 19.3.25, left MLDT at 08:45
on 24.03.25, arrived CGON at 07:10 hrs on 26.03.25. On 26.03.25- 3 panels unloaded in CGON- MRZA U/L. On 27.03.25- Block not granted. On
BSPC 20 RP Rake BIA 28.03.25, 11 panels unloaded. On 29.03.25-14 panels unloaded in CGON- MRZA Up. On 30.03.25- 07 Panels unloaded in CGON-MRZA, CGON- BMGN
5 AZA/RNY BNGN
no.1183 (AZA Rail) 19.03.25 and CGON- BOKO. On 31.03.25 No Labour. On 01.04.25- 4 panel unloaded betn BNGN-NBQ (DL). On 02.04.25- 6 panel unloaded betn BNGN-NBQ
(DL). Balance= 15 panels.

BSPC 20 RP Rake
6 no.1165 (NTSK Rail) NTSK/TSK BIA Yd Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake arrived BIA at 22:20 hrs
BSPC 20 RP Rake no.13
7 NTSK/TSK Indented on 24.03.25 for SSE/PW/MXN at NTSK. Not yet loaded.
(NTSK Rail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 Nos BOBYN Empty placed at 10.00 hrs on 30.03.2025 for SSE/PW/COB at BXT. Loading started at 11.00 hrs. Loading completed at 3:00 hrs of 01.04.25.
JOQ
1 BXT Ballast Ld= 53 BXT/APDJ NOQ To be rebooked to DBB under SSE/PW/TFGN for BCM site (NCB-MRDG). Rake left JOQ at 05:40 hrs on 02.04.25, arrived NOQ at 06:55 hrs and dropped.-
02.04.25
No power for unloading.

53 Nos BOBYN Empty placed at 10.00 hrs on 30.03.2025 for SSE/PW/COB at BXT. Loading started at 11.00 hrs. Loading completed at
JOQ
2 BXT Ballast Ld= 53
02.04.25
BXT/APDJ NOQ 3:00 hrs of 01.04.25. To be rebooked to DBB under SSE/PW/TFGN for BCM site (NCB-MRDG). Rake left JOQ at 05:40 hrs on
02.04.25, arrived NOQ at 06:55 hrs and dropped. On 02.04.25, No power for unloading.

53 BOBYNs placed at 02:20 hrs for SSE/PW/DPU at SKHV. JPO done 06:00- 09:30 hrs. Loading started at 19:00 hrs. of 22.3.25 & completed at 20:10 hrs on
SKHV Ballast NJN
3 SKHV/LMG KHKT 23.03.25. Unloading plan RXR- DSR BCM Site. Rake arrived KHKT at 22:20 hrs on 24.03.25 and dropped. On 25/26/27/28 /29/ 30 /31.03.25, 01.04.25-no
Ld= 53 (24.03.25)
power. On 02.04.25- 23 wagons unloaded in DSR- SKHV. Balance= 30 wagons.

SKHV Ballast NJN 53 BOBYNs placed at 18:30hrs for SSE/PW/DPU at LMG. JPO done 07:00- 09:00 hrs. Loading started at 9:10 hrs Loading completed at 21.00 hrs .of
4 DPU/LMG NJN
Ld= 53 (31.03.25) 31.03.25. On 02.04.25 - No power

SKHV/NTSK Ballast 48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake is rebooked to NTSK. Rake left CPQ at 09:40 hrs on 25.03.25, arrived LKG at 12:55 hrs on 26.03.25 &
CPQ
5 Ld= 48 NTSK/TSK FKG dropped. (Re-booking Commercial formalities by Con Processed on 29.3.25). On 30.03.25 not yet moved. On 31.03.25 left LKG at 14.18 hrs.Arrived FKG at
24.03.25
(Con to O/L-TSK) 19.50 hrs. On 1.4.25- 12 wagon unloaded betn FKG-JMI. On 2.4.25- 12 Wagon betn FKG-KXL. Balance= 24 Wagon.

SPTR 53 BOBYN Empty placed at 06:30 hrs on 31.03.2025 for SSE/PW/W/NLP at NLP. Loading started at 8:00 hrs and completed at 21:45 hrs of 31.03.25.
6 MZS Ballast, Ld=53 MZS/TSK SPTR
29.03.25 Unloading plan at PQRS site. On 01/02.04.25- No power
MOVEMENT OF RMC RAKE AS ON 03.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(f Status on date
No. (Div) stabled at
rom/date)
10 RP Empty On 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at 09:50 hrs of 21.03.25,
1 NBQ FB Plant
(Rake No-1) run/BSGN and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loading started at 13:20 hrs, completed at 11.00 hrs of
7.3.25 (41 New +19 nos SH). On 10.03.25, Rake checked by TXR at NBQ yard found one loaded BRN damage. Rake re-placed at 00.20 hrs of 12.03.25
20 RP NLP Rail, Rake
3 NLP/RNY NBQ unloading of Panel completed at 13.00 hrs of 13.3.25. (SECRBRN/55140312063 & NWBRN/56110871795) and 2 wagon ROH due. Jt inspection done on
18.03.25. 2 damaged wagon sent to W/Shop at 17:35 hrs of 20.03.25. Estimate prepared and sent to DEN/III/RNY for fund allocation. FAC issued on
27.03.25. Wagons placed at designated shop on 02.04.25. Work not started yet.
BSPC 20 RP Rake Indented on 04.03.25 for SSE/PW/MRG at LEDO. Loaded on 17.03.25, arrived BIA at 01:05 hrs on 18.03.25.Left BIA 14:22 hrs of
no.1158 (LLO Rail) 19.03.25, left MLDT at 08:45 hrs on 24.03.25. Arrived TII at 15:00 hrs on 31.03.25. On 01.04.25- 22 panel unloaded betn DBY-MRG
BIA
4 MRG/TSK MRG and MRG-LLO.LLO, LLO Yard. On 02.04.25- 23 panel unloaded betn DBY-MRG including MRG Yard. On 03.04.25- 15 panels
19.03.25
unloaded betn DBY-MRG, 100% unloaded.
Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs on 18.03.25. Left BIA 14:22 hrs of
19.3.25, left MLDT at 08:45 on 24.03.25, arrived CGON at 07:10 hrs on 26.03.25. On 26.03.25- 3 panels unloaded in CGON- MRZA
BSPC 20 RP Rake BIA
U/L. On 27.03.25- Block not granted. On 28.03.25, 11 panels unloaded. On 29.03.25-14 panels unloaded in CGON- MRZA Up.
5 AZA/RNY BNGN On 30.03.25- 07 Panels unloaded in CGON-MRZA, CGON- BMGN and CGON- BOKO. On 31.03.25 No Labour. On 01.04.25- 4
no.1183 (AZA Rail) 19.03.25
panel unloaded betn BNGN-NBQ (DL). On 02.04.25- 6 panel unloaded betn BNGN-NBQ (DL). On 03.04.25- 2 panels unloaded
betn BNGN-NBQ (DL). Balance= 13 panels.
BSPC 20 RP Rake
6 no.1165 (NTSK Rail) NTSK/TSK BIA Yd Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25 and Rake arrived BIA at 22:20 hrs

BSPC 20 RP Rake no.13


7 NTSK/TSK Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25 to be clubbed with other NTSK rail.
(NTSK Rail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 Nos BOBYN Empty placed at 10.00 hrs on 30.03.2025 for SSE/PW/COB at BXT. Loading started at 11.00 hrs. Loading completed at
JOQ
1 BXT Ballast Ld= 53
02.04.25
BXT/APDJ NOQ 3:00 hrs of 01.04.25. To be rebooked to DBB under SSE/PW/TFGN for BCM site (NCB-MRDG). Rake left JOQ at 05:40 hrs on
02.04.25, arrived NOQ at 06:55 hrs and dropped. On 02/03.04.25, No power for unloading.

2 NCB Ballast, Ld= 53 TJPS NCB/APDJ on run/BHW 53 BOBYNs loaded at 23:00 hrs on 31.03.25 for SSE/PW/FLK at NCB. Rake left BHW 20.46 hrs on 03.04.235

53 BOBYNs placed at 02:20 hrs for SSE/PW/DPU at SKHV. JPO done 06:00- 09:30 hrs. Loading started at 19:00 hrs. of 22.3.25 &
SKHV Ballast NJN completed at 20:10 hrs on 23.03.25. Unloading plan RXR- DSR BCM Site. Rake arrived KHKT at 22:20 hrs on 24.03.25 and dropped.
3 SKHV/LMG SKHV
Ld= 53 (24.03.25) On 25/26/27/28 /29/ 30 /31.03.25, 01.04.25-no power. On 02.04.25- 23 wagons unloaded in DSR- SKHV. On 03.04.25- 30 wagons
100% unloaded in DSR- SKHV.
SKHV Ballast NJN 53 BOBYNs placed at 18:30hrs for SSE/PW/DPU at LMG. JPO done 07:00- 09:00 hrs. Loading started at 9:10 hrs Loading completed
4 DPU/LMG NJN
Ld= 53 (31.03.25) at 21.00 hrs .of 31.03.25. On 02.04.25 - No power. On 03.04.25 not planned.

48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake is rebooked to NTSK. Rake left CPQ at 09:40 hrs on 25.03.25, arrived LKG at
SKHV/NTSK Ballast
CPQ 12:55 hrs on 26.03.25 & dropped. (Re-booking Commercial formalities by Con Processed on 29.3.25). On 30.03.25 not yet moved. On
5 Ld= 48 NTSK/TSK MXN/JTTN
(Con to O/L-TSK)
24.03.25 31.03.25 left LKG at 14.18 hrs.Arrived FKG at 19.50 hrs. On 01.04.25- 12 wagons unloaded betn FKG-JMI. On 02.04.25- 12 Wagons
betn FKG-KXL. On 03.04.25- 8 Wagons unloaded in TTB-MXN, Balance= 16 Wagons.
SPTR 53 BOBYN Empty placed at 06:30 hrs on 31.03.2025 for SSE/PW/W/NLP at NLP. Loading started at 8:00 hrs and completed at
6 MZS Ballast, Ld=53 MZS/TSK SRPN
29.03.25 21:45 hrs of 31.03.25. Rake at SRPN. Unloading plan at PQRS site. On 01/02/03.04.25- No power
MOVEMENT OF RMC RAKE AS ON 04.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)

10 RP Empty On 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at 09:50 hrs of 21.03.25,
1 NBQ FB Plant
(Rake No-1) run/BSGN and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loading started at 13:20 hrs, completed at 11.00 hrs of
7.3.25 (41 New +19 nos SH). On 10.03.25, Rake checked by TXR at NBQ yard found one loaded BRN damage. Rake re-placed at 00.20 hrs of 12.03.25
20 RP NLP Rail, Rake
3 NLP/RNY NBQ unloading of Panel completed at 13.00 hrs of 13.3.25. (SECRBRN/55140312063 & NWBRN/56110871795) and 2 wagon ROH due. Jt inspection done on
18.03.25. 2 damaged wagon sent to W/Shop at 17:35 hrs of 20.03.25. Estimate prepared and sent to DEN/III/RNY for fund allocation. FAC issued on
27.03.25. Wagons placed at designated shop on 02.04.25. Work started on 04.04.25.

20 RP Empty Rake
4 BIA On run Ledo rail 100% unloaded on 3.4.25 . Empty rake left LLO at 06:05 hrs on 04.04.25, arrived NTSK at 07:30 hrs. Sent for TXR examination.
no.1158 (LLO Rail)
Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs on 18.03.25. Left BIA 14:22 hrs of 19.3.25, left MLDT at 08:45
on 24.03.25, arrived CGON at 07:10 hrs on 26.03.25. On 26.03.25- 3 panels unloaded in CGON- MRZA U/L. On 27.03.25- Block not granted. On 28.03.25,
11 panels unloaded. On 29.03.25-14 panels unloaded in CGON- MRZA Up. On 30.03.25- 07 Panels unloaded in CGON-MRZA, CGON- BMGN and CGON-
BSPC 20 RP Rake BIA
5 AZA/RNY BNGN BOKO. On 31.03.25 No Labour. On 01.04.25- 4 panel unloaded betn BNGN-NBQ (DL). On 02.04.25- 6 panel unloaded betn BNGN-NBQ (DL). On 03.04.25-
no.1183 (AZA Rail) 19.03.25
2 panels unloaded betn BNGN-NBQ (DL). On 4.4.25- 2 Panel Unloaded betn BNGN-NBQ(Dn). Balance= 11 panels.

BSPC 20 RP Rake
6 no.1165 (NTSK Rail) NTSK/TSK BIA Yd Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25 and rake left Sarona Cabin at 20:31 hrs of 04.04.25. Raipur Div of SECR.

BSPC 20 RP Rake no.13 Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25 to be clubbed with other NTSK rail. Rake left Sarona Cabin at 20:31 hrs of
7 (NTSK Rail) NTSK/TSK BIA Yard
04.04.25. Raipur Div of SECR.
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 Nos BOBYN Empty placed at 10.00 hrs on 30.03.2025 for SSE/PW/COB at BXT. Loading started at 11.00 hrs. Loading completed at 3:00 hrs of 01.04.25.
JOQ
1 BXT Ballast Ld= 53 BXT/APDJ NOQ To be rebooked to DBB under SSE/PW/TFGN for BCM site (NCB-MRDG). Rake left JOQ at 05:40 hrs on 02.04.25, arrived NOQ at 06:55 hrs and dropped.
02.04.25
On 02/03.04.25, No power for unloading. On 04.04.25, 53 wagons unloaded in NCB-MRDG-TFGN. 100% unloaded.

2 NCB Ballast, Ld= 53 TJPS NCB/APDJ on run 53 BOBYNs loaded at TPJS 23:00 hrs on 31.03.25 for SSE/PW/FLK at NCB. Rake arrived RNI at 21:00 hrs on 04.04.25.

51 BOBYN Placed at CPQ 14.30 hrs of 3.4.25 for SSE/PW/CGON at AZRA . Loading started at 18.00 hrs of 3.4.25 and completed at 19:15 hrs of 04.04.25
3 AZRA Ballast, Ld=51 CPQ AZRA/RNY CPQ
(CPQ/Con to Open line). To be unloaded between AZA-MRZA (DL).

53 BOBYNs placed at 18:30hrs for SSE/PW/DPU at LMG. JPO done 07:00- 09:00 hrs. Loading started at 9:10 hrs Loading completed at 21.00 hrs .of
SKHV Ballast NJN
4 DPU/LMG NJN 31.03.25. On 02.04.25 - No power. On 03.04.25 not planned. Rake to be rebooked to JRBM. On 04.04.25, No crew. Commercial formalities not
Ld= 53 (31.03.25)
completed.

48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake is rebooked to NTSK. Rake left CPQ at 09:40 hrs on 25.03.25, arrived LKG at 12:55 hrs on 26.03.25 &
SKHV/NTSK Ballast
CPQ dropped. (Re-booking Commercial formalities by Con Processed on 29.3.25). On 30.03.25 not yet moved. On 31.03.25 left LKG at 14.18 hrs.Arrived FKG at
5 Ld= 48 NTSK/TSK MXN/JTTN
24.03.25 19.50 hrs. On 01.04.25- 12 wagons unloaded betn FKG-JMI. On 02.04.25- 12 Wagons betn FKG-KXL. On 03.04.25- 8 Wagons unloaded in TTB-MXN. On
(Con to O/L-TSK)
04.04.025- No power. Balance= 16 Wagons.

SPTR 53 BOBYN Empty placed at 06:30 hrs on 31.03.2025 for SSE/PW/W/NLP at NLP. Loading started at 8:00 hrs and completed at 21:45 hrs of 31.03.25. Rake at
6 MZS Ballast, Ld=53 MZS/TSK SRPN
29.03.25 SRPN. Unloading plan at PQRS site. On 01/02/03/4.04.25- No power

TJPS 50 nos empty Bobyn placed at 12.30 hrs on 03.04.2025 for SSE/PW/NAM at NTSK. Loading started at 12.45 hrs and completed at 17.30 hrs. of 03.04.2025.
7 NTSK Ballast ,Ld=50 NAM/TSK BKLE
03.04.2025 Rake at TLDEat 19:31 hrs of 4.4.25
MOVEMENT OF RMC RAKE AS ON 05.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty On 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs,
1 NBQ FB Plant
(Rake No-1) run/BSGN arrived BSGN at 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at
20 RP NLP Rail, Rake 11.00 hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt
3 NLP/RNY NBQ
inspection on 18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop
on 02.04.25. Work started on 04.04.25, and in progress.
20 RP Empty Rake LLO LLO Rail 100% unloaded on 03.04.25 . Empty rake left LLO at 06:05 hrs on 04.04.25, arrived NTSK at 07:30 hrs and
4 BIA On run
no.1158 (LLO Rail) 04.04.25 TXR done. Left NTSK at 10:00 hrs on 05.04.25, passed KBY at 20:50 hrs.
Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs 18.03.25 and left at
14:22 hrs of 19.03.25, arrived CGON at 07:10 hrs on 26.03.25 and - 3 panels in CGON- MRZA U/L. On 27.03.25- Block
BSPC 20 RP Rake BIA not granted. 28.03.25, 11 panels. 29.03.25-14 panel. 30.03.25- 07 Panels in MRZA-BOKO section. 31.03.25 No
5 AZA/RNY BNGN
no.1183 (AZA Rail) 19.03.25 Labour. 01.04.25- 4 panel, 02.04.25- 6 panel, 03.04.25- 2 panels, 04.04.25, 2 Panels Unloaded betn BNGN-NBQ(Dn).
05.04.25, Block not granted. Balance= 11 panels.
BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25,
6 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK On run/JSRY
Arrived Jharsuguda R Yard (JSRY) at 19:47 hrs on 05.04.2 (CKP Div/SER)
BSPC 20 RP Rake no.13 BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25, Arrived
7 (NTSK Rail) 04.04.25 NTSK/TSK On run/JSRY
Jharsuguda R Yard(JSRY) at 19:47 hrs on 05.04.2 (CKP Div/SER)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 BOBYNs loaded at TPJS 23:00 hrs on 31.03.25 for SSE/PW/FLK at NCB. Rake arrived KAMG at 03:30 hrs on
1 NCB Ballast, Ld= 53 TJPS NCB/APDJ KAMG
05.04.25. To unload in . On 05.04.25, no crew available. 6.4.25- Wagon unloaded betn FKM-CROA (Up)

45 BOBYN Placed at CPQ 14.30 hrs of 03.04.25 for SSE/PW/CGON at AZRA. Loading started at 18:00 hrs of 03.04.25
CPQ
2 AZA Ballast, Ld=45 AZRA/RNY DDNI and completed at 19:15 hrs of 04.04.25 (CPQ/Con to Open line). Rake left CPQ at 09:25 hrs on 05.04.25, arrived
05.04.25
DDNI at 19:55 hrs. To unload in AZA - MRZA (DL).
53 BOBYNs placed at 18:30hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. On 02.04.25 -
LMG Ballast NJN
3 DPU/LMG NJN No power. On 03.04.25 not planned. Rake to be rebooked to JRBM. On 04.04.25, No crew. Commercial formalities not
Ld= 53 (31.03.25)
yet completed.

SKHV/NTSK Ballast 48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake left CPQ at 09:40 hrs on 25.03.25, Re-booked by CON to NTSK.
CPQ
4 Ld= 48 NTSK/TSK TTB On 31.03.25 left LKG at 14.18 hrs. On 01.04.25- 12 wagons unloaded betn FKG-JMI. On 02.04.25- 12 Wagons betn
24.03.25
(Con to O/L-TSK) FKG-KXL. On 03.04.25, 8 Wagons unloaded in TTB- MXN. On 04/05.04.025- No power. Balance= 16 Wagons.

SPTR 53 BOBYN Empty placed at 06:30 hrs on 31.03.2025 for SSE/PW/W/NLP at NLP. Loading started at 8:00 hrs and
5 MZS Ballast, Ld=53 MZS/TSK SRPN
29.03.25 completed at 21:45 hrs of 31.03.25. Unloading plan at PQRS site. On 01/02/03/04/05.04.25- No power
50 nos empty Bobyn placed at 12.30 hrs on 03.04.2025 for SSE/PW/NAM at NTSK. Loading started at 12.45 hrs and
6 NTSK Ballast ,Ld=50 TJPS 03.04.25 NAM/TSK On Run completed at 17.30 hrs. of 03.04.2025. Rake left TJPS at 17:45 hrs on 03.04.25, arrived GOUR MALDA(GZM) at 15:30
hrs on 05-04-25.
MOVEMENT OF RMC RAKE AS ON 06.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty On 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs,
1 NBQ FB Plant
(Rake No-1) run/BSGN arrived BSGN at 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at
20 RP NLP Rail, Rake 11.00 hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt
3 NLP/RNY NBQ
inspection on 18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop
on 02.04.25. Work started on 04.04.25, and in progress.
20 RP Empty Rake LLO LLO Rail 100% unloaded on 03.04.25 . Empty rake left LLO at 06:05 hrs on 04.04.25, arrived NTSK at 07:30 hrs and
4 BIA On run/SPQ
no.1158 (LLO Rail) 04.04.25 TXR done. Left NTSK at 10:00 hrs on 05.04.25, arrived SPQ at 01:00 hrs of 06.04.25 & stabled.
Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs 18.03.25 and left at
14:22 hrs of 19.03.25, arrived CGON at 07:10 hrs on 26.03.25 and - 3 panels in CGON- MRZA U/L. On 27.03.25- Block
BSPC 20 RP Rake BIA not granted. 28.03.25, 11 panels. 29.03.25-14 panel. 30.03.25- 07 Panels in MRZA-BOKO section. 31.03.25 No
5 AZA/RNY BNGN Labour. 01.04.25- 4 panel, 02.04.25- 6 panel, 03.04.25- 2 panels, 04.04.25, 2 Panels Unloaded betn BNGN-NBQ(Dn).
no.1183 (AZA Rail) 19.03.25
On 05.04.25, Block not granted. On 06.04.25, 4 panels unloaded in
BNGN- NBQ Dn. Balance= 7 panels.

BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25,
6 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK On run/GPH
Arrived Garpos (GPH) at 00:54 hrs on 06.04.25 (CKP Div/SER) & dropped.
BSPC 20 RP Rake no.13 BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25,
7 (NTSK Rail) 04.04.25 NTSK/TSK On run/GPH
Arrived Garpos (GPH) at 00:54 hrs on 06.04.25 (CKP Div/SER) & dropped.
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYNs loaded at TPJS 23:00 hrs on 31.03.25 for SSE/PW/FLK at NCB. On 05.04.25, no crew available. 6.4.25-
1 NCB Ballast, Ld= 53 TJPS NCB/APDJ KAMG
29 Wagon unloaded betn FKM-CROA (Up). Balance= 14 wagons.
49 BOBYNs loaded at TPJS 13.00 hrs on 04.04.25 for SSE/PW/FKM at BSGN. Arrived MLDT at 22:40 hrs on
2 BSGN Ballast, Ld= 49 TJPS BSGN/APDJ On run
06.04.25.
45 BOBYN Placed at CPQ 14.30 hrs of 03.04.25 for SSE/PW/CGON at AZRA. Loading started at 18:00 hrs of 03.04.25
CPQ
3 AZA Ballast, Ld=45 AZRA/RNY AZA and completed at 19:15 hrs of 04.04.25 (CPQ/Con to Open line). Rake arrived DDNI at 19:55 hrs of 05.04.25. On
05.04.25
06.04.25,Rake arrived AZA at 17:20. To unload in AZA- MRZA Up/Dn both. .
53 BOBYNs placed at 18:30hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. On 02.04.25 -
LMG/BPB Ballast NJN
4 DPU/LMG NJN No power. On 03.04.25 not planned. Rake is rebooked to BPB. On 04.04.25, No crew. Commercial formalities of
Ld= 53 (31.03.25)
rebooking done on 06.04.25 and Power demanded for movement.

SKHV/NTSK Ballast 48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake left CPQ at 09:40 hrs on 25.03.25, Re-booked by CON to NTSK.
CPQ
5 Ld= 48 NTSK/TSK FKG On 31.03.25 left LKG at 14.18 hrs. On 01.04.25- 12 wagons unloaded betn FKG-JMI. On 02.04.25- 12 Wagons betn
24.03.25
(Con to O/L-TSK) FKG-KXL. On 03.04.25, 8 Wagons unloaded in TTB- MXN. On 04/05/06.04.025- No power. Balance= 16 Wagons.

53 BOBYN Empty placed at 06:30 hrs on 31.03.2025 for SSE/PW/W/NLP at NLP. Loading started at 8:00 hrs and
SPTR
6 MZS Ballast, Ld=52 MZS/TSK LXA completed at 21:45 hrs of 31.03.25. Unloading plan at PQRS site. On 01/02/03/04/05.04.25- No power. On 06.04.25,
29.03.25
52 Wagon unloaded betn SFR-LXA & 100% Unloaded.
50 nos empty Bobyn placed at 12.30 hrs on 03.04.2025 for SSE/PW/NAM at NTSK. Loading started at 12.45 hrs and
7 NTSK Ballast ,Ld=50 TJPS 03.04.25 NAM/TSK On Run
completed at 17.30 hrs. of 03.04.2025. Rake arrived SXX at 23:05 hrs of 06.04.25.
MOVEMENT OF RMC RAKE AS ON 07.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty On 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at
1 NBQ FB Plant
(Rake No-1) run/BSGN 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of
20 RP NLP Rail, Rake 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged
3 NLP/RNY NBQ
sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in
progress, likely to complete by Friday 11.4.25.
20 RP Empty Rake LLO LLO Rail 100% unloaded on 03.04.25 . Empty rake left LLO at 06:05 hrs on 04.04.25, arrived NTSK at 07:30 hrs and TXR done. Left
4 BIA On run/SPQ
no.1158 (LLO Rail) 04.04.25 NTSK at 10:00 hrs on 05.04.25, arrived SPQ at 01:00 hrs of 06.04.25 & stabled.
Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs 18.03.25 and left at 14:22 hrs of
19.03.25, arrived CGON at 07:10 hrs on 26.03.25 and - 3 panels in CGON- MRZA U/L. On 27.03.25- Block not granted. 28.03.25, 11
BSPC 20 RP Rake BIA panels. 29.03.25-14 panel. 30.03.25- 07 Panels in MRZA-BOKO section. 31.03.25 No Labour. 01.04.25- 4 panel, 02.04.25- 6 panel,
5 AZA/RNY BNGN
no.1183 (AZA Rail) 19.03.25 03.04.25- 2 panels, 04.04.25, 2 Panels Unloaded betn BNGN-NBQ(Dn). On 05.04.25- No Block . On 06.04.25-4 panels betn BNGN-
NBQ Dn.On 7.4.25- 2 Panel betn BSGN-DTX(Dn) Balance= 5 panels.
BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, arrived Rourkella
6 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK On run/ROU
Jn (ROU)at 17.45 hrs of 07.04.25 (CKP Div/SER).
BSPC 20 RP Rake no.13 BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25,arrived Rourkella Jn
7 (NTSK Rail) 04.04.25 NTSK/TSK On run/GPH
(ROU)at 17.45 hrs of 07.04.25 (CKP Div/SER).
BSPC 20 RP Rake no.65
8 (NTSK Rail) NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded
BSPC 20 RP Rake no.98
9 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
(NTSK Rail)
BSPC 20 RP Rake no.124
10 (NTSK Rail) AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYNs loaded at TPJS 23:00 hrs on 31.03.25 for SSE/PW/FLK at NCB. On 05.04.25, no crew available. 6.4.25- 29 Wagon
1 NCB Ballast, Ld= 53 TJPS NCB/APDJ KAMG
unloaded betn FKM-CROA (Up). On 7.4.25- 24 Wagon100% unloaded.
49 BOBYNs loaded at TPJS 13.00 hrs on 04.04.25 for SSE/PW/FKM at BSGN. Arrived SJRR 17.27 hrs on 07.04.25. Unloading
2 BSGN Ballast, Ld= 49 TJPS BSGN/APDJ SJRR
plan SJRR-GDX(Dn)
51 BOBYNE palced at 23:45 hrs of 06.04.25 for SSE/PW/W/NLP at NLP. JPO done at 10:00 hrs and loading started at 10:00 hrs
3 NLP Ballast, Ld=51 TNL NLP/RNY TNL
of 07.04.25.( 25 loaded till 18.00 hrs.) 2nd placement required.
45 BOBYN Placed at CPQ 14.30 hrs of 03.04.25 for SSE/PW/CGON at AZRA. Loading started at 18:00 hrs of 03.04.25 and completed
CPQ
4 AZA Ballast, Ld=45 AZRA/RNY AZA at 19:15 hrs of 04.04.25 (CPQ/Con to Open line). Rake arrived DDNI at 19:55 hrs of 05.04.25.On 7.4.25- 27 Wagon unloaded betn
05.04.25
AZA- MRZA DN.Balance= 18 wagon
53 BOBYNs placed at 18:30hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. On 02.04.25 - No power. On
LMG/BPB Ballast NJN
5 DPU/LMG NJN 03.04.25 not planned. Rake is rebooked to BPB. On 04.04.25, No crew. Commercial formalities of rebooking done on 06.04.25.
Ld= 53 (31.03.25)
On 07.04.25 no power.
SKHV/NTSK Ballast 48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake left CPQ at 09:40 hrs on 25.03.25, Re-booked by CON to NTSK. On 31.03.25 left
CPQ
6 Ld= 48 NTSK/TSK FKG LKG at 14.18 hrs. On 01.04.25- 12 wagons unloaded betn FKG-JMI. On 02.04.25- 12 Wagons betn FKG-KXL. On 03.04.25, 8 Wagons
24.03.25
(Con to O/L-TSK) unloaded in TTB- MXN. On 04/05/06/07.04.025- No power. Balance= 16 Wagons.
On 50 nos empty Bobyn placed at 12.30 hrs on 03.04.2025 for SSE/PW/NAM at NTSK. Loading started at 12.45 hrs and completed at
7 NTSK Ballast ,Ld=50 TJPS 03.04.25 NAM/TSK
Run/SNCA 17.30 hrs. of 03.04.2025. Arrived SNCA 17.40 hrs of 07.04.25 & crew CFR.
MOVEMENT OF RMC RAKE AS ON 08.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at
1 NBQ FB Plant BSGN
(Rake No-1) 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of
20 RP NLP Rail, Rake 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged
3 NLP/RNY NBQ
sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in
progress, likely to complete by Friday 11.04.25.
20 RP Empty Rake LLO LLO Rail 100% unloaded on 03.04.25 . Empty rake left LLO at 06:05 hrs on 04.04.25, arrived NTSK at 07:30 hrs and TXR done. Left
4 BIA On run/SPQ
no.1158 (LLO Rail) 04.04.25 NTSK at 10:00 hrs on 05.04.25, arrived SPQ at 01:00 hrs of 06.04.25 & stabled.
Indented on 04.03.25 for SSE/PW/CGON at AZA. Loaded on 17.03.25, arrived BIA at 01:10 hrs 18.03.25 and left at 14:22 hrs of
19.03.25, arrived CGON at 07:10 hrs on 26.03.25 and - 3 panels in CGON- MRZA U/L. On 27.03.25- Block not granted. 28.03.25, 11
BSPC 20 RP Rake BIA panels. 29.03.25-14 panel. 30.03.25- 07 Panels in MRZA-BOKO section. 31.03.25 No Labour. 01.04.25- 4 panel, 02.04.25- 6 panel,
5 AZA/RNY NBQ 03.04.25- 2 panels, 04.04.25, 2 Panels Unloaded betn BNGN-NBQ(Dn). On 05.04.25- No Block . On 06.04.25-4 panels betn BNGN-
no.1183 (AZA Rail) 19.03.25
NBQ Dn.On 7.4.25- 2 Panel betn BSGN-DTX(Dn). On 08.04.25,5 panels, 100% unloaded. Empty Rake at NBQ, to be moved
overnight.
BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed
6 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK On run
BERO(BERO) at 21:45 hrs on 08.04.25(Adra Div/SER)
BSPC 20 RP Rake no.13 BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25, passed
7 (NTSK Rail) 04.04.25 NTSK/TSK On run
BERO(BERO) at 21:45 hrs on 08.04.25(Adra Div/SER)
BSPC 20 RP Rake no.65
8 NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded
(NTSK Rail)
BSPC 20 RP Rake no.98
9 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
(NTSK Rail)
BSPC 20 RP Rake no.124
10 (NTSK Rail) AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
1 DLK Ballast, Ld= 53 PKR DLK/KIR PKR 53 BOBYNs loaded at Pakur 4.05 hrs on 08.04.25 for SSE/PW/SM at DLK. Rake not yet left MLDT.
49 BOBYNs loaded at TPJS 13.00 hrs on 04.04.25 for SSE/PW/FKM at BSGN. Arrived SJRR 17.27 hrs on 07.04.25. On 08.04.25,
2 BSGN Ballast, Ld= 49 TJPS BSGN/APDJ SJRR
20 Wagons unloaded betn SJRR - GDX(Dn). Balance= 29 Wagons.
51 BOBYNE palced at 23:45 hrs of 06.04.25 for SSE/PW/W/NLP at NLP. JPO done at 10:00 hrs and loading started at 10:00 hrs
3 NLP Ballast, Ld=51 TNL NLP/RNY TNL
and completed at 17:30 hrs on 08.04.25. To unload in SOB- KTPR, TBH- HMY Section.
43 BOBYN Placed at CPQ 14.30 hrs of 03.04.25 for SSE/PW/CGON at AZRA. Loading started at 18:00 hrs of 03.04.25 and completed
CPQ
4 AZA Ballast, Ld=43 AZRA/RNY AZA at 19:15 hrs of 04.04.25 (CPQ/Con to Open line). Rake arrived DDNI at 19:55 hrs of 05.04.25. On 07.04.25, 27 Wagon unloaded
05.04.25
betn AZA- MRZA DN. On 08.04.25, 16 Wagons unloaded in AZRA- MRZA Dn, 100% unloaded.
NJN 53 BOBYNs placed at 18:30 hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. On 02.04.25 - No power. On
LMG/BPB Ballast
5 08.04.25 BPB/LMG NLN 03.04.25 not planned. Rake is rebooked to BPB. On 04.04.25, No crew. Commercial formalities of rebooking done on 06.04.25.
Ld= 53
On 07.04.25 no power. On 08.04.25, Rake left NJN and arrived NLN at 03:53 hrs on 08.04.25.
48 BOBYNs loaded at 22:40 hrs on 24.03.25. Rake Re-booked by CON to NTSK. On 31.03.25 left LKG at 14.18 hrs. On 01.04.25- 12
SKHV/NTSK Ballast wagons unloaded betn FKG-JMI. On 02.04.25- 12 Wagons betn FKG-KXL. On 03.04.25, 8 Wagons unloaded in TTB- MXN. On
CPQ
6 Ld= 48 NTSK/TSK JTTN 04/05/06/07.04.25- No power. On 08.04.25, 16 wagons unloaded betn TTB-MXN & CMA-JTTN, and 100% unloaded.
24.03.25
On 50 nos BOBYN placed at 12.30 hrs on 03.04.2025 for SSE/PW/NAM at NTSK. Loading done on 03.04.25. Rake left TJPS at 17:45
7 NTSK Ballast ,Ld=50 TJPS 03.04.25 NAM/TSK
Run/MRZA hrs on 03.04.25, arrived MRZA at 19:41 hrs on 08.04.25.
52 nos BOBYN placed at 04:10 hrs on 08.04.25 for SSE/PW/SPTR at MZS. Loading started at 07:10 hrs, completed at 18:00 hrs.
8 MZS Ballast ,Ld=52 MZS/TSK SPTR
To unload in SPTR- MZS Section
MOVEMENT OF RMC RAKE AS ON 09.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at
1 NBQ FB Plant BSGN
(Rake No-1) 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of
20 RP NLP Rail, Rake 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged
3 NLP/RNY NBQ
sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in
progress, likely to complete by Friday 11.04.25.
4 20 RP Empty Rake BIA NBQ LLO Rail 100% unloaded on 03.04.25 . Empty rake left LLO at 06:05 hrs on 04.04.25, arrived NTSK at 07:30 hrs and TXR done. Left
no.1158 (LLO Rail) NTSK at 10:00 hrs on 05.04.25, arrived SPQ at 01:00 hrs of 06.04.25 & stabled. Arrived NBQ 2.40 hrs of 9.4.25 to be moved overnight
clubbed with AZRA Rail Empty.
5 20 RP Empty Rake BIA NBQ AZRA rail Loaded on 17.03.25, arrived BIA at 01:10 hrs 18.03.25 and left at 14:22 hrs of 19.03.25, arrived CGON at 07:10 hrs on
no.1183 (AZA Rail) 26.03.25 100% unloading completed on 8.4.25. Empty Rake at NBQ, to be moved overnight clubbed with LLO Rail Empty.
BSPC 20 RP Rake BIA On Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, arrived Durgapur
6 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK
run/DCOP Coke yard at 10.59 hrs on 09.04.25(ASN Div/ER)
BSPC 20 RP Rake no.13 BIA On Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25, arrived Durgapur
7 (NTSK Rail) 04.04.25 NTSK/TSK
run/DCOP Coke Yard at 10.59 hrs on 09.04.25(ASN Div/ER)
BSPC 20 RP Rake no.65
8 NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded
(NTSK Rail)
BSPC 20 RP Rake no.98
9 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
(NTSK Rail)
BSPC 20 RP Rake no.124
10 (NTSK Rail) AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYNs loaded at Pakur 4.05 hrs on 08.04.25 for SSE/PW/SM at DLK. Rake left MLDT at 23:50 hrs on 08.04.25, arrived EKI at
1 DLK Ballast, Ld= 53 PKR DLK/KIR SM
00:50 hrs on 09.04.25. On 09.04.25- could not be unloaded due to Crew reported sick. Balance= 53 wagons.

2 KIR Ballast, Ld= 53 KIR/KIR PKR 53 BOBYNs loaded in Pakur at 22:15 hrs on 08.04.25 for SSE/PW/E/KIR at KIR. Not yet left MLDT

49 BOBYNs loaded at TPJS 13.00 hrs on 04.04.25 for SSE/PW/FKM at BSGN. Arrived SJRR 17.27 hrs on 07.04.25. On 08.04.25, 20
3 BSGN Ballast, Ld= 49 TJPS BSGN/APDJ NBS
Wagons unloaded betn SJRR-GDX(Dn). On 09.04.25, 29 Wagons 100% unloaded betn SMTA - NBS-NOQ Up
51 BOBYNE palced at 23:45 hrs of 06.04.25 for SSE/PW/W/NLP at NLP. JPO done at 10:00 hrs and loading completed at 17:30
4 NLP Ballast, Ld=51 TNL NLP/RNY HLM
hrs on 08.04.25. HLM 21.30 hrsof 9.4.25 Unloading plan SOB- KTPR, TBH- HMY Section on 10.04.25.
45 BOBYN Loaded at CPQ 15.00 hrs of 06.04.25 for SSE/PW/CGON at AZRA. (CPQ/Con to Open line). Rake arrived AMGA 22.00
5 AZA Ballast, Ld=45 CPQ AZRA/RNY AMGA
hrs on 9.4.25. Unloading plan betn AZA- MRZA DN..
NJN
LMG/BPB Ballast 53 BOBYNs placed at 18:30 hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. Rake is rebooked to BPB.
6 08.04.25 BPB/LMG CNE
Ld= 53 Rake arrived CNE at 17.30 hrs on 09.04.25. Unloading plan betn CNE-KXJ on 10.4.25

49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs of
7 JRBM Ballast, Ld= 49 JRBM/LMG BHZ
9.4.25.
50 nos BOBYN placed at 12.30 hrs on 03.04.2025 for SSE/PW/NAM at NTSK. Loading done on 03.04.25. Rake left BXJ 21.55 hrs on
8 NTSK Ballast ,Ld=50 TJPS 03.04.25 NAM/TSK On Run/BXJ
09.04.25. Unloading plan LXA-SFR & SPK=-BFD on 10.4.25
PKR On 50 nos BOBYN placed at 17:30 hrs on 07.04.2025 for SSE/PW/FKG at MXN. Loading done at 22:30 hrs on 07.04.25. Rake left DPRA
9 MXN Ballast ,Ld=50 MXN/TSK
07.04.25 Run/DPRA 22.00 hrs of 09.04.25.
52 nos BOBYN placed at 04:10 hrs on 08.04.25 for SSE/PW/SPTR at MZS. Loading started at 07:10 hrs, completed at 18:00 hrs.
10 MZS Ballast ,Ld=52 MZS/TSK SPTR
On 9.4.25- 38 Wagon unloaded betn LMY-MZS & MZS Yard. Balance= 14 Wagon
MOVEMENT OF RMC RAKE AS ON 10.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at
1 NBQ FB Plant BSGN
(Rake No-1) 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of
20 RP NLP Rail, Rake 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged
3 NLP/RNY NBQ
sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in
progress, likely to complete by Friday 11.04.25.
4 20 RP Empty Rake BIA on run LLO Rail 100% unloaded on 03.04.25 . Empty rake left LLO at 06:05 hrs on 04.04.25, arrived NTSK at 07:30 hrs and TXR done. Left
no.1158 (LLO Rail) NTSK at 10:00 hrs on 05.04.25, arrived SPQ at 01:00 hrs of 06.04.25 & left at 23:15 hrs of 09.04.25. Left NBQ 2.40 hrs of 10.4.25
clubbed with AZRA Rail Empty. Arrived CAPG at 6:30 hrs and dropped left at 16.00 hrs
5 20 RP Empty Rake BIA on run AZRA rail Loaded on 17.03.25, arrived BIA at 01:10 hrs 18.03.25 and left at 14:22 hrs of 19.03.25, arrived CGON at 07:10 hrs on
no.1183 (AZA Rail) 26.03.25. 100% unloading completed on 8.4.25. Empty Rake at NBQ clubbed with LLO Rail empty. Both rakes arrived CAPG at 6:30
hrs of 10.04.25 and dropped. Left at 16.00 hrs
BSPC 20 RP Rake BIA On Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, arrived Durgapur
6 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK
run/DCOP Coke yard at 10.59 hrs on 09.04.25 (ASN Div/ER)
BSPC 20 RP Rake no.13 BIA On Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25, arrived Durgapur
7 (NTSK Rail) 04.04.25 NTSK/TSK
run/DCOP Coke Yard at 10.59 hrs on 09.04.25 (ASN Div/ER)
BSPC 20 RP Rake no.65
8 NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI instead of NTSK.
(NTSK Rail)
BSPC 20 RP Rake no.98
9 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
(NTSK Rail)
BSPC 20 RP Rake no.124
10 (NTSK Rail) AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYNs loaded at Pakur 4.05 hrs on 08.04.25 for SSE/PW/SM at DLK. Rake left MLDT at 23:50 hrs on 08.04.25, arrived EKI at
1 DLK Ballast, Ld= 53 PKR DLK/KIR SM 00:50 hrs on 09.04.25. On 09.04.25- could not be unloaded due to Crew reported sick.10.04.25 block not granted. Balance= 53
wagons.
53 BOBYNs loaded in Pakur at 22:15 hrs on 08.04.25 for SSE/PW/E/KIR at KIR. Left MLDT at 15:25 hrs of 09.04.25 and RWA in at
2 KIR Ballast, Ld= 53 PKR KIR/KIR RWA
0:05 hrs. ( Unloading plan JAU-SRI PQRS site)10.04.25 No plan due to RG M work .
51 BOBYNE palced at 23:45 hrs of 06.04.25 for SSE/PW/W/NLP at NLP. JPO done at 10:00 hrs and loading completed at 17:30 hrs
3 NLP Ballast, Ld=51 TNL NLP/RNY HLM
on 08.04.25. HLM 21.30 hrsof 9.4.25 On 10.4.25- 51 Wagon 100 % unloaded betn SOB- KTPR- HMY.
45 BOBYN Loaded at CPQ 15.00 hrs of 06.04.25 for SSE/PW/CGON at AZRA. (CPQ/Con to Open line). Rake arrived AMGA 22.00 hrs
4 AZA Ballast, Ld=45 CPQ AZRA/RNY AZRA
on 9.4.25. On 10.4.25- 45 wagon 100% Unloaded betn AZA- MRZA DN & AZRA Yard.
NJN
LMG/BPB Ballast 53 BOBYNs placed at 18:30 hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. Rake is rebooked to BPB.
5 08.04.25 BPB/LMG SIBR
Ld= 53 Rake arrived CNE at 17.30 hrs on 09.04.25. On 10.4.25- 18 Wagon Unloaded at CNE yard. Balance=35 Wagon
49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs of 9.4.25.
6 JRBM Ballast, Ld= 49 JRBM/LMG SIBR
Unloading plan betn SIBR-JRBM on 11.4.25
50 nos BOBYN placed at 12.30 hrs on 03.04.2025 for SSE/PW/NAM at NTSK. Loading done on 03.04.25. Rake left BXJ 21.55 hrs on
7 NTSK Ballast ,Ld=50 TJPS 03.04.25 NAM/TSK SFR
09.04.25. On 10.4.25- 50 wagon 100% Unloaded betn LXA-SFR & SPK-BOJ.
PKR 50 nos BOBYN placed at 17:30 hrs on 07.04.2025 for SSE/PW/FKG at MXN. Loading done at 22:30 hrs on 07.04.25. Rake dropped at
8 MXN Ballast ,Ld=50 MXN/TSK TTB
07.04.25 TTB 16.45 hrs of 10.04.25. Unloading plan betn MXN-TTB on 11.4.25
52 nos BOBYN placed at 04:10 hrs on 08.04.25 for SSE/PW/SPTR at MZS. Loading completed at 18:00 hrs. On 9.4.25- 38 Wagon
9 MZS Ballast ,Ld=52 SPTR MZS/TSK SPTR
unloaded betn LMY-MZS & MZS Yard. On 10.4.25-14 wagon 100% unloaded betn LMY-MZS.
52 nos BOBYN placed at 15.00 hrs on 10.04.25 for SSE/PW/SPTR at SPTR. Loading started at 16:00 hrsof 10.4.25, completed at
10 SPTR Ballast ,Ld=52 SPTR/TSK SPTR
18:10 hrs of 11.04.25. Plan between SPTR-BDLN.
MOVEMENT OF RMC RAKE AS ON 11.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at
1 NBQ FB Plant BSGN
(Rake No-1) 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of
20 RP NLP Rail, Rake 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged
3 NLP/RNY NBQ
sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in
progress, likely to complete on 12.04.25.
4
20 RP Empty Rake LLO
no.1158 (LLO Rail) 04.04.25
BIA On run Empty of LLO Rail clubbed with AZRA Rail Empty, arrived MLDT at 10:39 hrs on 11.04.25.

5 20 RP Empty Rake NBQ Empty of AZA Rail clubbed with LLO Rail empty rake, left NBQ at 02:40 hrs on 10.04.25, arrived MLDT at
no.1183 (AZA Rail) 10.04.25
BIA On run 10:39 hrs on 11.04.25.
BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25. Departed from
6 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK On run Jhapaterdhal (JTH) at 17:55 hrs of 11.04.25 (HWH div/E Rly)
BSPC 20 RP Rake no.13 BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25. Departed from
7 (NTSK Rail) 04.04.25 NTSK/TSK On run Jhapaterdhal (JTH) at 17:55 hrs of 11.04.25 (HWH div/E Rly)
BSPC 20 RP Rake no.65
8 (NTSK Rail) NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI instead of NTSK.

BSPC 20 RP Rake no.98


9 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
(NTSK Rail)
BSPC 20 RP Rake no.124
10 (NTSK Rail) AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 BOBYNs loaded at Pakur 4.05 hrs on 08.04.25 for SSE/PW/SM at DLK. Rake left MLDT at 23:50 hrs on 08.04.25, arrived EKI at
1 DLK Ballast, Ld= 53 PKR DLK/KIR SM 00:50 hrs on 09.04.25. On 09.04.25- could not be unloaded due to Crew reported sick. On 10.04.25 block not granted. On 11.04.25- 53
wagons100% unloaded in KMRJ- SM Up.

53 BOBYNs loaded in Pakur at 22:15 hrs on 08.04.25 for SSE/PW/E/KIR at KIR. Left MLDT at 15:25 hrs of 09.04.25 and RWA in at
2 KIR Ballast, Ld= 53 PKR KIR/KIR RWA
0:05 hrs. ( Unloading plan JAU-SRI PQRS site). On 10/11.04.25 Not planned due to RGM work .

3 GOGH Ballast, Ld= 53 GOGH/APDJ NMZ Empty BOBYN Rake placed at 14.20 hrs on 11.04.25 for SSE/PW/HAS at GOGH. Loading will be done on 12.04.25.

4 RNY Ballast, Ld= 51 RNY/RNY TNL 51 Empty BOBYNs placed at 03:00 hrs on 11.04.25 for SSE/PW/MJBT at RNY. Loading started 11:00 hrs.

NJN 53 BOBYNs placed at 18:30 hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. Rake is rebooked to BPB.
LMG/BPB Ballast
5 08.04.25 BPB/LMG HLX Rake arrived CNE at 17.30 hrs on 09.04.25. On 10.4.25- 18 Wagon Unloaded at CNE yard. On 11.4.25- 16 Wagons Unloaded at
Ld= 53
HLX, SQF Yard. Balance= 19 Wagons

49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs on 09.04.25.
6 JRBM Ballast, Ld= 49 BHZ JRBM/LMG SIBR
on 11.04.25 -35 Wagon unloaded betn SIBR-JRBM . Balance= 15 Wagon

PKR 50 nos BOBYN placed at 17:30 hrs on 07.04.2025 for SSE/PW/FKG at MXN. Loading done at 22:30 hrs on 07.04.25. Rake arrived
7 MXN Ballast ,Ld=50 MXN/TSK MXN
07.04.25 MXN at 16:48 hrs on 10.04.25. On 11.4.25- 15 wagon unloaded JTTN-CMA. Balance= 35 Wagon
8 SPTR Ballast ,Ld=52 SPTR/TSK SPTR 52 nos BOBYN placed at 15:00 hrs on 10.04.25 for SSE/PW/SPTR at MZS. Loading completed at 18:10 hrs of 11.04.25.
MOVEMENT OF RMC RAKE AS ON 12.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at 09:50
1 NBQ FB Plant BSGN
(Rake No-1) hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to
3 NLP/RNY NBQ
W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in progress,
likely to complete on 12.04.25.
BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25. Arrived KDPR of KIR
4 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK On run div at 23:06 hrs of 12.04.25.
BSPC 20 RP Rake BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25. Arrived KDPR of KIR div
5 no.13 (NTSK Rail) 04.04.25 NTSK/TSK On run at 23:06 hrs of 12.04.25.
BSPC 20 RP Rake
6 NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI instead of NTSK.
no.65 (NTSK Rail)
BSPC 20 RP Rake
7 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
no.98 (NTSK Rail)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYNs loaded in Pakur at 22:15 hrs on 08.04.25 for SSE/PW/E/KIR at KIR. Left MLDT at 15:25 hrs of 09.04.25 and RWA in at 0:05
1 KIR Ballast, Ld= 53 PKR KIR/KIR RWA hrs. ( Unloading plan JAU-SRI PQRS site). On 10/11.04.25 Not planned due to RGM work. On 12.04.25, 27 wagons unloaded in JAU-
SRI. Balance= 26 wagons.
Empty BOBYN Rake placed at 14.20 hrs on 11.04.25 for SSE/PW/HSA at GOGH. Loading started at 08:40 hrs on 12.04.25 and
2 GOGH Ballast, Ld= 53 GOGH/APDJ NMZ
completed at 18.20 hrs of 12.04.25.
51 Empty BOBYNs placed at 03:00 hrs on 11.04.25 for SSE/PW/MJBT at RNY. Loading started at 08:40 hrs on 12.04.25, completed at
3 RNY Ballast, Ld= 51 TNL RNY/RNY TNL
20:45 hrs. On 12.04.25, 16 wagons unloaded in GVR- KBY. Balance= 35 wagons.
NJN 53 BOBYNs placed at 18:30 hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. Rake is rebooked to BPB. Rake
LMG/BPB Ballast
4 08.04.25 BPB/LMG HLX arrived CNE at 17.30 hrs on 09.04.25. On 10.4.25- 18 Wagon Unloaded at CNE yard. On 11.4.25- 16 Wagons Unloaded at HLX, SQF
Ld= 53
Yard. On 12.04.25, 09 Wagons Unloaded at SQF Yard. Balance=10 Wagons.
49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs on 09.04.25. on
5 JRBM Ballast, Ld= 49 BHZ JRBM/LMG SIBR
11.04.25 -35 Wagons unloaded betn SIBR-JRBM . On 12.04.25 , No power. Balance= 15 Wagons.

6 LMG Ballast, Ld=51 LMG NJN 51 Empty BOBYNs placed at 04:30 hrs on 12.04.25 for SSE/PW/BXP at LMG. Loading started at 07:30 hrs. Loading in progress.

50 nos BOBYN placed at 17:30 hrs on 07.04.2025 for SSE/PW/FKG at MXN. Loading done at 22:30 hrs on 07.04.25. Rake arrived MXN
PKR
7 MXN Ballast ,Ld=50 MXN/TSK MXN at 16:48 hrs on 10.04.25. On 11.4.25- 15 wagon unloaded JTTN-CMA. On 12.04.25, 16 nos wagons unloaded in CMA- MXN, CMA-
07.04.25
JTTN Yd. Balance= 19 nos Wagons.

52 nos BOBYN placed at 15:00 hrs on 10.04.25 for SSE/PW/SPTR at MZS. Loading completed at 18:10 hrs of 11.04.25. On 12.04.25, 52
8 SPTR Ballast ,Ld=52 SPTR SPTR/TSK SPTR
nos wagons unloaded in SPTR- SRPN- BBNB. 100% unload.
MOVEMENT OF RMC RAKE AS ON 13.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at 09:50
1 NBQ FB Plant BSGN
(Rake No-1) hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to
3 NLP/RNY NBQ
W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in progress,
likely to complete on 12.04.25.
BSPC 20 RP Rake BIA
no.1165 (NTSK Rail) 04.04.25 Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25.
4 NTSK/TSK On run
Departed from JPE at 19.55 hrs on 13.04.25.
BSPC 20 RP Rake BIA
no.13 (NTSK Rail) 04.04.25 Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25.
5 NTSK/TSK On run
Departed from JPE at 19:55 hrs on 13.04.25.
BSPC 20 RP Rake
6 NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI instead of NTSK.
no.65 (NTSK Rail)
BSPC 20 RP Rake
7 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
no.98 (NTSK Rail)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYNs loaded in Pakur at 22:15 hrs on 08.04.25 for SSE/PW/E/KIR at KIR. Left MLDT at 15:25 hrs of 09.04.25 and RWA in at 0:05
1 KIR Ballast, Ld= 53 PKR KIR/KIR SRI hrs. ( Unloading plan JAU-SRI PQRS site). On 10/11.04.25 Not planned due to RGM work. On 12.04.25, 27 wagons unloaded in JAU-
SRI. On 13.04.25, 26 wagons unloaded (100%) in JAU- SRI.
Empty BOBYN Rake placed at 14.20 hrs on 11.04.25 for SSE/PW/HSA at GOGH. Loading started at 08:40 hrs on
2 GOGH Ballast, Ld= 53 NMZ GOGH/APDJ BNQ
12.04.25 and completed at 18.20 hrs of 12.04.25. On 13.04.25, Block granted but Loco shutdown.
Empty Bobyn Rake placed at 21.30 hrs on 12.04.25 for SSE/P.Way/FKM at BSGN. Loading started at 21.45 hrs on
3 BSGN Ballast, Ld=53 BSGN/APDJ PKR
12.04.25 and completed at 02:30 hrs on 13.04.25.

51 Empty BOBYNs placed at 03:00 hrs on 11.04.25 for SSE/PW/MJBT at RNY. Loading started at 08:40 hrs on 12.04.25, completed at
4 RNY Ballast, Ld= 51 TNL RNY/RNY GVR
20:45 hrs. On 12.04.25, 16 wagons unloaded in GVR- KBY. On 13.04.25, 35 wagons unloaded (100%) in GVR- KBY.

45 bobyn placed on Midnight of 09.04.25 for SSE/P.W./RNY at CGS . Loading started 08.00 hrs of 10.04.25 and completed at 09.00
5 CGS ballast, Ld= 45 CPQ RNY/RNY RNY
hrs of 11.04.25. On 13.04.25-11 nos wagon U/L CGS Yd. ,Bal=34 wagon.

NJN 53 BOBYNs placed at 18:30 hrs for SSE/PW/DPU at LMG. Loading completed at 21.00 hrs .of 31.03.25. Rake is rebooked to BPB. Rake arrived CNE
LMG/BPB Ballast
6 08.04.25 BPB/LMG HLX at 17.30 hrs on 09.04.25. On 10.4.25- 18 Wagon Unloaded at CNE yard. On 11.4.25- 16 Wagons Unloaded at HLX, SQF Yard. On 12.04.25, 09
Ld= 53 Wagons Unloaded at SQF Yard. Balance=10 Wagons. on 13.04.25, 10 nos wagon U/L (100%) at PNGM/KTX yd.

49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs on 09.04.25. on 11.04.25 -35
7 JRBM Ballast, Ld= 49 BHZ JRBM/LMG SIBR Wagons unloaded betn SIBR-JRBM . On 12/13.04.25 , No power. Balance= 15 Wagons. On 13.04.25 No power alloted.
51 Empty BOBYNs placed at 04:30 hrs on 12.04.25 for SSE/PW/BXP at LMG. Loading started at 07:30 hrs, completed at 22:00 hrs. On 13.04.25, 50
8 LMG Ballast, Ld=51 LMG NJN wagons unloaded (100%) in CJA- NJN.
50 nos BOBYN placed at 17:30 hrs on 07.04.2025 for SSE/PW/FKG at MXN. Loading done at 22:30 hrs on 07.04.25. Rake arrived MXN
PKR
9 MXN Ballast ,Ld=50 MXN/TSK SFR at 16:48 hrs on 10.04.25. On 11.4.25- 15 wagon unloaded JTTN-CMA. On 12.04.25, 16 nos wagons unloaded in CMA- MXN, CMA-
07.04.25
JTTN Yd. On 13.04.25, 19 wagons unloaded in SFR- BOJ, & 100% unloaded.

52 nos BOBYN placed at 14:30 hrs on 12.04.25 for SSE/PW/SPTR at MZS. Loading started at 07.30 hrs of 13.04.25 and completed
10 SPTR Ballast ,Ld=52 SPTR/TSK SPTR
at 18.50 hrs.
MOVEMENT OF RMC RAKE AS ON 14.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs, arrived BSGN at 09:50
1 NBQ FB Plant BSGN
(Rake No-1) hrs of 21.03.25, and dropped.
10 RP Empty
2 NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
(Rake No-2)
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to
3 NLP/RNY NBQ
W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and in progress,
likely to complete on 16.04.25.
BSPC 20 RP Rake BIA
Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25.
4 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK On run
Departed from CGS(Changsari) at 20:57 hrs on 14.04.25.
BSPC 20 RP Rake BIA
no.13 (NTSK Rail) 04.04.25 Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25.
5 NTSK/TSK On run
Departed from CGS(Changsari) at 20:57 hrs on 14.04.25.
BSPC 20 RP Rake
6 NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI instead of NTSK.
no.65 (NTSK Rail)
BSPC 20 RP Rake
7 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
no.98 (NTSK Rail)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date

49 Bobyn placed at 19.15 hrs of 12.04.25 for SSE/P.W/KNE AT NJP. Loading started 19.30 hrs of 12.04.25 and completed at 00.15 hrs of
1 NJP Ballast ,Ld=49 RJPS NJP/KIR On run
13.04.25. Not yet arrived.
Empty BOBYN Rake placed at 14.20 hrs on 11.04.25 for SSE/PW/HSA at GOGH. Loading started at 08:40 hrs on
2 GOGH Ballast, Ld= 53 NMZ GOGH/APDJ BNQ 12.04.25 and completed at 18.20 hrs of 12.04.25. On 13.04.25, loco failed. On 14.04.05=11 nos unloaded between
NKB-CLD. Balance= 42 wagons.
Empty Bobyn Rake placed at 21.30 hrs on 12.04.25 for SSE/P.Way/FKM at BSGN. Loading started at 21.45 hrs on
3 BSGN Ballast, Ld=53 BSGN/APDJ On run
12.04.25 and completed at 02:30 hrs on 13.04.25. Not yet arrived.
53 Empty BOBYNs Placed and loaded on 09.04.25 for SSE/PW/BPRD ay RNY. Rake arrived GOE at 18:00 hrs of 13.04.25. On 14.04.25
4 RNY Ballast, Ld= 53 PKR RNY/RNY GOE
no power alloted.

45 bobyn placed on Midnight of 09.04.25 for SSE/P.W./RNY at CGS handed over to OL by CON . Loading started 08.00 hrs of 10.04.25
5 CGS ballast, Ld= 45 CPQ CGS/RNY RNY and completed at 09.00 hrs of 11.04.25. On 13.04.25-11 nos wagon U/L CGS Yd. On 14.04.25=10 nos unloaded in CGS L/5 and BIZ
L/4. Bal=24 wagon.

49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs on 09.04.25. on 11.04.25 -35
6 JRBM Ballast, Ld= 49 BHZ JRBM/LMG SIBR Wagons unloaded betn SIBR-JRBM . On 12/13.04.25 , No power. Balance= 15 Wagons. On 13.04.25 and 14.04.25 No power alloted.

7 BHRB Ballast, Ld= 50 BHZ BHRB/LMG BHZ 50 BOBYNs placed at 0:05 hrs of 14.04.25 for SSE/PW/LLBR at HBRB. JPO done 06:00- 07:30 hrs. Loading completed at 20.00 Hrs on 14.04.25.

52 nos BOBYN placed at 14:30 hrs on 12.04.25 for SSE/PW/SPTR at MZS. Loading started at 07.30 hrs of 13.04.25 and completed at
8 SPTR Ballast ,Ld=52 SPTR/TSK SPTR
18.50 hrs. On 14.04.25=52 wagons unloaded between SMCP-TQM and TQM-LMY. 100% unloaded.
MOVEMENT OF RMC RAKE AS ON 15.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty 10 RP Empty rake left AZR 12:32 hrs on 19.03.25, dropped in CROA at 13:20 hrs on 20.03.25 and left at 08:30 hrs,
1 NBQ FB Plant BSGN
(Rake No-1) arrived BSGN at 09:50 hrs of 21.03.25, and dropped.
10 RP Empty
2
(Rake No-2)
NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at
20 RP NLP Rail, Rake 11.00 hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt
3 NLP/RNY NBQ
inspection on 18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop
on 02.04.25. Work started on 04.04.25, and in progress, likely to complete on 16.04.25.
BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25.
4 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK FKG
Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ.
BSPC 20 RP Rake BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25,
5 no.13 (NTSK Rail) 04.04.25 NTSK/TSK FKG
Arrived at FKG at 18:50 hrs on 15.04.25. Unloading plan in FKG- BLMR Section.
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI
6 no.65 (NTSK Rail) NTSK/TSK
instead of NTSK.
BSPC 20 RP Rake
7
no.98 (NTSK Rail)
NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
BSPC 20 RP Rake
8
no.124 (NTSK Rail)
AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
49 Bobyn placed at 19.15 hrs of 12.04.25 for SSE/P.W/KNE AT NJP. Loading started 19.30 hrs of 12.04.25 and
1 NJP Ballast ,Ld=49 RJPS NJP/KIR AUB completed at 00.15 hrs of 13.04.25. On 14.04.25 - 24 wagons unloaded between GIL-AUB. Bal= 25 wagons. On
15.04.25, No slot.
Empty BOBYN Rake placed at 14.20 hrs on 11.04.25 for SSE/PW/HSA at GOGH. Loading started at 08:40 hrs on
2 GOGH Ballast, Ld= 53 NMZ GOGH/APDJ BNQ 12.04.25 and completed at 18.20 hrs of 12.04.25. On 13.04.25, loco failed. On 14.04.25=11 nos unloaded between
NKB-CLD. On 15.04.25- 13 wagon unloading in bet NKB - BNQ. Balance= 29 wagons.

Empty Bobyn Rake placed at 21.30 hrs on 12.04.25 for SSE/P.Way/FKM at BSGN. Loading started at 21.45 hrs on
3 BSGN Ballast, Ld=53 PKR BSGN/APDJ FLK
12.04.25 and completed at 02:30 hrs on 13.04.25. Arrived FLK at 02:00 hrs on 15.04.25, and dropped.

53 Empty BOBYNs Placed and loaded on 09.04.25 for SSE/PW/BPRD ay RNY. Rake arrived GOE at 18:00 hrs of
4 RNY Ballast, Ld= 53 PKR RNY/RNY GOE
13.04.25. On 14.04.25,no power alloted. On 15.04.25,27 wagons unloaded in GOE-NLV(DN.) Balance= 26 Nos.

45 bobyn placed on Midnight of 09.04.25 for SSE/P.W./RNY at CGS handed over to OL by CON . Loading started
08.00 hrs of 10.04.25 and completed at 09.00 hrs of 11.04.25. On 13.04.25-11 nos wagon U/L CGS Yd. On
5 CGS ballast, Ld= 45 CPQ CGS/RNY BIZ
14.04.25=10 nos unloaded in CGS L/5 and BIZ L/4. On 15.04.25, 13 wagons unloaded in BIZ YD L/no -1 and 4.
Balance =11 wagons.
49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30
6 JRBM Ballast, Ld= 49 BHZ JRBM/LMG JRBM Hrs on 09.04.25. on 11.04.25 -35 Wagons unloaded betn SIBR-JRBM. On 12/13/14/15.04.25, No power alloted.
Balance= 15 Wagons.
50 BOBYNs placed at 0:05 hrs of 14.04.25 for SSE/PW/LLBR at HBRB. JPO done 06:00- 07:30 hrs. Loading
7 BHRB Ballast, Ld= 49 BHZ BHRB/LMG BHZ
completed at 20:00 Hrs on 14.04.25. To unload in KTX- BHRB. On 15.04.25, No power.
MOVEMENT OF RMC RAKE AS ON 16.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN One indent placed on 15.04.25 for SSE/PW/HSA at HSA (52 kg S/H)
10 RP Empty
2
(Rake No-2)
NBQ Empty rake arrived NBQ at 22:00 hrs of 31.01.25
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
3 NLP/RNY NBQ
17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, but LOA formalities not completed.
BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed MLDT at 19:05
4 no.1165 (NTSK Rail) 04.04.25 NTSK/TSK FKG hrs on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ.
BSPC 20 RP Rake BIA Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25, passed
no.13 (NTSK Rail) 04.04.25
5 NTSK/TSK GLGT MLDT at 19:05 hrs on 12.04.25.Arrived at FKG at 18:50 hrs on 15.04.25. On 16.04.25, 24 panels unloaded in GLGT-
NMGY. Balance= 36 panels.
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI
6 no.65 (NTSK Rail) NTSK/TSK
instead of NTSK.
BSPC 20 RP Rake
7
no.98 (NTSK Rail)
NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
BSPC 20 RP Rake
8
no.124 (NTSK Rail)
AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
49 Bobyn placed at 19.15 hrs of 12.04.25 for SSE/P.W/KNE AT NJP. Loading started 19.30 hrs of 12.04.25 and completed at 00.15 hrs of
1 NJP Ballast ,Ld=49 RJPS NJP/KIR DMZ 13.04.25. On 14.0425 - 24 wagons unloaded between GIL- AUB. On 15.04.25, No slot. On 16.04.25, 16 wagons unloaded in TMH- DMZ
Up, & 100% unloaded.
Empty BOBYN Rake placed at 14.20 hrs on 11.04.25 for SSE/PW/HSA at GOGH. Loading started at 08:40 hrs on 12.04.25 and completed at
2 GOGH Ballast, Ld= 53 NMZ GOGH/APDJ KCF 18.20 hrs of 12.04.25. On 13.04.25, loco failed. On 14.04.05=11 nos unloaded between NKB-CLD. On 15.04.25- 13 wagons unloaded in
bet NKB - BNQ. On 16.04.25, 29 wagons unloaded in HSA- KCF, & 100% unloaded.
Empty Bobyn Rake placed at 21.30 hrs on 12.04.25 for SSE/P.Way/FKM at BSGN. Loading started at 21.45 hrs on
3 BSGN Ballast, Ld=53 PKR BSGN/APDJ FKM 12.04.25 and completed at 02:30 hrs on 13.04.25. Arrived FLK at 02:00 hrs on 15.04.25. On 16.04.25, 11 wagons
unloaded in CROA- FKM Up. Balance= 42 wagons.
53 Empty BOBYNs Placed and loaded on 09.04.25 for SSE/PW/BPRD ay RNY. Rake arrived GOE at 18:00 hrs of 13.04.25. On 14.04.25,no
4 RNY Ballast, Ld= 53 PKR RNY/RNY NLV power alloted. On 15.04.25, 27 wagons unloaded in GOE - NLV Dn. On 16.04.25, 26 wagons unloaded in NLV- KTCH Dn, & 100%
unloaded.

45 bobyn placed on Midnight of 09.04.25 for SSE/P.W./RNY at CGS handed over to OL by CON . Loading started 08.00 hrs of 10.04.25 and
5 CGS ballast, Ld= 45 CPQ CGS/RNY KDKN completed at 09.00 hrs of 11.04.25. On 13.04.25-11 nos wagon U/L CGS Yd. On 14.04.25=10 nos unloaded in CGS L/5 and BIZ L/4. On
15.04.25, 13 wagons unloaded in BIZ YD L/no -1 and 4. On 16.04.25, 11 wagons unloaded in KDKN Yard, & 100% unloaded.

53 BOBYNS placed at 06:40 hrs on 13.04.25 for SSE/PW/RNY at RNY. Loading done 09:40 to 18:10 hrs on
6 RNY Ballast, Ld= 53 RNY/RNY PNVT
16.04.25. To unload in SBE, BPRD, SPQ and PBL yard.
49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs
7 JRBM Ballast, Ld= 49 BHZ JRBM/LMG JRBM on 09.04.25. on 11.04.25 -35 Wagons unloaded betn SIBR-JRBM. On 12/13/14/15/16.04.25, No power alloted.
Balance= 15 Wagons.
50 BOBYNs placed at 0:05 hrs of 14.04.25 for SSE/PW/LLBR at BHRB. JPO done 06:00- 07:30 hrs. Loading completed
8 BHRB Ballast, Ld= 49 BHZ BHRB/LMG BHRB
at 20:00 Hrs on 14.04.25. On 15.04.25, No power. On 16.04.25, all wagons, 100% unloaded in KTX- BHRB.
MOVEMENT OF RMC RAKE AS ON 17.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.

10 RP Empty Empty rake arrived NBQ at 22:00 hrs of 31.01.25. One indent placed on 15.04.25 for SSE/PW/HSA at HSA (52 kg
2 NBQ
(Rake No-2) S/H). Rake to be placed tonight for TXR Examination.

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00
20 RP NLP Rail, Rake hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on
3 NLP/RNY NBQ
18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25.
Work started on 04.04.25, and repairing completed on 16.04.25, but LOA formalities not completed.

BSPC 20 RP Rake BIA Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25,
no.1165 (NTSK Rail) 04.04.25
4 NTSK/TSK FKG passed MLDT at 19:05 hrs on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ. On
17.04.25, No power.
BSPC 20 RP Rake BIA
no.13 (NTSK Rail) 04.04.25
Indented on 24.03.25 for SSE/PW/MXN at NTSK. Loaded on 03.04.25. Rake left BIA at 13:10 hrs on 04.04.25, passed
MLDT at 19:05 hrs on 12.04.25. Arrived FKG at 18:50 hrs on 15.04.25. On 16.04.25, 24 panels unloaded in GLGT-
5 NTSK/TSK NMGY
NMGY. On 17.04.25, 36 Panels unloaded in bet GLGT- NMGY, & 100% Unloaded. Empty rake at NMGY, may move
overnight.
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI
6 no.65 (NTSK Rail) NTSK/TSK
instead of NTSK.
BSPC 20 RP Rake
7
no.98 (NTSK Rail)
NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
BSPC 20 RP Rake
8
no.124 (NTSK Rail)
AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date

50 empty placed at 13:00 hrs of 16.04.25 for SSE/PW/FLK at NCB. Loading completed at 18:00 hrs. Not yet arrived (Call at 21:45 hrs ex MLDT,
1 NCB Ballast, Ld=50 TJPS NCB/APDJ On Run Loco No. 38539)

Empty Bobyn Rake placed at 21.30 hrs on 12.04.25 for SSE/P.Way/FKM at BSGN. Loading started at 21.45 hrs on
2 BSGN Ballast, Ld=53 PKR BSGN/APDJ FKM 12.04.25 and completed at 02:30 hrs on 13.04.25. Arrived FLK at 02:00 hrs on 15.04.25. On 16.04.25, 11 wagons
unloaded in CROA- FKM Up. Balance= 42 wagons. on 17.04.25- 25 nos unloaded(FKM-KOJ) , Bal= 17 nos wagon.

53 BOBYNS placed at 06:40 hrs on 13.04.25 for SSE/PW/RNY at RNY. Loading done 09:40 to 18:10 hrs on
3 RNY Ballast, Ld= 53 PNVT RNY/RNY SBE 16.04.25. Rake left PNVT at 11:00 hrs on 17.04.25, arrived SBE at 21:50 hrs. To unloaded in SBE, BPRD, SPQ and
PBL yard.
49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs
4 JRBM Ballast, Ld= 49 BHZ JRBM/LMG KGBP on 09.04.25. on 11.04.25 -35 Wagons unloaded betn SIBR-JRBM. On 12/13/14/15/16.04.25, No power alloted. On
17.04.25, 7 wagons unloaded in KGBP Yard. Balance= 8 Wagons.
MOVEMENT OF RMC RAKE AS ON 18.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.

Empty rake arrived NBQ at 22:00 hrs of 31.01.25. One indent placed on 15.04.25 for SSE/PW/HSA at
HSA (52 kg S/H). Rake placed at S/line for TXR Examination at 07:00 hrs of 18.04.25, released at
2 HAS Rail, 52 kg S/H NBQ
13:15 hrs, one defective wagon fit at 17:00 hrs, rake placed at FB plant at 21:00 hrs. (37 panels to
be loaded)

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25.
Loaded at 11.00 hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2
20 RP NLP Rail, Rake
3 NLP/RNY NBQ wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC
issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed
on 16.04.25, but LOA formalities not completed.

Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on
BSPC 20 RP Rake BIA
4
no.1165 (NTSK Rail) 04.04.25
NTSK/TSK FKG 04.04.25, passed MLDT at 19:05 hrs on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading
plan in SFR- BOJ. On 17/18.04.25, No power.
Empty of BSPC 20 RP BIA
5 Rake no.13 04.04.25 NTSK/TSK NMGY On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18.04.25 no power.
(NTSK Rail)
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to
6 no.65 (NTSK Rail) NTSK/TSK
SSE/PW/SCE at AONI instead of NTSK.
BSPC 20 RP Rake
7
no.98 (NTSK Rail)
NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
BSPC 20 RP Rake
8
no.124 (NTSK Rail)
AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
50 empty placed at 13:00 hrs of 16.04.25 for SSE/PW/FLK at NCB. Loading completed at 18:00 hrs.
1 NCB Ballast, Ld=50 TJPS NCB/APDJ NCB
Arrived NCB at 15:40 hrs of 18.04.25. Unloading plan in NCB-MRDG Section.
Empty Bobyn Rake placed at 21.30 hrs on 12.04.25 for SSE/P.Way/FKM at BSGN. Loading started at
21.45 hrs on 12.04.25 and completed at 02:30 hrs on 13.04.25. Arrived FLK at 02:00 hrs on 15.04.25.
2 BSGN Ballast, Ld=53 PKR BSGN/APDJ FKM
On 16.04.25, 11 wagons unloaded in CROA- FKM Up. Balance= 42 wagons. on 17.04.25- 25 nos
unloaded (FKM-KOJ). On 18.04.25= 17 nos wagons, 100% unloading done.
53 BOBYNS placed at 06:40 hrs on 13.04.25 for SSE/PW/RNY at RNY. Loading done 09:40 to 18:10 hrs
3 RNY Ballast, Ld= 53 PNVT RNY/RNY SBE on 16.04.25. Rake left PNVT at 11:00 hrs on 17.04.25, arrived SBE at 21:50 hrs. On 18.04.25= 11
Wagons unloaded in SBE Yard L/4. Balance=42 nos.
49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading
completed at 20.30 Hrs on 09.04.25. on 11.04.25 -35 Wagons unloaded betn SIBR-JRBM. On
4 JRBM Ballast, Ld= 49 BHZ JRBM/LMG KGBP
12/13/14/15/16.04.25, No power alloted. On 17.04.25, 7 wagons unloaded in KGBP Yard. 18.04.25 no
power. Balance= 8 Wagons.
MOVEMENT OF RMC RAKE AS ON 19.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.

Empty rake arrived NBQ at 22:00 hrs of 31.01.25. One indent placed on 15.04.25 for SSE/PW/HSA at HSA (52 kg
10 RP H SA Rail, 52 kg( S/H). Rake placed at S/line for TXR Examination at 07:00 hrs of 18.04.25, released at 13:15 hrs, one defective
2 HSA /APDJ NBQ
S/H). wagon fit at 17:00 hrs, rake placed at FB plant at 21:00 hrs. (37 panels to be loaded) . Loading started at 07.00 hrs
on 19.04.25, completed at 16:00 hrs. No. of panels loaded = 36 nos. Rake is not withdran from plant.

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00
20 RP NLP Rail, Rake hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on
3 NLP/RNY NBQ
18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25.
Work started on 04.04.25, and repairing completed on 16.04.25, but LOA formalities not completed.

Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed
BSPC 20 RP Rake BIA
4
no.1165 (NTSK Rail) 04.04.25
NTSK/TSK BOJ MLDT at 19:05 hrs on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ. On 17/18.04.25,
No power. On 19.04.25, 9 panels unloaded in , Bal= 51 panels.
Empty of BSPC 20 RP BIA
5 Rake no.13 04.04.25 NTSK/TSK NMGY On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18/19.04.25 no power for movement.
(NTSK Rail)
BSPC 20 RP Rake
6 no.65 (NTSK Rail) NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI instead of NTSK.
BSPC 20 RP Rake
7
no.98 (NTSK Rail)
NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
BSPC 20 RP Rake
8
no.124 (NTSK Rail)
AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
52 empty Bobyn placed at 18:50 hrs of 18.04.25 for SSE/PW/TKG at SGUJ. Loading Started at 19:20 hrs, completed
1 SGUJ Ballast Ld=52 PKR SGUJ/KIR HCR at 23:50 hrs.of 18.04.25. Rake left MLDT at 16.00 hrs on 19.04.25. arrived HCR at 17:30 hrs. To U/L between HCR -
BKRD Dn.
53 bobyn placed at 21.15 hrs of 18.04.25 for SSE/PW/KNE at RNI. Loading done 21:30 hrs of 18.04.25 to 02:15 hrs
2 RNI ballast Ld=53 TJPS KNE/KIR On Run
of 19.04.25. Rake arrived MLDT at 20:30 hrs on 19-04-25. To unload in RGJ- RDP,
50 empty placed at 13:00 hrs of 16.04.25 for SSE/PW/FLK at NCB. Loading completed at 18:00 hrs. Arrived NCB at
3 NCB Ballast, Ld=50 TJPS NCB/APDJ AGMN 15:40 hrs of 18.04.25. Unloading plan in NCB-MRDG Section. On 19.04.25, 50 wagons unloaded in NCB-MRDJ,
BXHT-AGMN, & 100% unloaded.

53 BOBYNS placed at 06:40 hrs on 13.04.25 for SSE/PW/RNY at RNY. Loading done 09:40 to 18:10 hrs on 16.04.25.
4 RNY Ballast, Ld= 53 PNVT RNY/RNY SPQ Rake left PNVT at 11:00 hrs on 17.04.25, arrived SBE at 21:50 hrs. On 18.04.25= 11 Wagons unloaded in SBE Yard
L/4. On 19.04.25, 24 nos unloaded in BPRD & SPQ Yard. Bal= 15 wagons.

49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs
on 09.04.25. on 11.04.25 -35 Wagons unloaded betn SIBR-JRBM. On 12/13/14/15/16.04.25, No power alloted. On
5 JRBM Ballast, Ld= 49 BHZ JRBM/LMG KGBP
17.04.25, 7 wagons unloaded in KGBP Yard. 18.04.25 no power. Balance= 8 Wagons. On 19.04.25, 3 wagons
unloaded in KGBP Yard. Balance= 5 wagons.
6 DMR Ballast, Ld= 52 DMR/LMG BXG 52 Empty BOBYNs placed at 19:30 hrs on for SSE/PW/DMR at DMR. JPO/Loading will be done on 20.04.25.
MOVEMENT OF RMC RAKE AS ON 20.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)

10 RP H SA Rail, 52 kg( 36 nos 52 kg S/H 10 RP loaded at FB Plant/NBQ on 19.04.25 at 16:00 hrs for SSE/PW/.HSA at .HSA. Empty rake arrived NBQ at 22:00 hrs of
2 HSA /APDJ NBQ
S/H). 31.01.25. Rake left NBQ at 8:00 hrs of 20.04.25 and reach JOQ in 12.45 hrs and dropped.

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
3 NLP/RNY NBQ
17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, but LOA formalities not completed.

Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed MLDT at 19:05 hrs
BSPC 20 RP Rake BIA
4 NTSK/TSK BOJ on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ. On 17/18.04.25, No power. On 19.04.25, 9 panels
no.1165 (NTSK Rail) 04.04.25
unloaded in , Bal= 51 panels. On 20.04.25- 12 nos panels U/L ,Bal= 39 panels.

Empty of BSPC 20 RP BIA


Rake no.13 04.04.25 On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18/19.04.25 no power for movement. On 19.04.25 rake
5 NTSK/TSK NMGY
(NTSK Rail) brought to DJG. To be sent back to BSPC in one hook with other rake which is being unloaded.
BSPC 20 RP Rake
6 no.65 (NTSK Rail) NTSK/TSK Indented on 07.04.25 for SSE/PW/SLGR at NTSK. Not yet loaded. Rake has to be booked to SSE/PW/SCE at AONI instead of NTSK.
BSPC 20 RP Rake
7 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Not yet loaded
no.98 (NTSK Rail)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
52 empty Bobyn placed at 18:50 hrs of 18.04.25 for SSE/PW/TKG at SGUJ. Loading Started at 19:20 hrs, completed at
1 SGUJ Ballast Ld=52 PKR SGUJ/KIR HCR 23:50 hrs.of 18.04.25. Rake left MLDT at 16.00 hrs on 19.04.25. Arrived HCR at 17:30 hrs. To U/L between HCR -
BKRD Dn. On 20.04.25 block not granted (no slot).

53 bobyn placed at 21.15 hrs of 18.04.25 for SSE/PW/KNE at RNI. Loading done 21:30 hrs of 18.04.25 to 02:15 hrs of 19.04.25. Rake
2 RNI ballast Ld=53 TJPS KNE/KIR On Run arrived MLDT at 20:30 hrs on 19-04-25. To unload in RGJ- RDP. ON 20.04.25- Rake arrived at KAJ on 14.35 hrs.

53 BOBYNS placed at 06:40 hrs on 13.04.25 for SSE/PW/RNY at RNY. Loading done 09:40 to 18:10 hrs on 16.04.25. Rake left PNVT at
4 RNY Ballast, Ld= 53 PNVT RNY/RNY SPQ 11:00 hrs on 17.04.25, arrived SBE at 21:50 hrs. On 18.04.25= 11 Wagons unloaded in SBE Yard L/4. On 19.04.25, 24 nos unloaded in
BPRD & SPQ Yard. Bal= 15 wagons. On 20.04.25- 04 nos wagon U/L in PBL Yd. Bal= 11 nos Wagon.

49 BOBYNs placed at 18:30 hrs for SSE/PW/SCL at JRBM. JPO done 06:30- 08:00 hrs. Loading completed at 20.30 Hrs on 09.04.25. on
11.04.25 -35 Wagons unloaded betn SIBR-JRBM. On 12/13/14/15/16.04.25, No power alloted. On 17.04.25, 7 wagons unloaded in KGBP
5 JRBM Ballast, Ld= 49 BHZ JRBM/LMG KGBP
Yard. 18.04.25 no power. Balance= 8 Wagons. On 19.04.25, 3 wagons unloaded in KGBP Yard. Balance= 5 wagons. On 20.04.25- 05
nos wagon U/L in KGBP Yd.(100%)

52 Empty BOBYNs placed at 19:30 hrs on for SSE/PW/DMR at DMR. Loading started at 10:30 hrs of 20.04.25 and
6 DMR Ballast, Ld= 52 DMR/LMG BXG
stopped due to complain of CGS/BXG along with RPF staff.
MOVEMENT OF RMC RAKE AS ON 21.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
36 nos 52 kg S/H 10 RP loaded at FB Plant/NBQ on 19.04.25 at 16:00 hrs for SSE/PW/.HSA at .HSA. Empty rake arrived NBQ at 22:00 hrs of
10 RP H SA Rail, 52 kg(
2 HSA /APDJ NBQ 31.01.25. Rake left NBQ at 8:00 hrs of 20.04.25 and reach JOQ in 12.45 hrs and dropped. On 21.04.25= 21 panels unloaded between APDJ-
S/H).
RVK. 22.4.25- No power.Balance=15 panels.

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
3 NLP/RNY NBQ
17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, but LOA formalities not completed.

Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed MLDT at 19:05 hrs
BSPC 20 RP Rake BIA on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ. On 17/18.04.25, No power. On 19.04.25, 9 panels, on
4 NTSK/TSK BOJ
no.1165 (NTSK Rail) 04.04.25 20.04.25- 12 nos panels unloaded between BOJ-SFR. On 21.4.25= 16 panel unloaded betn BOJ-SFR. On 22.4.25- No power. Bal= 23
panels.
Empty of BSPC 20 RP BIA
Rake no.13 04.04.25 On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18/19.04.25 no power for movement. On 19.04.25 rake brought to DJG. To be
5 NTSK/TSK NMGY
(NTSK Rail) sent back to BSPC in one hook with other rake which is being unloaded.

BSPC 20 RP Rake
6 no.65 (AONIRail) AONI/LMG Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25.
BSPC 20 RP Rake
7 NTSK/TSK Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25.
no.98 (NTSK Rail)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 bobyn placed at 21.15 hrs of 18.04.25 for SSE/PW/KNE at RNI. Loading done 21:30 hrs of 18.04.25 to 02:15 hrs of 19.04.25. Rake
1 RNI ballast Ld=53 TJPS RNI/KIR KAJ arrived at KAJ 14.35 hrs on 20.04.25- . On 21.04.25- 35 nos unloaded between KAJ-RDP. On 22.4.25- 18 Wagon 100% unloaded betn
BJY-KAJ-RGJ.

51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/SM at HCR . Loading done 21:00 hrs of 19.04.25. Rake re booked to
2 BSGN Ballast, Ld= 51 BKIR BSGN/APDJ SXX
SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. Unloading plan betn KOJ-BSGN(Dn). On 22.4.25 - No power.

3 BSGN Ballast, Ld= 52 BKIR BSGN/APDJ On run 52 BOBYN Loading done 20:40 hrs of 20.04hrs of 20.04.25 for SSE/PW/FKM at BSGN. . Rake left EKI 11.17 hrs of 22.4.25

53 BOBYNS placed at 06:40 hrs on 13.04.25 for SSE/PW/RNY at RNY. Loading done 09:40 to 18:10 hrs on 16.04.25. Rake left PNVT at
11:00 hrs on 17.04.25, arrived SBE at 21:50 hrs. On 18.04.25= 11 Wagons unloaded in SBE Yard L/4. On 19.04.25, 24 nos unloaded in
4 RNY Ballast, Ld= 53 PNVT RNY/RNY SPQ
BPRD & SPQ Yard. Bal= 15 wagons. On 20.04.25- 04 nos wagon U/L in PBL Yd. On 21.4.24- Less block granted Not availed. On
22.4.25- 11 Wagon 100% unloaded at NLV yard.

52 Empty BOBYNs placed at 19:30 hrs on for SSE/PW/DMR at DMR. Loading started at 10:30 hrs of 20.04.25 and stopped due to complain
5 DMR Ballast, Ld= 52 DMR/LMG BXG of CGS/BXG along with RPF staff. Restarted at 17:50 hrs and completed at 10:00 hrs of 21.04.25. On 22.4.25- Wagon unloaded betn BXG-
NKMG . Balance= Wagon
MOVEMENT OF RMC RAKE AS ON 22.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
36 nos 52 kg S/H 10 RP loaded at FB Plant/NBQ on 19.04.25 at 16:00 hrs for SSE/PW/.HSA at .HSA. Empty rake arrived NBQ at 22:00 hrs of
10 RP H SA Rail, 52 kg(
2 HSA /APDJ NBQ 31.01.25. Rake left NBQ at 8:00 hrs of 20.04.25 and reach JOQ in 12.45 hrs and dropped. On 21.04.25= 21 panels unloaded between APDJ-
S/H).
RVK. 22.4.25- No power.Balance=15 panels.

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
3 NLP/RNY NBQ
17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, but LOA formalities not completed.

Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed MLDT at 19:05 hrs
BSPC 20 RP Rake BIA on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ. On 17/18.04.25, No power. On 19.04.25, 9 panels, on
4 NTSK/TSK BOJ
no.1165 (NTSK Rail) 04.04.25 20.04.25- 12 nos panels unloaded between BOJ-SFR. On 21.4.25= 16 panel unloaded betn BOJ-SFR. On 22.4.25- No power. Bal= 23
panels.
Empty of BSPC 20 RP BIA
Rake no.13 04.04.25 On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18/19.04.25 no power for movement. On 19.04.25 rake brought to DJG. To be
5 NTSK/TSK NMGY
(NTSK Rail) sent back to BSPC in one hook with other rake which is being unloaded.

BSPC 20 RP Rake BIA


6 no.65 (AONIRail) AONI/LMG on run Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25.Left BIA 13,38 hrs of 22.4.25
22.04.25
BSPC 20 RP Rake BIA
7 NTSK/TSK on run Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25.Left BIA 13,38 hrs of 22.4.25
no.98 (NTSK Rail) 22.04.25
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 bobyn placed at 21.15 hrs of 18.04.25 for SSE/PW/KNE at RNI. Loading done 21:30 hrs of 18.04.25 to 02:15 hrs of 19.04.25. Rake
1 RNI ballast Ld=53 TJPS RNI/KIR KAJ arrived at KAJ 14.35 hrs on 20.04.25- . On 21.04.25- 35 nos unloaded between KAJ-RDP. On 22.4.25- 18 Wagon 100% unloaded betn
BJY-KAJ-RGJ.

51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re booked to
2 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SXX
SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. Unloading plan betn KOJ-BSGN(Dn). On 22.4.25 - No power.

3 BSGN Ballast, Ld= 52 PKR BSGN/APDJ KLGR 52 BOBYN Loading done 20:40 hrs of 20.04hrs of 20.04.25 for SSE/PW/FKM at BSGN. . Rake Arrived KLGR at 21.00 hrs of 22.4.25

53 BOBYNS placed at 06:40 hrs on 13.04.25 for SSE/PW/RNY at RNY. Loading done 09:40 to 18:10 hrs on 16.04.25. Rake left PNVT at
11:00 hrs on 17.04.25, arrived SBE at 21:50 hrs. On 18.04.25= 11 Wagons unloaded in SBE Yard L/4. On 19.04.25, 24 nos unloaded in
4 RNY Ballast, Ld= 53 PNVT RNY/RNY SPQ
BPRD & SPQ Yard. Bal= 15 wagons. On 20.04.25- 04 nos wagon U/L in PBL Yd. On 21.4.24- Less block granted Not availed. On
22.4.25- 11 Wagon 100% unloaded at NLV yard.

41 Empty BOBYNs placed at 19:30 hrs on for SSE/PW/DMR at DMR. Loading started at 10:30 hrs of 20.04.25 and stopped due to complain
5 DMR Ballast, Ld= 41 DMR/LMG BXG of CGS/BXG along with RPF staff. Restarted at 17:50 hrs and completed at 10:00 hrs of 21.04.25. On 22.4.25- 4Wagon unloaded betn BXG-
NKMG . Balance= 37Wagon
Detention of Ballast & Rail Rakes ( 1.4.25 to 20.4.25)
RAIL RAKES
Arrived
SN Divn Commodity Wagon Loaded on Unloading details
destination

Actualy loaded on 9.4.25, 10.4.25- Moved from BHZ to ARCL 11.4.25=35 wagon SIBR-JRBM(12.4.to 16.4.25-No power). 17.4.25=7
1 LMG Ballast BOBYN 49 9.4.25 BHZ 10.4.25
wagon KGBP yard.18.4.25=No power. 19.4.25=3 wagon KGBP yd. 20.4.25=5 wagon at KGBP yd.100% unloaded

1.4.25= 123 wagon FKG-JMI, 2,4,25= 12 wagon=FKG-KXL, 3.4.25= 8 wagon = TTB-MXN, 4,4,25 to 7,4,25= No power. 8.4.25=16 wagon
2 TSK Ballast BOBYN 49 31.3.25 Ex CPQ 31.3.25
betn CMA-MXN.100% unloaded

15.4.25 ex 16.4.25 to 18.4.25= No power. 19.4.25= 9 panel betn BOJ-SFR, 20.4.25= 12 panel BOJ-SFR, 21.4.25= 16 panel BOJ-SFR. 22.4.25= No
3 TSK Rail 20 RP ex BSPC 15.4.25
BSPC power. 23.4.25= 13 Panel. Balance= 10 panel.

Ex NJN Re-
Arrived CNE on 9.4.25, 10.4.25= 18 wagon CNE yd, 11.4.25=16 wagon HLX yd,12.4.25=9 wagon,SQF yd, 13.4.25=10 PNGM & KTX Yard.
4 LMG Ballast BOBYN 53 booked on 9.4.25
100% unloaded.
4.4.25

5 TSK Ballast BOBYN 50 10.4.25 ex PKR 10.4.25 11.4.25=15 wagon JTTN-CMA,12.4.25= 16 wagon CMA-MXN,CMA-JTTN,13.4.25=19 wagon betn SFR-BOJ. 100% unloaded.

6 TSK Rail 20 RP ex BSPC BSPC 31.03.25 1.4.25=22 panel LLO-MRG,DBY-MRG,2.4.25=23 panel DBY-MRG, 3,4,25=15 panel DBY-MRG= 100% unloaded.

7 TSK Ballast BOBYN 51 Ex BKIR 30.03.25 31.3.25= 15 wagon SPGN-CGF, 1.4.25=22 wagon DJG-CGF, 2.4.25=14 wagon DJG-NHK. 100% unloaded.

8 APDJ Ballast BOBYN 53 Ex TPJS 15.4.25 16.4.25= 11 wagon betn CROA-FKM,17.4.25=25 wagon FKM-KOJ, 18.4.25=17 wagon FKM-KOJ. 100% unloaded.

9 APDJ Ballast BOBYN 49 Ex NMZ 12.4.25 13.4.25 13.4.25= Power failure, 14.4.25= 11wagon NKB-CLD, 15.4.25= 13 waghon NKB-BNQ, 16.4.25=29 wagon HSA-KCF. 100% unloaded.

10 APDJ Ballast BOBYN 51 Ex JOQ 29.3.25 30.3.25 30.3.25= 16 wagon betn CROA-FKM, 31.3.25= No labour, 1.4.25= 35 wagon betn CROA-FKM, 100% unloaded.

11 LMG Ballast BOBYN 53 Ex NJN 31.3.25 1.4.25 1.4.25= Not plan, 2.4.25= 23 wagon DSR-SHKV, 3.4.25= 30 wagon, SHKV-DSR. 100% unloaded

12 TSK Ballast BOBYN 52 Ex SPTR 8.4.25 9.4.25= 38 wagon betn LMY-MZS, 10.4.25= 14 wagon betn LMY-MZS. 100% unloaded.

13 APDJ Ballast BOBYN 49 Ex TPJS 7.4.25 8.4.25= 20 wagon betn SJRR-GDX, 9.4.25= 29 wagon betn SMTA-NOQ. 100% unloaded.
MOVEMENT OF RMC RAKE AS ON 23.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
36 nos 52 kg S/H 10 RP loaded at FB Plant/NBQ on 19.04.25 at 16:00 hrs for SSE/PW/.HSA at .HSA. Empty rake arrived NBQ at 22:00 hrs of
10 RP H SA Rail, 52 kg(
2 HSA /APDJ NBQ 31.01.25. Rake left NBQ at 8:00 hrs of 20.04.25 and reach JOQ in 12.45 hrs and dropped. On 21.04.25= 21 panels unloaded between APDJ-
S/H).
RVK. 22.4.25- No power.23.4.25= No crew.Balance=15 panels.

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
20 RP NLP Rail, Rake 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
3 NLP/RNY NBQ
17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, but LOA formalities not completed.

Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed MLDT at 19:05 hrs
BSPC 20 RP Rake BIA on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ. On 17/18.04.25, No power. On 19.04.25, 9 panels, on
4 NTSK/TSK BOJ
no.1165 (NTSK Rail) 04.04.25 20.04.25- 12 nos panels unloaded between BOJ-SFR. On 21.4.25= 16 panel unloaded betn BOJ-SFR. On 22.4.25- No power. on
23.4.25- 13 panel betn DBY-MRG,MRG-LLO. Bal= 10 panels.
Empty rake 20 RP On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18/19.04.25 no power for movement. On 19.04.25 rake brought to DJG. To be
5 NTSK Rail.no.13 BIA On run/AONI sent back to BSPC in one hook with other rake which is being unloaded. Empty left DJG 15,45 hrs of 22.4.25, BGN at 18.30 hrs of
23.4.25
BSPC 20 RP Rake BIA Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25.Left BIA 13,38 hrs of 22.4.25, arrived Bhupdeopur(BEF)
6 no.65 (AONIRail) AONI/LMG on run
22.04.25 14.21 hnrs of 23.4.25(SEC/BSP)
BSPC 20 RP Rake BIA Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25.Left BIA 13,38 hrs of 22.4.25,arrived Bhupdeopur(BEF) 14.21
7 NTSK/TSK on run
no.98 (NTSK Rail) 22.04.25 hnrs of 23.4.25(SEC/BSP)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date

1 HCR ballast Ld=53 PKR HCR/KIR PKR 53 BOBYN placed at 18.00 hrs of 22.04.25 for SSE/PW/OMLF at HCR. Loading completed 23.00 hrs of 22.04.25

51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re booked to
2 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SXX SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. Unloading plan betn KOJ-BSGN(Dn). On 22/23.4.25 - No
power.
52 BOBYN Loading done 20:40 hrs of 20.04hrs of 20.04.25 for SSE/PW/FKM at BSGN. . Rake Arrived KLGR at 21.00 hrs of 22.4.25.
3 BSGN Ballast, Ld= 52 PKR BSGN/APDJ KLGR
23.4.25= No power.

41 Empty BOBYNs placed at 19:30 hrs on for SSE/PW/DMR at DMR. Loading started at 10:30 hrs of 20.04.25 and stopped due to complain
4 DMR Ballast, Ld= 41 DMR/LMG BXG of CGS/BXG along with RPF staff. Restarted at 17:50 hrs and completed at 10:00 hrs of 21.04.25. On 22.4.25- 4Wagon unloaded betn BXG-
NKMG . 23.4.25- 20 wagon betn NKMG-NLBR.Balance= 17Wagon
MOVEMENT OF RMC RAKE AS ON 24.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
36 nos 52 kg S/H 10 RP loaded at FB Plant/NBQ on 19.04.25 at 16:00 hrs for SSE/PW/.HSA at .HSA. Empty rake arrived NBQ at 22:00 hrs of
10 RP H SA Rail, 52 kg(
2 HSA /APDJ NBQ 31.01.25. Rake left NBQ at 8:00 hrs of 20.04.25 and reach JOQ in 12.45 hrs and dropped. On 21.04.25= 21 panels unloaded between APDJ-
S/H).
RVK. 22.4.25- No power.23.4.25= No crew. On 24.04.25 = 100 % unloaded.
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
20 RP NLP Rail, Rake
3 NLP/RNY NBQ 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, LOA formalities completed on 23.04.25, now Jt inspection to be done before release from W/Shop. Joint inspection done of
24.4.25 and given fit .

Indented on 18.03.25 for SSE/PW/E/SLGR at NTSK. Loaded on 31.03.25. Rake left BIA at 13:10 hrs on 04.04.25, passed MLDT at 19:05 hrs
BSPC 20 RP Rake BIA on 12.04.25. Arrived FKG at 18.50 hrs on 15.04.25. Unloading plan in SFR- BOJ. On 17/18.04.25, No power. On 19.04.25, 9 panels, on
4 NTSK/TSK BOJ
no.1165 (NTSK Rail) 04.04.25 20.04.25- 12 nos panels unloaded between BOJ-SFR. On 21.4.25= 16 panel unloaded betn BOJ-SFR. On 22.4.25- No power. on
23.4.25- 13 panel betn DBY-MRG, MRG-LLO. On 24..04.25 100 % unloaded. Empty rake at LLO.
Empty rake 20 RP On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18/19.04.25 no power for movement. On 19.04.25 rake brought to DJG. To be
5 NTSK Rail.no.13 BIA On run/NJP sent back to BSPC in one hook with other rake which is being unloaded. Empty left DJG 15:45 hrs of 22.4.25, arrived NJP 19.20 hrs
of 24.4.25
BSPC 20 RP Rake BIA Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25.Left BIA 13:38 hrs of 22.4.25, left Mahalimarup (MMV)
6 no.65 (AONIRail) AONI/LMG on run
22.04.25 20.33 hrs of 24.4.25(SE /CKP)
BSPC 20 RP Rake BIA Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA 13:38 hrs of 22.4.25, left Mahalimarup (MMV) 20.33 hrs
7 NTSK/TSK on run
no.98 (NTSK Rail) 22.04.25 of 24.4.25(SE /CKP)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 BOBYN placed at 18.00 hrs of 22.04.25 for SSE/PW/OMLF at HCR. Loading completed 23.00 hrs of 22.04.25. Rake arrived HCR
1 HCR ballast Ld=53 PKR HCR/KIR PKR
00.04 hrs of 24.4.25. Unloading plan betn AZR-MFA(UP). On 24.4.25- No block slot.

2 DLK ballast Ld=53 PKR DLK/KIR PKR 53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not yet arrived MLDT

51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re booked to
3 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SXX SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. Unloading plan betn KOJ-BSGN(Dn). On 22/23/24.4.25 - No
power.
52 BOBYN Loading done 20:40 hrs of 20.04hrs of 20.04.25 for SSE/PW/FKM at BSGN. . Rake Arrived KLGR at 21.00 hrs of 22.4.25.
4 BSGN Ballast, Ld= 52 PKR BSGN/APDJ KLGR
23.4.25= No power. 24.4.25- 52 Wagon100% unloaded betn NMX-BYXA-ATM (Up).

41 Empty BOBYNs placed at 19:30 hrs on for SSE/PW/DMR at DMR. Loading started at 10:30 hrs of 20.04.25 and stopped due to complain
5 DMR Ballast, Ld= 41 DMR/LMG BXG of CGS/BXG along with RPF staff. Restarted at 17:50 hrs and completed at 10:00 hrs of 21.04.25. On 22.4.25- 4Wagon unloaded betn BXG-
NKMG . 23.4.25- 20 wagon betn NKMG-NLBR.On 24.4.25- 6 Wagon unloaded betn KGBC-NLBR.Balance= 11 Wagon

6 NGC Ballast, Ld= 53 NGC/LMG SCE 53 Empty BOBYNs placed at 9.15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed at 11.30 hrs of 25.4.25
MOVEMENT OF RMC RAKE AS ON 25.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)

Empty of 10 RP HSA
2 NBQ FB Plant On run HSARail 100% unloaded on On 24.04.25 . Empty at KCF left at 15.05 hrs of 25.4.25 APDJ in 16.15 hrs
Rail, 52 kg( S/H).

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
20 RP NLP Rail, Rake
3 NLP/RNY NBQ 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, LOA formalities completed on 23.04.25, now Jt inspection to be done before release from W/Shop. Joint inspection done of
24.4.25 and given fit. Memeo served for placement at FB Plant.

Empty Rake (NTSK BIA


4 NTSK/TSK BOJ On 24..04.25 100 % unloaded. Empty rake at NTSK for TXR examination. No power for movement.
Rail no.1165) 04.04.25
Empty rake 20 RP On 17.04.25, 100% Unloaded. Empty rake at NMGY. On 18/19.04.25 no power for movement. On 19.04.25 rake brought to DJG. To be
5 NTSK Rail.no.13 BIA MLDT sent back to BSPC in one hook with other rake which is being unloaded. Empty left DJG 15:45 hrs of 22.4.25, arrived MLDT at 10:55
hrs of 25.04.25.
BSPC 20 RP Rake BIA Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25.Left BIA 13:38 hrs of 22.4.25,arrived AnaraJn (ANR) 6.56
6 no.65 (AONIRail) AONI/LMG on run
22.04.25 hrs of 25.4.25(SE /ADRA)
BSPC 20 RP Rake BIA Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA 13:38 hrs of 22.4.25, arrived AnaraJn (ANR) 6.56 hrs of
7 NTSK/TSK on run
no.98 (NTSK Rail) 22.04.25 25.4.25(SE /ADRA)
BSPC 20 RP Rake
8 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 18.00 hrs of 22.04.25 for SSE/PW/OMLF at HCR. Loading completed 23.00 hrs of 22.04.25. Rake arrived HCR
1 HCR ballast Ld=53 PKR HCR/KIR PKR 00.04 hrs of 24.4.25. Unloading plan betn AZR-MFA(UP). On 24.4.25- No block slot. On 25.4.25- 36 Wagon unloaded betn AZR-
MFA(Up). Balance=17 Wagon

53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not yet arrived RWA
2 DLK ballast Ld=53 PKR DLK/KIR RWA
13.50 hrs of 25.4.25. Unloading plan betn SRI-MFA PQRS site on 26.4.25.

51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re booked to
3 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SXX SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. Unloading plan betn KOJ-BSGN(Dn). On 22/23/24/25.4.25 - No
power.

53 BOBYN placed at 19:45 hrs of 21.04.25 for SSE/PW/MJBT at BHNG . Loading completed at 0:45 hrs of 22.04.25. Rake arrived TNL at
4 BHNG Ballast, Ld= 53 PKR BHNG/RNY TNL
21:25 hrs of 24.04.25. On 25.4.25- 24 Wagon unloaded between TNL-HRSN. Balance= 29 Wagon

35 BOBYN placed at 5.30 hrs of 25.04.25 for SSE/PW/GLPT at MNDP. Loading completed at 18.00 hrs of 25.04.25. Unloading plan betn
5 MNDP Ballast, Ld=35 PNVT MNDP/RNY PNVT
DDNI-MNDP on 26.4.25

41 Empty BOBYNs placed at 19:30 hrs on for SSE/PW/DMR at DMR. Loading started at 10:30 hrs of 20.04.25 and stopped due to complain
of CGS/BXG along with RPF staff. Restarted at 17:50 hrs and completed at 10:00 hrs of 21.04.25. On 22.4.25- 4Wagon unloaded betn BXG-
6 DMR Ballast, Ld= 41 BXG DMR/LMG BXG
NKMG . 23.4.25- 20 wagon betn NKMG-NLBR.On 24.4.25- 6 Wagon unloaded betn KGBC-NLBR. On 25.4.25- 11Wagon 100% unloaded
betn KXJ-MSSN.

53 Empty BOBYNs placed at 5:30 hrs on 25.4.25 at BKIR for SSE/PW/KXJ at DMR. Loading completed at 10:30 hrs of 25.04.25. Not yet
7 DMR Ballast, Ld= 53 BKIR DMR/LMG BKLE
arrived MLDT
53 Empty BOBYNs placed at 9.15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed at 11.30 hrs of
8 NGC Ballast, Ld= 53 SCE NGC/LMG SCE
25.4.25. Unloading plan betn TKC-PNB(Up) on 26.4.25
MOVEMENT OF RMC RAKE AS ON 26.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)

Empty of 10 RP HSA
2 NBQ FB Plant BSGN HSA Rail 100% unloaded on On 24.04.25. Empty at KCF left at 15.05 hrs of 25.4.25 dropped at BSGN 00.40 hrs of 26.4.25
Rail, 52 kg( S/H).

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
20 RP NLP Rail, Rake
3 NLP/RNY NBQ 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, LOA formalities completed on 23.04.25, now Jt inspection to be done before release from W/Shop. Joint inspection done of
24.4.25 and given fit. Memeo served for placement at FB Plant.

Empty Rake (NTSK BIA


4 NTSK/TSK BOJ On 24..04.25 100 % unloaded. Empty rake arrived DMGN at No power for movement.
Rail no.1165) 04.04.25
BSPC 20 RP Rake BIA
5 no.65 (AONIRail) AONI/LMG on run
22.04.25
BSPC 20 RP Rake BIA Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA 13:38 hrs of 22.4.25, left Damodar Jn (DMA) at 22:47 hrs
6 NTSK/TSK on run
no.98 (NTSK Rail) 22.04.25 of 26.4.25(SE /ADRA)
BSPC 20 RP Rake
7 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 18.00 hrs of 22.04.25 for SSE/PW/OMLF at HCR. Loading completed 23.00 hrs of 22.04.25. Rake arrived HCR 00.04
1 HCR ballast Ld=53 PKR HCR/KIR PKR hrs of 24.4.25. Unloading plan betn AZR-MFA(UP). On 24.4.25- No block slot. On 25.4.25- 36 Wagon unloaded betn AZR-MFA(Up). on
26.4.25- Block not granted. Balance=17 Wagon

53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not yet arrived RWA
2 DLK ballast Ld=53 PKR DLK/KIR RWA
13.50 hrs of 25.4.25. Unloading plan betn SRI-MFA PQRS site. On 26.4.25- Block not granted.

51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re booked to
3 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SXX SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. Unloading plan betn KOJ-BSGN(Dn). On 22/23/24/25.4.25 - No
power. On 26.4.25- Block not granted.
53 BOBYN placed at 19:45 hrs of 21.04.25 for SSE/PW/MJBT at BHNG . Loading completed at 0:45 hrs of 22.04.25. Rake arrived TNL at
4 BHNG Ballast, Ld= 53 PKR BHNG/RNY TNL 21:25 hrs of 24.04.25. On 25.4.25- 24 Wagon unloaded between TNL-HRSN. On 26.4.25- 29 Wagon unloaded betn RWTB-MJBT. (100%
U/L).

35 BOBYN placed at 5.30 hrs of 25.04.25 for SSE/PW/GLPT at MNDP. Loading completed at 18.00 hrs of 25.04.25. On 26.4.25- 35 wagon
5 MNDP Ballast, Ld=35 PNVT MNDP/RNY PNVT
Unloaded betn DDNI-MNDP . (100% U/L).

53 Empty BOBYNs placed at 5:30 hrs on 25.4.25 at BKIR for SSE/PW/KXJ at DMR. Loading completed at 10:30 hrs of 25.04.25. Left KKA
6 DMR Ballast, Ld= 53 BKIR DMR/LMG BKLE
at 22:53 hrs of 26.04.25.

53 Empty BOBYNs placed at 9.15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed at 11.30 hrs of
7 NGC Ballast, Ld= 53 SCE NGC/LMG SCE
25.4.25. Unloading plan betn TKC-PNB(Up). On 26.4.25= No power
MOVEMENT OF RMC RAKE AS ON 27.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)

10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00.40 hrs of 26.4.25
( Rake No-2).

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00 hrs of 7.3.25On
10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Jt inspection on 18.03.25. 2 damaged sent to W/Shop at
20 RP NLP Rail, Rake
3 NLP/RNY NBQ 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25. Work started on 04.04.25, and repairing completed on
16.04.25, LOA formalities completed on 23.04.25, now Jt inspection to be done before release from W/Shop. Joint inspection done of
24.4.25 and given fit. Memeo served for placement at FB Plant.

Empty Rake (NTSK BIA


4 NTSK/TSK BOJ On 24..04.25 100 % unloaded. Empty rake arrived DMGN at 13.20 hrs of 26.4.25. No power for movement.
Rail no.1165) 04.04.25
BSPC 20 RP Rake BIA Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25.Left BIA 13:38 hrs of 22.4.25,arrived Kopai Jn (KPLE)
5 no.65 (AONIRail) AONI/LMG on run
22.04.25 12.50 hrs of 27.4.25(ER /HWH)
BSPC 20 RP Rake BIA Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA 13:38 hrs of 22.4.25, arrived Kopai Jn (KPLE) 12.50 hrs
6 NTSK/TSK on run
no.98 (NTSK Rail) 22.04.25 of 27.4.25(ER /HWH)
BSPC 20 RP Rake
7 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 18.00 hrs of 22.04.25 for SSE/PW/OMLF at HCR. Loading completed 23.00 hrs of 22.04.25. Rake arrived HCR 00.04
1 HCR ballast Ld=53 PKR HCR/KIR PKR hrs of 24.4.25. Unloading plan betn AZR-MFA(UP). On 24.4.25- No block slot. On 25.4.25- 36 Wagon unloaded betn AZR-MFA(Up). on
26.4.25- Block not granted. 27.4.25- No block slot. Balance=17 Wagon
53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not yet arrived RWA
2 DLK ballast Ld=53 PKR DLK/KIR RWA 13.50 hrs of 25.4.25. Unloading plan betn SRI-MFA PQRS site. On 26.4.25- Block not granted. On 27.4.25- 32 wagon unloaded betn SR-
MFA. Balance= 21 Wagon
51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re booked to
3 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SXX SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. On 22/23/24/25.4.25 - No power. On 26.4.25- Block not granted.
On 27.4.25- 20 Wagon Unloaded betn KOJ-SLKX(Dn). Balance=31 Wagon
53 Empty BOBYNs placed at 5:30 hrs on 25.4.25 at BKIR for SSE/PW/KXJ at DMR. Loading completed at 10:30 hrs of 25.04.25. left GHY
4 DMR Ballast, Ld= 53 BKIR DMR/LMG on run
21.34 hrs of 27.04.25.

53 Empty BOBYNs placed at 9.15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed at 11.30 hrs of
5 NGC Ballast, Ld= 53 SCE NGC/LMG JID
25.4.25. Unloading plan betn TKC-PNB(Up). On 26.4.25= No power. On 27.4.25- Not plan due to PQRS block in same section.
MOVEMENT OF RMC RAKE AS ON 28.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00
hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Joint inspection
20 RP NLP Rail, Rake done on 18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on
3 NLP/RNY NBQ
02.04.25. Work started on 04.04.25, and repairing completed on 16.04.25, LOA formalities completed on 23.04.25,
now Jt inspection to be done before release from W/Shop. Joint inspection done on 24.04.25 and given fit. Memo
served for placement at FB Plant.

Empty Rake (NTSK BIA On 24.04.25, 100 % unloaded. Empty rake arrived DMGN at 13:20 hrs of 26.04.25. No power for movement. This
4 NTSK/TSK DMGN
Rail no.1165) 04.04.25 empty rake will be sent combined with PAGT ( Con Rake) which is under unloading.
BSPC 20 RP Rake BIA Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25,
5 no.65 (AONIRail) AONI/LMG On run
22.04.25 arrived MLDT at 18:03 hrs of 28.04.25, left MLDT at 22:50 hrs.
BSPC 20 RP Rake BIA Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, arrived
6 no.98 (NTSK Rail) NTSK/TSK On run
22.04.25 MLDT at 18.03 hrs of 28.4.25, left MLDT at 22:50 hrs.
BSPC 20 RP Rake
7
no.124 (NTSK Rail)
AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 BOBYN placed at 18.00 hrs of 22.04.25 for SSE/PW/OMLF at HCR. Loading completed 23.00 hrs of 22.04.25. Rake
arrived HCR 00.04 hrs of 24.4.25. Unloading plan betn AZR-MFA(UP). On 24.4.25- No block slot. On 25.4.25- 36 Wagon
1 HCR ballast Ld=53 PKR HCR/KIR BOE
unloaded betn AZR-MFA(Up). on 26.04.25- Block not granted. 27.04.25- No block slot. 28.04.25- 16 wagons
unloaded betn MFA-BOE(Up). Balance= 1 wagon.
53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not
yet arrived RWA 13.50 hrs of 25.4.25. Unloading plan betn SRI-MFA PQRS site. On 26.04.25- Block not granted. On
2 DLK ballast Ld=53 PKR DLK/KIR RWA
27.04.25- 32 wagons unloaded betn SRI - MFA. On 28.04.25- Block not granted due to PQRS block. Balance= 21
Wagons
51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re
booked to SSE/PW/FKM at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. On 22/23/24/25.04.25 - No power.
3 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SLKX
On 26.04.25- Block not granted. On 27.04.25- 20 Wagons unloaded betn KOJ-SLKX(Dn). On 28.04.25- 17 Wagons
unloaded betn BSGN- SLKX(Dn). Balance=14 Wagons

53BOBYN placed at 17:00 hrs of 27.04.25 for SSE/PW/FKM at BSGN . Loading done 22:00 hrs of 27.04.25. Rake
4 BSGN Ballast, Ld= 53 PKR BSGN/APDJ On run
passed KMRJ at 22:46 hrs on 28.04.25.

53 Empty BOBYNs placed at 05:30 hrs on 25.04.25 at BKIR for SSE/PW/KXJ at DMR. Loading completed at 10:30 hrs
5 DMR Ballast, Ld= 53 BKIR DMR/LMG DCA
of 25.04.25. arrived DCA 21:30 hrs of 28.04.25. Unloading plan CBZ - KUGT on 29.04.25.
53 Empty BOBYNs placed at 09:15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed
6 NGC Ballast, Ld= 53 SCE NGC/LMG JID at 11.30 hrs of 25.4.25. Unloading plan betn TKC - PNB(Up). On 26.04.25= No power. On 27.04.25- Not planned due
to PQRS block in same section. On 28.04.25- No power.
MOVEMENT OF RMC RAKE AS ON 29.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed on 05.03.25. Loaded at 11.00
hrs of 7.3.25On 10.03.25, Rake checked by TXR and found 2 BRN damaged and 2 wagon ROH due. Joint inspection done
20 RP NLP Rail, Rake
3 NLP/RNY NBQ on 18.03.25. 2 damaged sent to W/Shop at 17:35 hrs of 20.03.25. FAC issued on 27.03.25, placed at shop on 02.04.25.
Work started on 04.04.25, and repairing completed on 16.04.25, LOA formalities completed on 23.04.25. Joint
inspection done on 24.04.25 and given fit. Memo served for placement at FB Plant.
Empty Rake (NTSK BIA On 24.04.25, 100 % unloaded. Empty rake arrived DMGN at 13:20 hrs of 26.04.25. No power for movement. This
4 NTSK/TSK DMGN
Rail no.1165) 04.04.25 empty rake will be sent combined with PAGT ( Con Rake) which is under unloading.
BSPC 20 RP Rake BIA On Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25,
5 no.65 (AONIRail) AONI/LMG
22.04.25 run/CROA passed MLDT at 22:50 hrs of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25.
BSPC 20 RP Rake BIA On Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed
6 no.98 (NTSK Rail) NTSK/TSK
22.04.25 run/CROA MLDT at 22:50 hrs of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25.
BSPC 20 RP Rake
7
no.124 (NTSK Rail)
AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 18.00 hrs of 22.04.25 for SSE/PW/OMLF at HCR. Loading completed 23.00 hrs of 22.04.25. Rake arrived HCR 00.04 hrs
of 24.4.25. Unloading plan betn AZR-MFA(UP). On 24.4.25- No block slot. On 25.4.25- 36 Wagon unloaded betn AZR-MFA(Up). on 26.04.25-
1 HCR ballast Ld=53 PKR HCR/KIR BOE
Block not granted. 27.04.25- No block slot. 28.04.25- 16 wagons unloaded betn MFA-BOE(Up). On 29.04.25, 1 wagon unloaded in n
MFA-AZR(Dn) & 100% unloaded

53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not yet arrived RWA 13.50
2 DLK ballast Ld=53 PKR DLK/KIR KIR hrs of 25.4.25. Unloading plan betn SRI-MFA PQRS site. On 26.04.25- Block not granted. On 27.04.25- 32 wagons unloaded betn SRI - MFA.
On 28.04.25- Block not granted due to PQRS block. On 29.04.25, 10 Wagons unloaded at KIR yard, L/ No- 8. Balance= 11 Wagons

51BOBYN placed at 16:00 hrs of 19.04.25 for SSE/PW/FKM at BSGN . Loading done 21:00 hrs of 19.04.25. Rake re booked to SSE/PW/FKM
at BSGN. Arrived SXX at 13.40hrs of 21.04.25 & dropped. On 22/23/24/25.04.25 - No power. On 26.04.25- Block not granted. On 27.04.25- 20
3 BSGN Ballast, Ld= 51 PKR BSGN/APDJ SJRR
Wagons unloaded betn KOJ-SLKX(Dn). On 28.04.25- 17 Wagons unloaded betn BSGN- SLKX(Dn). On 29.04.25- 14 Wagons unloaded betn
PQZ-SJRR(Dn) & 100% unloaded.
53BOBYN placed at 17:00 hrs of 27.04.25 for SSE/PW/FKM at BSGN . Loading done 22:00 hrs of 27.04.25. Rake
4 BSGN Ballast, Ld= 53 PKR BSGN/APDJ On run
arrived NQH at 08:35 hrs on 29.04.25. Unloading plan betn NMX-BYXA on 30.04.25.
53BOBYN placed at 2.00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 7.00hrs of 29.04.25. Rake not yet
5 NCB Ballast, Ld= 53 PKR NCB/APDJ PKR
arrived MLDT.
53 Empty BOBYNs placed at 05:30 hrs on 25.04.25 at BKIR for SSE/PW/KXJ at DMR. Loading completed at 10:30 hrs of 25.04.25. arrived
6 DMR Ballast, Ld= 53 BKIR DMR/LMG DMR
DCA 21:30 hrs of 28.04.25. On 29.4.25-27 Wagons Unloaded betn DMR-CBZ. Balance=26 Wagons
47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs
7 BPB Ballast, Ld= 47 TJPS BPB/LMG TJPS
of 29.04.25. Rake not yet arrived MLDT.
53 Empty BOBYNs placed at 09:15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed
8 NGC Ballast, Ld= 53 SCE NGC/LMG JID at 11:30 hrs of 25.04.25. Unloading plan betn TKC - PNB(Up). On 26.04.25= No power. On 28.04.25- No power. On
27/29.04.25- Not planned due to PQRS block in same section.
53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and
9 NTSK Ballast, Ld= 53 PKR NTSK/TSK PKR
completed at 14:00 hrs. Rake not yet left MLDT.
MOVEMENT OF RMC RAKE AS ON 30.04.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

20 RP NLP Rail, Rake Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.4.25. Loading started at 8.00 hrs
3 NLP/RNY NBQ
( 36 panel loaded till 19.00 hrs of 30.4.25).

On 24.04.25, 100 % unloaded. Empty rake arrived DMGN at 13:20 hrs of 26.04.25. This empty rake will be sent combined with PAGT
Empty Rake (NTSK BIA
4 NTSK/TSK SRPN (Con Rake) which is completed on 29.4.25. Empty Brought to SRPN at 14.50 hrs of 30.4.25. PAGT Empty ex MZS left at 22:32 hrs of
Rail no.1165) 04.04.25
30.4.25. Both rakes will be combined and sent to BSPC.

BSPC 20 RP Rake
no.65 (AONIRail) BIA On Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50
5 AONI/LMG
22.04.25 run/CROA hrs of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. No crew for movement.
BSPC 20 RP Rake BIA On Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT at 22:50 hrs of
6 no.98 (NTSK Rail) NTSK/TSK
22.04.25 run/CROA 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. No crew for movement.
BSPC 20 RP Rake
7 AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded
no.124 (NTSK Rail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not yet arrived RWA 13.50
hrs of 25.4.25. Unloading plan betn SRI-MFA PQRS site. On 26.04.25- Block not granted. On 27.04.25- 32 wagons unloaded betn SRI - MFA.
1 DLK ballast Ld=53 PKR DLK/KIR KIR
On 28.04.25- Block not granted due to PQRS block. On 29.04.25, 10 Wagons unloaded at KIR yard, L/ No- 8. On 30.4.25- Not plan due to
PQRS block in same section. Balance= 11 Wagons

53BOBYN placed at 17:00 hrs of 27.04.25 for SSE/PW/FKM at BSGN . Loading done 22:00 hrs of 27.04.25. Rake arrived NQH at 08:35 hrs
2 BSGN Ballast, Ld= 53 PKR BSGN/APDJ NQH
on 29.04.25. Unloading plan betn NMX-BYXA. On 30.04.25- No power.

53BOBYN placed at 2.00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 7.00hrs of 29.04.25. Rake dropped at NJP 13.27 hrs of
3 NCB Ballast, Ld= 53 PKR NCB/APDJ on run/NJP
30.4.25
53 BOBYN placed at 21.00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 3.00hrs of 30.04.25. On run, left ADF at 23:24 hrs of
4 NCB Ballast, Ld= 53 TJPS NCB/APDJ On run
30.04.25.
53 Empty BOBYNs placed at 05:30 hrs on 25.04.25 at BKIR for SSE/PW/KXJ at DMR. Loading completed at 10:30 hrs of 25.04.25. arrived
5 DMR Ballast, Ld= 53 BKIR DMR/LMG DMR DCA 21:30 hrs of 28.04.25. On 29.4.25-27 Wagons Unloaded betn DMR-CBZ. On 30.4.25-26 Wagon 100% unloaded betn PASG-PEC-
GUGT
47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs of 29.04.25. Left
6 BPB Ballast, Ld= 47 TJPS BPB/LMG On run/MXJ
MXJ 19.14 hrs of 30.4.25.

53 Empty BOBYNs placed at 09:15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed at 11:30 hrs of
7 NGC Ballast, Ld= 53 SCE NGC/LMG JID 25.04.25. Unloading plan betn TKC - PNB(Up). On 26.04.25= No power. On 27/29.04.25- Not planned due to PQRS block in same
section. On 28/30.04.25- No power.

53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs.
8 NTSK Ballast, Ld= 53 PKR NTSK/TSK On run/AZR
Rake MLDT left 18.00 hrs of 30.4.25. AZR at 20.30 hrs
MOVEMENT OF RMC RAKE AS ON 01.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

20 RP NLP Rail, Rake Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25. Loading started at 8.00
3 NLP/RNY NBQ
hrs on 30.04.25, completed at 12:00 hrs on 01.05.25.

On 24.04.25, 100 % unloaded. Empty rake arrived DMGN at 13:20 hrs of 26.04.25. This empty rake will be sent combined with PAGT
Empty Rake (NTSK SRPN
4 NTSK/TSK On run/NBQ (Con Rake) which is completed on 29.4.25. Empty Brought to SRPN at 14.50 hrs of 30.4.25. PSGT Empty ex MZS left at 22:32 hrs of
Rail no.1165) 01.05.25
30.4.25. Both rakes left SRPN at 01:48 hrs on 01.05.25, left NBQ 20.50 hrs of 1.5.25

BSPC 20 RP Rake
no.65 (AONIRail) BIA On Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50
5 AONI/LMG
22.04.25 run/CROA hrs of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. No crew for movement.
BSPC 20 RP Rake BIA On Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT at 22:50 hrs of
6 no.98 (NTSK Rail) NTSK/TSK
22.04.25 run/CROA 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. No crew for movement.
BSPC 20 RP Rake
7 no.124 (NTSK Rail) AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded

BSPC 20 RP Rake
8 HSA/APDJ Indented on 29.04.25 for SSE/PW/HSA at HSA. Not yet loaded
no.129 (HSARail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 04.40 hrs of 24.04.25 for SSE/PW/SM at DLK. Loading completed 9.40 hrs of 24.04.25. Rake not yet arrived RWA 13.50
hrs of 25.4.25. Unloading plan betn SRI-MFA PQRS site. On 26.04.25- Block not granted. On 27.04.25- 32 wagons unloaded betn SRI - MFA.
1 DLK ballast Ld=53 PKR DLK/KIR KIR
On 28.04.25- Block not granted due to PQRS block. On 29.04.25, 10 Wagons unloaded at KIR yard, L/ No- 8. On 30.04.25- Not plan due to
PQRS block )n 1.5.25 -11 Wagons 100% un loaded betn KIR-MIYN.

53BOBYN placed at 17:00 hrs of 27.04.25 for SSE/PW/FKM at BSGN . Loading done 22:00 hrs of 27.04.25. Rake arrived NQH at 08:35 hrs
2 BSGN Ballast, Ld= 53 PKR BSGN/APDJ NQH on 29.04.25. Unloading plan betn NMX-BYXA. On 30.04.25- No power. On 01.05.25- 24 wagons unloaded in BYXA-ATM (Up). Balance=
29 wagons.
53 BOBYN placed at 02:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 07:00hrs of 30.04.25. Rake arrived SXX at 05:17 hrs on
3 NCB Ballast, Ld= 53 TJPS NCB/APDJ SXX
01.05.25. To be unloaded in NCB- MRDG. On 01.05.25, not planned.
53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake
4 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
dropped at CAPG 17.00hrs on 01.05.25.
47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs of 29.04.25. Rake
5 BPB Ballast, Ld= 47 TJPS BPB/LMG On run/NJP
arrived NJP at 16.00 hrs. On 01.05.25. Fresh Call given at 19.00 hrs

53 Empty BOBYNs placed at 09:15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed at 11:30 hrs of
6 NGC Ballast, Ld= 53 SCE NGC/LMG PNB 25.04.25. On 26.04.25= No power. On 27/29.04.25- Not planned due to PQRS block in same section. On 28/30.04.25- No power. On
01.05.25- 42 wagons unloaded in TKC- PNB Up. Balance= 11 wagons.

53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs.
7 NTSK Ballast, Ld= 53 PKR NTSK/TSK On run/MXJ
Rake MLDT left 18.00 hrs of 30.4.25, arrived MXJ at 00:58 hrs on 01.05.25. Left at 20.00 hrs of 1.5.25
MOVEMENT OF RMC RAKE AS ON 02.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25. Loading started at 8.00
20 RP NLP Rail, Rake
3 NLP/RNY NBQ hrs on 30.04.25, completed at 12:00 hrs on 01.05.25. Rake left NBQ at 11:30 hrs on 02.05.25. Left NMM at 21:51 hrs. To be dropped at
VNE.

On 24.04.25, 100 % unloaded. Empty rake arrived DMGN at 13:20 hrs of 26.04.25. This empty rake will be sent combined with PAGT
Empty Rake (NTSK SRPN
4 NTSK/TSK On run (Con Rake) which is completed on 29.4.25. Empty Brought to SRPN at 14.50 hrs of 30.4.25. PSGT Empty ex MZS left at 22:32 hrs of
Rail no.1165) 01.05.25
30.4.25. Both rakes left SRPN at 01:48 hrs on 01.05.25, passed KWE at 21:42 hrs on 02.05.25.

BSPC 20 RP Rake
no.65 (AONIRail) BIA Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
5 AONI/LMG On run
22.04.25 of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. No crew for movement. Left at 7:32 hrs of 02.05.25, arrived GHY at 19:39 hrs.
BSPC 20 RP Rake BIA Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT at 22:50 hrs of
6 no.98 (NTSK Rail) NTSK/TSK On run
22.04.25 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. No crew for movement. Left at 7:32 hrs of 02.05.25, arrived GHY at 19:39 hrs
BSPC 20 RP Rake
7 no.124 (NTSK Rail) AZA/RNY Indented on 07.04.25 for SSE/PW/CGON at AZRA. Not yet loaded

BSPC 20 RP Rake
8 HSA/APDJ BIA Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 02.05.25.
no.129 (HSARail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53BOBYN placed at 17:00 hrs of 27.04.25 for SSE/PW/FKM at BSGN. Loading done 22:00 hrs of 27.04.25. Rake arrived NQH at 08:35 hrs on
1 BSGN Ballast, Ld= 53 PKR BSGN/APDJ NQH 29.04.25. Unloading plan betn NMX-BYXA. On 30.04.25- No power. On 01.05.25- 24 wagons unloaded in BYXA-ATM (Up). On 02.05.24=29
nos unloaded between ATM-BYXA (DL). 100% unloaded
53 BOBYN placed at 02:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 07:00hrs of 30.04.25. Rake arrived SXX at 05:17 hrs on
2 NCB Ballast, Ld= 53 TJPS NCB/APDJ SXX
01.05.25. To be unloaded in NBS- SMTA. On 01.05.25, not planned. On 02.05.25, No power.
53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake
3 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
arrived at CAPG 17:11 hrs on 01.05.25. To unload in CROA- FKM Dn. On 02.05.25, No power.
47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs of 29.04.25. Rake
4 BPB Ballast, Ld= 47 TJPS BPB/LMG On run
arrived PKB at 19:38 hrs of 02.05.25 and dropped.

53 Empty BOBYNs placed at 09:15 hrs on for SSE/PW/DGU at NGC. Loading started at 10:15hrs of 24.04.25 completed at 11:30 hrs of
5 NGC Ballast, Ld= 53 SCE NGC/LMG PNB 25.04.25. On 26.04.25= No power. On 27/29.04.25- Not planned due to PQRS block in same section. On 28/30.04.25- No power. On
01.05.25- 42 wagons unloaded in TKC- PNB Up. On 02.05.25- 11 wagons unloaded in TKC- NNGE Dn, & 100% unloaded.

6 LMG Ballast, Ld= 53 SCE LMG/LMG SCE 53 Empty BOBYNs placed at 22:40 hrs of 01.05.25 for SSE/PW/HJI at LMG. Loading started at 6:00 hrs of 02.05.25 and completed at 18:00 hrs.

53 Empty BOBYNs placed at 19:00 hrs on 01.05.25 for SSE/PW/BNGN at GLPT. Loading started at 19:00 hrs, completed at 00:10 hrs on
7 GLPT Ballast, Ld= 53 PKR GLPT/RNY PKR
02.05.25. Rake arrived in PAKUR(PKR) at 01:45 hrs on 02-05-25.

53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs.
8 NTSK Ballast, Ld= 53 PKR NTSK/TSK On run
Rake left MLDT at 18:00 hrs of 30.04.25, arrived SJRR at 07:40 hrs on 02.05.25. No power on 02.05.24.

9 MZS Ballast, Ld= 53 MZS/TSK SPTR 53 Empty BOBYNs placed at 05:35 hrs on 02.05.25 for SSE/PW/SPTR at MZS. Loading started at 08:00 hrs.
MOVEMENT OF RMC RAKE AS ON 03.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement(fro Status on date
No. (Div) stabled at
m/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25. Loading started at 8.00
20 RP NLP Rail, Rake
3 NLP/RNY VNE hrs on 30.04.25, completed at 12:00 hrs on 01.05.25. Rake left NBQ at 11:30 hrs on 02.05.25. Left NMM at 21:51 hrs. dropped at VNE
11.40 hrs of 3.5.25. Unloading plan betn VNE-NBX on 4.5.25.
On 24.04.25, 100 % unloaded. Empty rake arrived DMGN at 13:20 hrs of 26.04.25. This empty rake will be sent combined with PAGT
Empty Rake (NTSK SRPN
4 NTSK/TSK MLDT (Con Rake) which is completed on 29.4.25. Empty Brought to SRPN at 14.50 hrs of 30.4.25. PSGT Empty ex MZS left at 22:32 hrs of
Rail no.1165) 01.05.25
30.4.25. Both rakes left SRPN at 01:48 hrs on 01.05.25, made over at MLDT 1.45 hrs on 03.05.25.
BSPC 20 RP Rake Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
no.65 (AONIRail) BIA
5 AONI/LMG NGC of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. No crew for movement. Left at 7:32 hrs of 02.05.25, dropped at NGC 20.47 hrs of 2.5.25.
22.04.25
Unloading plan on 4.5.25
BSPC 20 RP Rake
Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT at 22:50 hrs of
no.98 (NTSK Rail) BIA
6 NTSK/TSK On run 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 7:32 hrs of 02.05.25, arrived GHY at 19:39 hrs. Left GHY at 04:20 hrs on
22.04.25
03.05.25, KWM 12.30/17.45 hrs
BSPC 20 RP Rake
7 no.124 (AZA Rail) BIA AZA/RNY BIA Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25

BSPC 20 RP Rake
8 BIA HSA/APDJ BIA Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 02.05.25. Rake arrived BIA at 00:25 hrs on 03.05.25
no.129 (HSARail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 02:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 07:00hrs of 30.04.25. Rake arrived SXX at 05:17 hrs on
1 NCB Ballast, Ld= 53 TJPS NCB/APDJ SXX
01.05.25. To be unloaded in NBS- SMTA. On 01.05.25, not planned. On 02/03.05.25, No power.
53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake
2 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
arrived at CAPG 17:11 hrs on 01.05.25. To unload in CROA- FKM Dn. On 02/03.05.25, No power.
47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs of 29.04.25. Rake
3 BPB Ballast, Ld= 47 TJPS BPB/LMG PKB
arrived PKB at 19:38 hrs of 02.05.25 and dropped. On 03.05.25, No power.
53 Empty BOBYNs placed at 22:40 hrs of 01.05.25 for SSE/PW/HJI at LMG. Loading started at 6:00 hrs of 02.05.25 and completed at 18:00
4 LMG Ballast, Ld= 53 SCE LMG/LMG KWM
hrs. Rake arrived JGJN at 15.45 hrs on 03.05.25. To unload in HJI- KWM Dn on 4.5.25.

PKR 53 Empty BOBYNs placed at 19:00 hrs on 01.05.25 for SSE/PW/BNGN at GLPT. Loading started at 19:00 hrs, completed at 00:10 hrs on
5 GLPT Ballast, Ld= 53 GLPT/RNY On run/PJP
01.05.25 02.05.25. Rake left PKR at 02:05 hrs on 01-05-25, PJP at 21.00hrs on 03.05.25

53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs.
6 NTSK Ballast, Ld= 53 PKR NTSK/TSK On run/SJRR
Rake left MLDT at 18:00 hrs of 30.04.25, arrived SJRR at 07:40 hrs on 02.05.25. On 02/03.05.24, No power

53 Empty BOBYNs placed at 05:35 hrs on 02.05.25 for SSE/PW/SPTR at MZS. Loading started at 08:00 hrs, completed at 19:15 hrs of
7 MZS Ballast, Ld= 53 SPTR MZS/TSK SFR 2.5.25. On 03.05.25- 20 wagons unloaded in SFR-LXA Balance= 33 wagons.
MOVEMENT OF RMC RAKE AS ON 04.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25.
20 RP NLP Rail
NBQ Loading started at 8.00 hrs on 30.04.25, completed at 12:00 hrs on 01.05.25. Rake left NBQ at 11:30 hrs on 02.05.25. Left
3 Rake NLP/RNY VNE
02.05.25 NMM at 21:51 hrs. dropped at VNE at 11:40 hrs of 03.05.25. Unloading plan betn VNE -BX. On 04.05.25, 12 Panels
unloaded in VNE - NBX. Balance= 48 panels.
Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25,
BSPC 20 RP Rake BIA
4 AONI/LMG NGC passed MLDT at 22:50 hrs of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25,
no.65 (AONIRail) 22.04.25
arrived NGC at 20:47 hrs of 02.05.25. Unloading planned on 04.05.25, but no power provided.
Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT
BSPC 20 RP Rake BIA at 22:50 hrs of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 7:32 hrs of 02.05.25, arrived GHY at 19:39
5 NTSK/TSK FKG
no.98 (NTSK Rail) 22.04.25 hrs. Left GHY at 04:20 hrs on 03.05.25, arrived FKG at 12:30 hrs on 04.05.25. Unloading plan on 05.04.25 ( in FKG -
BBGN)
BSPC 20 RP Rake
6
no.124 (AZA Rail) BIA AZA/RNY BIA Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25
BSPC 20 RP Rake
7
no.129 (HSARail) BIA HSA/APDJ BIA Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 02.05.25. Rake arrived BIA at 00:25 hrs on 03.05.25
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 BOBYN placed at 02:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 07:00hrs of 30.04.25. Rake arrived
1 NCB Ballast, Ld= 53 TJPS NCB/APDJ SXX SXX at 05:17 hrs on 01.05.25. To be unloaded in NBS- SMTA. On 01.05.25, not planned. On 02/03.05.25, No power.
On 04.05.25, 22 wagons unloaded in bet NOQ - SMTA. Balance = 31 wagons.

53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of
2 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
30.05.25. Rake arrived at CAPG 17:11 hrs on 01.05.25. To unload in CROA- FKM Dn. On 02/3/4.05.25, No power.

47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs
3 BPB Ballast, Ld= 47 TJPS BPB/LMG PKB
of 29.04.25. Rake arrived PKB at 19:38 hrs of 02.05.25 and dropped. On 03/4.05.25, No power.
53 Empty BOBYNs placed at 22:40 hrs of 01.05.25 for SSE/PW/HJI at LMG. Loading started at 6:00 hrs of 02.05.25 and
4 LMG Ballast, Ld= 53 SCE LMG/LMG KWM completed at 18:00 hrs. Rake arrived JGJN at 15.45 hrs on 03.05.25. To unload in HJI- KWM Dn. On 04.05.25, No
power.
53 Empty BOBYNs placed at 19:00 hrs on 01.05.25 for SSE/PW/BNGN at GLPT. Loading started at 19:00 hrs, completed
PKR
5 GLPT Ballast, Ld= 53
01.05.25
GLPT/RNY NBQ at 00:10 hrs on 02.05.25. Rake left PKR at 02:05 hrs on 01-05-25, Arrived NBQ at 13:56 hrs on 04.05.25. To unload in
DTX- BSGN Dn.
53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and
6 NTSK Ballast, Ld= 53 PKR NTSK/TSK On run completed at 14:00 hrs. Rake left MLDT at 18:00 hrs of 30.04.25, arrived SJRR at 07:40 hrs on 02.05.25. On
02/03.05.24, No power. On 04.05.25- rake passed RWTB/RNY Div at 22:38 hrs.
53 Empty BOBYNs placed at 05:35 hrs on 02.05.25 for SSE/PW/SPTR at MZS. Loading started at 08:00 hrs,
7 MZS Ballast, Ld= 53 SPTR MZS/TSK SFR completed at 19:15 hrs of 2.5.25. On 03.05.25- 20 wagons unloaded in SFR- LXA. Balance= 33 wagons. On 04.05.25-
33 Wagons unloaded in SPK-BFD, and 100% Unloaded.
MOVEMENT OF RMC RAKE AS ON 05.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25. Loading started at 8.00 hrs
20 RP NLP Rail
NBQ on 30.04.25, completed at 12:00 hrs on 01.05.25. Rake left NBQ at 11:30 hrs on 02.05.25. Left NMM at 21:51 hrs. dropped at VNE at 11:40 hrs
3 Rake NLP/RNY VNE
02.05.25 of 03.05.25. Unloading plan betn VNE -BX. On 04.05.25, 12 Panels unloaded in VNE - NBX. On 5.5.25- 14 panel betn VNE-NBX.Balance=
34 panels.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
BSPC 20 RP Rake BIA
4 AONI/LMG NGC of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On
no.65 (AONIRail) 22.04.25
04/05.05.25 - No power provided.

Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT at 22:50 hrs of
BSPC 20 RP Rake BIA
5 NTSK/TSK FKG 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 7:32 hrs of 02.05.25, arrived GHY at 19:39 hrs. Left GHY at 04:20 hrs on
no.98 (NTSK Rail) 22.04.25
03.05.25, arrived FKG at 12:30 hrs on 04.05.25. On 05.05.25- 14 panel unloaded betn FKG-GLGT. Balance= 46 Panel
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of
6 no.124 (AZA Rail) BIA AZA/RNY On run
4.5.25. Jharsuguda 17.03 hrs of 5.5.25
BSPC 20 RP Rake Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of
7 no.129 (HSARail) BIA HSA/APDJ On run
4.5.25. Jharsuguda 17.03 hrs of 5.5.25
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

53 BOBYN placed at 02:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 07:00hrs of 30.04.25. Rake arrived SXX at 05:17 hrs on
1 NCB Ballast, Ld= 53 TJPS NCB/APDJ SXX 01.05.25. On 01.05.25, not planned. On 02/03.05.25, No power. On 04.05.25-22 wagons unloaded betn NOQ - SMTA. 5.5.25-19 wagon
betn JOQ-KAMG(Up) Balance = 12 wagons.

53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake
2 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
arrived at CAPG 17:11 hrs on 01.05.25.Unloadin plan CROA- FKM Dn. On 02/3/4/5.05.25, No power.

3 DBB Ballast, Ld= 53 DBB/APDJ JOQ 53 BOBYN placed at 12.30 hrs of 5.5.25. for SSE/PW/FKM at DBB . Loading started at 15.30 hrs of 5.5.25

47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs of 29.04.25. Rake
4 BPB Ballast, Ld= 47 TJPS BPB/LMG PKB arrived PKB at 19:38 hrs of 02.05.25 and dropped. On 03/4.05.25, No power. Rake arrived NHLG3.41 hrs of 5.5.25. Unloading plan betn
NHLG-DTC. 5.5.25- No power.

53 Empty BOBYNs placed at 22:40 hrs of 01.05.25 for SSE/PW/HJI at LMG. Loading started at 6:00 hrs of 02.05.25 and completed at 18:00 hrs.
5 LMG Ballast, Ld= 53 SCE LMG/LMG KWM
Rake arrived JGJN at 15.45 hrs on 03.05.25. To unload in HJI- KWM Dn. On 04/05.05.25, No power.

53 Empty BOBYNs placed at 19:00 hrs on 01.05.25 for SSE/PW/BNGN at GLPT. Loading started at 19:00 hrs, completed at 00:10 hrs on
PKR
6 GLPT Ballast, Ld= 53 GLPT/RNY NBQ 02.05.25. Rake left PKR at 02:05 hrs on 01-05-25, Arrived NBQ at 13:56 hrs on 04.05.25. On 5.5.25- 16 wagon unload betn DTX- BSGN
01.05.25
Dn. Balance= 37 wagon

53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs. Rake
7 NTSK Ballast, Ld= 53 PKR NTSK/TSK DMC
left MLDT at 18:00 hrs of 30.04.25,dropped at DMC 9.10 hrs of 5.5.25. Unloading plan on 6.5.25
8 MZS Ballast, Ld= 53 SPTR MZS/TSK SPTR 53 Empty BOBYNs placed at 02.50 hrs on 03.05.25 for SSE/PW/SPTR at MZS. Loading started at 08:00 hrs,
MOVEMENT OF RMC RAKE AS ON 06.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25. Loading started at 8.00 hrs
20 RP NLP Rail
NBQ on 30.04.25, completed at 12:00 hrs on 01.05.25. Rake left NBQ at 11:30 hrs on 02.05.25. Left NMM at 21:51 hrs. dropped at VNE at 11:40 hrs
3 Rake NLP/RNY VNE
02.05.25 of 03.05.25. Unloading plan betn VNE -BX. On 04.05.25, 12 Panels unloaded in VNE - NBX. On 5.5.25- 14 panel betn VNE-NBX. On 6.5.25-
12 panel betn NCA-DQL. Balance= 22 panels.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
BSPC 20 RP Rake BIA
4 AONI/LMG NGC of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 -
no.65 (AONIRail) 22.04.25
No power provided. On 6.5.25- 12 Panel unlaoded betn BRHU-KKET,TTLA-KMLJ. Balance= 48 Panel
Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT at 22:50 hrs of
BSPC 20 RP Rake BIA 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 7:32 hrs of 02.05.25, arrived GHY at 19:39 hrs. Left GHY at 04:20 hrs on
5 NTSK/TSK FKG
no.98 (NTSK Rail) 22.04.25 03.05.25, arrived FKG at 12:30 hrs on 04.05.25. On 05.05.25- 14 panel unloaded betn FKG-GLGT. 6.5.25- 24 panel betn FKG-GLGT.
Balance= 22 Panel
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of
6 no.124 (AZA Rail) BIA AZA/RNY On run
4.5.25. Chakradharpur(CKP) 14.53 hrs of 6.5.25
BSPC 20 RP Rake Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of
7 no.129 (HSARail) BIA HSA/APDJ On run
4.5.25. JChakradharpur(CKP) 14.53 hrs of 6.5.25
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

1 RNI Ballast, Ld= 52 PKR RNI/KIR PKR 52 BOBYN placed at 19:45 hrs of 05.05.25 for SSE/PW/KNE at RNI. Loading done at 0:45 hrs of 06.05.25. Noy yet arrived.

53 BOBYN placed at 02:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 07:00hrs of 30.04.25. Rake arrived SXX at 05:17 hrs on
2 NCB Ballast, Ld= 53 TJPS NCB/APDJ SXX 01.05.25. On 01.05.25, not planned. On 02/03.05.25, No power. On 04.05.25-22 wagons unloaded betn NOQ - SMTA. 5.5.25-19 wagon
betn JOQ-KAMG(Up) , On 6.5.25-12 wagon 100% unloaded betn JOQ-SRPB(Up).

53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake
3 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
arrived at CAPG 17:11 hrs on 01.05.25.Unloadin plan CROA- FKM Dn. On 02/3/4/5/6.05.25, No power.

4 DBB Ballast, Ld= 53 DBB/APDJ JOQ 53 BOBYN placed at 12.30 hrs of 5.5.25. for SSE/PW/FKM at DBB . Loading started at 15.30 hrs of 5.5.25

47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs of 29.04.25. Rake
5 BPB Ballast, Ld= 47 TJPS BPB/LMG NHLG arrived PKB at 19:38 hrs of 02.05.25 and dropped. On 03/4.05.25, No power. Rake arrived NHLG3.41 hrs of 5.5.25. Unloading plan betn
NHLG-DTC. 5.5.25- No power. On 6.5.25- 28 Wagon unloaded betn NHLG-JGLP-NHGJ. Balance=19 Wagon
53 Empty BOBYNs placed at 22:40 hrs of 01.05.25 for SSE/PW/HJI at LMG. Loading started at 6:00 hrs of 02.05.25 and completed at 18:00 hrs.
6 LMG Ballast, Ld= 53 SCE LMG/LMG KWM Rake arrived JGJN at 15.45 hrs on 03.05.25. On 04/05.05.25, No power. On 6.5.25- 22 wagon unloaded betn HJI-JGJN, JGJN-JMK(Dn).
Balance= 31 wagon.
53 Empty BOBYNs placed at 19:00 hrs on 01.05.25 for SSE/PW/BNGN at GLPT. Loading started at 19:00 hrs, completed at 00:10 hrs on
PKR
7 GLPT Ballast, Ld= 53 GLPT/RNY NBQ 02.05.25. Rake left PKR at 02:05 hrs on 01-05-25, Arrived NBQ at 13:56 hrs on 04.05.25. On 5.5.25- 16 wagon unload betn DTX- BSGN
01.05.25
Dn. On 6.5.25- 26 Wagon unloaded betn DTX-BSGN (Dn). Balance= 11 wagon
53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs. Rake
8 NTSK Ballast, Ld= 53 PKR NTSK/TSK DMC left MLDT at 18:00 hrs of 30.04.25,dropped at DMC 9.10 hrs of 5.5.25. On 6.5.25- 22 Wagon unloaded betn NHK-DJG, NAM-NHK.
Balance = 31 Wagon
53 Empty BOBYNs placed at 02.50 hrs on 05.05.25 for SSE/PW/SPTR at MZS, loading started at 08:00 hrs. Completed at 18:45 hrs of
9 MZS Ballast, Ld= 53 SPTR MZS/TSK SPTR
05.05.25. To be unlaoded between BBNB-SPTR. On 06.05.25 no power.
MOVEMENT OF RMC RAKE AS ON 07.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).
Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25. Loading started at 8.00 hrs
20 RP NLP Rail
NBQ on 30.04.25, completed at 12:00 hrs on 01.05.25. Rake left NBQ at 11:30 hrs on 02.05.25. Left NMM at 21:51 hrs. dropped at VNE at 11:40 hrs
3 Rake NLP/RNY VNE
02.05.25 of 03.05.25. Unloading plan betn VNE -BX. On 04.05.25, 12 Panels unloaded in VNE - NBX. On 5.5.25- 14 panel betn VNE-NBX. On 6.5.25-
12 panel betn NCA-DQL. On 7.5.25- 14 panel unloaded betn VNE-NCA. Balance= 8 panels.
Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
BSPC 20 RP Rake BIA of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 -
4 AONI/LMG TTLA
no.65 (AONIRail) 22.04.25 No power provided. On 6.5.25- 12 Panel unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. Balance=
48 Panel
Indented on 07.04.25 for SSE/PW/FKG at NTSK. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.4.25, passed MLDT at 22:50 hrs of
BSPC 20 RP Rake BIA 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 7:32 hrs of 02.05.25, arrived GHY at 19:39 hrs. Left GHY at 04:20 hrs on
5 NTSK/TSK FKG
no.98 (NTSK Rail) 22.04.25 03.05.25, arrived FKG at 12:30 hrs on 04.05.25. On 05.05.25- 14 panel unloaded betn FKG-GLGT. 6.5.25- 24 panel betn FKG-GLGT. On
07.05.25- 22 panels 100% unloaded in GLGT- NMGY. Empty left MXN 20.28 hrs of 7.5.25
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of
6 no.124 (AZA Rail) BIA AZA/RNY On run
4.5.25. arrived Andal Jn (UDL) 20.57 hrs of 7.5.25
BSPC 20 RP Rake Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 arrived Andal Jn (UDL)
7 no.129 (HSARail) BIA HSA/APDJ On run
20.57 hrs of 7.5.25
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date

1 RNI Ballast, Ld= 52 PKR RNI/KIR EKI 52 BOBYN placed at 19:45 hrs of 05.05.25 for SSE/PW/KNE at RNI. Loading done at 0:45 hrs of 06.05.25. Left MLDT 20.10hrs 7.5.25.

53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake
2 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
arrived at CAPG 17:11 hrs on 01.05.25.Unloadin plan CROA- FKM Dn. On 02/3/4/5/6/07.05.25, No power.

3 DBB Ballast, Ld= 53 JOQ DBB/APDJ JOQ 53BOBYN placed at 12.30hrs of 5.5.25. for SSE/PW/FKM at DBB .Loading started at 15.30 hrs of 5.5.25, completed at 18.00hrs 7.5.25

4 BSGN Ballast, Ld= 53 TJPS BSGN/APDJ TJPS 53 BOBYN placed at 7.30 hrs of 7.5.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 7.5.25. Rake not yet arrived MLDT

47 Empty BOBYNs placed at 20.00 hrs on 28.04.25 at TJPS for SSE/PW/NHGJ at BPB. Loading completed at 01:00 hrs of 29.04.25. Rake
arrived PKB at 19:38 hrs of 02.05.25 and dropped. On 03/4.05.25, No power. Rake arrived NHLG3.41 hrs of 5.5.25. Unloading plan betn NHLG-
5 BPB Ballast, Ld= 47 TJPS BPB/LMG NHLG
DTC. 5.5.25- No power. On 6.5.25- 28 Wagon unloaded betn NHLG-JGLP-NHGJ. On 7.5.25- 19Wagon 100% unloaded betn NHGJ-DTC & DTC
Yd.
53 Empty BOBYNs placed at 22:40 hrs of 01.05.25 for SSE/PW/HJI at LMG. Loading started at 6:00 hrs of 02.05.25 and completed at 18:00 hrs.
6 LMG Ballast, Ld= 53 SCE LMG/LMG KWM Rake arrived JGJN at 15.45 hrs on 03.05.25. On 04/05.05.25, No power. On 6.5.25- 22 wagon unloaded betn HJI-JGJN, JGJN-
JMK(Dn).On 07.05.25, not planned due to Panchayat Election. Balance= 31 wagon.
7 JRBM Ballast, Ld= 53 BHZ JRBM/LMG BHZ 53 Empty BOBYNs placed at 07:10 hrs of 07.05.25 for SSE/PW/SCL at JRBM. Loading started at 09:00 hrs of 7.5.25
53 Empty BOBYNs placed at 19:00 hrs on 01.05.25 for SSE/PW/BNGN at GLPT. Loading started at 19:00 hrs, completed at 00:10 hrs on
PKR
8 GLPT Ballast, Ld= 53 GLPT/RNY NBQ 02.05.25. Rake left PKR at 02:05 hrs on 01-05-25.Arrived NBQ at 13:56 hrs on 04.05.25. On 5.5.25- 16 wagon unload betn DTX- BSGN Dn.On
01.05.25
6.5.25- 26 Wagon unloaded in DTX-BSGN (Dn). On 07.5.25-5 Wagon unloaded in DTX-BSGN (Dn) . Balance= 6 wagon
53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs. Rake
9 NTSK Ballast, Ld= 53 PKR NTSK/TSK BFD left MLDT at 18:00 hrs of 30.04.25,dropped at DMC 9.10 hrs of 5.5.25. On 6.5.25- 22 Wagon unloaded betn NHK-DJG, NAM-NHK. On
07.05.25- 9 wagons unloaded in SPK- BFD. Balance = 22 Wagon
53 Empty BOBYNs placed at 02.50 hrs on 05.05.25 for SSE/PW/SPTR at MZS, loading started at 08:00 hrs. Completed at 18:45 hrs of
10 MZS Ballast, Ld= 53 SPTR MZS/TSK SPTR
05.05.25. To be unlaoded between BBNB-SPTR. On 06/07.05.25 no power.
MOVEMENT OF RMC RAKE AS ON 08.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Indent placed on 04.03.25 for SSE/PW/VNE at NLP (52 KG, New and S/H). Empty placed at 02.30 hrs of 30.04.25. Loading started at 8.00 hrs
20 RP NLP Rail
NBQ on 30.04.25, completed at 12:00 hrs on 01.05.25. Rake left NBQ at 11:30 hrs on 02.05.25. Left NMM at 21:51 hrs. dropped at VNE at 11:40 hrs
3 Rake NLP/RNY VNE
02.05.25 of 03.05.25. Unloading plan betn VNE -BX. On 04.05.25, 12 Panels unloaded in VNE - NBX. On 5.5.25- 14 panel betn VNE-NBX. On 6.5.25-
12 panel betn NCA-DQL. On 7.5.25- 14 panel unloaded betn VNE-NCA.08.05.25 8 panels unloading in bet DQL-NCA . 100% Unloaded.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
BSPC 20 RP Rake BIA of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 -
4 AONI/LMG TTLA
no.65 (AONIRail) 22.04.25 No power provided. On 6.5.25- 12 Panel unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On
08.05.25, no power. Balance= 48 Panel

20 RP Empty BSPC
5 BIA On run/NLN NTSK rail 100% unloaded on 7.5.25 . Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. No power
Rake no.98 (NTSK Rail)

BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of
6 no.124 (AZA Rail) BIA AZA/RNY On run
4.5.25, passed MLDT at 14:00 hrs on 08.05.25. left RNI 21.15 hrs of 8.5.25
BSPC 20 RP Rake Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, passed MLDT at 14:00 hrs
7 no.129 (HSARail) BIA HSA/APDJ On run
on 08.05.25. left RNI 21.15 hrs of 8.5.25
BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
52 BOBYN placed at 19:45 hrs of 05.05.25 for SSE/PW/KNE at RNI. Loading done at 0:45 hrs of 06.05.25. Left MLDT 20:10 hrs of 7.5.25,
1 RNI Ballast, Ld= 52 PKR RNI/KIR EKI
arrived EKI at 23:44 hrs .To unload in SM-KMRJ Up. On 08.05.25, not planned.
53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake
2 NCB Ballast, Ld= 53 PKR NCB/APDJ CAPG
arrived at CAPG 17:11 hrs on 01.05.25. Unloadin plan CROA- FKM Dn. On 02/3/4/5/6/07/08.05.25, No power.
53BOBYN placed at 12.30hrs of 5.5.25. for SSE/PW/FKM at DBB .Loading started at 15.30 hrs of 5.5.25, completed at 18.00hrs 7.5.25. To
3 DBB Ballast, Ld= 53 JOQ DBB/APDJ JOQ
unload in NCB-MRDG. On 08.05.25, no power.
TJPS
4 BSGN Ballast, Ld= 53 BSGN/APDJ On Run 53 BOBYN placed at 7.30 hrs of 7.5.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 7.5.25. Rake ADF 16.39 hrs 8.5.25
07.05.25

53 Empty BOBYNs placed at 22:40 hrs of 01.05.25 for SSE/PW/HJI at LMG. Loading started at 6:00 hrs of 02.05.25 and completed at 18:00 hrs.
5 LMG Ballast, Ld= 53 SCE LMG/LMG KWM Rake arrived JGJN at 15.45 hrs on 03.05.25. On 04/05.05.25, No power. On 6.5.25- 22 wagon unloaded betn HJI-JGJN, JGJN-
JMK(Dn).On 07.05.25, not planned due to Panchayat Election. On 08.05.25- 31 wagons unloaded in KWM-JGJN, & 100% unloaded.

53 Empty BOBYNs placed at 07:10 hrs of 07.05.25 for SSE/PW/SCL at JRBM. Loading started at 09:00 hrs, completed at 07:10 hrs of
6 JRBM Ballast, Ld= 53 BHZ JRBM/LMG BPB
08.05.25. On 8.5.25-13 Wagon unloaded betn PNGM-KTX-SCA. Balance= 40 Wagon
53 Empty BOBYNs placed at 19:00 hrs on 01.05.25 for SSE/PW/BNGN at GLPT. Loading started at 19:00 hrs, completed at 00:10 hrs on
PKR 02.05.25. Rake left PKR at 02:05 hrs on 01-05-25.Arrived NBQ at 13:56 hrs on 04.05.25. On 5.5.25- 16 wagon unload betn DTX- BSGN Dn.On
7 GLPT Ballast, Ld= 53 GLPT/RNY DTX
01.05.25 6.5.25- 26 Wagon unloaded in DTX-BSGN (Dn). On 07.5.25-5 Wagon unloaded in DTX-BSGN (Dn) . On 08.05.25- 6 wagons unloaded in DTX-
BSGN Dn, 100% unloaded.
53 Empty BOBYNs placed at 09:00 hrs on 29.04.25 for SSE/PW/NAM at NTSK. Loading started at 12:10 hrs, and completed at 14:00 hrs. Rake
8 NTSK Ballast, Ld= 53 PKR NTSK/TSK AGI left MLDT at 18:00 hrs of 30.04.25,dropped at DMC 9.10 hrs of 5.5.25. On 6.5.25- 22 Wagon unloaded betn NHK-DJG, NAM-NHK. On
07.05.25- 9 wagons unloaded in SPK- BFD. On 08.05.25- 22 wagons 100% unloaded in NMT- AGI.
53 Empty BOBYNs placed at 02.50 hrs on 05.05.25 for SSE/PW/SPTR at MZS, loading started at 08:00 hrs. Completed at 18:45 hrs of
9 MZS Ballast, Ld= 53 SPTR MZS/TSK SRPN
05.05.25. On 06/07.05.25 no power. On 08.05.25- 53 wagons 100% unloaded in SPTR-BBNB- SRPN.
MOVEMENT OF RMC RAKE AS ON 09.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).
Empty of 20 RP NLP
NBQ 100% unloaded on 08.05.25. Empty rake at VNE to be sent to NBQ. No power on 09.05.25. Indent placed on 09.05.25 for SSE/PW/NLP/W at
3 Rail Rake NLP/RNY VNE
02.05.25 MZS.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
BSPC 20 RP Rake BIA of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 -
4 AONI/LMG TKC
no.65 (AONIRail) 22.04.25 No power provided. On 6.5.25- 12 Panel unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On
08/09.05.25, no power. On 10.05.25, panels unloaded in PNB- TKC Dn. Balance= Panels.

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back
5 BIA On run/NLN
Rake no.98 (NTSK Rail) to BSPC. On 08/09.05.25, no power.
BSPC 20 RP Rake Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of 4.5.25,
6 no.124 (AZA Rail) BIA AZA/RNY On run
left MLDT at 14:00 hrs on 08.05.25, arrived NCB at 03:57 hrs on 09.05.25. No crew/Guard.
BSPC 20 RP Rake Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on
7 no.129 (HSA Rail) BIA HSA/APDJ On run
08.05.25, arrived RVK at 11:15 hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section.

8 BSPC 20 RP Rake Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
no.183 (KNE Rail)
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.

BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.

BALLAST RAKES
Rake Rake stabled
Rake Destination/ at
Details movement from Status on date
No. Div
& date
52 BOBYN placed at 19:45 hrs of 05.05.25 for SSE/PW/KNE at RNI. Loading done at 0:45 hrs of 06.05.25. Left MLDT 20:10 hrs of 7.5.25,
1 RNI Ballast, Ld= 52 PKR RNI/KIR SM arrived EKI at 23:44 hrs. On 08.05.25, not planned. On 09.05.28, 30 wagons unloaded in SM - KMRJ Up. On 10.05.25, No block slot.
Balance= 22 wagons.

53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake arrived
NCB/BSGN Ballast, Ld=
2 PKR NCB/APDJ FKM at CAPG 17:11 hrs on 01.05.25. Unloadin plan CROA- FKM Dn. On 02/3/4/5/6/07/08.05.25, No power. On 09.05.25, 14 wagons unloaded in
53
FKM- CROA Dn. On 10.05.25, wagons unloaded in FKM- CROA Dn. Balance= wagons.

53BOBYN placed at 12.30hrs of 5.5.25. for SSE/PW/FKM at DBB .Loading started at 15.30 hrs of 5.5.25, completed at 18.00hrs 7.5.25. To
3 DBB Ballast, Ld= 53 JOQ DBB/APDJ JOQ
unload in NCB - MRDG. On 08/09/10.05.25, no power.

TJPS 53 BOBYN placed at 7.30 hrs of 7.5.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 7.5.25. Rake arrived SXX at 03:44 hrs on
4 BSGN Ballast, Ld= 53 BSGN/APDJ SXX
07.05.25 09.05.25. To unload in APDJ- SMTA. On 09/10.05.25, not planned.

53 Empty BOBYNs placed at 07:10 hrs of 07.05.25 for SSE/PW/SCL at JRBM. Loading started at 09:00 hrs, completed at 07:10 hrs of 08.05.25.
5 JRBM Ballast, Ld= 53 BHZ JRBM/LMG MNBD
On 8.5.25-13 Wagon unloaded betn PNGM-KTX-SCA. On 09.05.25, block not granted. On 10.05.25, No power.

6 DMR Ballast, Ld= 50 BKIR DMR/LMG BKIR 50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:0 hrs.

53 Empty BOBYNs placed at 03:30 hrs on 09.05.25 for SSE/PW/SPTR at MZS. Loading started at 08:00 hrs, completed at 21:15 hrs. On
7 MZS Ballast, Ld= 53 SPTR MZS/TSK SPTR
10.05.25, no power. To be unloaded in SRPN- DMC.
53 Empty BOBYNs placed at 18:00 hrs on 08.05.25 for SSE/PW/NAM at NTSK. Loading started at 18:20 hrs, completed
8 NTSK Ballast, Ld= 53 NTSK/TSK PKR
at 23:00 hrs. Not yet arrived.
MOVEMENT OF RMC RAKE AS ON 10.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).
Empty of 20 RP NLP
NBQ 100% unloaded on 08.05.25. Empty rake at VNE to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. No power on
3 Rail Rake NLP/RNY VNE
02.05.25 09.05.25 and 10.05.25.
Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs
BSPC 20 RP Rake BIA of 28.04.25, arrived CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 -
4 AONI/LMG TKC
no.65 (AONIRail) 22.04.25 No power provided. On 6.5.25- 12 Panel unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On
08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB- TKC Dn. Balance= 40 Panels.

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back
5 BIA On run/NLN
Rake no.98 (NTSK Rail) to BSPC. On 08/09/10.05.25, no power.
BSPC 20 RP Rake
no.124 (AZA Rail) Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of 4.5.25,
6 BIA AZA/RNY On run
left MLDT at 14:00 hrs on 08.05.25, arrived NCB at 03:57 hrs on 09.05.25. No crew/Guard. On 10.05.25- Arrived BSGN at 18.58 hrs.

BSPC 20 RP Rake Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on
7 no.129 (HSA Rail) BIA HSA/APDJ On run
08.05.25, arrived RVK at 11:15 hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section. 10.05.25- no power.
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.

BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.

BALLAST RAKES
Rake Rake stabled
Rake Destination/
Details movement from at Status on date
No. Div
& date
52 BOBYN placed at 19:45 hrs of 05.05.25 for SSE/PW/KNE at RNI. Loading done at 0:45 hrs of 06.05.25. Left MLDT 20:10 hrs of 7.5.25,
1 RNI Ballast, Ld= 52 PKR RNI/KIR SM arrived EKI at 23:44 hrs. On 08.05.25, not planned. On 09.05.28, 30 wagons unloaded in SM - KMRJ Up. On 10.05.25, No block slot.
Balance= 22 wagons.

53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake arrived
NCB/BSGN Ballast, Ld=
2 PKR NCB/APDJ FKM at CAPG 17:11 hrs on 01.05.25. Unloadin plan CROA- FKM Dn. On 02/3/4/5/6/07/08.05.25, No power. On 09.05.25, 14 wagons unloaded in
53
FKM- CROA Dn. On 10.05.25 - Block not granted.
53BOBYN placed at 12.30hrs of 5.5.25. for SSE/PW/FKM at DBB .Loading started at 15.30 hrs of 5.5.25, completed at 18.00hrs 7.5.25. To
3 DBB Ballast, Ld= 53 JOQ DBB/APDJ JOQ
unload in NCB - MRDG. On 08/09/10.05.25, no power.
TJPS 53 BOBYN placed at 7.30 hrs of 7.5.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 7.5.25. Rake arrived SXX at 03:44 hrs on
4 BSGN Ballast, Ld= 53 BSGN/APDJ SXX
07.05.25 09.05.25. To unload in APDJ- SMTA. On 09/10.05.25, not planned.

53 Empty BOBYNs placed at 07:10 hrs of 07.05.25 for SSE/PW/SCL at JRBM. Loading started at 09:00 hrs, completed at 07:10 hrs of 08.05.25.
5 JRBM Ballast, Ld= 53 BHZ JRBM/LMG MNBD
On 8.5.25-13 Wagon unloaded betn PNGM-KTX-SCA. On 09.05.25, block not granted. On 10.05.25- 32 wagon U/L, Bal=8 wagon.

50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:0 hrs. On
6 DMR Ballast, Ld= 50 BKIR DMR/LMG BKIR
10.05.25-Departed from ADINA on 17.53 hrs.
53 Empty BOBYNs placed at 03:30 hrs on 09.05.25 for SSE/PW/SPTR at MZS. Loading started at 08:00 hrs, completed at 21:15 hrs. On
7 MZS Ballast, Ld= 53 SPTR MZS/TSK SPTR
10.05.25, Block not granted. To be unloaded in SRPN- DMC.
53 Empty BOBYNs placed at 18:00 hrs on 08.05.25 for SSE/PW/NAM at NTSK. Loading started at 18:20 hrs, completed
8 NTSK Ballast, Ld= 53 NTSK/TSK PKR
at 23:00 hrs. Not yet arrived.
MOVEMENT OF RMC RAKE AS ON 11.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
Empty of 20 RP NLP
3 Rail Rake NBQ FB Plant VNE Empty rake at VNE to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. No power on 09/10.05.25.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
BSPC 20 RP Rake BIA CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
4 AONI/LMG TKC
no.65 (AONIRail) 22.04.25 unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB-
TKC Dn. On 11.05.25, No power. Balance= 40 Panels.

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back to BSPC. On
5 BIA On run/NLN
Rake no.98 (NTSK Rail) 08/09/10/11.05.25, no power.
BSPC 20 RP Rake
no.124 (AZA Rail) Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of 4.5.25, left MLDT at 14:00
6 BIA AZA/RNY On run/NBQ
hrs on 08.05.25, arrived NCB at 03:57 hrs on 09/10.05.25. No crew/Guard. Arrived NBQ at 00.15 hrs of 11.5.25.
BSPC 20 RP Rake
no.129 (HSA Rail) Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at
7 BIA HSA/APDJ On run/NCB
03.57 hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section. 10/11.05.25- no power.
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
BALLAST RAKES
Rake Rake
Rake Destination/ stabled at
Details movement Status on date
No. Div
from & date
52 BOBYN placed at 19:45 hrs of 05.05.25 for SSE/PW/KNE at RNI. Loading done at 0:45 hrs of 06.05.25. Left MLDT 20:10 hrs of 7.5.25, arrived EKI at 23:44
1 RNI Ballast, Ld= 52 PKR RNI/KIR SM hrs. On 08.05.25, not planned. On 09.05.28, 30 wagons unloaded in SM - KMRJ Up. On 10.05.25, No block slot. On 11.05.25-22 WagonS unloaded betn SM-
KMRJ(Up), 100% Unloaded.

53BOBYN placed at 21:00 hrs of 29.04.25 for SSE/PW/FLK at NCB . Loading done 21:15 hrs of 29.04.25 to 03:00 hrs of 30.05.25. Rake arrived at CAPG 17:11 hrs
NCB/BSGN Ballast, Ld=
2
53
PKR NCB/APDJ FKM on 01.05.25. On 02/3/4/5/6/07/08.05.25, No power. On 09.05.25 -14 wagons unloaded in FKM- CROA Dn. On 10.05.25 - Block not granted. On 11.5.25- 39 Wagon
betn CROA-FKM(Dn). 100% unloaded.

53BOBYN placed at 12.30hrs of 5.5.25. for SSE/PW/FKM at DBB .Loading started at 15.30 hrs of 5.5.25, completed at 18.00hrs 7.5.25. To unload in NCB -
3 DBB Ballast, Ld= 53 JOQ DBB/APDJ JOQ
MRDG. On 08/09/10/11.05.25, no power.
TJPS 52 BOBYN placed at 7.30 hrs of 7.5.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 7.5.25. Rake arrived SXX at 03:44 hrs on 09.05.25. To unload in
4 BSGN Ballast, Ld= 53 BSGN/APDJ SXX
07.05.25 APDJ- SMTA. On 09/10/11.05.25- No power.
5 DKGN Ballast, Ld= 52 PKR DKGN/RNY PKR 53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN . Loading completed at 09.00hrs of 11.05.25. Rake at PKR

53 Empty BOBYNs placed at 07:10 hrs of 07.05.25 for SSE/PW/SCL at JRBM. Loading started at 09:00 hrs, completed at 07:10 hrs of 08.05.25. On 8.5.25-13 Wagon
6 JRBM Ballast, Ld= 53 BHZ JRBM/LMG MNBD
unloaded betn PNGM-KTX-SCA. On 09.05.25, block not granted. On 10.05.25- 32 wagon U/L, On 11.5.25- 8 Wagons betn SIBR-MNBD, 100% unloaded.

50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:0 hrs. On 09.05.25- Rake passed
7 DMR Ballast, Ld= 50 BKIR DMR/LMG On run
Amjonga(AMGA)/RNY Div at 22:23 hrs of 11.5.25
53 Empty BOBYNs placed at 03:30 hrs on 09.05.25 for SSE/PW/SPTR at MZS. Loading started at 08:00 hrs, completed at 21:15 hrs. On 10.05.25-Block not
8 MZS Ballast, Ld= 53 SPTR MZS/TSK SPTR
granted. On 11.05.25, 53 Wagons unloaded in SRPN- BBNB, SRPN-DMC. 100% unloaded.

53 Empty BOBYNs placed at 18:00 hrs on 08.05.25 for SSE/PW/NAM at NTSK. Loading completed at 23:00 hrs of 8.5.25. Rake arrived NJP at 20:43 hrs on
9 NTSK Ballast, Ld= 53 PKR NTSK/TSK On run/NJP
11.05.25
MOVEMENT OF RMC RAKE AS ON 12.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
Empty of 20 RP NLP
Empty rake at VNE to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. No power on 09/10.05.25. On 11.05.25 VNE out 15.42 hrs and ULG in
3 Rail Rake NBQ FB Plant VNE
at 3.23 hrs of 12.05.25.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
BSPC 20 RP Rake BIA CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
4 AONI/LMG TKC
no.65 (AONIRail) 22.04.25 unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB-
TKC Dn. On 11.05.25, No power. Balance= 40 Panels. On 12.05.25- 14 nos panel U/L, Bal=26 panels.

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back to BSPC. On
5 BIA On run/NLN
Rake no.98 (NTSK Rail) 08/09/10/11/12.05.25, no power.
BSPC 20 RP Rake
no.124 (AZA Rail) Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake arrived BIA at 00:36 hrs on 03.05.25 left BIA 21.04 hrs of 4.5.25, left MLDT at 14:00
6 BIA AZA/RNY On run/NBQ
hrs on 08.05.25, arrived NCB at 03:57 hrs on 09/10.05.25. No crew/Guard. Arrived NBQ at 00.15 hrs of 11.5.25. On 12.05.25- No Power/Crew.

BSPC 20 RP Rake
no.129 (HSA Rail) Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at
7 BIA HSA/APDJ On run/NCB
03.57 hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section. 10/11.05.25- no power. On 12.05.25- No Power.
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
BALLAST RAKES
Rake Rake
Rake Destination/ stabled at
Details movement Status on date
No. Div
from & date
53BOBYN placed at 12.30hrs of 5.5.25. for SSE/PW/FKM at DBB .Loading started at 15.30 hrs of 5.5.25, completed at 18.00hrs 7.5.25. To unload in NCB -
3 DBB Ballast, Ld= 53 JOQ DBB/APDJ JOQ
MRDG. On 08/09/10/11.05.25, no power. On 12.05.25 - 53 wagon U/L (100%).
TJPS 52 BOBYN placed at 7.30 hrs of 7.5.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 7.5.25. Rake arrived SXX at 03:44 hrs on 09.05.25. To unload in
4 BSGN Ballast, Ld= 53 BSGN/APDJ SXX
07.05.25 APDJ- SMTA. On 09/10/11/12.05.25- No power.
53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN . Loading completed at 09.00hrs of 11.05.25. Rake at PKR . Arrived at NJP on 16.05 hrs
5 DKGN Ballast, Ld= 52 PKR DKGN/RNY PKR
of 12.05.25.

50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:0 hrs. Rake arrived LKG at 10:54 hrs of
7 DMR Ballast, Ld= 50 BKIR DMR/LMG On run
12.05.25.

53 Empty BOBYNs placed at 18:00 hrs on 08.05.25 for SSE/PW/NAM at NTSK. Loading completed at 23:00 hrs of 8.5.25. Rake arrived NJP at 20:43 hrs on
9 NTSK Ballast, Ld= 53 PKR NTSK/TSK On run/NJP
11.05.25. On 12.05.25- Arrived DTX on 17.15 hrs .
MOVEMENT OF RMC RAKE AS ON 13.05.25
RAIL RAKES
Rake
Rake Destination Rake stabled
Details movement Status on date
No. (Div) at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
Empty of 20 RP NLP
3 Rail Rake NBQ FB Plant ULG Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
BSPC 20 RP Rake BIA CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
4 AONI/LMG TTLA
no.65 (AONIRail) 22.04.25 unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB-
TKC Dn. On 11.05.25, No power. On 12.05.25- 14 nos panel U/L, Bal=26 panels. On 13.05.25- No power

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back to BSPC. On
5 BIA NLN
Rake no.98 (NTSK Rail) 08/09/10/11/12.05.25, no power.

Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs of 04.05.25, left MLDT at 14:00 hrs on 08.05.25, Arrived NBQ at
BSPC 20 RP Rake BIA
6 AZA/RNY CGON 00.15 hrs of 11.5.25. On 12.05.25- No Power/Crew. Rake arrived CGON at 02:10 hrs of 13.05.25. On 13.05.25- 20 Panels unloaded betn CGON- BMGN(Dn).
no.124 (AZA Rail) 04.05.25
Balance= 40Panel
BSPC 20 RP Rake
no.129 (HSA Rail) BIA Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at
7 HSA/APDJ NCB
04.05.25 03.57 hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section. On 10/11/12/13.05.25- No Power.
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
BALLAST RAKES
Rake Rake
Rake Destination/ stabled at
Details movement Status on date
No. Div
from & date
BXT Ballast, 53 BOBYN placed at 08:45 hrs of 13.05.25. for SSE/PW/COB at BXT . Loading started at 10:00 hrs, 15 wagons loaded on 13.05.25. Second placement loading
1 JOQ BXT/APDJ JOQ
Ld= 53 will be done on 14.05.25.
BSGN Ballast, TJPS 52 BOBYN placed at 7.30 hrs of 7.5.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 7.5.25. Rake arrived SXX at 03:44 hrs on 09.05.25. To unload in
2 BSGN/APDJ SXX
Ld= 53 07.05.25 APDJ- SMTA. On 09/10/11/12/13.05.25- No power.
JOQ Ballast, 47 BOBYN placed at 23:55 hrs of 12.05.25 for SSE/PW/NOQ at JOQ . Loading completed at 05:00 hrs of 13.05.25. Rake arrived Kotalpukur(KLP), HWH Div/ER
3 PKR JOQ/APDJ On Run/KLP
Ld= 47 at 20:19 hrs on 13.05.25.
DKGN Ballast, 53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN. Loading completed at 09.00hrs of 11.05.25. Rake at PKR . Arrived MJBT at 17:00 hrs
4 PKR DKGN/RNY MJBT
Ld= 52 of 13.05.25. Unloading plan on 14.05.25 betn MJBT- RPAN.

DMR Ballast, On run/ 50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:00 hrs. Rake dropped LKG at 10:54 hrs
5 BKIR DMR/LMG
Ld= 50 LKG of 12.05.25. On 13.05.25- No power for movement.

NTSK Ballast, 53 Empty BOBYNs placed at 18:00 hrs on 08.05.25 for SSE/PW/NAM at NTSK. Loading completed at 23:00 hrs of 08.05.25. Rake dropped at DMC 12.10 hrs on
6 PKR NTSK/TSK DMC
Ld= 53 13.05.25. Unloading plan betn GLGT-NMGY PQRS site on 14.05.25

BOJ/BOE Ballast, 53 Empty BOBYNs placed at 06:00 hrs on 12.05.25 for SSE/PW/NAM at BOJ. Loading completed at 11:00 hrs of 12.5.25. Rake arrived PJP at 13:05 hrs on
7 BKIR BOJ/TSK PJP
Ld= 53 13.05.25. This rake has to be intercepted under KIR/Divn. for SSE/PW/BOE (as per Dy CE/TK). Unloading plan in TETA- SUD DN.

MZS Ballast, 53 Empty BOBYNs placed at 20.05 hrs on 12.05.25 for SSE/PW/SPTR at MZS. Loading 7.00-19.00 hrs of 12.5.25. On 13.05.25- all 52 Wagons unloaded betn
8 SPTR MZS/TSK DMC
Ld= 52 SRPN- DMC, 100% unloaded.
MOVEMENT OF RMC RAKE AS ON 14.05.25
RAIL RAKES
Rake
Rake Destination Rake stabled
Details movement Status on date
No. (Div) at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
Empty of 20 RP NLP
Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left ULG 10.10 hrs 14.5.25
3 Rail Rake NBQ FB Plant NBQ
arrived NBQ 15.50 hrs of 14.5.25

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
BSPC 20 RP Rake BIA CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
4 AONI/LMG TTLA
no.65 (AONIRail) 22.04.25 unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB-
TKC Dn. On 11.05.25, No power. On 12.05.25- 14 nos panel U/L, Bal=26 panels. On 13/14.05.25- No power

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back to BSPC. On
5 BIA NLN
Rake no.98 (NTSK Rail) 08/09/10/11/12/13/14.05.25, no power.

Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs of 04.05.25, left MLDT at 14:00 hrs on 08.05.25, Arrived NBQ at
BSPC 20 RP Rake BIA
6
no.124 (AZA Rail) 04.05.25
AZA/RNY CGON 00.15 hrs of 11.5.25. On 12.05.25- No Power/Crew. Rake arrived CGON at 02:10 hrs of 13.05.25. On 13.05.25- 20 Panels unloaded betn CGON- BMGN(Dn).
On 14.05.25- Block not granted. Balance= 40 Panels.
BSPC 20 RP Rake
no.129 (HSA Rail)
Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at
BIA
7
04.05.25
HSA/APDJ NCB 03.57 hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section. On 10/11/12/13.05.25- No Power. On 14.05.25- 6 panels unloaded in APDJ -SMTA.
Balance= 54 panels.
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
BALLAST RAKES
Rake Rake
Rake Destination/ stabled at
Details movement Status on date
No. Div
from & date

BOJ/DLK Ballast, 53 Empty BOBYNs placed at 06:00 hrs on 12.05.25 for SSE/PW/NAM at BOJ. Loading completed at 11:00 hrs of 12.5.25. Rake arrived PJP at 13:05 hrs on
1 BKIR BOJ/TSK PJP
Ld= 53 13.05.25. This rake intercepted under KIR/Divn. for SSE/PW/BOE at DLK (as per Dy CE/TK). Unloading plan in TETA- SUD DN. on 15.5.25

BXT Ballast, 53 BOBYN placed at 08:45 hrs of 13.05.25. for SSE/PW/COB at BXT. Loading started at 10:00 hrs of 13.525, (15 wagons loaded) on 13.05.25. Further loading
2 JOQ BXT/APDJ JOQ
Ld= 53 in progress

BSGN Ballast, TJPS 52 BOBYN placed at 07:30 hrs of 07.05.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 07.05.25. Rake arrived SXX at 03:44 hrs on 09.05.25. On
3 BSGN/APDJ FKM
Ld= 53 07.05.25 09/10/11/12/13.05.25- No power. On 14.05.25- 21 wagons unloaded in FKM- KOJ Up.Balance=32 wagons.

JOQ Ballast, On
4 PKR JOQ/APDJ 47 BOBYN placed at 23:55 hrs of 12.05.25 for SSE/PW/NOQ at JOQ . Loading completed at 05:00 hrs of 13.05.25. Rake arrived NQH at 21.18 hrs on 14.05.25.
Ld= 47 Run/NQH

DKGN Ballast, 53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN. Loading completed at 09.00hrs of 11.05.25. Rake at PKR . Arrived MJBT at 17:00 hrs
5 PKR DKGN/RNY MJBT
Ld= 52 of 13.05.25. On 14.05.25- 11 wagons unloaded in MJBT- DKJR. Balance= 41wagons.

DMR Ballast, On run/ 50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:00 hrs. Rake dropped LKG at 10:54 hrs
6 BKIR DMR/LMG
Ld= 50 LKG of 12.05.25. On 13/14.05.25- No power for movement.

NTSK Ballast, 53 Empty BOBYNs placed at 18:00 hrs on 08.05.25 for SSE/PW/NAM at NTSK. Loading completed at 23:00 hrs of 08.05.25. Rake arrived FKG at hrs on
7 PKR NTSK/TSK NMGY
Ld= 53 14.05.25. On 14.05.25 - 53 wagons 100% unloaded betn FKG - GLGT-NMGY PQRS site.

DMC Ballast, 53 Empty BOBYNs placed at 17:21 hrs on 13.05.25 for SSE/PW/SPTR at DMC. Loading started at 07:00 hrs & completed at 19.15 hrs of 14.5.25. unloading plan on
8 SPTR DMC/TSK SPTR
Ld= 52 15.5.25
MOVEMENT OF RMC RAKE AS ON 15.05.25
RAIL RAKES
Rake
Rake Destination Rake stabled
Details movement Status on date
No. (Div) at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25

Empty of 20 RP NLP Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left ULG 10.10 hrs 14.05.25,
3 Rail Rake NBQ FB Plant NBQ arrived NBQ at 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on 15.05.25, released at 13:50 hrs. Six(6) nos BRN found defective, to be placed in Sick
line for rectification.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
BSPC 20 RP Rake BIA
4
no.65 (AONIRail) 22.04.25
AONI/LMG PKB unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB-
TKC Dn. On 11.05.25, No power. On 12.05.25- 14 nos panel U/L. On 13/14.05.25- No power. On 15.05.25, 6 panels unloaded in LMG- PKB Dn. Balance= 20
panels.

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back to BSPC. On
5 BIA NLN
Rake no.98 (NTSK Rail) 08/09/10/11/12/13/14/15.05.25, no power.

Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs of 04.05.25, left MLDT at 14:00 hrs on 08.05.25, Arrived NBQ at
BSPC 20 RP Rake BIA
6
no.124 (AZA Rail) 04.05.25
AZA/RNY CGON 00.15 hrs of 11.5.25. On 12.05.25- No Power/Crew. Rake arrived CGON at 02:10 hrs of 13.05.25. On 13.05.25- 20 Panels unloaded betn CGON- BMGN(Dn).
On 14.05.25- Block not granted. On 15.05.25, 18 Panels unloaded betn CGON- BMGN(Dn). Balance= 22 Panels.

BSPC 20 RP Rake
no.129 (HSA Rail)
Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at
BIA
7
04.05.25
HSA/APDJ HSA 03:57 hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section. On 10/11/12/13.05.25- No Power. On 14.05.25- 6 panels unloaded in APDJ -
SMTA. On 15.05.25, 6 panels unloaded in HSA- KCF. Balance= 48 panels.
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
BALLAST RAKES
Rake Rake
Rake Destination/ stabled at
Details movement Status on date
No. Div
from & date
53 Empty BOBYNs placed at 06:00 hrs on 12.05.25 for SSE/PW/NAM at BOJ. Loading completed at 11:00 hrs of 12.5.25. Rake arrived PJP at 13:05 hrs on
BOJ/DLK Ballast,
1 BKIR BOJ/TSK SUD 13.05.25. This rake intercepted under KIR/Divn. for SSE/PW/BOE at DLK (as per Dy CE/TK). On 15.05.25, 24 wagons unloaded in TETA- SUD DN. Balance= 29
Ld= 53
wagons.
BXT Ballast, 53 BOBYN placed at 08:45 hrs of 13.05.25. for SSE/PW/COB at BXT. Loading started at 10:00 hrs of 13.525, completed at 21:00 hrs on 14.05.25. Unloading
2 JOQ BXT/APDJ JOQ
Ld= 53 plan in APDJ- BXT. On 15.05.25, No popwer.
52 BOBYN placed at 07:30 hrs of 07.05.25. for SSE/PW/FKM at BSGN . Loading done 13.30 hrs of 07.05.25. Rake arrived SXX at 03:44 hrs on 09.05.25. On
BSGN Ballast, TJPS
3 BSGN/APDJ SMTA 09/10/11/12/13.05.25- No power. On 14.05.25- 21 wagons unloaded in FKM- KOJ Up. On 15.05.25- 32 wagons unloaded in SMTA- APDJ, and 100%
Ld= 53 07.05.25
unloaded.

JOQ Ballast, 47 BOBYN placed at 23:55 hrs of 12.05.25 for SSE/PW/NOQ at JOQ . Loading completed at 05:00 hrs of 13.05.25. Rake arrived SXX at 22:10 hrs on 14.05.25.
4 PKR JOQ/APDJ SXX
Ld= 47 To unload in NCB- GKJ. On 15.05.25, No power.

DKGN Ballast, 53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN. Loading completed at 09.00hrs of 11.05.25. Arrived MJBT at 17:00 hrs of 13.05.25. On
5 PKR DKGN/RNY MJBT
Ld= 52 14.05.25- 11 wagons unloaded in MJBT- DKJR. On 15.05.25, no power. Balance= 41 wagons.

RNY Ballast, BKIR


6 RNY/RNY On run/NJP. 49 BOBYNs loaded at 14:30 hrs on 14.05.25 for SSE/PW/RNY at RNY. Rake left BKIR at 17:22 hrs on 14.05.25, arrived NJP at 22:00 hrs on 15.05.25
Ld= 49 14.05.25

DMR Ballast, 50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:00 hrs. Rake dropped LKG at 10:54 hrs
7 BKIR DMR/LMG ABSA
Ld= 50 of 12.05.25. On 13/14.05.25- No power for movement. On 15.05.25, 3 wagons unloaded in MANU- ABSA. Balance= 47 wagons.
DMC Ballast, 52 Empty BOBYNs placed at 17:21 hrs on 13.05.25 for SSE/PW/SPTR at DMC. Loading started at 07:00 hrs & completed at 19:15 hrs of 14.05.25. On 15.05.25,
8 SPTR DMC/TSK SRPN
Ld= 52 all 52 wagons unloaded in DMC- SRPN, 100% unloaded.
MOVEMENT OF RMC RAKE AS ON 16.05.25
RAIL RAKES
Rake
Rake Destination Rake stabled
Details movement Status on date
No. (Div) at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).
Empty of 20 RP NLP Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left ULG 10.10 hrs 14.05.25, arrived NBQ
3 Rail Rake NBQ FB Plant NBQ at 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on 15.05.25, released at 13:50 hrs. Six(6) nos BRN found defective, placed at 7:00 hrs of 16.05.25 at
Sick line for rectification.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
BSPC 20 RP Rake BIA
4 AONI/LMG PKB unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB- TKC
no.65 (AONIRail) 22.04.25
Dn. On 11/13/14.05.25, No power. On 12.05.25- 14 nos panel U/L. On On 15.05.25, 6 panels unloaded in LMG- PKB Dn. On 16.05.25 no power. Balance= 20
panels.

20 RP Empty BSPC NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back to BSPC. On
5 BIA NLN
Rake no.98 (NTSK Rail) 08/09/10/11/12/13/14/15/16.05.25, no power.

Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs of 04.05.25, left MLDT at 14:00 hrs on 08.05.25, Arrived NBQ at
BSPC 20 RP Rake BIA
6 AZA/RNY CGON 00.15 hrs of 11.5.25. On 12.05.25- No Power/Crew. Rake arrived CGON at 02:10 hrs of 13.05.25. On 13.05.25- 20 Panels unloaded betn CGON- BMGN(Dn). On
no.124 (AZA Rail) 04.05.25
14.05.25- Block not granted. On 15.05.25, 18 Panels unloaded betn CGON- BMGN(Dn). On 16.5.25- 10 Panel unloaded betn CGON-BMGN.Balance= 12 Panels.

BSPC 20 RP Rake
no.129 (HSA Rail) Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at 03:57
BIA
7 HSA/APDJ HSA hrs on 09.05.25. Unloading plan in HSA- RVK & GLMA- MBZ section. On 10/11/12/13.05.25- No Power. On 14.05.25- 6 panels unloaded in APDJ - SMTA. On
04.05.25
15.05.25, 6 panels unloaded in HSA- KCF.On 16.5.25-16 Panel unloaded betn HSA-KCF & KCF Yd. Balance= 32 panels.

BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.

BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.

BALLAST RAKES

Rake Rake stabled


Rake Destination/ at
Details movement from Status on date
No. Div
& date
53 Empty BOBYNs placed at 06:00 hrs on 12.05.25 for SSE/PW/NAM at BOJ. Loading completed at 11:00 hrs of 12.5.25. Rake arrived PJP at 13:05 hrs on 13.05.25.
BOJ/DLK Ballast,
1 BKIR DLK/KIR SUD This rake intercepted under KIR/Divn. for SSE/PW/BOE at DLK (as per Dy CE/TK). On 15.05.25, 24 wagons unloaded in TETA- SUD DN. On 16.5.25- No slot.
Ld= 53
Balance= 29 wagons.

53 Empty BOBYNs placed at 20.05 hrs on 15.05.25 for SSE/PW/VNE at NLP. Loading completed at 1.05 hrs of 16.5.25. This rake intercepted under KIR/Divn. for
2 NLP/NJP Ballast Ld=53 BKIR NJP/KIR BKIR
SSE/PW/KNE at NJP (as per Dy CE/TK).
BXT Ballast, 53 BOBYN placed at 08:45 hrs of 13.05.25. for SSE/PW/COB at BXT. Loading started at 10:00 hrs of 13.525, completed at 21:00 hrs on 14.05.25. Unloading plan
3 JOQ BXT/APDJ JOQ
Ld= 53 in APDJ- BXT. On 15.05.25- No power. On 16.5.25- 10 Wagon unloaded betn NCB-APDJ. Balance=43 Wagon
JOQ Ballast, 47 BOBYN placed at 23:55 hrs of 12.05.25 for SSE/PW/NOQ at JOQ . Loading completed at 05:00 hrs of 13.05.25. Rake arrived SXX at 22:10 hrs on 14.05.25. To
4 PKR JOQ/APDJ SXX
Ld= 47 unload in NCB- GKJ section. On 15/16.05.25 - No power.

DKGN Ballast, 53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN. Loading completed at 09.00hrs of 11.05.25. Arrived MJBT at 17:00 hrs of 13.05.25. On
5 PKR DKGN/RNY MJBT
Ld= 52 14.05.25- 11 wagons unloaded in MJBT- DKJR. On 15.05.25, no power. On 16.5.25- 15 Wagon unloaded betn DKJR-MJBT. Balance= 26 wagons.

RNY Ballast, BKIR 49 BOBYNs loaded at 14:30 hrs on 14.05.25 for SSE/PW/RNY at RNY. Rake left BKIR at 17:22 hrs on 14.05.25, arrived NLV at 11.30 hrs on 16.05.25. Rake to be
6 RNY/RNY On run/NLV.
Ld= 49 14.05.25 re-booked to NLP to unload under VNE section.
50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:00 hrs. Rake dropped LKG at 10:54 hrs of
DMR Ballast,
7 BKIR DMR/LMG ABSA 12.05.25. On 13/14.05.25- No power. On 15.05.25, 3 wagons unloaded in MANU- ABSA. On 16.5.25- 8 Wagon unloaded betn ABSA-MGKM. Balance= 39
Ld= 50
wagons.
TULI Ballast, 53 Empty BOBYNs placed at 20.55 hrs of 15.05.25 for SSE/PW/SLGR at TULI. Loading started at 8.00hrs of 16.5.25, Loading completed at 21.15 hrs unloading
8 SPTR SLGR/TSK SPTR
Ld= 53 plan in bet section MRHT-STRN on17.05.25.
MOVEMENT OF RMC RAKE AS ON 17.05.25
RAIL RAKES
Rake
Rake Destination Rake stabled
Details movement Status on date
No. (Div) at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Empty of 20 RP NLP Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left ULG 10.10 hrs 14.05.25, arrived NBQ
3 Rail Rake NBQ FB Plant NBQ at 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on 15.05.25, released at 13:50 hrs. Six(6) nos BRN found defective, placed at 7:00 hrs of 16.05.25 at
Sick line for rectification. On date 17.05.25 ,as per SSE/C&W/NBQ yd. three nos BRN are not fit for loading of panels due to sole bar bent etc.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
BSPC 20 RP Rake BIA
4 AONI/LMG PKB unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB- TKC Dn.
no.65 (AONIRail) 22.04.25
On 11/13/14.05.25, No power. On 12.05.25- 14 nos panel U/L. On On 15.05.25, 6 panels unloaded in LMG- PKB Dn. On 16.05.25 and 17.5.25- No power. Balance= 20
panels.
20 RP Empty Rake NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. To be sent back to BSPC. On
5 BIA On run/TKC
no.98 (NTSK Rail) 08/09/10/11/12/13/14/15/16.05.25, no power. Left NLN 1.18 hrs of 17.5.25 TKC 13.37 hrs. Arrived at NGC on 15.05 hrs.

Indented on 07.04.25 for SSE/PW/CGON at AZRA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs of 04.05.25, left MLDT at 14:00 hrs on 08.05.25, Arrived NBQ at
BSPC 20 RP Rake BIA 00.15 hrs of 11.5.25. On 12.05.25- No Power/Crew. Rake arrived CGON at 02:10 hrs of 13.05.25. On 13.05.25- 20 Panels unloaded betn CGON- BMGN(Dn). On
6 AZA/RNY CGON
no.124 (AZA Rail) 04.05.25 14.05.25- Block not granted. On 15.05.25, 18 Panels unloaded betn CGON- BMGN(Dn). On 16.5.25- 10 Panel unloaded betn CGON-BMGN. On 17.5.25- 12 Panel
(100%) unloaded betn CGON-BMGN(Dn).
BSPC 20 RP Rake
no.129 (HSA Rail) Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at 03:57
BIA
7 HSA/APDJ HSA hrs on 09.05.25. On 10/11/12/13.05.25- No Power. On 14.05.25- 6 panels unloaded in APDJ - SMTA. On 15.05.25, 6 panels unloaded in HSA- KCF.On 16.5.25-16
04.05.25
Panel unloaded betn HSA-KCF & KCF Yd. On 17.5.25-8 Panel unloaded between HSA-KCF. Balance= 24 panels.

BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.

BALLAST RAKES
Rake Rake stabled
Rake Destination/
Details movement from at Status on date
No. Div
& date
53 Empty BOBYNs placed at 06:00 hrs on 12.05.25 for SSE/PW/NAM at BOJ. Loading completed at 11:00 hrs of 12.5.25. Rake arrived PJP at 13:05 hrs on 13.05.25.
BOJ/DLK Ballast,
1 BKIR DLK/KIR SUD This rake intercepted under KIR/Divn. for SSE/PW/BOE at DLK (as per Dy CE/TK). On 15.05.25, 24 wagons unloaded in TETA- SUD DN. On 16.5.25- No slot. On
Ld= 53
17.5.25-21 Wagon unloaded betn TETA-SUD(Dn) . Balance= 8 wagons.

53 Empty BOBYNs placed at 20.05 hrs on 15.05.25 for SSE/PW/VNE at NLP. Loading completed at 1.05 hrs of 16.5.25. This rake intercepted under KIR/Divn. for
2 NLP/NJP Ballast Ld=53 BKIR NJP/KIR PJP
SSE/PW/KNE at NJP (as per Dy CE/TK). Arrived PJP at 20.27 hrs of 16.5.25. Unloading plan betn GIL-AUB (Up ) On 18.5.25

BXT Ballast, 53 BOBYN placed at 08:45 hrs of 13.05.25. for SSE/PW/COB at BXT. Loading started at 10:00 hrs of 13.525, completed at 21:00 hrs on 14.05.25. Unloading plan in
3 JOQ BXT/APDJ JOQ
Ld= 53 APDJ- BXT. On 15.05.25- No power. On 16.5.25- 10 Wagon unloaded betn NCB-APDJ. On 17.5.25- 27 Wagon unloaded betn NCB-APDJ . Balance= 16 Wagon

JOQ Ballast, 47 BOBYN placed at 23:55 hrs of 12.05.25 for SSE/PW/NOQ at JOQ . Loading completed at 05:00 hrs of 13.05.25. Rake arrived SXX at 22:10 hrs on 14.05.25. On
4 PKR JOQ/APDJ SXX
Ld= 47 15/16.05.25 - No power. On 17.5.25- 47 Wagon 100% unloaded betn AGMN - GKJ section.
53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN. Loading completed at 09.00hrs of 11.05.25. Arrived MJBT at 17:00 hrs of 13.05.25. On
DKGN Ballast,
5 PKR DKGN/RNY MJBT 14.05.25- 11 wagons unloaded in MJBT- DKJR. On 15.05.25, no power. On 16.5.25- 15 Wagon unloaded betn DKJR-MJBT. On 17.5.25- 16 Wagon unloaded betn
Ld= 52
DKJR-MJBT. Balance= 10 wagons.
RNY/NLP Ballast, BKIR 49 BOBYNs loaded at 14:30 hrs on 14.05.25 for SSE/PW/RNY at RNY. Rake left BKIR at 17:22 hrs on 14.05.25, arrived ULG 1.46 hrs on 17.05.25. Rake to be re-
6 NLP/RNY ULG
Ld= 49 14.05.25 booked to NLP to unload under VNE section ( BVU-DQL-NCA) on 18.5.25.
50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:00 hrs. Rake dropped LKG at 10:54 hrs of
DMR Ballast,
7 BKIR DMR/LMG ABSA 12.05.25. On 13/14.05.25- No power. On 15.05.25, 3 wagons unloaded in MANU- ABSA. On 16.5.25- 8 Wagon unloaded betn ABSA-MGKM. On 17.5.25- 22 Wagon
Ld= 50
unloaded betn TLMR-JRNA. Balance= 17 wagons.
TULI Ballast, 53 Empty BOBYNs placed at 20.55 hrs of 15.05.25 for SSE/PW/SLGR at TULI. Loading started at 8.00hrs of 16.5.25, Loading completed at 21.15 hrs of 16.5.25 On
8 SPTR SLGR/TSK MRHT
Ld= 53 17.5.25-26 Wagon unloaded bet section MRHT-KRHT-SRTN. Balance =27 Wagon
MOVEMENT OF RMC RAKE AS ON 18.05.25
RAIL RAKES
Rake
Rake Destination Rake stabled
Details movement Status on date
No. (Div) at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Empty of 20 RP NLP Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left ULG 10.10 hrs 14.05.25, arrived NBQ at
3 Rail Rake NBQ FB Plant NBQ 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on 15.05.25, released at 13:50 hrs. Six(6) nos BRN found defective, placed at 7:00 hrs of 16.05.25 at Sick
line for rectification. On date 17.05.25 ,as per SSE/C&W/NBQ yd, three nos BRN are not fit for loading of panels due to sole bar bent etc.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
BSPC 20 RP Rake BIA
4 AONI/LMG JMK unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB- TKC Dn.
no.65 (AONIRail) 22.04.25
On 11/13/14.05.25, No power. On 12.05.25- 14 nos panel U/L. On On 15.05.25, 6 panels unloaded in LMG- PKB Dn. On 16/17.05.25 - 10 panel at Yards. 18.5.25- No
power. Balance= 10 panels, to be unloaded in hill section betn ( MXR-NHLG).

20 RP Empty Rake MXN NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. Left NLN at 01:18 hrs of 17.05.25,
5 BIA On run
no.98 (NTSK Rail) 07.05.25 arrived BMGN at 16:05 hrs. Rake is clubbed with empty AZA Rail Rake and left BMGN at 19:15 hrs, passed AYU at 22:32 hrs on 18.05.25.

20 RP Empty Rake BMGN 20 RP AZRA Rail 100% unloaded on 17.05.25. Empty rake left BMGN at 19:15 hrs, passed AYU at 22:32 hrs on 18.05.25 (Clubbed with
6 BIA On run
no.124 (AZA Rail) 18.05.25 Empty NTSK Rail rake.)
BSPC 20 RP Rake
no.129 (HSA Rail) Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25, arrived NCB at 03:57
BIA
7 HSA/APDJ HSA hrs on 09.05.25. On 10/11/12/13.05.25- No Power. On 14.05.25- 6 panels unloaded in APDJ - SMTA. On 15.05.25, 6 panels unloaded in HSA- KCF.On 16.5.25-16 Panel
04.05.25
unloaded betn HSA-KCF & KCF Yd. On 17.5.25-8 Panel unloaded between HSA-KCF. On 18.5.25- 14 Panels unloaded betn HSA-KCF. Balance= 10 panels.

BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.

BALLAST RAKES
Rake Rake stabled
Rake Destination/
Details movement from at Status on date
No. Div
& date
53 Empty BOBYNs placed at 06:00 hrs on 12.05.25 for SSE/PW/NAM at BOJ. Loading completed at 11:00 hrs of 12.5.25. Rake arrived PJP at 13:05 hrs on 13.05.25.
BOJ/DLK Ballast,
1 BKIR DLK/KIR SUD This rake intercepted under KIR/Divn. for SSE/PW/BOE at DLK (as per Dy CE/TK). On 15.05.25, 24 wagons unloaded in TETA- SUD DN. On 16.5.25- No slot. On
Ld= 53
17.05.25-21 Wagon unloaded betn TETA-SUD(Dn). On 18.05.25- 8 wagons unloaded, 100% unloaded.

53 Empty BOBYNs placed at 20.05 hrs on 15.05.25 for SSE/PW/VNE at NLP. Loading completed at 1.05 hrs of 16.5.25. This rake intercepted under KIR/Divn. for
2 NLP/NJP Ballast Ld=53 BKIR NJP/KIR PJP
SSE/PW/KNE at NJP (as per Dy CE/TK). Arrived PJP at 20.27 hrs of 16.5.25. On 18.5.25- 42 Wagon Unloaded betn GIL-AUB (Up ) . Balance=11 Wagons

53 BOBYN placed at 08:45 hrs of 13.05.25. for SSE/PW/COB at BXT. Loading started at 10:00 hrs of 13.525, completed at 21:00 hrs on 14.05.25. Unloading plan in
BXT Ballast,
3 JOQ BXT/APDJ NCB APDJ- BXT. On 15.05.25- No power. On 16.5.25- 10 Wagon unloaded betn NCB-APDJ. On 17.5.25- 27 Wagon unloaded betn NCB - APDJ . On 18.05.25- 16 Wagons
Ld= 53
unloaded in NCB- DWT, and 100% unloaded.
53 BOBYN placed at 4.05 hrs of 11.05.25. for SSE/PW/RPAN at DKGN. Loading completed at 09.00hrs of 11.05.25. Arrived MJBT at 17:00 hrs of 13.05.25. On
DKGN Ballast,
4 PKR DKGN/RNY RPAN 14.05.25- 11 wagons unloaded in MJBT- DKJR. On 15.05.25, no power. On 16.5.25- 15 Wagon unloaded betn DKJR-MJBT. On 17.5.25- 16 Wagon unloaded betn
Ld= 52
DKJR-MJBT. On 18.05.25- 10 Wagon unloaded betn DKJR- RPAN, 100% unloaded.

RNY/NLP Ballast, BKIR 49 BOBYNs loaded at 14:30 hrs on 14.05.25 for SSE/PW/RNY at RNY. Rake left BKIR at 17:22 hrs on 14.05.25, arrived ULG at 01:46 hrs on 17.05.25. Rake to be re-
5 NLP/RNY ULG
Ld= 49 14.05.25 booked to NLP to unload under VNE section ( BVU-DQL-NCA). On 18.05.25- Power not given for movement.

50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:00 hrs. Rake dropped LKG at 10:54 hrs of
DMR Ballast,
6 BKIR DMR/LMG AGTL 12.05.25. On 13/14.05.25- No power. On 15.05.25, 3 wagons unloaded in MANU- ABSA. On 16.5.25- 8 Wagon unloaded betn ABSA-MGKM. On 17.5.25- 22 Wagon
Ld= 50
unloaded betn TLMR-JRNA. On 18.05.25- 7 Wagons unloaded betn MGKM - AGTL. Balance= 10 wagons.

53 Empty BOBYNs placed at 20.55 hrs of 15.05.25 for SSE/PW/SLGR at TULI. Loading started at 8.00hrs of 16.5.25, Loading completed at 21.15
TULI Ballast,
7
Ld= 53
SPTR SLGR/TSK NMT hrs of 16.5.25 On 17.5.25-26 Wagon unloaded bet section MRHT-KRHT-SRTN. On 18.05.25- 26 Wagons unloaded betn AGI- NMT, 100%
unloaded.
NTSK Ballast,
8
Ld= 49
PKR NTSK/TSK PKR 49 BOBYN loaded on 16.05.25 for SSE/PW/NAM at NTSK. Not yet left MLDT
MOVEMENT OF RMC RAKE AS ON 19.05.25
RAIL RAKES
Rake
Rake Destination Rake stabled
Details movement Status on date
No. (Div) at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left ULG 10.10 hrs
Empty of 20 RP NLP
14.05.25, arrived NBQ at 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on 15.05.25, released at 13:50 hrs. Six(6) nos BRN found
3 Rail Rake NBQ FB Plant NBQ
defective, placed at 7:00 hrs of 16.05.25 at Sick line for rectification. On date 17.05.25 ,as per SSE/C&W/NBQ yd, three nos BRN are not
fit for loading of panels due to sole bar bent etc.

Indented on 07.04.25 booked to SSE/PW/SCE at AONI. Rake loaded on 21.04.25. Left BIA at 13:38 hrs of 22.04.25, passed MLDT at 22:50 hrs of 28.04.25, arrived
CROA at 19:56 hrs of 29.04.25. Left CROA at 07:32 hrs of 02.05.25, arrived NGC at 20:47 hrs of 02.05.25. On 04/05.05.25 - No power provided. On 6.5.25- 12 Panel
BSPC 20 RP Rake BIA
4 AONI/LMG MYD unlaoded betn BRHU-KKET,TTLA-KMLJ. On 07.05.25, No labours for panchayat election. On 08/09.05.25, no power. On 10.05.25, 8 panels unloaded in PNB- TKC Dn.
no.65 (AONIRail) 22.04.25
On 11/13/14.05.25, No power. On 12.05.25- 14 nos panel U/L. On On 15.05.25, 6 panels unloaded in LMG- PKB Dn. On 16/17.05.25 - 10 panel at Yards. 18.5.25- No
power.On 19.5.25- 10 Panel 100% unloaded betn NHLG- MGE, MGE-MXR. Empty Left at 17.30 hrs dropped at MYD 20.00 hrs of 19.5.25.

NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. Left NLN at
20 RP Empty Rake MXN
5 BIA On run/SJKL 01:18 hrs of 17.05.25, arrived BMGN at 16:05 hrs. Rake is clubbed with empty AZA Rail Rake and left BMGN at 19:15 hrs, passed AYU at
no.98 (NTSK Rail) 07.05.25
22:32 hrs on 18.05.25. NJP in 10.35 hrs and left 17.10 hrs of 19.5.25, SJKL at 20.43 hrs
20 RP Empty Rake BMGN 20 RP AZRA Rail 100% unloaded on 17.05.25. Empty rake left BMGN at 19:15 hrs, passed AYU at 22:32 hrs on 18.05.25 (Clubbed with
6 BIA On run/SJKL
no.124 (AZA Rail) 18.05.25 Empty NTSK Rail rake.) NJP in 10.35 hrs and left 17.10 hrs of 19.5.25, SJKL 20.43 hrs
BSPC 20 RP Rake
no.129 (HSA Rail) Indented on 29.04.25 for SSE/PW/HSA at HSA. Loaded on 01.05.25. Rake left BIA at 21:04 hrs on 04.05.25, left MLDT at 14:00 hrs on 08.05.25,
arrived NCB at 03:57 hrs on 09.05.25. On 10/11/12/13.05.25- No Power. On 14.05.25- 6 panels unloaded in APDJ - SMTA. On 15.05.25, 6
BIA
7
04.05.25
HSA/APDJ HSA panels unloaded in HSA- KCF.On 16.5.25-16 Panel unloaded betn HSA-KCF & KCF Yd. On 17.5.25-8 Panel unloaded between HSA-KCF. On
18.5.25- 14 Panels unloaded betn HSA-KCF. On 19.5.25-10 panels unloaded betn HSA-KCF. 100% unloading completed. Empty at HSA
to be move together with AONI Empty rake
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.

BALLAST RAKES
Rake Rake stabled
Rake Destination/
Details movement from at Status on date
No. Div
& date
53 Empty BOBYNs placed at 20.05 hrs on 15.05.25 for SSE/PW/VNE at NLP. Loading completed at 1.05 hrs of 16.5.25. This rake intercepted
1 NLP/NJP Ballast Ld=53 BKIR NJP/KIR PJP under KIR/Divn. for SSE/PW/KNE at NJP (as per Dy CE/TK). Arrived PJP at 20.27 hrs of 16.5.25. On 18.5.25- 42 Wagon Unloaded betn GIL-
AUB (Up ) . 19.5.25- No block slot. Balance=11 Wagons

49 BOBYNs loaded at 14:30 hrs on 14.05.25 for SSE/PW/RNY at RNY. Rake left BKIR at 17:22 hrs on 14.05.25, arrived ULG at 01:46 hrs on
RNY/NLP Ballast, BKIR
2
Ld= 49 14.05.25
NLP/RNY BVU 17.05.25. Rake to be re-booked to NLP to unload under VNE section ( BVU-DQL-NCA). On 18.05.25- Power not given for movement. 19.5.25-
Not plan due to labour not available.

50 Empty BOBYNs placed at 09:10 hrs of 09.05.25 for SSE/PW/KXJ at DMR. Loading started at 09:20 hrs, completed at 14:00 hrs. Rake dropped
DMR Ballast, LKG at 10:54 hrs of 12.05.25. On 13/14.05.25- No power. On 15.05.25, 3 wagons unloaded in MANU- ABSA. On 16.5.25- 8 Wagon unloaded
3 BKIR DMR/LMG AGTL
Ld= 50 betn ABSA-MGKM. On 17.5.25- 22 Wagon unloaded betn TLMR-JRNA. On 18.05.25- 7 Wagons unloaded betn MGKM - AGTL. On 19.5.25- 10
Wagon 100% unloaded betn JRNA-AGTL.

NTSK Ballast,
4 PKR NTSK/TSK on run/KNE 49 BOBYN loaded at 17.00 hrs on 16.05.25 for SSE/PW/NAM at NTSK. Left KNE 21.00 hrs of 19.5.25
Ld= 49
MOVEMENT OF RMC RAKE AS ON 20.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left
Empty of 20 RP NLP
ULG 10.10 hrs 14.05.25, arrived NBQ at 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on 15.05.25, released at 13:50 hrs.
3 Rail Rake NBQ FB Plant NBQ
Six(6) nos BRN found defective, placed at 7:00 hrs of 16.05.25 at Sick line for rectification. On date 17.05.25, as per SSE/C&W/NBQ
yd, three nos BRN are not fit for loading of panels due to sole bar bent etc. Pushed to NBQ W/Shop on 19.05.25, but not yet started.

Empty 20 RP Rake BIA On 19.5.25- 10 Panel 100% unloaded betn NHLG- MGE, MGE-MXR. Empty Rake left MXR at 17.30 hrs on 19.05.25, passed DTX
4 AONI/LMG MYD
no.65 (AONIRail) 22.04.25 at 20:50 hrs on 20.05.25. To attach empty of HSA rail at KCF

NTSK rail 100% unloaded on 07.05.25. Empty left MXN 20.28 hrs of 7.5.25, arrived NLN at 00:47 hrs on 08.05.25 and dropped. Left
20 RP Empty Rake MXN
5 BIA On run NLN at 01:18 hrs of 17.05.25, arrived BMGN at 16:05 hrs. Rake is clubbed with empty AZA Rail Rake and left BMGN at 19:15 hrs
no.98 (NTSK Rail) 07.05.25
on 17.05.25, Made over to MLDT at 02:00 hrs on 20.05.25.

20 RP Empty Rake BMGN 20 RP AZRA Rail 100% unloaded on 17.05.25. Empty rake left BMGN at 19:15 hrs, passed AYU at 22:32 hrs on 18.05.25 (Clubbed
6 BIA On run
no.124 (AZA Rail) 18.05.25 with Empty NTSK Rail rake). Made over to MLDT at 02:00 hrs on 20.05.25.

Empty 20 RP Rake BIA On 19.05.25-10 panels unloaded betn HSA-KCF. 100% unloading completed. Empty at KCF to move together with AONI Empty
7 HSA/APDJ KCF
no.129 (HSA Rail) 04.05.25 rake which left DTX at 20:50 hrs.
BSPC 20 RP Rake
8 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.
BSPC 20 RP Rake
9 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.
BSPC 20 RP Rake
10 Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
no.229 (AZA Rail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/
Details movement at Status on date
No. Div
from & date
1 RMPB Ballast, Ld=52 ADF RMPB/KIR ADF 52 Empty BOBYNs placed at 5:45 hrs on 19.05.25 for SSE/PW/BNDP at RMPB. Loading completed at 14:20 hrs of 19.5.25.

53 Empty BOBYNs placed at 20.05 hrs on 15.05.25 for SSE/PW/VNE at NLP. Loading completed at 1.05 hrs of 16.5.25. This rake
2 NLP/NJP Ballast Ld=53 BKIR NJP/KIR MXJ intercepted under KIR/Divn. for SSE/PW/KNE at NJP (as per Dy CE/TK). Arrived PJP at 20.27 hrs of 16.5.25. On 18.5.25- 42
Wagon Unloaded betn GIL-AUB (Up ). On 19/20.05.25- No block slot. Balance=11 Wagons

49 BOBYNs loaded at 14:30 hrs on 14.05.25 for SSE/PW/RNY at RNY. Rake left BKIR at 17:22 hrs on 14.05.25, arrived BVU at
RNY/NLP Ballast, BKIR 07:40 hrs on 19.05.25. Rake to be re-booked to NLP to unload under VNE section ( BVU-DQL-NCA). On 18.05.25- Power not given
3 NLP/RNY BVU
Ld= 49 14.05.25 for movement. On 19.05.25- Not plan due to labour not available. On 20.05.25, 22 wagons unloaded in BVU- NCA. Balance= 25
wagons.

4 GLPT Ballast, Ld= ULG GLPT/RNY ULG 52 Empty BOBYNs placed at 6:00 hrs on 20.05.25 for SSE/PW/CGON at GLPT. Loading started at 9:30 hrs.

NTSK Ballast,
5 PKR NTSK/TSK on run/KNE 49 BOBYN loaded at 17.00 hrs on 16.05.25 for SSE/PW/NAM at NTSK. Left NBQ at 20:30 hrs of 20.5.25
Ld= 49
NTSK Ballast,
6 NLP/TSK SPTR 53 Empty BOBYNs placed at 11.40 hrs on 20.05.25 for SSE/PW/ at NLP. Loading started at 15.10 hrs
Ld= 49
MOVEMENT OF RMC RAKE AS ON 21.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Left ULG
Empty of 20 RP NLP
10.10 hrs 14.05.25, arrived NBQ at 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on 15.05.25, released at 13:50 hrs. Six(6) nos
3 Rail Rake NBQ FB Plant NBQ
BRN found defective, placed at 7:00 hrs of 16.05.25 at Sick line for rectification. On date 17.05.25, as per SSE/C&W/NBQ yd, three nos
BRN are not fit for loading of panels due to sole bar bent etc. Pushed to NBQ W/Shop on 19.05.25, but repairing not yet started.

Empty 20 RP Rake MXR On 19.5.25- 10 Panel 100% unloaded betn NHLG- MGE, MGE-MXR. Empty Rake left MXR at 17.30 hrs on 19.05.25, arrived HSA at
4 BSPC On Run
no.65 (AONIRail) 19.05.25 04:10 hrs on 21.05.25. Rake attached with Empty HSA Rail Rake and left HSA at 07:00 hrs on 21.05.25,SM at 21.30 hrs

Empty 20 RP Rake HSA On 19.05.25-10 panels unloaded betn HSA-KCF & 100% unloading completed. Empty Rake left HSA at 07:00 hrs on 21.05.25,
5 BSPC On Run
no.129 (HSA Rail) 21.05.25 SM at 21.30 hrs
BSPC 20 RP Rake
6 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.

BSPC 20 RP Rake
7 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.

BSPC 20 RP Rake
8 Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
no.229 (AZA Rail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/
Details movement at Status on date
No. Div
from & date
52 Empty BOBYNs placed at 5:45 hrs on 19.05.25 for SSE/PW/BNDP at RMPB. Loading completed at 14:20 hrs of 19.05.25. On
1 RMPB Ballast, Ld=52 ADF RMPB/KIR GRMP
21.05.25-20 wagons unloaded in GRMP- RMPB. Balance= 32 wagons.

53 Empty BOBYNs placed at 20.05 hrs on 15.05.25 for SSE/PW/VNE at NLP. Loading completed at 1.05 hrs of 16.5.25. This rake
intercepted under KIR/Divn. for SSE/PW/KNE at NJP (as per Dy CE/TK). Arrived PJP at 20.27 hrs of 16.5.25. On 18.5.25- 42 Wagon
2 NLP/NJP Ballast Ld=53 BKIR NJP/KIR MXJ
Unloaded betn GIL-AUB (Up ). On 19/20.05.25- No block slot. On 21.05.25 - 11 wagons unloaded in MXJ-TMH Up, & 100%
unloaded.
53 Empty BOBYNs placed at 02.05 hrs on 21.05.25 for SSE/PW/NOQ at JOQ. Loading completed at 7.05 hrs of 21.5.25. On run arrived
3 JOQ Ballast, Ld=53 TJPS JOQ/APDJ On Run
BHW 17.43 hrs of 21.5.25
49 BOBYNs loaded at 14:30 hrs on 14.05.25 for SSE/PW/RNY at RNY. Rake left BKIR at 17:22 hrs on 14.05.25, arrived BVU at 07:40
RNY/NLP Ballast, BKIR
4 NLP/RNY BVU hrs on 19.05.25. On 18.05.25- Power not given for movement. On 19.05.25- Not plan due to labour not available. On 20.05.25, 22
Ld= 49 14.05.25
wagons unloaded in BVU- NCA. On 21.05.25, 25 wagons unloaded in BVU- NCA, 100% unloaded.

5 GLPT Ballast, Ld=52 ULG GLPT/RNY ULG 52 Empty BOBYNs placed at 06:00 hrs on 20.05.25 for SSE/PW/CGON at GLPT. Loading started at 9:30 hrs on 21.05.25.

NTSK Ballast, PKR 49 BOBYN loaded at 17.00 hrs on 16.05.25 for SSE/PW/NAM at NTSK. Rake left PKR on 18.05.25, arrived DMC at 11:52 hrs on
6 NTSK/TSK DMC
Ld= 49 18.05.25 21.05.25. Unloading plan in PQRS Sites, BOJ- SFR & GLGT- NMGY.

NTSK Ballast, 53 Empty BOBYNs placed at 11.40 hrs on 20.05.25 for SSE/PW/NLP at NLP. Loading started at 15.10 hrs of 20.5.25 to 15.30 hrs of
7 NLP/TSK SPTR
Ld= 53 21.5.25. Unloading plan on 22.5.25
MOVEMENT OF RMC RAKE AS ON 22.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Empty rake at ULG since 03:23 hrs of 12.05.25, to be sent to NBQ. Indent placed on 09.05.25 for SSE/PW/NLP/W at
Empty of 20 RP NLP MZS. Left ULG 10.10 hrs 14.05.25, arrived NBQ at 15:50 hrs of 14.05.25. Made over to TXR at 10:15 hrs on
3 Rail Rake NBQ FB Plant NBQ 15.05.25, released at 13:50 hrs. Six(6) nos BRN found defective, placed at 7:00 hrs of 16.05.25 at Sick line for
rectification. On date 17.05.25, as per SSE/C&W/NBQ yd, three nos BRN are not fit for loading of panels due to sole
bar bent etc. Pushed to NBQ W/Shop on 19.05.25, but repairing not yet started.

On 19.5.25- 10 Panel 100% unloaded betn NHLG- MGE, MGE-MXR. Empty Rake left MXR at 17.30 hrs on
Empty 20 RP Rake MXR
4
no.65 (AONIRail) 19.05.25
BSPC On Run 19.05.25, arrived HSA at 04:10 hrs on 21.05.25. Rake attached with Empty HSA Rail Rake and left HSA at 07:00
hrs on 21.05.25, Made over to MLDT at 03:45 hrs on 22.05.25.

Empty 20 RP Rake HSA On 19.05.25-10 panels unloaded betn HSA-KCF & 100% unloading completed. Empty Rake left HSA at 07:00
5 BSPC On Run
no.129 (HSA Rail) 21.05.25 hrs on 21.05.25, Made over to MLDT at 03:45 hrs on 22.05.25.
BSPC 20 RP Rake
6 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.

BSPC 20 RP Rake
7 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.

BSPC 20 RP Rake
8 Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
no.229 (AZA Rail)
BALLAST RAKES
Rake Rake stabled
Rake Destination/
Details movement at Status on date
No. Div
from & date
52 Empty BOBYNs placed at 5:45 hrs on 19.05.25 for SSE/PW/BNDP at RMPB. Loading completed at 14:20 hrs of
1 RMPB Ballast, Ld=52 ADF RMPB/KIR GRMP 19.05.25. On 21.05.25-20 wagons unloaded in GRMP- RMPB. On 22.05.25- 32 wagons 100% unloaded in
RMPB- BLGT.

53 Empty BOBYNs placed at 02.05 hrs on 21.05.25 for SSE/PW/NOQ at JOQ. Loading completed at 7.05 hrs of
2 JOQ Ballast, Ld=53 TJPS JOQ/APDJ NCB
21.5.25. Arrived NCB 20.15 hrs on 22.05.25. Unloading plan betn NBS-SMTA(Up) on 23.5.25

52 Empty BOBYNs placed at 06:00 hrs on 20.05.25 for SSE/PW/CGON at GLPT. Loading started at 9:30 hrs on
3 GLPT Ballast, Ld=52 ULG GLPT/RNY ULG
21.05.25 to 20.20 hrs of 22.5.25. Unloading plan betn NBQ-DTX .

NTSK Ballast, PKR 49 BOBYN loaded at 17.00 hrs on 16.05.25 for SSE/PW/NAM at NTSK. Rake left PKR on 18.05.25, arrived DMC at
4 NTSK/TSK DMC
Ld= 49 18.05.25 11:52 hrs on 21.05.25. Unloading plan in PQRS Sites, BOJ- SFR & GLGT- NMGY. On 22.05.25, No power.

NTSK Ballast, 53 Empty BOBYNs placed at 11.40 hrs on 20.05.25 for SSE/PW/NLP at NLP. Loading started at 15.10 hrs of
5 SPTR NLP/TSK NLP
Ld= 53 20.5.25 to 15.30 hrs of 21.5.25. On 22.05.25-52 wagons 100% unloaded betn SOB- NLP.
MOVEMENT OF RMC RAKE AS ON 23.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).

Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Empty arrived NBQ at 15:50 hrs of 14.05.25.
Empty of 20 RP NLP
On 17.05.25, as per SSE/C&W/NBQ yd, three nos BRN are not fit for loading of panels due to sole
3 Rail Rake NBQ FB Plant NBQ
bar bent etc. Pushed to NBQ W/Shop on 19.05.25, preliminary inspection done on 23.05.25, repairing
not yet started.
BSPC 20 RP Rake
4 no.183 (KNE Rail) Indented on 09.05.25 for SSE/PW/DLK at KNE, not yet loaded.

BSPC 20 RP Rake
5 no.188 (NTSK Rail) Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK, not yet loaded.

BSPC 20 RP Rake
6 Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
no.229 (AZA Rail)
BALLAST RAKES
Rake Rake
Rake Destination/
Details movement stabled at Status on date
No. Div
from & date
53 Empty BOBYNs placed at 02.05 hrs on 21.05.25 for SSE/PW/NOQ at JOQ. Loading completed
1 JOQ Ballast, Ld=53 TJPS JOQ/APDJ NCB at 7.05 hrs of 21.5.25. Arrived NCB 20.15 hrs on 22.05.25. On 23.05.25, 27 wagons unloaded in
NBS - NOQ Up line. Balance= 26 wagons.

52 Empty BOBYNs placed at 06:00 hrs on 20.05.25 for SSE/PW/CGON at GLPT. Loading done
ULG
2 GLPT Ballast, Ld=52 GLPT/RNY On run. 09:30 hrs on 21.05.25 to 20:20 hrs of 22.05.25. Unloading plan betn NBQ- DTX. Rake left ULG at
23.05.25
11:49 hrs on 23.05.25. Weighment done at RNY.

49 BOBYN loaded at 17.00 hrs on 16.05.25 for SSE/PW/NAM at NTSK. Rake left PKR on 18.05.25,
NTSK Ballast, PKR
3 NTSK/TSK DMC arrived DMC at 11:52 hrs on 21.05.25. Unloading plan in PQRS Sites, BOJ- SFR & GLGT- NMGY.
Ld= 49 18.05.25
On 22.05.25, No power. On 23.05.25, 20 wagons unloaded in SFR- BOJ. Balance= 29 wagons.
MOVEMENT OF RMC RAKE AS ON 24.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1 NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
(Rake No-1)
10 RP Empty
2 NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25
( Rake No-2).
Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Empty arrived NBQ at 15:50 hrs of 14.05.25.
Empty of 20 RP NLP
On 17.05.25, as per SSE/C&W/NBQ yd, three nos BRN are not fit for loading of panels due to sole
3 Rail Rake NBQ FB Plant NBQ
bar bent etc. Pushed to NBQ W/Shop on 19.05.25, preliminary inspection done on 23.05.25, repairing
not yet started.
BSPC 20 RP Rake
4 no.183 (KNE Rail) KNE/KIR Indented on 09.05.25 for SSE/PW/DLK at KNE. Rake under loading.

BSPC 20 RP Rake
5 no.188 (NTSK Rail) NTSK/TSK Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK. Rake under loading.

BSPC 20 RP Rake
6 Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.
no.229 (AZA Rail)
BALLAST RAKES
Rake Rake
Rake Destination/
Details movement stabled at Status on date
No. Div
from & date
53 Empty BOBYNs placed at 02.05 hrs on 21.05.25 for SSE/PW/NOQ at JOQ. Loading completed
1 JOQ Ballast, Ld=53 TJPS JOQ/APDJ NOQ at 7.05 hrs of 21.5.25. Arrived NCB 20.15 hrs on 22.05.25. On 23.05.25, 27 wagons unloaded in
NBS - NOQ Up line. On 24.05.25, 26 wagons unloaded in KAMG- NOQ Dn, & 100% unloaded..

53 Empty BOBYNEs placed at 09:10 hrs on 24.05.25 for SSE/PWay/BXP at LMG. JPO
2 LMG Ballast, Ld=53 LMG NJN
09:25 hrs to10:25 hrs. Loading started at 10:25 hrs.

52 Empty BOBYNs placed at 06:00 hrs on 20.05.25 for SSE/PW/CGON at GLPT. Loading done
ULG 09:30 hrs on 21.05.25 to 20:20 hrs of 22.05.25. Unloading plan betn NBQ- DTX. Rake left ULG at
3 GLPT Ballast, Ld=52 GLPT/RNY NBQ
23.05.25 11:49 hrs on 23.05.25, Weighment done at RNY at arrived BNGN at 21:10 hrs. On 24.05.25, 34
wagons unloaded in NBQ - DTX DN. Balance= 18 wagons.

49 BOBYN loaded at 17.00 hrs on 16.05.25 for SSE/PW/NAM at NTSK. Rake left PKR on 18.05.25,
NTSK Ballast, PKR arrived DMC at 11:52 hrs on 21.05.25. Unloading plan in PQRS Sites, BOJ- SFR & GLGT- NMGY.
4 NTSK/TSK SPK
Ld= 49 18.05.25 On 22.05.25, No power. On 23.05.25, 20 wagons unloaded in SFR- BOJ. Balance= 29 wagons,
to be unloaded in GLGT- NMGY. On 24.05.25, No power provided.
MOVEMENT OF RMC RAKE AS ON 25.05.25
RAIL RAKES
Rake
Rake Destination Rake
Details movement Status on date
No. (Div) stabled at
(from/date)
10 RP Empty
1
(Rake No-1)
NBQ FB Plant BSGN Empty Rake dropped at BSGN L/5 at 09:50 hrs of 21.03.25.
10 RP Empty
2
( Rake No-2).
NBQ FB Plant BSGN Empty Rake dropped at BSGN 00:40 hrs of 26.04.25

Indent placed on 09.05.25 for SSE/PW/NLP/W at MZS. Empty arrived NBQ at 15:50
Empty of 20 RP NLP
hrs of 14.05.25. On 17.05.25, as per SSE/C&W/NBQ yd, three nos BRN are not fit for
3 Rail Rake NBQ FB Plant NBQ
loading of panels due to sole bar bent etc. Pushed to NBQ W/Shop on 19.05.25,
preliminary inspection done on 23.05.25, repairing not yet started.
BSPC 20 RP Rake
4 no.183 (KNE Rail) KNE/KIR Indented on 09.05.25 for SSE/PW/DLK at KNE. Rake loading completed on date.
BSPC 20 RP Rake Indented on 09.05.25 for SSE/PW/SLGR (E) at NTSK. Rake loading completed on
5 no.188 (NTSK Rail) NTSK/TSK
date.
BSPC 20 RP Rake
6 no.229 (AZA Rail) Indented on 09.05.25 for SSE/PW/CGON at AZRA, not yet loaded.

BALLAST RAKES
Rake
Rake
Rake Destination/ stabled at
Details movement Status on date
No. Div
from & date

53 Empty BOBYNEs placed at 09:10 hrs on 24.05.25 for SSE/PWay/BXP at LMG. JPO
LMG Ballast,
1 LMG NJN 09:25 hrs to10:25 hrs. Loading started at 10:25 hrs.Loading complited at 21.35
Ld=53
hrs24.05.25. Unloading plan betn CJA-BXJ ,DMV-RXR. On 25.05.25 - No power.

52 Empty BOBYNs placed at 06:00 hrs on 20.05.25 for SSE/PW/CGON at GLPT.


Loading done 09:30 hrs on 21.05.25 to 20:20 hrs of 22.05.25. Unloading plan betn
ULG
2 GLPT Ballast, Ld=52 GLPT/RNY NBQ NBQ- DTX. Rake left ULG at 11:49 hrs on 23.05.25, Weighment done at RNY at
23.05.25
arrived BNGN at 21:10 hrs. On 24.05.25, 34 wagons unloaded in NBQ - DTX DN. On
25.05.25 - 18 wagons unloaded in DTX-NBQ (UP) & 100% unloaded.
49 BOBYN loaded at 17.00 hrs on 16.05.25 for SSE/PW/NAM at NTSK. Rake left PKR
on 18.05.25, arrived DMC at 11:52 hrs on 21.05.25. Unloading plan in PQRS Sites,
NTSK Ballast, PKR
3 NTSK/TSK FKG BOJ- SFR & GLGT- NMGY. On 22.05.25, No power. On 23.05.25, 20 wagons
Ld= 49 18.05.25
unloaded in SFR- BOJ. On 24.05.25, No power provided. On 25.05.25.-29 Wagons
unloaded in bet FKG-GLGT & 100% unloaded.