TERMS OF REFERENCE
Supply, Delivery, Installation and Implementation of the PNP
Body-Worn Camera System
VERSION 1.0-2019
OCTOBER 2019
This document is confidential. Written permission from the PNP NFHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
h u
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
TABLE OF CONTENTS
I. INTRODUCTION 2
A. PROJECT BACKGROUND 2
B. PROJECT OVERVIEW 2
A. GENERAL REQUIREMENTS 3
1. HARDWARE 3
2. SOFTWARE 4
3. INSTALLATION 5
4. INTER-CONNECTIVITY. 7
5. DISTRIBUTION OF BODY WORN CAMERA 7
6. DISTRIBUTION OF DOCKING STATION 8
7. TRAINING 8
8. WARRANTIES/GUARANTEES 10
B. CONCEPTUAL FRAMEWORK OF BWC System 11
C. DETAILEDTECHNICAL REQUIREMENTS(MINIMUM) 12
V. APPROVED BUDGET 22
A. SAMPLE SIZE 23
B. ACTUAL SIMULATION 23
C. SEQUENCE/ORDER OF TESTING 24
Page 1 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended J
y
u
I t
1. INTRODUCTION
A. PROJECT BACKGROUND
Increasing number of law enforcement agencies are adopting the use of Body-
Worn Cameras which represents one new form of technology that significantly
contributes in the field of policing. The PNP will use Body-Worn Cameras in various
ways: to improve evidence collection, to strengthen officer performance and
accountability, to enhance agency transparency, to document encounters between
police and the public, and to investigate and resolve complaints and officer involved
incidents. Body-Worn Cameras not only create concerns about the public's privacy
rights but also can affect how officers relate to people in the community, the
community's perception of the police, and expectations about how police agencies
should share information with the public.
B. PROJECT OVERVIEW
The CDC shall be established as backbone of the entire system; while the
NMMC shall be setup for nationwide monitoring and management of BWCs. All
Monitoring centers shall be connected to the CDC through a virtual private network
(VPN)
There shall be a backup site (colocation) within Metro Manila for video
recordings and system backup, which will ensure a minimal or almost zero downtime
of operation.
The video recordings of BWCs will be transmitted to CDC through docking
system via VPN.
Page 2 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
(j
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
While the video recordings of BWCs with sim cards can be transmitted to CDC
through wireless network connection such as 3G,4G,LTE or better or through docking
system via VPN.
The retention of BWC video recordings shall be stored at CDC for at least 60
days.
A Video Management Software(VMS) platform shall be scalable, flexible and
can work around the organization which must offer secure and comprehensive
management of videos and images taken from the body worn cameras.
The PNP Body-Worn Camera System project aims to provide PNP personnel
performing special, tactical and public safety operations with a body wom camera for
an accurate documentation of police and community contacts, arrests, critical
incidents, tactical response and other forms of police operations and other related law
enforcement activities.
The use of the BWC will help collect evidence while improving transparency
and accountability and strengthening public trust. Further, the BWC may provide
impartial evidence and documentation to settle disputes and allegations of officer
misconduct.
A. GENERAL REQUIREMENTS
Page 3 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose It is intended
6 V y
(i'
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
2. SOFTWARE
Page 4 of 27
This document ie confidentiel. Written permieeion from the PNP NHQ Bide end Awerde Committee
(BAG)shall be secured to produce copies only for the purpose it is intendeci
(f
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
3. INSTALLATION
The winning bidder/supplier shall provide the necessary installation, setup and
configuration services of all deliverables, to include but not limited to hardware,
software, network, electrical and other components.
The CDC shall be established at the PNP ITMS Server Farm, ITMS Building,
Camp Bgen Rafael T Crame, Quezon City as the backbone of the entire system with
a space of at least 15 square meters wherein two (2) floor-mounted SIR air-
conditioned unit shall be installed.
The winning bidder/supplier shall identify the backup site (colocation) within
Metro Manila wherein back-up units and systems shall be established and installed.
The backup site (colocation) must have a minimum standard configuration for security,
cooling and power systems.
The location of the Body Worn Camera System components shall be at the
ITMS.
While the location of the NMMC shall be at the National Operations Center,
Directorate for Operations, Philippine National Police National Headquarters, Camp
BGen Rafael T Crame, Quezon City.
Further, the locations of the 17 Regional Monitoring Centers and its Video
Displays shall be at the Regional IT Project Office or Regional Tactical Operations
Center of the following Police Regional Offices(PROs):
PRO ADDRESS
NCRPO Camp Bagong Diwa, Bicutan, Taguig, Metro Manila
PR01 Camp BGen Oscar Florendo Parian, San Fernando City, La Union
PRO 2 Camp Marcelo A Adduru, Alimanao Tuguegarao City, Cagayan
PROS Camp Olivas City of San Fernando, PampangA
PR04A Camp Vicente Lim, Calamba City, Laguna
PRO 4B Camp Efigenio C Navarro, Calapan City Oriental Mindoro
PROS Camp General Simeon A Ola, Legaspi City
PRO 6 Camp Martin Teofilo B. Delgado, Fort San Perdo, lloilo City
PRO 7 Camp Sergio Osmena Sr Osmeha, Boulevard, Cebu City
PROS Camp Sec. Roberto K. Kangleon Brgy Campetic, Palo, Leyte
PRO 9 Camp Col Romeo Abendan Brgy. Mercedes,Zamboanga City
PRO 10 Camp lit Vicente G Alagar, Brgy. Lapasan Cagayan De Oro City
PRO 11 Camp Quintin M Merecido, Brgy Communal, Buhangin, District, Davao City
PRO 12 Brgy. Tambler, General Santos City
PRO 13 Camp Rafael Rodriguez, J.C. Aquino St., Libertad, Butuan City
COR Camp Bado Dangwa, La Trinidad, Benguet
ARMM Camp BGen Salipada K Pendatun Parang, Maguindanao
Page 5 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be aecured to produce copies only for the purpose it is intended
6 6
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
While the locations of the 171 Office/Police Station Monitoring Room (ANNEX
"B")with video management software and video displays shall be at the 20 City Police
Office Operation Branch of the City Police Offices; 108 City Police Station Operation
Section of the Component City Police Stations; five (5) District Operation Section of
the District Offices; 15 City/Municipal Operation Section of the City/Municipal Police
Stations of NCRPO;and 23 Police Operation Section of the Numbered Police Stations
of NCRPO.
Page 6 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAC)shall ba secured to produce copies only for the purpose it is intended
A- h J o
&
6
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
4. INTER-CONNECTIVITY
A total of Six Hundred Eighty-Four (684) SIM cards for 24 months with 30GB
data capacity per month volume allowance (four (4) sim cards per police station) of
3G/4G/LTE or better from mobile telecommunication for BWCs. This will facilitate the
uploading of critical video footages and online monitoring of BWCs.
TOTAL
TOTAL NUMBER
PRO CPO CCPS NUMBER
OFFICE/STATION OF BWC
OF BWC
PRO CAR 1 1 2 16 32
PRO 1 0 9 9 16 144
PRO 2 1 3 4 16 64
PRO 3 2 12 14 16 224
PRO 4A 0 18 18 16 288
PRO 4B 1 1 2 16 32
PROS 1 6 7 16 112
PROS 2 14 16 16 256
PRO 7 3 13 16 16 256
PROS 2 5 7 16 112
PRO 9 1 4 5 16 80
PRO 10 2 7 9 16 144
PRO 11 1 5 6 16 96
PRO 12 2 3 5 16 80
PRO
1 5 6 16 96
CARAGA
PRO ARMM 0 2 2 16 32
NCRPO
DISTRICTS 5 8 40
CPS/MPS 15 16 240
#PS 23 16 368
Page 7 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended •
(f
6
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-\A/orn Camera System (BWCS)
7. TRAINING
Page 8 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
ted
6 ir (f
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
The above training modules will be conducted by cluster and simultaneous for
the BWC System components:
CLUSTER NUMBER OF PARTICIPANTS AND
MODULE
NHQ Cluster (Administrators) 25 ITMS and 5 CES personnel
* Module 2
NCRPO Cluster (End-users Training) Districts, CPS/MPS and Numbered PS
(46 personnel including RITPO and NOC
personnel)
* Modules 1,3 and 4
PR03 Cluster(End-users Training) PROCAR, PR01,PR02 and PR03
(35 personnel including RITPO and
NOC personnel)
* Modules 1,3 and 4
Page 9 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
I ^ /r- U ^ r
6
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
All trainings costs such as training venue, billeting, travel expenses, and
training materials shall be shouldered by the winning bidder/supplier.
8. WARRANTIES/GUARANTEES
d. Onsite Support - for Metro Manila: within 2 hours from receipt of notice,
spare parts ready if necessary; for Regional Offices: within 24 hours from
receipt of notice, spare parts ready if necessary.
f. Provision of service unit/s if repair will exceed 1 day within the warranty
period;
g. Certification from the winning bidder/supplier that they shall provide a testing
facility for functionality demonstration or staging purposes; and
h. The winning bidder/supplier must have local qualified and trained technical
personnel in the Philippines supported by a Certification from the OEM.
Page 10 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
ded g
Conceptual Framework
3G/4G/LTE
/Worn /-•
Cameras
4wlthSIMCard$|
8-port Docking
Station
* 0|-* /////IttUVA HI
Desktop Computer
Ns-fwerk
Attached Sfo»aoe
Workflow as follows:
a. There will be one (1) Central Data Center(CDC)to be established at the PNP
ITMS Server Farm; One(1) National Management and Monitoring Center at the
PNP National Operation Center; 17 Regional Monitoring Centers at the 17
PRCs; and 81 Provincial Monitoring Centers at the PPOs.
b. There shall be a backup site (colocation) outside Camp Crame for back-up
storage of systems and units.
c. The BWC data will be transmitted through the docking system via VPN; while
4 out of 8 BWC data can be sent through the wireless network (3G/4G/LTE).
d. Data will be sent directly to the CDC which shall be managed and monitored at
the NMMC. Schedule of data transmission will be observed.
e. All Regional and Provincial Monitoring Centers has its own video displays and
can monitor their respective AORs.
f. Each CPO/CCPS/NCRPO(Districts/CPS/MPS/PS)has its own video display for
monitoring and network-attached storage for backup.
Page 11 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
6^
jil' &
0"
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
Page 12 of 27
Thia document is confidential. Written permission from the PNF* NMQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
^ 0^
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
E. Battery
Built-in or Removable
• If removable battery, Extra battery
should be the same with the original
battery
Type
• If built-in battery, Power Bank with
eOOOmAH power rating, 300grams
(maximum weight), and its accessories
must be supplied.
Minimum of eight(8) hours continuous
Recording Life operation (day time, normal
operation,720p)
Charging Time maximum of 3 hours
F. Accessories
Body mounting clip and shoulder
Camera Clips epaulette for body camera.
Page 13 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copps only for the purpose it is intended
6 ^ I. {§f
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
Page 14 of 27
This document is confidential. Written permission fnam the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
5d fl
^ A- (J /O &
6 0
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
BACKUP SITE(COLOCATiON)
2 Management Servers Each Server must include the following:
At least 2x12-core CPUs with a frequency
Processor not less than 2.4 GHz or better(based on
NAPOLCOM approved Standard)
Type Rack
The memory must be greater than or
Memory equal to 384 GO and use DDR4,2666
MHZ, or higher specifications
Controller RAID 0, 1, 5,6 and 10 15K rpm or better
Provides 4xHDD,600GB,
Hard disk
SAS 12Gb/s,15K rpm
Industry Standard Slot with SSD card in
I/O Expansion
PCIe Slot or better
Page 15 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only^ the purpose it is intended /
6 W ^ K 6
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
Page 16 of 27
This document is confidentiol. Written permission from the PNP NHQ Bids and Awards Committee
3e
6 1 ^ d
0
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
2 Router
Category Branded and brand new
Page 17 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended , j,
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
Page 18 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
e
(BAG)shall be secured to produce copies only for the purpose it is intended
A— .V ^
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
Height 42U
Color Black
1 LAN Cabling
a. Ethemet Protocol (802.3 family)
b. 10Mbps -10Base-T Ethernet (IEEE
802.3)
c. 100 Mbps -100/1000 Base-TX Fast
Ethemet (IEEE802.3u)
Protocol
d. 1000 Mbps -10/100/1000 Base-T/TX
Gigabit Ethernet (IEEE802.3z)
e. 10-Gigabit -1 OGBase-R Ethemet
(IEEE802.3ae)
f. Or latest Network Cabling
a. Cate for lOmbps- Base-T(802.3) or for
100 Mbps - Fast Ethemet (802.3u)
Standard Cable Type b. Cats for Gigabit Ethernet(802.3z)
c. Fiber Optics for 10-Gigabit -1 OGBase-R
(802.3ae)
Page 19 of 27
This document is confidential. Written permission from the PNP NNQ Bids and Awards Committee
omminee
A ^ ^ ^&
^ b
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
Memory(RAM) 16 Gigabytes
256GB Solid State Drive;
Storage
8TB Hard Disk Drive
Power Supply
Manufacturer's Standard
Latest Licensed
Professional Operating System
Software Latest Licensed Anti-Virus
Video Management Software compatible
with the BWC
Network Interface At least two (2)10/100/1000 Mbps LAN
Port
At least 6 USB Ports(2X USB 2.0,
4X USB 3.0)
Standard I/O Ports DVIA/GA IX HDMI
Page 20 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
le
& f, ^ &
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Instaliation and Implementation of PNP Body-Worn Camera System (BWCS)
Video Formats Supported 3GP, AVI, FLV, M4V, MKV, MP4, WMV
Audio Surround Sound
Power Supply (Voltage, Hz) 100~240Vac 50-60Hz
Page 21 of 27
This document Is confidentiaf. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose It is Intended j^
u
few A' d'
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
OTHER REQUIREMENTS:
The project's duration shall be one hundred forty (140) days. Extending the
project will subject the proponent to penalties and surcharges (as stipulated in
RA9184) unless the fault is attributable to the PNP. The proponent is expected to
follow the scheduled delivery strictly.
V. APPROVED BUDGET
All declared eligible bidders(e.g. SCB/LCB, 2"*^ LCB, 3'^^ LCB,etc.) are required
to submit 20 sample units of body worn cameras within five (5)days (non-extendibie)
Page 22 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only fbr the purpose It Is latended
€
h ^ U
0
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
after the opening of bids to PNP NHQ Bids and Awards Committee Secretariat Division
Annex Office, Camp BGen Rafael T Crame, Quezon City.
During the Post-Qualification of Items (dates will be determined by the TWG-
TEE on IT), the declared single/lowest calculated bidder shall bring with them all the
equipment and components, including the provision of internet connectivity, needed
for the simulation activity and all other logistical support for the conduct of functional
testing.
A. SAMPLE SIZE
B. ACTUAL SIMULATION
a. The bidder must be able to present the proof of concept which will be
done at their choice of venue within Metro Manila;
b. Actual Simulation of System using the required equipment based on
the Conceptual Framework as shown in Section III.B. Conceptual
Design of BWCS police station level will include the following:
Page 23 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended • I
TERMS OF REFERENCE VERSION 1.0-2019
Supply, Delivery, Installation and Implementation of PNP Body-Worn Camera System (BWCS)
0. SEQUENCE/ORDER OF TESTING
a. Proof of Concept
b. Phase I - Visual/Dimensional/Technical Inspection Test;
c. Actual Simulation
d. Phase 11 - Functional Test;
e. Phase IV - Endurance Test; and lastly
f. Phase III - Adverse Condition Test.
MC No. 2018-023
Body Worn Camera Resolution No. 2017-369 MC No. 2014-056
(For Humidity)
Desktop Computer Resolution No. 2015-055 MC No. 2016-023
Page 24 of 27
This document is confidential. Written permission from the PNP NHQ Bids and AwardsI ouri
Committee
II Millet;
4. A partial test result shall be submitted by the Testing Team to the CIA for
its evaluation and subsequent approval or disapproval. Once the items
and equipment are accepted at this stage, the CIA shall direct the Testing
Team to proceed with the Second Stage of inspection.
1. The winning bidder/supplier shall submit the proof of full payment for the
Internet connectivity from NHQ down to police stations (ITMS, NOC,
Page 25 of 27
This document Is confidential. Written permission from the PNP NHQ Bids and Awards Committee
tee
(BAG)shall be secured to produce copies only for the purpose it is intended
af ^ ^ /
k r
3. Operational Test will only commence when all systems are installed and
fully operational.
6. A final test result on the System shall be submitted by the Testing Team
to the CIA for its evaluation and subsequent approval or disapproval.
Once the system is accepted at this stage, the CIA shall issue the Final
Inspection and Acceptance.
Page 26 of 27
This document Is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAC)ahall be aeoured to produoe oopiea.only for the purpoae it ia intended
6 ^ ^ A ^
^ 1 t
PLTCOL GRACefA/f^ALAGUIT
Head, NHOBAQ TWG-TEE on IT
Page 27 of 27
This document is confidential. Written permission from the PNP NHQ Bids and Awards Committee
(BAG)shall be secured to produce copies only for the purpose it is intended
ANNEX"A"
NR PRO LOCATION PRO
Camp Capt Valentin S Juan Bgy 23, San Matias, Laoag
1 ILOCOS NORTE PRO PR01
City
2 ILOCOS SUR PRO Camp Elpidio Quirino, Bgy Bulag, Bantay, I.S PRO 1
3 LA UNION PRO Camp Diego Silang, San Femando City, La Union PR01
4 PANGASINAN PRO Bgy Libsong West, Lingayen, Pangasinan PRO 1
20
Capitol Compound, Brgy Sto. Nino, San Femando City,
PAMPANGA PRO PRO 3
Pampanga
21 TARLAC PRO Camp Macabulos, Brgy San Vicente, Tarlac PRO 3
22 ZAMBALES PRO Camp Conrado D Yap, Iba, Zambales PRO 3
23 BATANGAS PRO
Camp General Miguel C Malvar, Brgy Kumintang llaya,
PR0 4A
Batangas City 4200
24 CAVITE PRO Camp Gen Pantaleon Garcia, Imus, Cavite PR0 4A
25 LAGUNA PRO Brgy Bagumbayan, Sta Cruz, Laguna PR0 4A
26 RIZAL PRO Brgy Dolores, Hilltop Tikling, Taytay, Rizal PR0 4A
27 QUEZON PRO Camp Nakar, Lucena City PR0 4A
Page 1 of 4
6 1- y
(f
Of
NR PRO LOCATION PRO
Page 2 of4
J
b I &
V (Sf
NR PRO LOCATION PRO
ZAMBOANGA DEL
56 Camp Abellon, Lumbia District, Pagadian City PRO 9
SUR PRO
ZAMBOANGA
57 National Highway, Brgy Sanito, Ipil, Zamboanga Sibugay PRO 9
SIBUGAY PRO
58 BUKIDNON PRO Cp Onahon, Bgy 7, Malaybalay City PRO 10
59 CAMIGUIN PRO BIdg 1, Camp Bonifacio, Bgy Baylao, Mambajao PRO 10
MISAMIS
60 Camp Naranjo, Brgy Lower Lamac , Oroquita City PRO 10
OCCIDENTAL PRO
MISAMIS ORIENTAL
61 San Martin, Viilanueva, Misamis Oriental PRO 10
PRO
LANAO DEL NORTE
62 Cp Gallego, Bgy Pigcarangan, Tubod, Lanao Norte PRO 10
PRO
63 DAVAO DEL SUR PRO Brgy San Agustin, Digos City, Dvo del Sur PRO 11
DAVAO DEL NORTE
64 Nat'l Hwy, Visayan Vill, Tagum City PRO 11
PRO
DAVAO ORIENTAL
65 Bgy Dalahican, Mati, Davab Oriental PRO 11
PRO
DAVAO OCCIDENTAL
66 Poblacion Malita, Davao Occidental PRO 11
PRO
COMPOSTELA
67 Poblacion Nabunturan, Compostela Valley PRO 11
VALLEY PRO
68 COTABATO PRO Brgy Amas, Kidapawan City, Cotabato PRO 12
SOUTH COTABATO
69 Rob. Koronadal City PRO 12
PRO
70 SARANGANIPRO Brgy Kawas, Atabel, Sarangani PRO 12
SULTAN KUDARAT
71 Camp Dumlao, Isulan, SK PRO 12
PRO
AGUSAN DEL NORTE
72 Libertad St, Butuan City PRO 13
PRO
AGUSAN DEL SUR
73 Brgy Patin-ay, Prosperidad, Agusan Del Sur PRO 13
PRO
SURIGAO DEL NORTE
74 Borromeo St, Brgy Taft, Surigao City, Surigao del Norte PRO 13
PRO
SURIGAO DEL SUR
75 BrgyTelaje, Tandag, Surigao del Sur PRO 13
PRO
DINAGAT ISLANDS
76 Brgy Sta. Cruz Sari Jose PRO 13
PROVINCE
77 BASILAN PRO Camp Suarez Menzi, Isabela City, Basilan ARMM
Camp Bagong Amai, Pakpak, Brgy Biaba Damag,
78 LANAO DEL SUR PRO ARMM
Marawi City
79 MAGUINDANAO PRO Camp Datu Akilan, Brgy Limpongo, Shariff Aguak ARMM
80 SULU PRO Camp PCOL Julasirim A Kasim Asturias, Jolo, Sulu ARMM
^ 1 r-HUK 3
P;)SO a af
Ml 4
c*
6 ^ Y
NR PPO !b©#ATI9.N PRO
y Page 4 of4 |
^ f d
ANNEX"B"
NR CCPS LOCATION PRO
4 Vigan City PS Burgos St cor Quezon Avenue, Brgy 1, Vigan City PR01
5 San Fernando City PS Brgy Tanqui, San Fernando City, La Union PR01
8 San Carlos City PS Brgy Brgy Poblacion San Carlos City PRO 1
22 San Jose City PS Cardenas St, Brgy San Jose, San Jose City PROS
h C|i«'J ir-
NR CCPS LOCATION PRO
36 San Pablo City PS A Mabini St Dona Leonora Park, San Pablo City PR0 4A
37 Santa Rosa City PS Brgy Tagapo, Sta Rosa City, Laguna PR0 4A
41 Antipolo City PS Sitio Tanag, Brgy San Jose, Antipolo City PRO 4A
6) I- J h
NR CCPS LOCATION PRO
65 Tagbilaran City PS Old City Hall BIdg, Pob. II, Tagbilaran City, Bohol PRO 7
67 Bogo City PS Camp Don Pedro Rodriguez, Taytayan, Bogo City PRO 7
6 I (I-
A'
NR CCPS LOCATION PRO
83 Dapitan City PS City Hall Drive, Brgy Banonong, Dapitan City PRO 9
84 Dipolog City PS Herrera/ Bonifacio Sts, Brgy Central Dipolog City PRO 9
90 Ozamis City PS Don Bernard Ave, Brgy Aguada, Ozamis City PRO 10
94 Digos City PS Jose Abad Santos, St, Bgy Zone III, Digos City PRO 11
■J
6 ^^ I
0
NR CCPS LOCATION PRO
104 Surigao City PS Pamucho St, Brgy Washington, Surigao City PRO 13
108 Marawi City PS Perez St., Brgy West Marinaut, Marawi City ARMM
District Address
109 Eastern Police District Caruncho Avenue, Brgy Malinao, Pasig City NCRPO
110 Manila Police District United Nations Avenue, Ermita, Manila NCRPO
112 Southern Police District Fort Andres Bonifabio, Makati City NCRPO
r ^ ■
Quezon City Police Camp Bgen Tomas Karingal, Sikatuna Village,
113 NCRPO
District Diliman, Quezon City
11PSMPD
STATION 1(Raxabago-
114 Raxabago SL, Tdo., Mia. NCRPO
Tondo)
116 STATION 3(Sta Cruz) Old Bilibid Compound, Quezon Blvd NCRPO
119 STATION 6(Sta Ana) #123 Plaza Hugo, Sta. Ana, Manila NCRPO
121 STATION 8(Sta Mesa) RM Blvd cor Old Sta Mesa NCRPO
123 STATION 10(Pandacan) Pandacan St. near cor Jesus St. NCRPO
12PSQCPD
Q .jis' (k'^ k-
. ^
0 «
NR CCPS LOCATION PRO
125 STATION 1(La Loma) Mayon comer Malaya Streets, Laloma QC NCRPO
135 STATION 11 (Galas) Luzon Ave corner Unang Hakbang St., Galas QC NCRPO
136 STATION 12 (Eastwood ) #148 C-5 Rd cor Richmond Rd, Brgy Bagumbayan NCRPO
EPD
STATION 1 (Marikina New Justice Hall BIdg, Brgy Sta Elena, Marikina
137 NCRPO
City) City
138 STATION 2(Pasig City) C. Raymundo Ave, Brgy Caniogan, Pasig City NCRPO
STATION 3
139 Maysilo Circle, Mandaluyong City NCRPO
(Mandaluyong City)
NPD
STATION 1 (Caloocan
141 Samson Road, Sangandaan, Caloocan City NCRPO
City)
STATION 2(Malabon
142 F. Sevilla Boulevard, Malabon City NCRPO
City)
STATION 3(Navotas
143 M. Naval St., Brgy Sipac Almacen, Navotas City NCRPO
City)
(f
A /^^
NR CCPS LOCATION PRO
SPD
145 STATION 1 (Pasay City) F.B Harison Street Pasay City NCRPO
146 STATION 2(Makati City) Ayala Ave Extn cor Yakal St, Makati City NCRPO
150 STATION 6(Taguig City) Gen Luna St., Tuktukan, Taguig City NCRPO
STATION 7(Pateros
151 G. De Borja St., Brgy. Aguho, Pateros NCRPO
MPS)
CPO
152 SANTIAGO CITY PO Camacam St, Bgy Victory Norte, Santiago City PRO 2
PUERTO PRINCESA
156 Bgy San Pedro, Puerto Princesa City PRO 4B
CITY PO
6 (U-' ly
m CCPS LOCATION PRO
165 ZAMBOANGACITYPO Gov Lim Avenue, Brgy Zone IV, Zambo Gity PRO 9
CAGAYAN DE ORO
166 Gumamela St, Carmen PRO 10
CITVPO
167 ILIGAN GITY PO Aguinaldo/ Benito Labao Sts, Bgy Pob, lligan Gity PRO 10
170 GEN SANTOS GITY PO Gamp Lira, Gen Santos Gity PRO 12
A-
(T
C
ANNEX"C"
MIL-STD-105E
TABLE II-A - Single sampling plans tor nonnal inspection (Master table)
Sec 4.9.3. and 4.9.4)
Acceptable Quality Lev Is(Nonnal Inspection)
0.065 O.iQ 0,15 0.3 0.40 0.55
Ac Re Ac Re
4 15
= Use fifs! sampling plan below arrow. If sample size equals or exceeds lot or batcb size, do 100 percent inspecsons
0 = Use first sampling plan above arrow.
Ac ' Acceptance number
^^Re ^ Rejection number .. . - ,
h d'
Desktop Computers ' "
^'X
— —
24-port Switch
16-port Switch i-
Firewall
■ ■ 'S
Rack Cabinet
j
SkVAUPS
r'
650 VAUPS
m
3 TR Floor-mounted Air-conditioning Unit '' '
nasas
9. Establishment of Backup site/Coiocation ^ . ' '
10. Training
rm
A- (A