GSB RESS Li Ion Battery Installation Guide

This installation guide provides instructions for safely installing and operating RESS Li-ion batteries (5KWH and 10KWH) with a specific BMS version. It includes steps for unpacking, connecting cables, and ensuring proper setup for parallel connections. Additionally, it emphasizes safety precautions and the importance of professional maintenance for the batteries.

Uploaded by

asalfoseven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
443 views1 page

GSB RESS Li Ion Battery Installation Guide

This installation guide provides instructions for safely installing and operating RESS Li-ion batteries (5KWH and 10KWH) with a specific BMS version. It includes steps for unpacking, connecting cables, and ensuring proper setup for parallel connections. Additionally, it emphasizes safety precautions and the importance of professional maintenance for the batteries.

Uploaded by

asalfoseven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

RESS 5KWH, 10KWH-51.

2V
Li-ion Battery Installation Guide ⑥二 GSBsolar®
This guide provides guidance on the safe and effective installation and operation wall mounted
RESS batteries (5KWH ,10KWH ) which use 48100-5G-B0 version BMS . It also provides 1
1 Unpacking Inspection
3 Connecting Cables
information on how to safely connect multiple batteries in parallel (Max. 15), as well as how to
charge and discharge the batteries. 1. Unpack the battery and visually inspect the appearance. If any shipping damage is found,
3.1. For 3~5KVA inverter or load less than 5KW, refer to below cable connection.
notify the carrier immediately.
CAUTION
2. Press ON/OFF button to active the battery, the SOC and RUN indicator will be light. Inverter
Due to the regulations governing the transportation of Lithium Ion cells and batteries turn on MCB to measure the output voltage by multimeter, For parallel application, the
internationally. The battery is only 50% SOC during transport. Please charge battery voltage difference should less than 500mV.
fully in the first use.
3. Press ON/OFF button to shutdown the battery, the indicator light will turn off.
Before connecting any electrical cable, turn OFF all the switches and breakers and turn
OFF the batteries by press the ON/OFF button.
.Avoid any fall or collision during the installation process.
Do not remove the battery components. The maintenance of the battery should be
carried out by a professional engineer.
24. Check the accessories which should include:

5KWH
Com Cable, RS485 or CAN
Do not expose the Li-ion battery to heat in excess of 55°C during operation, 60 °C in storage.
10KWH

2 pcs Brackets for floor 8 pcs stainless steel 1pc Communication cable-586B,CAT5e, 1m DIP Switch
1 pc Bracket for wall
System Introduction mounted mounted expansion screws CAN: Victron
The master battery
module’s ID must be 1
M8*100mm for wall mounted
RS485: Growatt / DEYE / INHENERGY ON
Battery to Battery:LINK IN/OUT
1 2 3 4 OFF
2pcs RJ45 crystal head for modify other brands
inverter communication.

3.2. For 5KVA and above capacity inverter or multi batteries in parallel , refer to
below cable connection.
1pc Black power cable 1pc Optional Part
with 25-6 OT terminal User manual RS485-USB device
25mm², Length=1m.
Only for install engineer Inverter
1pc Red power cable and after-sale engineer. Distribution BOX
with 25-6 OT terminal
25mm², Length=1m.

2 Mechanical Installation

RESS-10KWH-51.2V RESS-5KWH-51.2V
2.1. Wall mounted 2.2. Floor mounted
Com Cable, RS485 or CAN

2.1.1. Install the floor mount brackets. 2.2.1. Install the wall mount brackets.
DIP Switch
RUN 340 mm(10KWH) The master battery module’s ID
- + must be 1
224mm(5KWH)

80mm
ALM

SOC ON
LINK-IN RS485
ADD 100%
ON

75% 1 2 3 4 OFF

50%
ON/OFF
LINK-OUT CAN
OFF
25%

Power output, COM port, Breaker SOC, RUN, ALARM indicators Note :
1. The power cable to every battery should be same size and length.
2. The communication cable connection and modification refer to user manual.

RS485 PIN MAP CAN PIN MAP LINK-IN/OUT PIN MAP 2.1.2. Put the battery into floor mount brackets. 2.2.2. Install the battery.
Step 1. Make sure all batteries are turned off and the breaker is in off condition.
Connect the internal power cable and output power cable. Make sure the
screws are tight.
Step 2. Connect the communication cable.
8 7 6 5 4 3 21
8 7 6 5 4 3 21
8 7 6 5 4 3 21
Step 3. Set the battery module ID by ADD. The master battery which do
communication with inverter ADD must be 1. Change others battery ID
RJ45 PIN Description RJ45 PIN Description RJ45 PIN Description from 2~...
Step 4. Make sure the inverter had be installed correctly.
1 RS485_B 1,2,3,4,5,6 NC 1,2,3,4,5,6 NC
Step 5. Turn on all batteries breaker and then press the master battery’s
2 RS485_A 7 CAN_H 7 RS485-2_A ON/OFF button to active the battery. the slave modules will be activated
automatic.
3,4,5,6,7,8 NC 8 CAN_L 8 RS485-2_B Step6. Charge the batteries fully in first use.

Ver V1.0 Publish Date:2023-04-10