Saudi Electricity Company: Document Title Document Number

The document contains detailed specifications and design information for various piping systems and components related to a fuel gas receiving station. It includes temperature and pressure ratings, material specifications, and references to related documents. Additionally, it outlines installation notes and requirements for vent lines and insulation kits.

Uploaded by

engahmedhelmy19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views5 pages

Saudi Electricity Company: Document Title Document Number

The document contains detailed specifications and design information for various piping systems and components related to a fuel gas receiving station. It includes temperature and pressure ratings, material specifications, and references to related documents. Additionally, it outlines installation notes and requirements for vent lines and insulation kits.

Uploaded by

engahmedhelmy19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

To Cold Vent Stack Header


0267 Design

b
Design Design Piping Piping Piping Specification Insulation

DN 25
40EKG05
A SH 3 - 1/K Temperature A
Section Pressure (barg) Material Rating Code Type

BR502
(°C)

b a 80 91 CS 600 C6I P
40EKG05
b 80 10 CS 150 C1G P
BP001
c 175 51.7 CS 600 C6G H
a d 250 51.7 CS 600 C6G H
NC e 250 10 CS 150 C1G P
40EKG05 f 250 5 CS 150 C1G P
Insulation Kit Insulation Kit AA502 g 80 5 CS 150 C1G P
B B
NC h 175 10 CS 150 C1G P
M1 40EKG05 i 280 95 CS 900 C9F P
AA501 ESDV SKID
SEC EE UG AG TP-01 TP-04 TP-0068 TARIFF METERING SKID TP-0050 Notes:
40EKA10 40EKU11/12
INLET FILTER SEPARATOR SKID 1. For P&IDs Symbols and Legends, Please refer to Document No.

a
NOTE 15 EE TIND TIND EE EE METAS METAS EE

DN 25
40EKG05
TP-05 TP-10
40EKE11/12 40EKG15 40EKG20 2011-M-MFB030-018001.

BR501
40EKG05 40EKG05 40EKG05 40EKG10
BR001 a BR002 a NOTE 3 BR003 a BR001 a
EE TIND TIND EE BR003 a BR001 a 2. Common header three Pressure Transmitters with bulk material (Tubing, Fitting,
To ESDV Skid From ESDV Skid To Tariff Metering Skid From Tariff Metering Skid
0082 0004
40EKG15
0163 0179
Instruments) are supplied by Hanwha Power Systems. Pressure measurement to
DN 600 DN 600 DN600\DN500 DN 500 2011-EK-MFB030-302016 2011-EK-MFB030-302016 DN 500 To Inlet Filter Separator #11 From Inlet Filter Separator #11
BR001 a DN 500 2011-EKU-MFB030-306042 2011-EKU-MFB030-306042 DN 500 be located as close as possible to the gas compressors.
40EKG05 40EKG05 SH 1 - 1/H SH 1 - 10/H 0062 0011 SH 1 - 1/I SH 1 - 7/K 3. Reducer shall be placed as close as possible to the ESD skid inlet.
C 2011-EKE10-MFB030-302017 2011-EKE10-MFB030-302017 DN 500 4. Removable piping spool for temporary strainer to be installed outside skid edge C
BU001 BU002
SH 1 - 1/H SH 1 - 9/H
for commissioning only.
a

DN 50

TP-11 TP-16
40EKG05

5. A minimum slope of 5 mm in 1 m to be applied for all individual vent lines, vent


BR451

EE TIND TIND EE header and condensate lines.


NC
40EKG10 40EKG15 6. Vent lines from individual devices should normally enter vent header from above.
40EKG05
BR003 a
To Inlet Filter Separator #12 From Inlet Filter Separator #12
BR002 a 7. Vent lines from individual devices that are located below the header should be
AA452 0066 0064 arranged to rise continuously to the top of the header entry point.
NC
DN 500 2011-EKE10-MFB030-302017 2011-EKE10-MFB030-302017 DN 500 8. All individual vent lines shall be connected with the vent header with angle entry.
SH 2 - 1/H SH 2 - 9/I
40EKG05 9. All vent lines routed to safe location shall be provided with bird mesh.
AA451 10. A condensation loop to be installed in the line.
D D
11. Probe assembly is immersed in the line with no additional tubing required.
40EKG05
12. Blind flange to be installed only during ICOD.
AA201
13. Removable piping spool to be installed with the same length between N10 and
N11 in place of the supplier’s bypass skid during ICOD.
14. A flexible hose to be provided for truck connection.
15. Painting system no. 12 shall be followed as per document Technical
N2 PURGE
40EKG30 Specification for Painting and Coating - 2011-OT110-MEC020-018364.
BR003 a

E
DN 250 Abbreviations: E
NOTE 2 SEC: Saudi Electricity Company
EE: Elsewedy Electric PSP
40EKG30
H/L SE: Siemens Energy
BR002 a PIS TIND: Tromene Industriale
40EKC20 N/E: Nooter Eriksen
DN 250
CP901 HPS: Hanwha Power Systems
UG: Underground
40EKG30 PIT PIT PIT
AG: Above ground
BR001 a 40EKG20 40EKG20 40EKG20
CP003 CP002 CP001 Reference Documents:
F F
DN 250
40EKG20 Document Title Document Number
40EKG20 AA306 Fuel Gas Receiving Station - ESD Skid P&ID 2011-EK-MFB030-302016
TP-0076 GT PRESSURE REDUCING SKID TP-0014 BR303 a Fuel Gas Receiving Station - Inlet Filter Separator Skid P&ID 2011-EKE10-MFB030-302017
EE METAS 40EKD51/52 METAS EE Fuel Gas Receiving Station - Gas Condensate Tank Skid P&ID 2011-EKR10-MFB030-302018
40EKG35 40EKG40 DN 25 Fuel Gas Receiving Station - Cold Vent Stack Skid P&ID 2011-EKR30-MFB030-302020
BR005 a BR001 c 40EKG20
To GT Pressure Reducing #51 From GT Pressure Reducing #51 Efficiency Heater Skid P&ID 2011-EKC30-MFB030-302019
AA305
0076 0014 40EKG20 Fuel Gas Compressors - P&ID 2011-EKH-MFB030-300508
DN 300 2011-EKD50-MFB030-018323 2011-EKD50-MFB030-018323 DN 300 40EKG20 AA304 Gas Metering System (GMS) - P&ID 2011-EKU-MFB030-306042
a

TP-0201 SH 1 - 1/I SH 1 - 13/I TP-0051


DN 350

BR302 a
40EKG35

Water Bath Heater - Process & Instrumentation Diagrams - P&ID 2011-EKC-MFB030-305001


G EE METAS G
BR004

METAS EE
Fuel gas supply system - GT Performance Metering Skid P&ID 2011-EKG70-MFB030-018396
40EKG35 40EKG40 DN 25
40EKG20
Fuel gas supply system - Gas Turbine Pressure Reducing skid P&ID 2011-EKD50-MFB030-018323
BR006 a BR002 c 40EKG20
TP-H1 WATER BATH HEATER SKID TP-H2 To GT Pressure Reducing #52 From GT Pressure Reducing #52 40EKG40 AA303
Fuel gas supply system - HRSG Supplementary Firing Pressure
0201 AA302 2011-EKD30-MFB030-018324
EE
SIGMA 40EKC11/12/13 SIGMA
EE 0051
BR004 c
Reducing skid P&ID
THERMAL THERMAL DN 300 2011-EKD50-MFB030-018323 2011-EKD50-MFB030-018323 DN 300 To Main Gas Header 40EKG20
DN350\DN200 Gas Turbine Auxiliaries P&ID 2011-MB-MFB030-060022
40EKG35 SH 1 - 1/D SH 1 - 13/D 0205 BR301 a HRSG - DUCT BURNER - P&I Diagram 2011-HA-MFB030-300080
To Water Bath Heater #11 From Water Bath Heater #11 BR001 a DN 300 SH 2 - 1/J
Fuel Gas Supply System - System Description 2011-EK-MFE020-018026
0054 0019
DN 25
2011-EKC-MFB030-305001 2011-EKC-MFB030-305001 DN 250 40EKG20
a

SH 2 - 1/H SH 2 - 6/K AA301


DN 200
40EKG50

NOTE 12 NOTE 12 To Main Gas Header


BR001

H TP-H1 TP-H2 H
01A 02A 0053
SIGMA SIGMA
EE EE TP-0204 Employer
THERMAL THERMAL TP-0006 HRSG SF PRESSURE REDUCING SKID EE HPS COMPRESSOR SKID HPS EE SH 2 - 1/K
40EKG35
EE METAS 40EKD31/32 METAS EE 40EKH14 40EKG24
BR002 a
To Water Bath Heater #12 From Water Bath Heater #12
0196 0199
40EKG50
BR002 a
40EKG55
BR001 b
To Fuel Gas Compressor From Fuel Gas Compressor
BR002 c
Saudi Electricity Company
2011-EKC-MFB030-305001 2011-EKC-MFB030-305001 DN 250 To HRSG SF Pressure Reducing #31 From HRSG SF Pressure Reducing #31
SH 2 - 1/H SH 2 - 6/K 0006 0204 NOTE 4 2011-EKH-MFB030-300508 2011-EKH-MFB030-300508 DN 250
DN 200 2011-EKD30-MFB030-018324 2011-EKD30-MFB030-018324 DN 300 SH 2 - 1/F SH 2 - 19/D
SH 1 - 1/I SH 1 - 13/I Main Contractor
TP-H1 TP-H2
SIGMA SIGMA TP-0005 TP-0203
EE EE
THERMAL THERMAL NOTE 12 NOTE 12
J 40EKG35 METAS EE
J
EE METAS 01A 02A
BR003 a 40EKG50 40EKG55
To Water Bath Heater #13 From Water Bath Heater #13 EE HPS HPS EE
COMPRESSOR SKID
0198
2011-EKC-MFB030-305001
0202
2011-EKC-MFB030-305001 DN 250
BR003 a
To HRSG SF Pressure Reducing #32 From HRSG SF Pressure Reducing #32
BR002 b
40EKG23 40EKH13 40EKG23 THE CONSORTIUM OF SIEMENS ENERGY GLOBAL
0005 0203
SH 2 - 1/G SH 2 - 6/J
DN 200 2011-EKD30-MFB030-018324 2011-EKD30-MFB030-018324 DN 300
HHG70TP001 BR001 a
To Fuel Gas Compressor From Fuel Gas Compressor
BR002 c
GMBH & CO. KG.& ELSEWEDY ELECTRIC PSP
SH 1 - 1/E SH 1 - 13/E EE N/E
DN 300 NOTE 4 2011-EKH-MFB030-300508 2011-EKH-MFB030-300508 DN 250 Project
41EKG55
SH 2 - 1/F SH 2 - 19/D
BR001 b
To HRSG 41 Duct Burner Reinforcement of Rabigh Power Plant

DN 400
40EKG25
DN 200 DN200\DN150 2011-HA-MFB030-300080
NOTE 12

BR001
NOTE 12
K SH 1 - 7/A 02A K
01A

EE HPS HPS EE
b

COMPRESSOR SKID
DN 300
40EKG55

HHG70TP001 40EKG22 40EKH12 40EKG22


BR003

BR001 a BR002 c
EE N/E To Fuel Gas Compressor From Fuel Gas Compressor 07 2025-02-10 Issued For Review Critical OA HZ MM
06 2024-12-15 Issued For Review Critical OA HZ MM
DN 300 NOTE 4 2011-EKH-MFB030-300508 2011-EKH-MFB030-300508 DN 250
42EKG55
To HRSG 42 Duct Burner SH 2 - 1/F SH 2 - 19/D 05 2024-10-07 Issued For Review Critical OA HZ MM
BR001 b 04 2024-07-30 Issued For Review Critical OA HZ MM
DN200\DN150 2011-HA-MFB030-300080 03 2024-07-14 Issued For Review Critical OA HZ MM
SH 1 - 7/A
DN 200 02 2024-06-25 Issued For Review Critical OA HZ MM
L NOTE 12 NOTE 12 L
02A 01 2024-01-24 Issued For Review Critical OA HZ MM
01A
00 2023-12-17 Issued For Review Critical OA HZ MM
HHG70TP001 EE HPS COMPRESSOR SKID HPS EE
Rev. Date Details of revision Created Checked Approved
EE N/E 40EKG21 40EKH11 40EKG21
Contract
BR001 a BR002 c Scale: NTS Size: A1 Origin No.: - Rev.: 07
No.:
-
To Fuel Gas Compressor From Fuel Gas Compressor
43EKG55 Originator Title:
To HRSG 43 Duct Burner
BR001 b DN 300 NOTE 4 2011-EKH-MFB030-300508 -2011 EKH-MFB 300508-030 DN 250

DN200\DN150 2011-HA-MFB030-300080 SH 2 - 1/F SH/19 - 2 D Fuel Gas Supply System P&ID


DN 200 SH 1 - 7/A
Document No.: Rev.
M M
2011-EK-MFB030-018024 07
Copyright © Elsewedy Electric for Power System Projects. All rights reserved. The reproduction, disclosure or use of this Page
document or its contents is forbidden without express written authority from Elsewedy Electric for Power System Projects. 1 / 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

H/L
PIS Design
Design Design Piping Piping Piping Specification Insulation
A 40EKG25 Temperature A
Section Pressure (barg) Material Rating Code Type
CP901 (°C)
From Fuel Gas Compressors
a 80 91 CS 600 C6I P
0053
SH 1 - 13/E PIT PIT
b 80 10 CS 150 C1G P
c 175 51.7 CS 600 C6G H
40EKG25 40EKG25
d 250 51.7 CS 600 C6G H
CP001 CP002
e 250 10 CS 150 C1G P
40EKG25 f 250 5 CS 150 C1G P
AA302 g 80 5 CS 150 C1G P
B PIR B
h 175 10 CS 150 C1G P
41EKG75 i 280 95 CS 900 C9F P
CP001
40EKG25 Notes:
AA301 1. For P&IDs Symbols and Legends, Please refer to Document No.
40EKG25 PIT 2011-M-MFB030-018001.
AA304
41EKG75 2. Common header three Pressure Transmitters with bulk material (Tubing, Fitting,
CP001 Instruments) are supplied by Hanwha Power Systems. Pressure measurement to
be located as close as possible to the gas compressors.
41EKG75 3. Reducer shall be placed as close as possible to the ESD skid inlet.
C 40EKG40 40EKG25 C
AA302 4. Removable piping spool for temporary strainer to be installed outside skid edge
BR004 c AA303
From GT PRS for commissioning only.
0205
41EKG75 5. A minimum slope of 5 mm in 1 m to be applied for all individual vent lines, vent
SH 1 - 10/E DN 300 DN400\DN600
AA301 header and condensate lines.
6. Vent lines from individual devices should normally enter vent header from above.
7. Vent lines from individual devices that are located below the header should be

DN 25
41EKG75
1550A arranged to rise continuously to the top of the header entry point.
GT41 PERFORMANCE METERING SKID

BR301
TP-0242 TP-0016 N10 GT41 PERFORMANCE HEATER SKID N11 EE SE 8. All individual vent lines shall be connected with the vent header with angle entry.
41EKG70
EE METAS METAS EE EE TIND 41EKC30 TIND EE 9. All vent lines routed to safe location shall be provided with bird mesh.
41EKG65 41EKG70 41EKG75 10. A condensation loop to be installed in the line.
D D
BR001 c BR010 c BR001 d 10D MINIMUM STRAIGHT PIPE LENGTH 11. Probe assembly is immersed in the line with no additional tubing required.
To GT Performance Metering Skid From GT Performance Metering Skid To Performance Heater Skid From Performance Heater Skid To GT 41 Fuel Gas System
0180 0016 0015 0061
12. Blind flange to be installed only during ICOD.
DN 200 2011-EKG70-MFB030-018396 2011-EKG70-MFB030-018396 DN 200 2011-EKC30-MFB030-302019 2011-EKC30-MFB030-302019 DN 250 1070D 1070E 1071C 2011-MB-MFB030-060022 13. Removable piping spool to be installed with the same length between N10 and
SH 1 - 1/I SH 1 - 13/I SH 1 - 1/J SH 1 - 12/J
EE SE SE EE EE SE
SH 25/61 - 7/B N11 in place of the supplier’s bypass skid during ICOD.
14. A flexible hose to be provided for truck connection.
41EKC30
15. Painting system no. 12 shall be followed as per document Technical
BR050 d WOBBE METER WOBBE METER
Specification for Painting and Coating - 2011-OT110-MEC020-018364.
PROBE ANALYZER
NOTE 11 ASSEMBLY ¼” OD - 0.035" THK CABINET
DN 200
SS316L
E
DN200\DN250 Abbreviations: E
NOTE 13 SEC: Saudi Electricity Company
PIR
42EKG75
EE: Elsewedy Electric PSP
CP001 SE: Siemens Energy
TIND: Tromene Industriale
PIT N/E: Nooter Eriksen
42EKG75 HPS: Hanwha Power Systems
CP001 UG: Underground
AG: Above ground
42EKG75

F
AA302 Reference Documents: F
Document Title Document Number
42EKG75
Fuel Gas Receiving Station - ESD Skid P&ID 2011-EK-MFB030-302016
AA301
Fuel Gas Receiving Station - Inlet Filter Separator Skid P&ID 2011-EKE10-MFB030-302017

c
Fuel Gas Receiving Station - Gas Condensate Tank Skid P&ID 2011-EKR10-MFB030-302018

DN 25
42EKG75
1550A
GT42 PERFORMANCE METERING SKID Fuel Gas Receiving Station - Cold Vent Stack Skid P&ID 2011-EKR30-MFB030-302020

BR301
TP-0242 TP-0016 N10 GT42 PERFORMANCE HEATER SKID N11 EE SE
42EKG70 Efficiency Heater Skid P&ID 2011-EKC30-MFB030-302019
EE METAS METAS EE EE TIND
42EKC30 TIND EE Fuel Gas Compressors - P&ID 2011-EKH-MFB030-300508
42EKG65 42EKG70 42EKG75 Gas Metering System (GMS) - P&ID 2011-EKU-MFB030-306042
10D MINIMUM STRAIGHT PIPE LENGTH
BR001 c BR010 c BR001 d
To GT Performance Metering Skid From GT Performance Metering Skid To Performance Heater Skid From Performance Heater Skid To GT 42 Fuel Gas System Water Bath Heater - Process & Instrumentation Diagrams - P&ID 2011-EKC-MFB030-305001
G 0255 0181 0070 0100 G
Fuel gas supply system - GT Performance Metering Skid P&ID 2011-EKG70-MFB030-018396
DN 200 2011-EKG70-MFB030-018396 2011-EKG70-MFB030-018396 DN 200 2011-EKC30-MFB030-302019 2011-EKC30-MFB030-302019 DN 250 1070D 1070E 1071C 2011-MB-MFB030-060022
Fuel gas supply system - Gas Turbine Pressure Reducing skid P&ID 2011-EKD50-MFB030-018323
SH 2 - 1/I SH 2 - 13/I SH 2 - 1/J SH 2 - 12/J SH 25/61 - 7/B
EE SE SE EE EE SE Fuel gas supply system - HRSG Supplementary Firing Pressure
2011-EKD30-MFB030-018324
Reducing skid P&ID
42EKC30
Gas Turbine Auxiliaries P&ID 2011-MB-MFB030-060022
BR050 d
HRSG - DUCT BURNER - P&I Diagram 2011-HA-MFB030-300080
WOBBE METER WOBBE METER
NOTE 11 Fuel Gas Supply System - System Description 2011-EK-MFE020-018026
DN 200 PROBE ¼” OD - 0.035" THK ANALYZER
DN200\DN250 ASSEMBLY SS316L CABINET
NOTE 13
H H
PIR Employer
43EKG75
CP001
Saudi Electricity Company
c

DN 600
40EKG45

PIT
BR001

43EKG75
CP001 Main Contractor

43EKG75
J AA302 J

43EKG75
AA301 THE CONSORTIUM OF SIEMENS ENERGY GLOBAL
GMBH & CO. KG.& ELSEWEDY ELECTRIC PSP

DN 25
43EKG75
1550A
GT43 PERFORMANCE METERING SKID

BR301
TP-0242 TP-0016 N10 GT43 PERFORMANCE HEATER SKID N11 Project
EE SE
43EKG70
43EKC30
43EKG65
EE METAS METAS EE
43EKG70
EE TIND TIND EE
43EKG75
Reinforcement of Rabigh Power Plant
BR001 c BR010 c BR001 d 10D MINIMUM STRAIGHT PIPE LENGTH
K To GT Performance Metering Skid From GT Performance Metering Skid To Performance Heater Skid From Performance Heater Skid To GT 43 Fuel Gas System K
0256 0094 0182 0119
DN 200 2011-EKG70-MFB030-018396 2011-EKG70-MFB030-018396 DN 200 2011-EKC30-MFB030-302019 2011-EKC30-MFB030-302019 DN 250 1070D 1070E 1071C 2011-MB-MFB030-060022
SH 3 - 1/I SH 3 - 13/I SH 3 - 1/J SH 3 - 12/J EE SE SE EE EE SE SH 25/61 - 7/B

43EKC30 07 2025-02-10 Issued For Review Critical OA HZ MM


BR050 d 06 2024-12-15 Issued For Review Critical OA HZ MM
WOBBE METER WOBBE METER
PROBE ANALYZER 05 2024-10-07 Issued For Review Critical OA HZ MM
DN 200 NOTE 11 ASSEMBLY ¼” OD - 0.035" THK CABINET 04 2024-07-30 Issued For Review Critical OA HZ MM
DN200\DN250 SS316L
03 2024-07-14 Issued For Review Critical OA HZ MM
NOTE 13
02 2024-06-25 Issued For Review Critical OA HZ MM
L L
01 2024-01-24 Issued For Review Critical OA HZ MM
00 2023-12-17 Issued For Review Critical OA HZ MM
Rev. Date Details of revision Created Checked Approved
Contract
Scale: NTS Size: A1 Origin No.: - Rev.: 07
No.:
-

Originator Title:

Fuel Gas Supply System P&ID

Document No.: Rev.


M M
2011-EK-MFB030-018024 07
Copyright © Elsewedy Electric for Power System Projects. All rights reserved. The reproduction, disclosure or use of this Page
document or its contents is forbidden without express written authority from Elsewedy Electric for Power System Projects. 2 / 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Design
Design Design Piping Piping Piping Specification Insulation
A 40EKG05 40EKG05 Temperature A
From Fuel Gas Supply Line Section Pressure (barg) Material Rating Code Type
Manual Vent
BR502 b BR503 b (°C)
0267
SH 1 - 3/L DN25\DN80 a 80 91 CS 600 C6I P
DN 25 DN 80
SAMPLING b 80 10 CS 150 C1G P
c 175 51.7 CS 600 C6G H

b
PORT

DN 150
40EKG30
d 250 51.7 CS 600 C6G H

BR501
TP-03
e 250 10 CS 150 C1G P
TIND EE f 250 5 CS 150 C1G P
40EKA10 40EKA10 g 80 5 CS 150 C1G P
B B
From ESDV Skid Manual Vent
BR502 b BR503 b h 175 10 CS 150 C1G P
0286 i 280 95 CS 900 C9F P
opcref.owner.diarefarray(1) DN 25 DN25\DN80 DN 80
SH opcref.owner.pagearray(0) - / SAMPLING Notes:
PORT 1. For P&IDs Symbols and Legends, Please refer to Document No.
TP-07
TP-22 2011-M-MFB030-018001.
TIND EE
EE TIND
2. Common header three Pressure Transmitters with bulk material (Tubing, Fitting,
40EKE11 40EKE11 Instruments) are supplied by Hanwha Power Systems. Pressure measurement to
BR192 b BR193 b be located as close as possible to the gas compressors.
From Filter #11 Vent
0063 To Cold Vent Stack 3. Reducer shall be placed as close as possible to the ESD skid inlet.
C 2011-EKE10-MFB030-302017 DN 50 DN50\DN80 DN 80 0242 C
2011-EKR30-MFB030-302020
4. Removable piping spool for temporary strainer to be installed outside skid edge
SH 1 - 7/L SAMPLING
PORT SH 1 - 6/D for commissioning only.
5. A minimum slope of 5 mm in 1 m to be applied for all individual vent lines, vent
TP-13 header and condensate lines.
TIND EE 6. Vent lines from individual devices should normally enter vent header from above.
40EKE12 40EKE12 7. Vent lines from individual devices that are located below the header should be
BR192 b BR193 b arranged to rise continuously to the top of the header entry point.
From Filter #12 Vent
0072
8. All individual vent lines shall be connected with the vent header with angle entry.
9. All vent lines routed to safe location shall be provided with bird mesh.

b
2011-EKE10-MFB030-302017 DN 50 DN50\DN80 DN 80

DN 150
40EKG30
SH 2 - 8/L SAMPLING 10. A condensation loop to be installed in the line.

BR501
D PORT D
11. Probe assembly is immersed in the line with no additional tubing required.
TP-0015 12. Blind flange to be installed only during ICOD.
a b 13. Removable piping spool to be installed with the same length between N10 and
METAS EE
N11 in place of the supplier’s bypass skid during ICOD.
40EKU20 40EKU20 40EKU20
14. A flexible hose to be provided for truck connection.
BR501 a BR502 a BR503 b
From Tariff Metering Skid 15. Painting system no. 12 shall be followed as per document Technical
0105
Specification for Painting and Coating - 2011-OT110-MEC020-018364.
2011-EKU-MFB030-306042 DN 25 DN 25 DN25\DN80 DN 80
SH 1 - 13/K 40EKD40
40EKU20
BR502 b
BP001
TP-S5 DN25\DN80 HRSG SF PRS Skid Vent Abbreviations:
E 0104 E
SIGMA
EE
DN 80
2011-EKD30-MFB030-018324
SEC: Saudi Electricity Company
THERMAL
40EKC11 SAMPLING SH 1 - 8/A EE: Elsewedy Electric PSP
BR503 b
PORT SE: Siemens Energy
From WBH #11 Pilot Burner
Supply Automatic Vent
TIND: Tromene Industriale
40EKC11AA110 DN20\DN32 DN 32 N/E: Nooter Eriksen
HPS: Hanwha Power Systems
40EKD60
UG: Underground
TP-S5 BR502 b
DN25\DN80 GT PRS Skid Vent AG: Above ground
SIGMA 0274
EE
THERMAL DN 80 2011-EKD50-MFB030-018323
F 40EKC12 SAMPLING SH 1 - 12/A
Reference Documents: F
BR503 b PORT Document Title Document Number
From WBH #12 Pilot Burner
Supply Automatic Vent Fuel Gas Receiving Station - ESD Skid P&ID 2011-EK-MFB030-302016
40EKC12AA110 DN 32
DN20\DN32 Fuel Gas Receiving Station - Inlet Filter Separator Skid P&ID 2011-EKE10-MFB030-302017
TP-N2
a Fuel Gas Receiving Station - Gas Condensate Tank Skid P&ID 2011-EKR10-MFB030-302018
b SIGMA
TP-S5 EE Fuel Gas Receiving Station - Cold Vent Stack Skid P&ID 2011-EKR30-MFB030-302020
THERMAL
40EKC13
SIGMA 40EKC13 Efficiency Heater Skid P&ID 2011-EKC30-MFB030-302019
EE BR014 b
THERMAL BR013 a Fuel Gas Compressors - P&ID 2011-EKH-MFB030-300508
40EKC13 From WBH #13 NG
Outlet Manual Vent Gas Metering System (GMS) - P&ID 2011-EKU-MFB030-306042
BR503 b DN 80 Valve 40EKC13AA011
From WBH #13 Pilot Burner DN50\DN80 DN 50 DN25\DN50
Water Bath Heater - Process & Instrumentation Diagrams - P&ID 2011-EKC-MFB030-305001
G Supply Automatic Vent SAMPLING G
40EKC13 Fuel gas supply system - GT Performance Metering Skid P&ID 2011-EKG70-MFB030-018396
40EKC13AA110 DN20\DN32 DN 32 PORT
BP001
Fuel gas supply system - Gas Turbine Pressure Reducing skid P&ID 2011-EKD50-MFB030-018323
Fuel gas supply system - HRSG Supplementary Firing Pressure
TP-S4 2011-EKD30-MFB030-018324
TP-N2 Reducing skid P&ID
SIGMA
EE
b a SIGMA Gas Turbine Auxiliaries P&ID 2011-MB-MFB030-060022
THERMAL EE
THERMAL HRSG - DUCT BURNER - P&I Diagram 2011-HA-MFB030-300080
40EKC11
40EKC12 40EKC12
BR504 b Fuel Gas Supply System - System Description 2011-EK-MFE020-018026
From WBH #11Burner BR014 b BR013 a
Supply Automatic Vent From WBH #12 NG
40EKC11AA195 Outlet Manual Vent
DN 32
DN 80 DN50\DN80 DN 50 DN25\DN50 Valve 40EKC12AA011
H SAMPLING 40EKC12 H
TP-S4 PORT BP001
Employer
SIGMA
EE
THERMAL
40EKC12 TP-N2

From WBH #12 Burner


BR504 b b a
EE
SIGMA Saudi Electricity Company
THERMAL
Supply Automatic Vent
40EKC11 40EKC11
40EKC12AA195 DN 32
BR014 b BR013 a
From WBH #11 NG Main Contractor
Outlet Manual Vent
TP-S4 DN 80 DN50\DN80 DN 50 DN25\DN50 Valve 40EKC11AA011

J SIGMA SAMPLING 40EKC11 J


EE
THERMAL PORT BP001
40EKC13

From WBH #13 Burner


Supply Automatic Vent
BR504 b
S3 THE CONSORTIUM OF SIEMENS ENERGY GLOBAL
SIGMA
40EKC13AA195 DN 32 EE
THERMAL GMBH & CO. KG.& ELSEWEDY ELECTRIC PSP
40EKC13
BR307 b
Project
S2 From WBH #13 Burner
SIGMA
THERMAL
EE DN 50
Fuel Train PSV
40EKC13AA191 Reinforcement of Rabigh Power Plant
40EKC11
K BR011 b K
From WBH #11
Electrical Heater PSV
40EKC11AA194 DN 50
S3
SIGMA
EE
THERMAL 07 2025-02-10 Issued For Review Critical OA HZ MM
S2
40EKC12
SIGMA 06 2024-12-15 Issued For Review Critical OA HZ MM
EE BR307 b
THERMAL From WBH #12 Burner 05 2024-10-07 Issued For Review Critical OA HZ MM
40EKC12 Fuel Train PSV 04 2024-07-30 Issued For Review Critical OA HZ MM
BR011 b DN 50 40EKC12AA191
From WBH #12 03 2024-07-14 Issued For Review Critical OA HZ MM
Electrical Heater PSV
02 2024-06-25 Issued For Review Critical OA HZ MM
L 40EKC12AA194 DN 50 L
01 2024-01-24 Issued For Review Critical OA HZ MM
00 2023-12-17 Issued For Review Critical OA HZ MM
S2 S3 Rev. Date Details of revision Created Checked Approved
SIGMA SIGMA
EE EE Contract
THERMAL THERMAL Scale: NTS Size: A1 Origin No.: - Rev.: 07 -
No.:
40EKC13 40EKC11
Originator Title:
BR011 b BR307 b
From WBH #13 From WBH #11 Burner
Electrical Heater PSV Fuel Train PSV Fuel Gas Supply System P&ID
40EKC13AA194 DN 50 40EKG30 DN 50 40EKC11AA191
BR501 b Rev.
M Document No.: M
2011-EK-MFB030-018024 07
DN 150 Copyright © Elsewedy Electric for Power System Projects. All rights reserved. The reproduction, disclosure or use of this Page
document or its contents is forbidden without express written authority from Elsewedy Electric for Power System Projects. 3 / 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

TO SAFE LOCATION TO SAFE LOCATION


TO SAFE LOCATION Design
Design Design Piping Piping Piping Specification Insulation
A Temperature A
Section Pressure (barg) Material Rating Code Type
1505A (°C)
09A 11A TP-18 TP-20
SE EE a 80 91 CS 600 C6I P
HPS EE HPS EE TIND EE TIND EE b 80 10 CS 150 C1G P
40EKH11 40EKH14 43EKG75 40EKR10 c 175 51.7 CS 600 C6G H
From Fuel Gas Compressor Vent
BR194 h
From Seal Gas Vent
BR195 h BR501 e
From Condensate Tank
BR502 b d 250 51.7 CS 600 C6G H
From GT 43
0091 To Cold Vent Stack e 250 10 CS 150 C1G P
Final Filter PSV
2011-EKH-MFB030-300508 DN 150 2011-EKH-MFB030-300508 DN 25 DN 25 2011-EKR10-MFB030-302018 DN 100 f 250 5 CS 150 C1G P
SH 2 - 19/H SH 5 - 3/D SH 1 - 5/K SAMPLING g 80 5 CS 150 C1G P
B PORT B
h 175 10 CS 150 C1G P
i 280 95 CS 900 C9F P

Notes:
TO SAFE LOCATION TO SAFE LOCATION 1. For P&IDs Symbols and Legends, Please refer to Document No.
2011-M-MFB030-018001.
1070A 2. Common header three Pressure Transmitters with bulk material (Tubing, Fitting,
TP-0004
TO SAFE LOCATION TO SAFE LOCATION SE EE Instruments) are supplied by Hanwha Power Systems. Pressure measurement to
METAS EE
be located as close as possible to the gas compressors.
41EKG70
3. Reducer shall be placed as close as possible to the ESD skid inlet.
C BR502 h C
From GT 41 Wobbe NOTE 10 From GT 41 Performance Metering Vent 4. Removable piping spool for temporary strainer to be installed outside skid edge
Meter Vent Conn. #1 0254 for commissioning only.
09A 10A ¼” OD - 0.035" THK 2011-EKG70-MFB030-018396 DN 25
SS316L SH 1 - 11/K
5. A minimum slope of 5 mm in 1 m to be applied for all individual vent lines, vent
HPS EE HPS EE
header and condensate lines.
40EKH12 40EKH11
6. Vent lines from individual devices should normally enter vent header from above.
BR194 h BR196 b TO SAFE LOCATION TO SAFE LOCATION
From Fuel Gas Compressor Vent From Oil Demister Vent 7. Vent lines from individual devices that are located below the header should be
arranged to rise continuously to the top of the header entry point.
2011-EKH-MFB030-300508 DN 150 2011-EKH-MFB030-300508 DN 40 1070A
TP-0004 8. All individual vent lines shall be connected with the vent header with angle entry.
SH 2 - 19/H SH 3 - 2/J SE EE
METAS EE
9. All vent lines routed to safe location shall be provided with bird mesh.
42EKG70 10. A condensation loop to be installed in the line.
D D
BR502 h 11. Probe assembly is immersed in the line with no additional tubing required.
From GT 42 Performance Metering Vent
From GT 42 Wobbe NOTE 10
0257
12. Blind flange to be installed only during ICOD.
Meter Vent Conn. #1
¼” OD - 0.035" THK 2011-EKG70-MFB030-018396 DN 25 13. Removable piping spool to be installed with the same length between N10 and
SS316L SH 2 - 11/K N11 in place of the supplier’s bypass skid during ICOD.
TO SAFE LOCATION TO SAFE LOCATION
14. A flexible hose to be provided for truck connection.
TO SAFE LOCATION TO SAFE LOCATION 15. Painting system no. 12 shall be followed as per document Technical
Specification for Painting and Coating - 2011-OT110-MEC020-018364.
1070A TP-0004
09A 10A
SE EE METAS EE
E HPS EE HPS EE Abbreviations: E
43EKG70
40EKH13 40EKH12 SEC: Saudi Electricity Company
BR502 h
BR194 h BR196 b From GT 43 Performance Metering Vent EE: Elsewedy Electric PSP
From Fuel Gas Compressor Vent From Oil Demister Vent From GT 43 Wobbe NOTE 10 0496
Meter Vent Conn. #1 SE: Siemens Energy
2011-EKG70-MFB030-018396 DN 25
2011-EKH-MFB030-300508 DN 150 2011-EKH-MFB030-300508 DN 40 ¼” OD - 0.035" THK SH 3 - 11/K
TIND: Tromene Industriale
SH 2 - 19/H SH 3 - 2/J SS316L N/E: Nooter Eriksen
HPS: Hanwha Power Systems
TO SAFE LOCATION TO SAFE LOCATION UG: Underground
AG: Above ground
1070B
N9
F SE EE Reference Documents: F
TIND EE
TO SAFE LOCATION TO SAFE LOCATION Document Title Document Number
41EKC30
Fuel Gas Receiving Station - ESD Skid P&ID 2011-EK-MFB030-302016
BR503 e
From GT 41 Wobbe From GT 41 Fuel Gas Receiving Station - Inlet Filter Separator Skid P&ID 2011-EKE10-MFB030-302017
NOTE 10 NOTE 10
Meter Vent Conn. #2 Efficiency Heater Vent Fuel Gas Receiving Station - Gas Condensate Tank Skid P&ID 2011-EKR10-MFB030-302018
¼” OD - 0.035" THK DN 25
09A 10A Fuel Gas Receiving Station - Cold Vent Stack Skid P&ID 2011-EKR30-MFB030-302020
SS316L
HPS EE HPS EE Efficiency Heater Skid P&ID 2011-EKC30-MFB030-302019
40EKH14 40EKH13 TO SAFE LOCATION TO SAFE LOCATION Fuel Gas Compressors - P&ID 2011-EKH-MFB030-300508
BR194 h BR196 b Gas Metering System (GMS) - P&ID 2011-EKU-MFB030-306042
From Fuel Gas Compressor Vent From Oil Demister Vent
1070B Water Bath Heater - Process & Instrumentation Diagrams - P&ID 2011-EKC-MFB030-305001
G N9 G
2011-EKH-MFB030-300508 DN 150 2011-EKH-MFB030-300508 DN 40
SE EE
Fuel gas supply system - GT Performance Metering Skid P&ID 2011-EKG70-MFB030-018396
SH 2 - 19/H SH 3 - 2/J TIND EE
Fuel gas supply system - Gas Turbine Pressure Reducing skid P&ID 2011-EKD50-MFB030-018323
42EKC30
Fuel gas supply system - HRSG Supplementary Firing Pressure
BR503 e 2011-EKD30-MFB030-018324
Reducing skid P&ID
From GT 42 Wobbe NOTE 10 From GT 42
NOTE 10 Gas Turbine Auxiliaries P&ID 2011-MB-MFB030-060022
Meter Vent Conn. #2 Efficiency Heater Vent
¼” OD - 0.035" THK DN 25 HRSG - DUCT BURNER - P&I Diagram 2011-HA-MFB030-300080
SS316L
Fuel Gas Supply System - System Description 2011-EK-MFE020-018026
TO SAFE LOCATION TO SAFE LOCATION
TO SAFE LOCATION TO SAFE LOCATION

H H
1070B N9
Employer
11A 10A SE EE
TIND EE
HPS EE HPS EE 43EKC30
40EKH11 40EKH14 BR503 e Saudi Electricity Company
BR195 h BR196 b From GT 43 Wobbe NOTE 10 From GT 43
From Seal Gas Vent From Oil Demister Vent NOTE 10
Meter Vent Conn. #2 Efficiency Heater Vent
¼” OD - 0.035" THK DN 25
2011-EKH-MFB030-300508 DN 25 2011-EKH-MFB030-300508 DN 40 SS316L Main Contractor
SH 5 - 3/D SH 3 - 2/J
TO SAFE LOCATION
TO SAFE LOCATION
J J
1070C S1
SIGMA
SE EE THERMAL
EE
THE CONSORTIUM OF SIEMENS ENERGY GLOBAL
40EKC11
TO SAFE LOCATION
TO SAFE LOCATION From WBH #11 NG
BR306 b GMBH & CO. KG.& ELSEWEDY ELECTRIC PSP
From GT 41 Wobbe Meter Supply Line PSV Project
Probe Assembly Vent Connection 40EKC11AA192 DN 80
¼” OD - 0.035" THK

11A
1505A
SS316L Reinforcement of Rabigh Power Plant
SE EE
HPS EE TO SAFE LOCATION
K TO SAFE LOCATION K
40EKH12 41EKG75
BR195 h BR501 e S1
From Seal Gas Vent 1070C
From GT 41
Final Filter PSV SIGMA
SE EE EE
2011-EKH-MFB030-300508 DN 25 DN 25 THERMAL
SH 5 - 3/D 40EKC12 07 2025-02-10 Issued For Review Critical OA HZ MM
BR306 b 06 2024-12-15 Issued For Review Critical OA HZ MM
From WBH #12 NG
From GT 42 Wobbe Meter Supply Line PSV 05 2024-10-07 Issued For Review Critical OA HZ MM
Probe Assembly Vent Connection 40EKC12AA192 DN 80 04 2024-07-30 Issued For Review Critical OA HZ MM
¼” OD - 0.035" THK
SS316L 03 2024-07-14 Issued For Review Critical OA HZ MM
02 2024-06-25 Issued For Review Critical OA HZ MM
L TO SAFE LOCATION
L
01 2024-01-24 Issued For Review Critical OA HZ MM
TO SAFE LOCATION TO SAFE LOCATION
TO SAFE LOCATION 00 2023-12-17 Issued For Review Critical OA HZ MM
S1
1070C Rev. Date Details of revision Created Checked Approved
SIGMA
EE Contract
1505A SE EE THERMAL Scale: NTS Size: A1 Origin No.: - Rev.: 07 -
No.:
11A 40EKC13
SE EE Originator Title:
BR306 b
HPS EE From WBH #13 NG
40EKH13 42EKG75
Supply Line PSV Fuel Gas Supply System P&ID
From GT 43 Wobbe Meter 40EKC13AA192
Probe Assembly Vent Connection DN 80
BR195 h BR501 e
From Seal Gas Vent ¼” OD - 0.035" THK Document No.: Rev.
M From GT 42 SS316L M
Final Filter PSV 2011-EK-MFB030-018024 07
2011-EKH-MFB030-300508 DN 25 DN 25
Copyright © Elsewedy Electric for Power System Projects. All rights reserved. The reproduction, disclosure or use of this Page
SH 5 - 3/D
document or its contents is forbidden without express written authority from Elsewedy Electric for Power System Projects. 4 / 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

TP-21
Design
TIND EE Design Design Piping Piping Piping Specification Insulation
A Temperature A
Section Pressure (barg) Material Rating Code Type
(°C)
From Cold Vent Stack
0092 a 80 91 CS 600 C6I P
2011-EKR30-MFB030-302020 b 80 10 CS 150 C1G P
SH 1 - 7/G
c 175 51.7 CS 600 C6G H
d 250 51.7 CS 600 C6G H
e 250 10 CS 150 C1G P
TP-17 f 250 5 CS 150 C1G P
EE TIND g 80 5 CS 150 C1G P
B B
40EKE20
h 175 10 CS 150 C1G P
BR401 g
i 280 95 CS 900 C9F P
DN50\DN25
TP-09
To Condensate Tank Notes:
TIND EE DN 50
1. For P&IDs Symbols and Legends, Please refer to Document No.
40EKE11
2011-M-MFB030-018001.
BR420 g
From Filter #11 2. Common header three Pressure Transmitters with bulk material (Tubing, Fitting,
0065 Instruments) are supplied by Hanwha Power Systems. Pressure measurement to
2011-EKE10-MFB030-302017 DN 50
be located as close as possible to the gas compressors.
SH 1 - 1/F
3. Reducer shall be placed as close as possible to the ESD skid inlet.
C 4. Removable piping spool for temporary strainer to be installed outside skid edge C
for commissioning only.
5. A minimum slope of 5 mm in 1 m to be applied for all individual vent lines, vent
header and condensate lines.
TP-15 6. Vent lines from individual devices should normally enter vent header from above.
TIND EE
7. Vent lines from individual devices that are located below the header should be
arranged to rise continuously to the top of the header entry point.
40EKE12
8. All individual vent lines shall be connected with the vent header with angle entry.
BR420 g
From Filter #12 9. All vent lines routed to safe location shall be provided with bird mesh.
0067
10. A condensation loop to be installed in the line.
D 2011-EKE10-MFB030-302017 DN 50 PDI PI PI D
SH 2 - 1/F 11. Probe assembly is immersed in the line with no additional tubing required.
40EKR10 40EKR10 40EKR10 12. Blind flange to be installed only during ICOD.
CP502 CP503 CP504
13. Removable piping spool to be installed with the same length between N10 and
N11 in place of the supplier’s bypass skid during ICOD.
40EKR10 40EKR10 40EKR10 40EKR10 14. A flexible hose to be provided for truck connection.
AA306 AA307 AA308 AA309 15. Painting system no. 12 shall be followed as per document Technical
Specification for Painting and Coating - 2011-OT110-MEC020-018364.
g

g
DN 25

DN 25

DN 25

DN 25
TP-19
40EKR10

40EKR10

40EKR10

40EKR10
BR302

BR303

BR304

BR305
E TIND EE Abbreviations: E
40EKR10 40EKR10 SEC: Saudi Electricity Company
BR403 g BR404 g EE: Elsewedy Electric PSP
DN50\DN25 DN50\DN25 DN50\DN25 DN50\DN25
From Condensate Tank DISPOSAL BY TRUCK SE: Siemens Energy
DN 50 DN 50 TIND: Tromene Industriale
NOTE 14
40EKR10 N/E: Nooter Eriksen
40EKR10
40EKR10 HPS: Hanwha Power Systems
AA403
AT001
AP001 UG: Underground
AG: Above ground

F
Reference Documents: F
Document Title Document Number
Fuel Gas Receiving Station - ESD Skid P&ID 2011-EK-MFB030-302016
Fuel Gas Receiving Station - Inlet Filter Separator Skid P&ID 2011-EKE10-MFB030-302017
Fuel Gas Receiving Station - Gas Condensate Tank Skid P&ID 2011-EKR10-MFB030-302018
Fuel Gas Receiving Station - Cold Vent Stack Skid P&ID 2011-EKR30-MFB030-302020
Efficiency Heater Skid P&ID 2011-EKC30-MFB030-302019
Fuel Gas Compressors - P&ID 2011-EKH-MFB030-300508
Gas Metering System (GMS) - P&ID 2011-EKU-MFB030-306042
Water Bath Heater - Process & Instrumentation Diagrams - P&ID 2011-EKC-MFB030-305001
G G
Fuel gas supply system - GT Performance Metering Skid P&ID 2011-EKG70-MFB030-018396
Fuel gas supply system - Gas Turbine Pressure Reducing skid P&ID 2011-EKD50-MFB030-018323
Fuel gas supply system - HRSG Supplementary Firing Pressure
2011-EKD30-MFB030-018324
Reducing skid P&ID
Gas Turbine Auxiliaries P&ID 2011-MB-MFB030-060022
HRSG - DUCT BURNER - P&I Diagram 2011-HA-MFB030-300080
Fuel Gas Supply System - System Description 2011-EK-MFE020-018026

H H
Employer

Saudi Electricity Company

Main Contractor

J J

THE CONSORTIUM OF SIEMENS ENERGY GLOBAL


GMBH & CO. KG.& ELSEWEDY ELECTRIC PSP
Project

Reinforcement of Rabigh Power Plant


K K

07 2025-02-10 Issued For Review Critical OA HZ MM


06 2024-12-15 Issued For Review Critical OA HZ MM
05 2024-10-07 Issued For Review Critical OA HZ MM
04 2024-07-30 Issued For Review Critical OA HZ MM
03 2024-07-14 Issued For Review Critical OA HZ MM
02 2024-06-25 Issued For Review Critical OA HZ MM
L L
01 2024-01-24 Issued For Review Critical OA HZ MM
00 2023-12-17 Issued For Review Critical OA HZ MM
Rev. Date Details of revision Created Checked Approved
Contract
Scale: NTS Size: A1 Origin No.: - Rev.: 07
No.:
-

Originator Title:

Fuel Gas Supply System P&ID

Document No.: Rev.


M M
2011-EK-MFB030-018024 07
Copyright © Elsewedy Electric for Power System Projects. All rights reserved. The reproduction, disclosure or use of this Page
document or its contents is forbidden without express written authority from Elsewedy Electric for Power System Projects. 5 / 5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like