Basement Roof Beam Detail at 99.65 LVL - R1!31!05-25

The document contains detailed specifications for concrete slabs and beams, including dimensions, material grades, and reinforcement requirements. It outlines testing procedures for concrete and steel, as well as guidelines for placement and anchorage of materials. Additionally, it specifies clear cover requirements for reinforcement and the necessary approvals for fabrication drawings.

Uploaded by

dhanush kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

Basement Roof Beam Detail at 99.65 LVL - R1!31!05-25

The document contains detailed specifications for concrete slabs and beams, including dimensions, material grades, and reinforcement requirements. It outlines testing procedures for concrete and steel, as well as guidelines for placement and anchorage of materials. Additionally, it specifies clear cover requirements for reinforcement and the necessary approvals for fabrication drawings.

Uploaded by

dhanush kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Slab 175mm GENERAL NOTES

Thick 6-16# +6-20# 1.All dimensions are in Meters, unless otherwise specified.
100.70 2.Drawing not to be scaled.
3.All concrete shall have crushing strength as specified
7 8 9 10 by the grade/corresponding mix mentioned elsewhere
1 2 5 in the Drawing,and cubes shall be tested at site as per
the instructions of our site Engineer.
4.# denotes MS twisted for steel bars. All steel shall confirm
1.70 1.70 2.30 2.30 2.30 2.30 2.30 2.30 2.45 2.45 1.30 1.30 to accepted ISI standards of specified yield strengths.
4L- 10#@0.15m C/C a.In addition to the above clause testing shall be done at
site for steel bars selected at random from the unloaded

1.25
3-16# 3-16# 3-16# 3-16# 3-16# 3-16# 3-16# consignment as per the instructions of our site Engineer
2-16# 2-16# 2-16# 2-16# 2-16# 2-16# 10#@0.20m C/C before using it on the job.
3-16# 3-16# 3-16# 3-16# 3-16# 3-16# 3-16# (Side Face) 5.Arrangement shall be made by the contractor so that the
Slab 200mm
placement of the steel bars is not disturbed during concreting
99.65 Thick by providing bridges.
0.60

6.Laps in tension shall be ..50Ø.......& in compression .45Ø......


Laps shall be staggered.
a.Anchorage shall be according to good accepted practice
3-16# 3-16# 3-16# 3-16# 3-16# 3-16# or as mentioned in the drawing.
6-16# +6-20# b.Splices,Expansion joints and construction joints
6.075 8.10 8.10 8.10 8.52 4.78 shall be done as per the instructions of our site Engineer.
7.Centering for the cantilever beams/slabs shall be lifted at
2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# SECTION x-x the free edge by the amount specified in the drawing.
@0.175m C/C @0.175m C/C @0.175m C/C @0.175m C/C @0.175m C/C @0.175m C/C 8.The designed live load : 4.0 Kn/m2.
Inverted B (0.60 X 1.25) 9.The bearing capacity of the soil = 246 kN/m2
9 10 10.The foundations are designed to take up
L/S OF BEAM B1(0.30 X 0.60) Basement+Ground + 3 floors only.
0.60 11.Clear cover to main reinforcement not less than the diameter
12- 20# of the bar or
a.Columns:40mm b.Footings:50mm
1 2 8 10#@0.20C/C c . Beam :30mm d. Slab: 25mm.
4L-10#@
1 2 1 2 Side reinforcement
2 5 0.15m C/C 12.For structural steel work,detailed shop/fabrication drawings

0.60
shall be prepared by the fabricator for
1.70 1.70 2.40 6-20# 6-16# approval before commencing the fabrication work.
1.70 1.70 2.40
1.70 1.70 2.15 Hanger Bar 13.Concrete grade for All Structure element = M35
0.30 2.15 Hanger Bar Except the columns as mentioned in the layout = M40

2
2-16#

1
3-20# 3-20# 3-20# 2-16# (from Foundation level to Ground floor level) .
6 - 20# +2-16#
3-20# 2-20# 2-20# + 1-25# 2-20#+1-25# 3-20# 2-20# + 1-25# 2-20#+1-25# 3-20# 2-20# + 1-25# 3-20#+2-16# 5-16# 3-20#+2-16# 6-20# 6-20# SECTION 1-1 14.Steel grade for all structural elements = Fe550
2L-8#@0.125m C/C 0.60 Test certificates for each consignment shall be

0.45
6- 20# produced before using the steel on the job.
0.60
0.60

0.60

0.60
3-20# 0.40 0.40
6-16# 6-20# 15.Read this drawing along with Architectural drawing.
0.50 0.50 4L-10#@
0.50 0.50 0.50 0.50 3-20# 3-20# 0.75 0.75 0.75 0.75 0.15m C/C
3-20# 3-20# 5-16# 6-20#

0.60
3-20# 3-20# 3-16# 2-16#
6.075 3-20# 6.075 6.075 7.80

1
8.52 4.78
2L-10#

2
2L-8# 2L-8# 2L-8# C/S OF BEAM 2L-8# 2L-8# 2L-8# 2L-10# 2L-10# 2L-10# 4L-10# 4L-10# 4L-10# 4L-10#
@0.15m C/C
@0.10m C/C @0.15m C/C @0.10m C/C B4(0.30 X 0.60) @0.10mm C/C @0.15m C/C @0.10m C/C @0.10mm C/C @0.15m C/C @0.10m C/C @0.15m C/C @0.20m C/C @0.15m C/C @0.15m C/C 6 - 20# +2-16#

L/S OF BEAM B5(0.30 X 0.60) L/S OF BEAM B5a(0.45 X 0.45) L/S OF BEAM B6(0.60 X 0.60) L/S OF BEAM B7(0.60 X 0.60), Inverted B (0.60 X 1.25). SECTION 2-2
L/S OF BEAM B2(0.30 X 0.60)
8 9 10 1 2 5
2 5 7 R1 31-05-2025 Beam B6 & B8 revised.
2.40 2.40 1.70
2.25 2.25 2.25 2.25 2.25 2.25 1.70 2.30 2.30 REV NO DATE DESCRIPTION
Hanger Bar
2-20# + 1-25# 2-20# + 1-25# 2-20# + 1-25# 2-20# + 1-25# 3-20# 3-16# 3-16# 2-16# 3-16# DRAWING ISSUED FOR :
2-20# + 1-25# 2-20# 2-20# + 1-25# 2-20# 2-20# + 1-25# 2-20# 2-20# + 1-25# 2-20# 3-16# 3-20# 3-16# 2-16# 3-16# 2-16# 3-16# APPROVAL :
TENDER :
0.60

0.60
STUDY :
0.75 3-20# 0.75 0.75 3-20# 0.75 0.75 3-20# 0.75 0.75 3-20# 0.75 0.40 3-20# 0.40 3-16# 3-16#
2-20# 2-20# 2-20# 2-20# 3-25# EXECUTION :
8.10 8.10 8.10 8.52 4.70 6.075 8.10
2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# STRUCTURAL
@0.175m C/C @0.175m C/C @0.175m C/C @0.175m C/C @0.15m C/C @0.15m C/C @0.15m C/C

L/S OF BEAM B8(0.30 X 0.60)


ORIENTATION :
L/S OF BEAM B3(0.30 X 0.60)
10 H G E C B A
8 9

2.30
Hanger Bar
2.30 1.25 1.25 1.00 1.00 2.50
Hanger Bar
2.50 2.60
Hanger Bar
2.60 2.60
Hanger Bar
2.60 N
3-20# 2-16# 3-20# + 1-25# 3-20# 2-16# 2-16# 2-16#
3-20# 2-20# 2-20#+1-25# 3-16# 2-20# 3-20# 3-20# 2-20# 3-20# 3-20# 2-20# 3-20# 3-20# 2-20# 3-20# 3-20#
0.60
0.60

CLIENT :
0.75 0.75 0.40 3-20# 0.40 0.80 3-20# 0.80 0.80 3-20# 0.80 0.80 3-20# 0.80 3-20#
M/S AONE DEV MANTRA FINANCIAL
3-25# 3-20# 2-20# 2-16# 3-20# 3-20# 3-20# 2-16#
8.20 4.78 4.025 8.70 9.10 9.10 2.80
SERVICES PRIVATE LIMITED.
2L-10# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# 2L-8# JOB TITLE :
@0.15m C/C @0.15m C/C @0.15m C/C @0.125m C/C @0.20m C/C @0.125m C/C @0.125m C/C @0.20m C/C @0.125m C/C @0.125m C/C @0.20m C/C @0.125m C/C @0.15m C/C

L/S OF BEAM B11(0.30 X 0.60) PROPOSED CONSTRUCTION OF COMMERCIAL


L/S OF BEAM B9(0.30 X 0.60) BUILDING IN PLOT NOS.5-A-15 &5-A-16 IN THE
HARDWARE SECTOR AT HI-TECH, DEFENCE AND
E
AEROSPACE PARK, BENGALURU, COMPRISED IN
G C B
SY.NO. 104-P, HOOVINAYAKANAHALLI, JALA
HOBLI, BENGALURU NORTH YELAHANKA TALUK,
2.30 2.30 2.50 2.50 2.50 2.50
Hanger Bar Hanger Bar Hanger Bar BENGALURU URBAN DISTRICT
4

0.45
3

8- 20# 0.45 2-16# 2-16# 2-16# 0.20


6 -20# 0.60 0.60 0.30
6-20# 6-20# 6-20# 6-20# 6-20# 6-20# 6-20# 12- 20# 6- 20# 6 - 20# 2-20#
DRAWING :
4L-10#@ 4L-10#@
Basement roof beam detail at 99.65 lvl.
0.45

2L-10#@ 0.15m C/C 0.15m C/C 2L-8#@


0.60

0.60

0.60

0.60

0.60
2L-8#@ 0.15m C/C 2L-8#@
0.10m C/C
0.125m C/C 0.75 0.75 1.00 1.00 1.00 1.00 0.15m C/C
4-16# 6-20# 4-16# 6-20# 4-16# 6-20#
6 - 20#
8- 20# 8.40 9.10 9.10
6 - 20# +4-16# 6 - 20# +4-16# 6-20# 2-20# SCALE : 1:100 DEALT : RAVI
4
3

4L-10# 4L-10# 4L-10# 4L-10# 4L-10# 4L-10# 4L-10# 4L-10# 4L-10# C/S OF BEAM B14 C/S OF BEAM B15
C/S OF BEAM B12 C/S OF BEAM B13a @0.10m C/C @0.15m C/C @0.10m C/C @0.10m C/C @0.15m C/C @0.10m C/C @0.10mm C/C @0.15m C/C @0.10m C/C SECTION 3-3 SECTION 4-4 (0.30 X 0.60) INV (0.20 X 0.60) DATE : 26-09-2024 DRAWN : RAVI
(0.45 X 0.60) (0.30 X 0.60)
L/S OF BEAM B13(0.60 X 0.60) ISSUED : CHECKED: MSK

I G
ARCHITECTS :
1.70
1.70 0.30
6 - 20# 0.45 3-20# 3-20#
6 -20# 0.45 6 -20#
6 - 20# 3-16# 2-20# 3-16# KAREKAR & ASSOCIATES
DETAILING OF 'U' TYPE BARS
FOR COLUMN & BEAM JUNCTION. #282, Ground Floor, 14th Cross,
0.60
0.60

0.45

0.60

2L-8#@
0.45

0.15m C/C 2L-10#@ 2L-10#@ 2L-8#@ Vertical bars for column HIG Dollars Colony, RMV 2nd Stage,
0.150m C/C 0.125m C/C 0.50 3-20# 0.50 0.150m C/C Reinforcement

6 - 20#
3-16# 60mm Bengaluru-560094
6 - 20# 6 - 20# 6.075 Column
6 - 20# hanger bar: 2-16#
C/S OF BEAM B15a C/S OF BEAM B16 C/S OF BEAM B17 Column
(0.45 X 0.45) 2L-8# 2L-8# 2L-8# Centerline 0.30 0.30 DRAWING NO :
(0.30 X 0.60) (0.45 X 0.45)
@0.15mm C/C @0.15m C/C @0.15m C/C C/S OF BEAM B19 Ld U - Type Bars
(0.30 X 0.60) Beam SECTION DEV / STR / Basement roof/ 02-02 R0
L/S OF BEAM B18(0.30 X 0.60) Main beam

°
Secondary beam

60
Ld/3
COPY RIGHT :
0.075 0.075 Drawings and specifications as instruments of services are the property of the architect
whether the work for which they are made be executed or not ,
DETAIL BEAM AT SUPPORT Typical hanger bars detail PLAN U - Type Bars and they are not to be used on their work except by agreement .