Drainage System RF G.H

The document provides a detailed drainage layout for the roof floor plan of parcels G and H in the Riyadh-Al-Yasmeen district, including various symbols and their descriptions for different types of pipes and drains. It outlines the project details, including the owner, consultant, and contractors involved. The layout includes specifications for soil stacks, waste stacks, vent stacks, and other drainage components, along with slope percentages and dimensions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views1 page

Drainage System RF G.H

The document provides a detailed drainage layout for the roof floor plan of parcels G and H in the Riyadh-Al-Yasmeen district, including various symbols and their descriptions for different types of pipes and drains. It outlines the project details, including the owner, consultant, and contractors involved. The layout includes specifications for soil stacks, waste stacks, vent stacks, and other drainage components, along with slope percentages and dimensions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SYMBOL DESCRIPTION

SS SOIL STACK
WS WASTE STACK
VS VENT STACK
N RS RAIN STACK
SP SOIL PIPE
WP WASTE PIPE
RP RAIN PIPE
VP VENT PIPE
SRD SIDE ROOF DRAIN
WP WASTE PIPE
BFS BELOW FLOOR SLAB
W/RVC WITH ROOF VENT CAP
CP CONDENSATE DRAIN PIPE
PARCEL - F -

RD ROOF DRAIN
CO CLEAN OUT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
@CLG AT CEILING
UG UNDER GROUND
FMP FORCE MAIN PIPE
UG UNDERGROUND
UT UNDER TILE
S% PIPE SLOPE
T/A TO ABOVE
F/A FROM ABOVE
METAL SHADE METAL SHADE
METAL SHADE METAL SHADE F/B FROM BELOW
T/B TO BELOW
GT GULLY TRAP
CB CATCH BASIN
TD TRENCH DRAIN
GD GARAGE DRAIN
SDC SLOW DOWN SHAMBER

S=
1% 1%
S= 1%
S=

S=
1
%
4.26
RD-3

4.76
RD-3

0.28
RS Ø110 T/B
W/RVC
VS Ø75 T/A 1% RS Ø110 T/B VS Ø75 T/A VS Ø75 T/A
3.60

S= S= VS Ø75 T/A
W/RVC 1% S=1 W/RVC W/RVC W/RVC S=1 1% W/RVC
% % S=
RP Ø110 BFS SRD SRD 3.29
0.35

0.35
1.08
1.05

1.05
4.26

S=
RP Ø110 BFS

1%
2.63 2.63 4.15
7.93

VS Ø75 T/A
VS Ø75 T/A WS Ø110 T/B

7.11
WS Ø110 T/B RS Ø110 T/B
RS Ø110 T/B SS Ø110 T/B
SS Ø110 T/B 17.02 RP Ø110 BFS RP Ø110 BFS
16.05 W/RVC
W/RVC
CO CO
1.16

1.16

1.16
VS Ø75 T/A VS Ø75 T/A
W/RVC2.80 5.77
W/RVC
S= S=
1% 1%
2.60 2.34
1 1% RP Ø110 BFS
% S= S=

0.90
0.99

0.99
2.68
Electrical Duct FUTURE EXPANSION ELEVATED TANK FUTURE EXPANSION Electrical Duct
3.66

3.66
RP Ø110 BFS
0.29

0.190.29
STAIRS STAIRS
0.290.12

0.29 0.12
0.39

0.39
2.67

CO 5.76
ELEVATED TANK CO
RP Ø110 BFS
4.79

RP Ø110 BFS
S= OPEN BELOW 5.77 5.88 OPEN BELOW
1% RD-3 RD-3
3.09
1 %
3.49

S= 1%

3.77
S= S=
1%

1% S= S=
1% 1%
S= S= 1%

4.03
4.28
RD-3
0.26

0.78

0.04
4.51
RD-3
METAL SHADE METAL SHADE
VS Ø75 T/A
S= W/RVC 1 %
1% S=

1 % S=
S= 1%

METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE
METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE

Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct

ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK

METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE

PARCEL (A) PARCEL (B) PARCEL (C) PARCEL (D) PARCEL (E) PARCEL (F) PARCEL (G) PARCEL (H)

REV. NO ISSUE DATE

1
2
3
4

PROJECT

ADMINISTRATION BUILDINGS
PARCEL (G) PARCEL (H) LOCATION

RIYADH- AL-YASMEEN DISTRICT


STAGE
WORKING DRAWINGS
OWNER
PARCEL - F -

HAMA AL-TATWEER
Real Estate Co.
CONSULTANT

CLIENT

CONTRACTOR

SHEET TITLE

ROOF FLOOR PLAN PARCELS (G&H)


(DRAINAGE LAYOUT)
ARCHITECTURE STRUCTURE ELECTRICAL HVAC PLUMBING REVIEWED BY

M.ABO ELKHIER A.ELDYEEB S.HALMY M.ELKADY W.ELSAID M.ABDELKADER

PROJECT No. SCALE SHEET No. SHEET SIZE SERIAL

22117-ADMINISTRATION BUILDINGS 1-100 22117-PL-229 A0 065