Penthouse Drainage System Layout A.B

The document provides a detailed drainage layout for the penthouse floor plan of the Administration Buildings project in Riyadh, including various symbols and their descriptions for different types of pipes and drains. It outlines specific components such as soil stacks, waste stacks, vent stacks, and other drainage elements, along with their respective slopes and configurations. Additionally, it includes project details such as the client, consultant, contractor, and review information.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views1 page

Penthouse Drainage System Layout A.B

The document provides a detailed drainage layout for the penthouse floor plan of the Administration Buildings project in Riyadh, including various symbols and their descriptions for different types of pipes and drains. It outlines specific components such as soil stacks, waste stacks, vent stacks, and other drainage elements, along with their respective slopes and configurations. Additionally, it includes project details such as the client, consultant, contractor, and review information.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SYMBOL DESCRIPTION

SS SOIL STACK
WS WASTE STACK
VS VENT STACK
N
RS RAIN STACK
SP SOIL PIPE
WP WASTE PIPE
RP RAIN PIPE
VP VENT PIPE
SRD SIDE ROOF DRAIN
WP WASTE PIPE
BFS BELOW FLOOR SLAB
W/RVC WITH ROOF VENT CAP
CP CONDENSATE DRAIN PIPE

PARCEL - C -
RD ROOF DRAIN
CO CLEAN OUT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
@CLG AT CEILING
UG UNDER GROUND
FMP FORCE MAIN PIPE
S= S= 1 % UG UNDERGROUND
1% %
S =1 1 % S=
UT UNDER TILE
S% PIPE SLOPE
S=
RP Ø110 BFS % RP Ø110 BFS

1%

S=
1% 1 T/A TO ABOVE
CO S= CO

1%
S=
RD-3 RD-3
F/A FROM ABOVE
S=
S=
F/B FROM BELOW
1% 1%
1% 1%
S= S= T/B TO BELOW

RD-3
GT GULLY TRAP
RD-3
RP Ø110 BFS CB CATCH BASIN
RP Ø110 BFS TD TRENCH DRAIN
RP Ø110 BFS RP Ø110 BFS GD GARAGE DRAIN
= 1% S=
S 1%
CO
RP Ø110 BFS RP Ø110 BFS CO SDC SLOW DOWN SHAMBER
CO CO
S=
1% 1%
S = 1% RS Ø110 T/B
CPØ25 S=
@CLG. CPØ25
@CLG.

697
475
RS Ø110 T/B 704
463

1995 1933

SS Ø110 T/B

594
SS Ø110 T/B FD
966

1025
WS Ø110 T/B
1305

SPØ110@
WS Ø110 T/B WPØ110@
CO CO
CLG.BELOW
VS Ø75 T/A VS Ø75 T/A VS Ø75 T/A
1495

VS Ø75T/A CLG.BELOW

1593
FD SPØ75@ WPØ75@ CO
CO CLG.BELOW RP Ø75 BFS CLG.BELOW
RP Ø75 BFS CO
FD CO
VPØ50@ FD
FD
@CLG.

1156
VPØ50@
877

730
FD @CLG.
564

DN
CPØ50 DN
UT CO CO CPØ50
WPØ50 WPØ50 UT WPØ50
WPØ50
CPØ25 CPØ25 CPØ25 CPØ25
@CLG. CO @CLG. @CLG. CO @CLG.

RP Ø75 BFS CPØ32


CPØ32 @CLG.
@CLG.
CPØ32 CPØ25 CPØ32
RP Ø75 BFS @CLG. @CLG. @CLG. VS Ø75 T/A
VS Ø75T/A SS Ø110 T/B SS Ø110 T/B WS Ø110 T/B
CPØ25 WS Ø110 T/B VS Ø75 T/A VS Ø75 T/A RS Ø110 T/B CPØ25
@CLG. 647 1053 704 1038 647 WPØ50 @CLG.
317 699
RS Ø110 T/B WS Ø110 T/B 308 647 305
851
504
WS Ø110 T/B SS Ø110 T/B 506
203
943
660
WPØ50
SS Ø110 T/B FD DN
328

337
FD VPØ50@ FD FD
VPØ50@
601

605
FD @CLG.
Electrical Duct FUTURE EXPANSION
CO
@CLG. FUTURE EXPANSION Electrical Duct
WPØ50 WPØ50
STAIRS CO STAIRS
479

1175
FD FD

1400
800

CO CO CO
98 SPØ110@ 97
FD 97 76 CLG.BELOW 75 96
CO WPØ75@ SPØ75@ WPØ75@ CO
77 WPØ75@ 76
CLG.BELOW 96 CLG.BELOW CLG.BELOW 95 CLG.BELOW
SPØ110@ 78 WPØ50 77 SPØ110@
CLG.BELOW
95 WPØ110@ 94
CLG.BELOW 78 CLG.BELOW
VPØ50@ 94 79 93
@CLG.
OPEN ABOVE OPEN ABOVE
VPØ50@
93 80 79 92 @CLG.
92 81 80 91
91 82 81 90
90 83 82 89
89 84 FD
1526 1569
FD 83 88
1585 1492
FD 85 84 FD
CPØ25
@CLG. CPØ25
1412

1378

1210
1208

VPØ50 88 VPØ50 @CLG. VPØ50 87 VPØ50


87 86 85 86
DN DN
CO CO
CPØ50 CPØ50
UT UT
RP Ø75 BFS RP Ø75 BFS RP Ø75 BFS
VS Ø75 T/A
VS Ø75 T/A
CPØ25 CPØ25
@CLG. @CLG.

S= 1% S= 1% RP Ø75 BFS
1% S= 1% S=

CPØ25
CPØ25 @CLG.
@CLG.

RD-3 RD-3 S= CO
1% 1 %
CO
S= S= CO CO
1% 1 % METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE

S= S= S=
1%
Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct

1%
ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK

1% 1%
METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE

S=1% RD-3 S=
1% S= S= 1% RD-3 S=1% PARCEL (A) PARCEL (B) PARCEL (C) PARCEL (D) PARCEL (E) PARCEL (F) PARCEL (G) PARCEL (H)

S=

REV. NO ISSUE DATE

1
2
3

PARCEL (A) PARCEL (B) 4

PROJECT

ADMINISTRATION BUILDINGS

LOCATION

RIYADH- AL-YASMEEN DISTRICT

PARCEL - C -
STAGE
WORKING DRAWINGS
CLIENT

CONSULTANT

CONTRACTOR

SHEET TITLE

PENTHOUSE FLOOR PLAN PARCELS (A&B)


(DRAINAGE LAYOUT)
ARCHITECTURE STRUCTURE ELECTRICAL HVAC PLUMBING REVIEWED BY

M.ABO ELKHIER A.ELDYEEB S.HALMY M.ELKADY W.ELSAID M.ABDELKADER

PROJECT No. SCALE SHEET No. SHEET SIZE SERIAL

22117-ADMINISTRATION BUILDINGS 1-100 22117-PL-221 A0 057