Penthouse Drainage System Layout A.B
Penthouse Drainage System Layout A.B
SS SOIL STACK
WS WASTE STACK
VS VENT STACK
N
RS RAIN STACK
SP SOIL PIPE
WP WASTE PIPE
RP RAIN PIPE
VP VENT PIPE
SRD SIDE ROOF DRAIN
WP WASTE PIPE
BFS BELOW FLOOR SLAB
W/RVC WITH ROOF VENT CAP
CP CONDENSATE DRAIN PIPE
PARCEL - C -
RD ROOF DRAIN
CO CLEAN OUT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
@CLG AT CEILING
UG UNDER GROUND
FMP FORCE MAIN PIPE
S= S= 1 % UG UNDERGROUND
1% %
S =1 1 % S=
UT UNDER TILE
S% PIPE SLOPE
S=
RP Ø110 BFS % RP Ø110 BFS
1%
S=
1% 1 T/A TO ABOVE
CO S= CO
1%
S=
RD-3 RD-3
F/A FROM ABOVE
S=
S=
F/B FROM BELOW
1% 1%
1% 1%
S= S= T/B TO BELOW
RD-3
GT GULLY TRAP
RD-3
RP Ø110 BFS CB CATCH BASIN
RP Ø110 BFS TD TRENCH DRAIN
RP Ø110 BFS RP Ø110 BFS GD GARAGE DRAIN
= 1% S=
S 1%
CO
RP Ø110 BFS RP Ø110 BFS CO SDC SLOW DOWN SHAMBER
CO CO
S=
1% 1%
S = 1% RS Ø110 T/B
CPØ25 S=
@CLG. CPØ25
@CLG.
697
475
RS Ø110 T/B 704
463
1995 1933
SS Ø110 T/B
594
SS Ø110 T/B FD
966
1025
WS Ø110 T/B
1305
SPØ110@
WS Ø110 T/B WPØ110@
CO CO
CLG.BELOW
VS Ø75 T/A VS Ø75 T/A VS Ø75 T/A
1495
VS Ø75T/A CLG.BELOW
1593
FD SPØ75@ WPØ75@ CO
CO CLG.BELOW RP Ø75 BFS CLG.BELOW
RP Ø75 BFS CO
FD CO
VPØ50@ FD
FD
@CLG.
1156
VPØ50@
877
730
FD @CLG.
564
DN
CPØ50 DN
UT CO CO CPØ50
WPØ50 WPØ50 UT WPØ50
WPØ50
CPØ25 CPØ25 CPØ25 CPØ25
@CLG. CO @CLG. @CLG. CO @CLG.
337
FD VPØ50@ FD FD
VPØ50@
601
605
FD @CLG.
Electrical Duct FUTURE EXPANSION
CO
@CLG. FUTURE EXPANSION Electrical Duct
WPØ50 WPØ50
STAIRS CO STAIRS
479
1175
FD FD
1400
800
CO CO CO
98 SPØ110@ 97
FD 97 76 CLG.BELOW 75 96
CO WPØ75@ SPØ75@ WPØ75@ CO
77 WPØ75@ 76
CLG.BELOW 96 CLG.BELOW CLG.BELOW 95 CLG.BELOW
SPØ110@ 78 WPØ50 77 SPØ110@
CLG.BELOW
95 WPØ110@ 94
CLG.BELOW 78 CLG.BELOW
VPØ50@ 94 79 93
@CLG.
OPEN ABOVE OPEN ABOVE
VPØ50@
93 80 79 92 @CLG.
92 81 80 91
91 82 81 90
90 83 82 89
89 84 FD
1526 1569
FD 83 88
1585 1492
FD 85 84 FD
CPØ25
@CLG. CPØ25
1412
1378
1210
1208
S= 1% S= 1% RP Ø75 BFS
1% S= 1% S=
CPØ25
CPØ25 @CLG.
@CLG.
RD-3 RD-3 S= CO
1% 1 %
CO
S= S= CO CO
1% 1 % METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
METAL SHADE
S= S= S=
1%
Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct Electrical Duct
1%
ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK ELEVATED TANK
1% 1%
METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE METAL SHADE
S=1% RD-3 S=
1% S= S= 1% RD-3 S=1% PARCEL (A) PARCEL (B) PARCEL (C) PARCEL (D) PARCEL (E) PARCEL (F) PARCEL (G) PARCEL (H)
S=
1
2
3
PROJECT
ADMINISTRATION BUILDINGS
LOCATION
PARCEL - C -
STAGE
WORKING DRAWINGS
CLIENT
CONSULTANT
CONTRACTOR
SHEET TITLE