Plumbing
Plumbing
ALL WORKS HEREIN SHALL BE EXECUTED ACCORDING TO THE PROVISIONS OF THE LAV LAVATORY SP SOIL PIPE
PHILIPPINE NATIONAL PLUMBING CODE, THE NATIONAL BUILDING CODE OF THE WC WATER CLOSET CB CATCH BASIN
PHILIPPINES. FD FLOOR DRAIN SH SHOWER HEAD
CO CLEANOUT SV SHOWER VALVE
OTHER TRADES SHALL COORDINATE THE DRAWING WITH OTHER TRADE VSTR VENT STACK THRU ROOF SF FAUCET
DRAWINGS AND TECHNICAL SPECIFICATIONS. ST SEPTIC TANK HB HOSE BIBB
DS DOWNSPOUT MH MANHOLE
ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR
HD HOUSE DRAINAGE GV GATE VALVE
PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE
KS KITCHEN SINK CV CHECK VALVE
DESIGNER.
1 2 1 2 1 2
2 3 2 3 2 3
LANAI
WC
LAUNDRY
AREA
A A A
SH
FD FD
WC
KS
1
HALLWAY 2 "Ø PPR PIPE RISER
1/2" Ø PPR PIPE
FD
LIVING WC
1/2" Ø PPR PIPE SH 1/2" Ø PPR PIPE
AREA HALLWAY
1
2"ØPPR PIPE RISER LAV
1
2"Ø PPR PIPE RISER
FROM GROUND FLOOR FROM GROUND FLOOR
SEPTIC VAULT
3/4" Ø PPR PIPE
D D D
PORCH PORCH
FL-1
DS DOWNSPOUT MH MANHOLE
ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR
HD HOUSE DRAINAGE GV GATE VALVE
PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE
KS KITCHEN SINK CV CHECK VALVE
DESIGNER.
1 2 1 2 1 2
2 3 2 3 2 3
LANAI
WC
LAUNDRY
AREA
A A A
SH
FD CO FD
WC
KS
KS
BEDROOM 1
DINING KITCHEN LAV
SINK
AREA SH BEDROOM 2 BEDROOM 3
WC FD
4"Ø PPR SANTARY 4"Ø PPR SANTARY
4"Ø PPR SANTARY PIPE RISER TO PIPE RISER FROM PIPE RISER FROM
THIRD FLOOR GROUND FLOOR GROUND FLOOR
B HALLWAY B B
LAV
CO
FD
LIVING WC
AREA SH
HALLWAY LAV
CO
WC
LAV MASTER'S
BEDROOM
FAMILY/OFFICE/
GUEST ROOM
C C C
STORAGE
OPEN
SEPTIC VAULT
D D D
PORCH PORCH
FL-1
1 4 1 4 1 4
5 5 5
DS DOWNSPOUT MH MANHOLE
ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR
HD HOUSE DRAINAGE GV GATE VALVE
PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE
KS KITCHEN SINK CV CHECK VALVE
DESIGNER.
1 2 1 2 1 2
2 3 2 3 2 3
LAUNDRY
LANAI AREA
CB CB
KS
BEDROOM 1
KITCHEN
WC
SH
HALLWAY LAV
LIVING
AREA HALLWAY
CO
WC
LAV MASTER'S
CB CB BEDROOM
FAMILY/OFFICE/
3"Ø DS 3"Ø DS 3"Ø DS 3"Ø DS 3"Ø DS GUEST ROOM 3"Ø DS
C C C
STORAGE
3"Ø PPR SANITARY PIPE
OPEN
CB PORCH CB PORCH
FL-1
1 4 1 4 1 4
5 5 5
TAP TO NEAREST TAP TO NEAREST
DRAINAGE OUTLET DRAINAGE OUTLET
(VERIFY CONNECTION ON SITE) (VERIFY CONNECTION ON SITE)
3
PROPOSED CONSTRUCTION OF THREE STOREY RESIDENTIAL BUILDING P3 6
DRAINAGE LAYOUT
PROJECT LOCATION AISHA MAUNTING ALONTO GENERAL NOTES/LEGENDS AND SYMBOLS 22 25
LOT 23 BLOCK 76 PHASE 2 XAVIER ESTATE UPPER BALULANG CAGAYAN DE ORO PLUMBING
1 2
2 3
R
3"Ø RD 3"Ø RD 3 R O
ISEFLO
GA#24, SS 304 GUTTER, M ER D
OO PIP UN
SATIN FINISH DR R RO
PPM G
3"Ø DS 3"Ø DS
BE 1 2"Ø
F R O
A PIP
E
SLOPE 2 PP
R
M
OO 1/2
"Ø
AY
DR LW
BE HA
L
GE
FD V PIP
E
RO OR
RA
WC LA 1 PP
R
SETFLO
IS
ER D
GA#24, PRE-PAINTED,G.I RIDGE CAP M " Ø
E/ PIP UN
SH OO 1/2
IC R RO
DR FF M PPM G
3
/O OO
1 2"Ø O
BE FR
FD
2 I LYST R
M Y
B
3"Ø RD 3"Ø DS 3"Ø DS 3"Ø RD SH FA GUYE WA
WC L
DERA AL
LA
V
FD UNPIP E H
GAUGE 24 G.I.SHEET W/ PIP
E
SH
WC
LPAPR AR FD
" Ø
COATED STONE
R
PP 1/2
"Ø LAV
1/2
R
K ISE OR
I SIN E R FLO
NA KS R'S M
E O
PIP D
R HIR
SLOPE
SLOPE
1 LA KSST N O PP O T
T
DR
1 2"Ø
MAH E UP
RC1
H
BE
ITC
E
PIP
K PP
R
PAOY FL-
LW
"Ø
1/2
L
HA
NG PIP
E
2 NI A
DI ARE
R
LAV PP
WC "Ø
GA#24, SS 304 GUTTER, 1/2 E
PIP
3"Ø RD 3"Ø DS 3"Ø DS 3"Ø RD SATIN FINISH G
R
PP
IN A "Ø
C Y LIVARE EN
3/4
L WA OP E
AL
PIP ER
AIN VID
,MPRO
A H GV V
C
PLY E
UP VIC
R S ER
H TO
FF M TE M S
WAFRO
4
C RS
HU
OR
TE
ME
SLOPE 3"Ø DS P
D
B E
3"Ø RD R AG 5
GA#24, SS 304 GUTTER, GA
SATIN FINISH
D' C
D
1
1
5
4 D'
ROOF
DRAINAGE LAYOUT
SCALE 1:60M
WATERLINE
ISOMETRIC LAYOUT
SCALE 1:60M
I LA
V SIN
K 3"Ø
RY
ITA CO WC L3A"Ø
3 1 3"Ø
DS ST
AN M E/
NA Y 2 ER
OO Y
RS
KS SH
IC
PP
RIS OR
1 LAANTAFRROMOR KS N IPE FLO
3"Ø
DR DR FF OM
S
R ER FL
O
HE 'S YP D
AR UN BEAUNREACB /O RO
PP RISUND TC ER M NT RO L A ILYST
4"ØPIPERO KI ST OO Y FSDA M G M
FDA GU
E Y
WA SH
WA
G R O
MA EDR H PP FR IPE
LL DS CO
LL
P
RFL-C1 WC
3"Ø DS F RY
B HA 3"Ø 3"Ø
ITA
HA
TO
PO DISSER
AN
ISE
R
LA
V
FD "ØR
RS DS
NG
PP
R SH IP3E R 3"Ø
NI A
E 3"Ø
WC YP O
E
2 PIP CO
PIP
DI ARE AR FLO K
Y V RY
AR LA ITA V NT D SIN
NT
SA R
WC AI AN LA SAOUN CB DS
AN
RS R S
PP G K AY
R
R OO 3"Ø
E PP
PP D FL PIP 1 L DS
3"Ø
3"ØROM KS N DS
G ITA
RY 3"Ø E "Ø LW
4"Ø
TH
IR
IN A AN
F
H 'S 3 L
IPE
YP
LIVARE RS N TC ER OM HA
R
KI
ITA
Y PP
PE ST RO
AN
WA 4"Ø RS
O
MA ED H
PP
LL 3"Ø
RC
A HA CO B
PO FL
-1
4 CB
CH NG
E
DS
PIP
RY
R 2 NI A
CB 3"Ø
DI ARE
ITA
PO
E
PIP
DISSE
R V
LA
AN E
RY RS
"ØR CO WC DS PIP Y
IP3E
ITA
3"Ø
PP AR
LT
AN E
4"Ø PIP NIT
RS RY YP SA
PP U ITA Y AR R
VA WA NT OR
PP
B 4"Ø SA
N
SA FLO DS
3"Ø
TIC L
PR
AL
R
PPHIRD EN
P
DS G 3"Ø CB
P 3"Ø
H IN A OP
SE 5 3"Ø T
3"Ø
LIVARE
T O
CB
A
H 4 E)
SIT
RC
E
PIP
RY ST N
ITA
PO RE LET O
AN EA UT ION
C
RS
O N E O CT
P T AG E
PP
TA RAIN ONN
3"Ø
B DS D YC
3"Ø
CB GE (VE
RIF
D RA 5
IPE
YP
AR
GA
1 NIT
SA
D'
R
PP
3"Ø
CB
C
)
ITE
SEWERLINE
D ST NS
RE ET O
EA UTL ION
ISOMETRIC LAYOUT 1 A
T RA O
D YC
O N E O CT
P TINAGNNE
ISOMETRIC LAYOUT
SCALE 1:60M
5
PROPOSED CONSTRUCTION OF THREE STOREY RESIDENTIAL BUILDING P5 6
SEWERLINE ISOMETRIC LAYOUT
PROJECT LOCATION AISHA MAUNTING ALONTO DRAINAGE ISOMETRIC LAYOUT 24 25
LOT 23 BLOCK 76 PHASE 2 XAVIER ESTATE UPPER BALULANG CAGAYAN DE ORO PLUMBING
2400
700 1250
600 600 500
150
100 300 100
1200
MAN MAN
900
HOLE HOLE OUTLET INLET
500
CO
150 FD
PLAN
11-12mmØ TEMP. BARS PLAN
PLAN OF TOP COVER SPACED @ 220mm O.C. P-TRAP
WYE
MH MH INLET
2 % SLOPE
OUTLET
200
600
2 % SLOPE
150
300
2400
700 1250
600
150
180 305
1200
900
(VER. ARCH'L.)
PLAN OF FOUNDATION 11-12mmØ TEMP. BARS 15Ø CWL
800
15Ø CWL/HWL
SPACED @ 220mm O.C.
210
50Ø WASTE
360
PIPE
501
470
15Ø CWL
150
20Ø CWL
15Ø HWL
20Ø CWL
FFL
TYPICAL
50Ø WASTE
SEPTIC VAULT DETAILS PIPE
COLLECTOR
SCALE 1:40M 50Ø 14 BEND
50Ø 41 BEND
100Ø 14 BEND
6
PROPOSED CONSTRUCTION OF THREE STOREY RESIDENTIAL BUILDING P6 6