Poject-: Four laning of NH-119 from Behsuma at Km 39.250 (Ex. Km 39+240) To Bijnor at Km 78.810 (Ex.
Km 86+590) ( Design Length= 39.560 Km) in the state of Uttar Pradesh on Hybrid Annuity Mode
RFI SUMMARY INSPECTION - 01-06-2025
Chainage Date Time of
Sr.No. RFI No. Side Work Description Comments
From To Submission Inspection Inspection
Highway (Carriagway)
1 GWR/BH_BJR/NH119/HW/6841 68+740 68+900 RHS 31-May-25 1-Jun-25 11:00:AM FDD & Lavel Checking for Subgrade top Layer (Existing Road)
2 GWR/BH_BJR/NH119/HW/6842 69+520 69+800 LHS 31-May-25 1-Jun-25 11:30:AM FDD & Lavel Checking for GSB Top Layer (Existing CW)
3 GWR/BH_BJR/NH119/HW/6843 71+250 71+350 BHS 31-May-25 1-Jun-25 10:00:AM FDD Checking for Emb 1st Layer (Bijnor Bypass)
4 GWR/BH_BJR/NH119/HW/6844 71+250 71+350 BHS 31-May-25 1-Jun-25 5:00:PM FDD Checking for Emb 2nd Layer (Bijnor Bypass)
5 GWR/BH_BJR/NH119/HW/6845 71+350 71+500 BHS 31-May-25 1-Jun-25 10:30:AM FDD & Lavel Checking for Subgrade 1st Layer (Bijnor Bypass)
6 GWR/BH_BJR/NH119/HW/6846 71+350 71+500 BHS 31-May-25 1-Jun-25 5:30:PM FDD & Lavel Checking for Subgrade top Layer (Bijnor Bypass)
7 GWR/BH_BJR/NH119/HW/6847 77+900 78+150 LHS 31-May-25 1-Jun-25 6:00:AM FDD & Lavel Checking for Subgrade top Layer (Service Road)
Structures Works
Checking of Reinforcement, Stressing , Shuttering & pouring of concrete M-55 Grade for MJB
8 GWR/BH_BJR/NH119/STR/5345 64+575 MJB NA 31-May-25 1-Jun-25 10:00AM
43.2m outer Girder no. 197,198,199& 200
Checking of reinforcement and shuttering and concrete pouring span A1- P1 LHS
9 GWR/BH_BJR/NH119/STR/5346 60+440 AUP LHS 31-May-25 1-Jun-25 3:00 PM
intermediate X girder
Checking of reinforcement and shuttering and concrete pouring span A1- P1 LHS
10 GWR/BH_BJR/NH119/STR/5347 61+947 MNB LHS 31-May-25 1-Jun-25 12:00 PM
intermediate X girder
67+026 MJB RHS A2 abutment wall 1st lift with return wal checking for reinforcement
11 GWR/BH_BJR/NH119/STR/5348 67+026 MJB RHS 31-May-25 1-Jun-25 4:00pm
Shuttering concreting at 2:00pm
12 GWR/BH_BJR/NH119/STR/5349 71+136 VUP LHS 31-May-25 1-Jun-25 5:00pm checking of reinforcement Shuttering & concreting for VUP Deck Slab (A1 LHS )
13 GWR/BH_BJR/NH119/STR/5350 71+172 B/C RHS 31-May-25 1-Jun-25 2:00pm Box Culvert BHS MCW U-trough checking for excavation level layout laying PCC at 10:00am
14 GWR/BH_BJR/NH119/STR/5351 71+785 B/C LHS 31-May-25 1-Jun-25 2:00pm Checking for reinforcement Shuttering concreting at box Culvert Wall 1st lift (MCW A1 & A2)
15 GWR/BH_BJR/NH119/STR/5352 74+278 VUP BHS 31-May-25 1-Jun-25 2:00pm Checking for reinforcement Shuttering concreting at box Culvert Wall 1st lift (MCW A1 & A2)
16 GWR/BH_BJR/NH119/STR/5353 77+395 MNB RHS 31-May-25 1-Jun-25 11:00 AM Checking for reinforcement Shuttering concreting A1 VUP Abutement Raft (RA1)