0% found this document useful (0 votes)
36 views1 page

PBD CVC Sim10424 Rev.1

The document outlines the schedule of materials for a stormwater lift station project, including detailed specifications for various components such as pumps, piping, and valves. It emphasizes the need for field verification of dimensions and orientations prior to fabrication and installation. Additionally, it includes performance calculations, installation notes, and disclaimers regarding responsibilities for certain tasks and materials.

Uploaded by

chris p
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

PBD CVC Sim10424 Rev.1

The document outlines the schedule of materials for a stormwater lift station project, including detailed specifications for various components such as pumps, piping, and valves. It emphasizes the need for field verification of dimensions and orientations prior to fabrication and installation. Additionally, it includes performance calculations, installation notes, and disclaimers regarding responsibilities for certain tasks and materials.

Uploaded by

chris p
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE OF MATERIALS

ID DESCRIPTION TYPE QTY


NOTE : 8 4 2 1 12
① SUBMERSIBLE PUMP STORM WATER 2
CONTRACTOR OR OTHERS TO FIELD VERIFY 17
PRIOR TO FABRICATION: ② DISCHARGE ELBOW T80D 2
- ALL INLET/OUTLET ORIENTATIONS
- ALL DIMENSIONS AND ELEVATIONS
52” O.D.
③ UPPER GUIDE BRACKET 304SST 2
Project: 1845 OAK ROAD-TR6085 **TOP VIEW AND ELEVATION VIEWS MAY BE 48” I.D. ④ PIPE BRACE/STRUT 304SST 2
Date: 2/21/2025 ROTATED TO SHOW CLARITY*** REFER TO
Calcula on By: C BASSO GRADING AND DRAINAGE PLANS FOR WET WELL ⑤ SS GUIDE RAIL 2”SS-GRP 4
OVERALL ORIENTATION & PIPE PENETRATIONS 17
⑥ LIFTING CHAIN ~19 FT LF 2
SYSTEM CALCULATION 12
⑦ PUMP CABLE 30 FT 2
LIFT STATION PROFILE & CALCULATIONS ⑧ DISCHARGE PIPING 3” PVC SCH80 2
3" SCH 80 2.864 INCH I.D. 10
⑨ BEND 90° ELBOW FITTING SOC 3” PVC SCH80 2
3" PVC PIPE (QTY) 19 x 1 FT 19 FT NOTE: INLET PIPING TO BE INSTALLED,
3" PVC 90 ELBOW (QTY) 1 x 8.1 FT 8.1 FT
CORED & SEALED BY OTHERS ⑩ ENTRY BOOT FEH-400 1
3" PVC 45 BEND (QTY) 0 x 3.8 FT 0 FT INV-OUT 1014.00 ⑪ PRESS SEAL OR EQUAL PS-24 PSX 1
8
3" PVC TEE (QTY) 0 x 17 FT 0 FT 4”-FM- BY OTHERS
3" BALL VALVE (QTY) 1 x 1.7 FT 1.7 FT 2 ⑫ FIBERGLASS WET WELL Fb48” X 252”S 1
3" CHECK VALVE (QTY) 1 x 20 FT 20 FT ⑬ ACCESS COVER-NON-TRAFFIC 48-H20 1
TOTAL EQUIVALENT LENGTH 48.8 FT
21 ⑭ IN-FLUENT PIPE 18” PER PLANS 1
FRICTION LOSS PER 100 FT 3" PVC 11.76 FT PER 100 FT
FRICTION LOSS 3" 48.8 / 100 x 11.76 FT 5.74 FT 1 ⑮ SWING CHECK VALVE 3” C.I. FLG. 2
9
4" SCH 80 3.786 INCH I.D. NOTE: CONNECTION TO FORCE MAIN ⑯ DOUBLE UNION BALL VALVE 3” PVC SCH80 2
4" PIPE (QTY) 108 x 1 FT 108 FT PROVIDED BY AND INSTALLED BY OTHERS 22
4 ⑰ ANTI-FLOTATION COLLAR STEEL 1
4" 90 ELBOW (QTY) 1 x 11 FT 11 FT
4" 45 BEND (QTY) 1 x 5 FT 5 FT ⑱ FLOAT SWITCH 30 FT CORD 4
19 INV.-IN 999.20 14
4" TEE (QTY) 1 x 22 FT 22 FT ⑲ FLOAT BRACKET SS/4 HOOKS 1
4" SHUTOFF VALVE (QTY) 0 x 2.3 FT 0 FT (18” ~PER PLANS)
4" CHECK VALVE (QTY) 0 x 22 FT 0 FT BY OTHERS ⑳ Ø2” ELECTRICAL CONDUIT BY OTHERS 2
TOTAL EQUIVALENT LENGTH 146 FT
20 21 TEE FITTING W/ BUSHINGS 4” PVC SCH80 1
FRICTION LOSS PER 100 FT 4" PVC 3.03 FT FT PER 100 FT
20
22 ALUMINUM INLET SLEEVE SLV2400A 1
FRICTION LOSS 4" 146 / 100 x 3.03 FT 4.42 FT 23
TOTAL DYNAMIC HEAD
3" & 4" FRICTION LOSS 10.16 FT
WET WELL 23
DUPLEX CONTROL PANEL
-SHIPPED LOOSE)
WD3P-4-3025 1
STATIC HEAD 17.86 FT TOP VIEW-NTS
SYSTEM CONFIGURATION
PERFORMANCE 195 @ 28.02 FT TDH THROUGH 4 INCH PVC LINE
HAZEN-WILLIAMS EQUATION/HEAD LOSS IN WATER PIPE PUMP(S) MODEL: 80AFP42.2
(f) = 0.2083 (100 / c)1.852 q1.852 / dh4.8655 MOTOR OUTPUT: 3 HP
3" PIPE 4" PIPE TOP SLAB/ACCESS COVER VOLTAGE: 230V/460V
l = length of pipe ( ) 100 100 TO BE H-20 TRAFFIC RATED/SOLID GLAVANIZED PHASE: 3PH
c = Hazen-Williams roughness constant 140 140
FLA: 8.9 /4.3 AMPS
q = volume flow (gal/min) 195 195 52” 20
dh = inside or hydraulic diameter (inches) 2.864 3.786 DESIGN PARAMETERS
f = fric on head loss in feet of water H20 /100 11.76 3.03 48” REQUIRED FLOW / Q: 180 GPM
Velocity ( /s) = 9.72 5.56 FLOW RATE (EACH PUMP) 195 GPM EACH PUMP
3 13
T/RIM 1016.14 TOTAL DYNAMIC HEAD: 28.02 FT TDH
STATIC HEAD: 17.86 FT
P.O.C 1013.96
WET WELL DIAMETER: 48”

12”
LIFT STATION CALCULATION TO BOTTOMLESS 19
WET WELL DEPTH: 252”
DROP INLET (PER PLANS) 108 FT 10 20
FLOAT LEVELS
LF 4”FM
7 HIGH WATER ALARM HWA 999.20
21
LAG PUMP ON L-2 998.75
8
INV-OUT 1014.00 LEAD LUMP ON L-1 998.25
(4” ~PER PLANS) 6 PUMP(S) OFF L-0 996.14

5 GENERAL NOTES/DISCLAIMERS, BUT NOT LIMITED TO:


NOTE: INLET PIPING TO BE INSTALLED, CONTRACTOR TO CONFIRM FINAL ALIGNMENT, PLACEMENT, AND FIELD VERIFY ALL
4 12 CORED & SEALED BY OTHERS DIMENSIONS AND ELEVATIONS PRIOR TO INSTALLING. ALL ELEVATIONS AND
DIMENSIONS ARE NOMINAL AND HAVE BEEN PROVIDED BY OTHERS.
8 IT IS THE CONTRACTORS OR OTHERS RESPONSIBILITY TO PROVIDE COMPONENTS FOR
NOTE: CONNECTION TO FORCE MAIN
COMPLETE AND OPERATING SYSTEM. THIS SHALL INCLUDE BUT NOT LIMITED TO:
PROVIDED BY AND INSTALLED BY OTHERS
PUMPS BY DESIGN INC. IS NOT RESPONSIBLE FOR ANY OF THE FOLLOWING:
16 INV.-IN 999.20 (1) ANY FASTENERS NOT ASSOCIATED WITH THE PRE-ASSEMBLED SYSTEMS
14 (2) ANY GENERATOR FUEL OF ANY KIND
(18” ~PER PLANS)
(3) UNLOADING TRUCKS, TRAFFIC CONTROL, SITE SAFETY
11 HWA 999.00 HIGH WATER ALARM (4) SECURING MATERIALS DELIVERED TO PROJECT SITE: DUNNAGE, FENCING,
252” STORAGE
(5) EXCAVATION, SHORING, DE-WATERING, SUB-BASE ROCK, BACKFILL MATERIAL
15 L-2 998.75 LAG PUMP ON (6) INSTALLATION OF SUPPLIED PUMP STATION SYSTEMS AND COMPONENTS
(7) PIPING TO AND FROM PUMP STATION
L-1 998.25 LEAD PUMP ON (8) ELECTRICAL CONDUIT AND WIRING (EXCEPT WIRES ATTACHED TO SUPPLIED
COMPONENTS)
(9) SITE ELECTRICAL SERVICE/METER EQUIPMENT
(10) CORING OF THE HOLES FOR THE ELECTRICAL CONDUITS IN ANY STRUCTURES
4 (11) CONCRETE POURED IN PLACE, CRUSHED ROCK, ASPHALT PAVING
18 (12) SITE LIGHTING, SIGN AGE, FENCING, BOLLARDS AND DRAINAGE CONTROL
THESE LAYOUT DRAWINGS ARE INTENDED TO SHOW OVERALL REFERENCE OF THE
SYSTEM. DO NOT SCALE DRAWING. PLACEMENT AND ORIENTATION OF INSTALLATIONS
STATIC HEAD (h) 1 L-0 996.32 PUMPS OFF ARE AT THE DISCRETION OF THE INSTALLING CONTRACTOR. ALL ITEMS LISTED BY
15.64 OTHERS WILL NOT BE SUPPLIED BY PUMPS BY DESIGN INC. AND MUST BE PROVIDED BY
OTHERS
6136_014PE_L22BK

2 17
50006774261G U_304-052_K_TRK

BOT. 995.14
12”
NOTE: BACKFILL, FOUNDATION,
SUBGRADE , EXCAVATION BY OTHERS
PUMP PERFORMANCE WET WELL
MINIMUM 8” OVER EXCAVATE ELEVATION VIEW-NTS
COMPACT-3/4” MINUS BASE
(CRUSHED ROCK OR EQUAL)

SYSTEM BY:
STORM WATER LIFT STATION JOB NUMBER
DIG ALERT TR 6085
BE
FOR E YO
U
PUMPS BY DESIGN INC. COUNTY OF VENTURA DATE: 10/04/24
L
UNAUTHORIZED USE AND/OR CHANGES 2045 SOUTH BAKER AVE. DRAWN: C.B.
D

PROJECT:
L
CA

IG

Pumps By Design Inc. Has prepared these drawings for use as a


ONTARIO, CA 91761 SIMI VALLEY 2 CHECKED: D.T.
overall design reference. For use by the design engineer. Pumps By 1845 OAK ROAD SCALE: NTS
Design Inc. Will not be responsible or liable for unauthorized SIMI VALLEY, 93063 SHEET
Call: TOLL FREE revisions or changes to or uses of these drawings. Any and all
1-800-227-2600 OR 811 changes to these drawings must be submitted in writing and must Web : www.pumpsbydesign.com LSD-1
TWO FULL WORKING DAYS BEFORE YOU DIG be approved by the design engineer. Email: [email protected] (909) 673-9945 DWG: PBD-CVC-SIM100424

You might also like