CONCRETE CASTING RECORD SUMMARY
Concrete Casting Time Concrete Casting Details
Departure Duration
Arrival Time Elapsed Approx. elevation
No. Docket No. Date Time Start End (hh:mm) Cum. Vol. Temp
② Slump Flow
① (min) ④-① Class E Type Vol. (m³) after casting Specimen* Weather Remarks
③ ④ (m³) (≤ 35°C) (600~700mm)
④-③ (mCD)
Start concrete casting at
1 H24 580160 17 Apr 2025 17:18 17:50 17:56 18:10 0:14 0:52 Class E Fc35 6 6 -27.36 33.2°C 610 6 Light Rain El. -30.80 mCD
2 H24 580161 17 Apr 2025 17:37 18:10 18:15 18:41 0:26 1:04 Class E Fc35 6 12 -23.22 32.8°C 620 - Light Rain
3 H24 580162 17 Apr 2025 18:42 19:16 19:20 19:30 0:10 0:48 Class E Fc35 6 18 -19.07 33.1°C 660 - Cloudy
4 H24 580164 17 Apr 2025 19:14 19:40 19:45 19:52 0:07 0:38 Class E Fc35 6 24 -14.93 33.3°C 680 6 Cloudy
5 H24 580165 17 Apr 2025 19:27 19:53 20:01 20:24 0:23 0:57 Class E Fc35 6 30 -10.79 32.6°C 650 - Cloudy
6 H24 580166 17 Apr 2025 19:36 20:07 20:29 20:38 0:09 1:02 Class E Fc35 6 36 -6.65 33.0°C 660 - Cloudy
7 H24 580168 17 Apr 2025 20:04 20:35 20:48 20:59 0:11 0:55 Class E Fc35 6 42 -2.50 32.9°C 660 - Cloudy
8 H24 580169 17 Apr 2025 20:18 20:40 21:09 21:18 0:09 1:00 Class E Fc35 6 48 1.64 33.4°C 620 - Cloudy
until top elevation
9 H24 580171 17 Apr 2025 21:36 21:59 22:01 22:04 0:03 0:28 Class E Fc35 2 50 (+2.313)
32.9°C 680 - Cloudy
* Concrete specimens were taken randomly, 12 nos concrete cylinder including spares
Tremie Pipe Length: 31 m
Tremie Pipe Diameter: 35cm