Format Ts Mar25 Master

The document is a Daily Activities Report for the Project Management Consulting Services for the Construction of LRT Jakarta, Phase 1B, detailing the time sheet for IT Officer-1, Bangun Mahardhika, for March 2025. It includes information on work hours, leave days, and requires submission to the Acting Project Manager for confirmation. The report was filled out and approved on March 31, 2025.

Uploaded by

bangunocg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views1 page

Format Ts Mar25 Master

The document is a Daily Activities Report for the Project Management Consulting Services for the Construction of LRT Jakarta, Phase 1B, detailing the time sheet for IT Officer-1, Bangun Mahardhika, for March 2025. It includes information on work hours, leave days, and requires submission to the Acting Project Manager for confirmation. The report was filled out and approved on March 31, 2025.

Uploaded by

bangunocg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Daily Activities Report (Time Sheet)

Project Name : Project Management Consulting Services (PMC) for Construction LRT Jakarta, Phase 1B,
Velodrome - Manggarai

Job No.: C03310643

Name: Bangun Mahardhika From 1 Mar 2025


Position: D21, IT OFFICER-1 To 31 Mar 2025

Arrival Leaving Work


Date Day Work Abstract Location Remark
Time Time Hours
1 Sat
2 Sun
3 Mon
4 Tue
5 Wed
6 Thu
7 Fri

8 Sat

9 Sun

10 Mon

11 Tue

12 Wed

13 Thu

14 Fri

15 Sat

16 Sun

17 Mon

18 Tue

19 Wed

20 Thu

21 Fri

22 Sun

23 Mon

24 Mon

25 Tue

26 Wed

27 Thu

28 Fri Collective Leave

28 Sat Seclusion Day

29 Sun

30 Mon Eid Ul-Fitri

30/30 1.00 MM Accumulated Leave: 9.0 day(s)

Leave used this month: 0.0 day(s)

Right of Leave gained this month: 1.0 day

Remaining Leave for next month: 10.0 day(s)


Note: To be filled by each member. Submit to Acting Project Manager for confirmation every month and then transfer to Administrator.
Reported by: Approved by:
Name: Mr. Bangun Mahardhika Name: Mr. Lim Kok Sheng

Position: D21, IT OFFICER-1 Positition: Project Director

Date: March 31, 2025 Date: March 31, 2025