EE-TECH2024 v0
EE-TECH2024 v0
(Please refer to Code of Practice for Energy Efficiency of Building Services Installation)
☐ Lighting layout(s) and calculation sheet(s) for Lighting Power Density and provision of Automatic
Lighting Control (For compliance of BEC Clause 5.4, 5.5 and 5.6)
☐ Calculation sheet(s) for provision of daylight responsive control for daylight and the area of
daylight control zone. (For compliance of BEC Clause 5.6.2 and 5.6.3)
Air Conditioning Installation (Section 6 of BEC)
☐ Schematic or layout drawings with highlighted the air conditioning system serving processing
zone(s) and comfort only zone(s) (if any) (For compliance of BEC Clause 6.5) It is deemed to no
AC system(s) to be shared with any processing zone if this item not be selected.
☐ T&C document(s) for the air leakage limit of a ductwork system(s) (For compliance of BEC
Clause 6.6)
☐ Equipment Schedules and / or Calculation Sheet for system fan power (For compliance of BEC
Clause 6.7)
☐ Schematic and / or control drawings showing the low-speed operation of CAV and / or
VAV systems (For compliance of BEC Clause 6.7.4.1 and 6.7.4.2)
☐ Schematic and / or control drawings showing the water side pumping arrangement and the
design arrangement under part load condition (For compliance of BEC Clause 6.8)
☐ Calculation Sheet for frictional loss of water pipping system (For compliance of BEC Clause 6.9)
☐ Schematic and / or control drawings and / or BMS captures showing the control logic of
temperature / humidity / provision of auto damper / demand control of ventilation / DDC
provision / Chilled water temperature reset (For compliance of BEC Clause 6.10, 6.14 and 6.15)
☐ Schedule showing the thermal insulation thickness and thermal properties for installed AHU
casing, ductwork & pipework (For compliance of BEC Clause 6.11)
☐ Equipment Schedules and Manufacturer-issued technical documents to indicate the capacity
rating and COP of Air-conditioning equipment(s) (For compliance of BEC Clause 6.12)
☐ Equipment Schedules and Manufacturer-issued technical documents of cooling tower
performance (For compliance of BEC Clause 6.12.4 & 6.12.5)
☐ LMCP schematic(s) and / or control drawing(s) showing the energy meter provision of air-
conditioning equipment(s) and AHU(s) (For compliance of BEC Clause 6.13)
Electrical Installation (Section 7 of BEC)
☐ Electrical schematic(s) highlighted the provision of metering device(s); power factor correction
device(s) or connection point(s) for correction device(s) and / or harmonic correction device(s) or
Part 2 – Lighting Installation - Luminaires and Lighting Power Worksheet Page ___of ___
(For COCR only, please tick where applicable)
1) Use of corresponding lamp types (by approximate percentage of coverage in terms of lighting area)
LED : ☐ Used, with approximate % of coverage: ______________________ ☐ Not used
T5: ☐ Used, with approximate % of coverage: ______________________ ☐ Not used
CFL: ☐ Used, with approximate % of coverage: ______________________ ☐ Not used
Discharge: ☐ Used, with approximate % of coverage: ______________________ ☐ Not used
Other (please specify): ☐ Used, with approximate % of coverage: ______________________ ☐ Not used
Part 2– Lighting Installation - Simplified Trade-off Scheme Worksheet*1 Page ___ of ___
(Complete this part if LPD Trade-off are applied in this submission under Clause 5.7 for BEC 2024 only)
a b c d ≤ 1.25*c e=axb f=axc g=f-e h = 0.5*g
Achieved 50% of
Name of space / Maximum Installed LPD ≤ Installed Baseline
Type of reduction in Achieved
Space Ref. Internal floor Installed LPD allowable LPD in 125% x Maximum lighting power lighting power
Space*3 lighting power reduction in
No.*2 area (m2) (W/m2) BEC Table 5.4 allowable LPD in lighting as per BEC
compared with lighting power
(W/m2)*5 (W/m2) space (W) Table 5.4 (W)
baseline (W) for trade-off (W)
(Please insert additional row if necessary)
Total lighting power in lighting space cannot meet BEC Table 5.4 (W)
High temperature chiller or chiller at elevated temperature involved (BEC Clause 6.12)
o o
Design Supply temperature: . C Design Return Temperature C
4) Any variable refrigerant flow (VRF) system involved (BEC Clause 6.12)?
☐ Yes, (If yes, please provide information in table below) ☐ No VRF system involved
Air- Capacity & COP *4 at cooling Capacity & COP *4 at heating
cooled( mode at full load mode at full load
M) / Air-
Technical
Equipment cooled(S Refrigerant Min. allowed Min. allowed
catalogue Rated Rated Rated
Ref. No. )/ type COP in BEC Rated COP in BEC
Ref. No. capacity COP capacity
Water- Table 6.12a COP *4 Table 6.12a
cooled (kW) *4 (kW)
*1*6
(Part 2) (Part 2)
Any installation of three-phase single-speed totally enclosed induction motor involved (BEC Clause 7.5.1) ?
Yes (if yes, please provide information in table below except those motors(s) under BEC Clause 7.5.3)
No installation of three-phase single-speed totally enclosed induction motor involved
Part 5 – Lift and Escalator Installation - Traction Lift and Hydraulic Lift Page ___of ___
(Please tick where applicable)
Any installation of traction/hydraulic lift involved ? (* Please delete, if not applicable)
Yes, installation of traction* / hydraulic* lift involved (If yes, please provide information in table below) No installation of lift involved
1) Electrical Power (BEC Clause 8.4) (Please provide information in table below)
Part 5 – Lift & Escalator Installation - Escalator/Passenger Conveyor Page ___of ___
(Please tick where applicable)
Any installation of escalator (excluding passenger conveyor) involved?
Yes (If yes, please provide information in table below) No installation of escalator involved
1) Electrical Power (BEC Clause 8.4) (Please provide information in table below)
Type
Running active Max allowed Total
(Non-public electrical electrical
Nominal Rated Total Harmonic
Escalator Service / power (kW) power (kW)
Rise (m) width speed Power Distortion
Ref. No. Public
(mm) (m/s) (BEC Clause (BEC Table Factor(1) (1)
Service /
Heavy Duty) 8.4.3) 8.4.3) (THD %)
1) Electrical Power (BEC Clause 8.4) (Please provide information in table below)
Part 6 – Declaration
I, Registered Energy Assessor, hereby declare that all the submitted information materials have been thoroughly
examined and well prepared to demonstrate the compliance with the Building Energy Code.
I understand that any missing information, inconsistency and incorrectness on the submitted materials /
information may result in jeopardizing the approval process and having the entire submission been rejected.
Signature of
Date:
the REA
DD / MM / YYYY