Usda Implementation Baba Act 09132022

The document outlines the USDA's implementation of the Build America, Buy America (BABA) Act, detailing requirements for federal funding in infrastructure projects, including the necessity for all iron, steel, manufactured products, and construction materials to be produced in the United States. It also specifies exceptions to these requirements and provides guidance for waiver applications. The document emphasizes that new USDA financial assistance awards will incorporate a Buy America preference effective from May 14, 2022.

Uploaded by

VM O
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views5 pages

Usda Implementation Baba Act 09132022

The document outlines the USDA's implementation of the Build America, Buy America (BABA) Act, detailing requirements for federal funding in infrastructure projects, including the necessity for all iron, steel, manufactured products, and construction materials to be produced in the United States. It also specifies exceptions to these requirements and provides guidance for waiver applications. The document emphasizes that new USDA financial assistance awards will incorporate a Buy America preference effective from May 14, 2022.

Uploaded by

VM O
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

USDA’s Implementation of the Build America, Buy

America (BABA) Act


This document is designed to assist United States Department of Agriculture (USDA) award
recipients by providing important information related to the Build America, Buy America
provisions of the “Infrastructure Investment and Jobs Act” (IIJA; P.L. 117-58), where federal
funding supports a project for infrastructure as defined at Section 70912 of the BABA Act.

Note: The guidance provided on this webpage is subject to change if the Office of
Management and Budget (OMB) guidance on the application of Buy America preference in
Federal financial assistance programs for infrastructure is updated.

REQUIREMENTS

The following information provides details on the requirements of the IIJA and the (BABA Act,
and standards provided by the White House Office of Management and Budget (OMB), M-22-
11,” Initial Implementation Guidance on the Application of Buy America Preference in Federal
Financial Assistance Programs for Infrastructure.”

1. No USDA funds made available on or after May 14, 2022, may be used for a project for
infrastructure unless:

A. All iron and steel used in the project are produced in the United States. This means all
manufacturing processes, from the initial melting stage through the application of
coatings, occurred in the United States.

B. All manufactured products used in the project are produced in the United States. This
means the manufactured product was manufactured in the United States and the cost of the
components of the manufactured product that are mined, produced, or manufactured in the
United States is greater than 55 percent of the total cost of all components of the
manufactured product, unless another standard for determining the minimum amount of
domestic content of the manufactured product has been established under applicable law
or regulation; and

C. All construction materials1 are manufactured in the United States. This means that all
manufacturing processes for the construction material occurred in the United States.

1
Excludes cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding
agents or additives.
2. The Build America, Buy America preference only applies to articles, materials, and supplies
that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it
does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to
the construction site and removed at or before the completion of the infrastructure project.
Nor does a Buy America preference apply to equipment and furnishings, such as movable
chairs, desks, and portable computer equipment, that are used at or within the finished
infrastructure project but are not an integral part of the structure or permanently affixed to the
infrastructure project.

EXCEPTIONS

The following information provides details on the exceptions to the IIJA, the BABA Act, and
OMB M-22-11.

1. When necessary, award recipients may apply for, and USDA agency or staff office
administrative level may approve, a waiver from these requirements. The USDA agency or
staff office may waive the application of the domestic content procurement preference in any
case in which it determines that one of the following exceptions applies:

A. Public interest: Applying the domestic content procurement preference would be


inconsistent with the public interest.

B. Nonavailability: The types of iron, steel, manufactured products or construction materials


are not produced in the United States in sufficient and reasonably available quantities or of
a satisfactory quality; or

C. Unreasonable Cost: The inclusion of iron, steel, manufactured products or construction


materials produced in the United States will increase the cost of the overall project by
more than 25 percent.

2. This guidance does not apply to “expenditures for assistance authorized under section 402,
403, 404, 406, 408, or 502 of the Robert T. Stafford Disaster Relief and Emergency
Assistance Act (42 U.S.C. 5170a, 5170b, 16 5170c, 5172, 5174, or 5192) relating to a major
disaster or emergency declared by the President under section 401 or 501, respectively, of
such Act (42 U.S.C. 5170, 5191) or pre and post disaster or emergency response
expenditures.”2

2
IIJA § 70912(4)(B)
“[P]re and post disaster or emergency response expenditures” consist of expenditures for
financial assistance that are (1) authorized by statutes other than the Stafford Act, 42 U.S.C.
§§ 5121 et seq., and (2) made in anticipation of or response to an event or events that qualify
as an “emergency” or “major disaster” within the meaning of the Stafford Act, id. § 5122(1),
(2).

Awards made to support the construction or improvement of infrastructure to mitigate the


damage that may be caused by a non-imminent future emergency or disaster, such as awards
made under FEMA’s Flood Mitigation Assistance program3, do not qualify as “pre and post
disaster or emergency response expenditures.”

3. For instructions on how to submit a USDA Build America, Buy America waiver, please refer
to the following guidance provided on the Build America, Buy America Act (BABA) Act
webpage:

• Guidance on USDA Waiver Review Process for USDA Agencies and Staff Offices
• Guidance for Submission of a USDA Waiver Request by Recipients and Subrecipients

APPLICABILITY

New USDA financial assistance awards and funding amendments to existing awards made on or
after May 14, 2022, will contain a term and condition incorporating a Buy America preference.
The OMB Memorandum M-22-11, Initial Implementation Guidance on Application of Buy
America Preference in Federal Financial Assistance Programs for Infrastructure, Appendix I,
provides an Example of Award Term – Required Use of American, Iron, Steel, Manufactured
Products, and Construction Materials.

DEFINITIONS

The following information provides the definitions used in IIJA, BABA Act, and OMB
Memorandum M-22-11.

Construction Materials includes an article, material, or supply— other than an item of primarily
iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone,
sand, or gravel; or aggregate binding agents or additives4— that is or consists primarily of:

• non-ferrous metals;
• plastic and polymer-based products (including polyvinylchloride, composite building
materials, and polymers used in fiber optic cables);
• glass (including optic glass);
• lumber; or
3
See 42 U.S.C. § 4104c
4
IIJA § 70917(c)(1)
• drywall5.

To provide clarity to item, product, and material manufacturers and processers, we note that items
that consist of two or more of the listed materials that have been combined together through a
manufacturing process, and items that include at least one of the listed materials combined with a
material that is not listed through a manufacturing process, should be treated as manufactured
products, rather than as construction materials. For example, a plastic framed sliding window should
be treated as a manufactured product while plate glass should be treated as a construction material.

Domestic Content Procurement Preference means all iron and steel used in the project are
produced in the United States; the manufactured products used in the project are produced in the
United States; or the construction materials used in the project are produced in the United
States.

Federal financial assistance means assistance that non-Federal entities receive or administer in
the form of grants, cooperative agreements, non-cash contributions or donations of property,
direct assistance, loans, loan guarantees, and other types of financial assistance.

Non-Federal entity includes States, local governments, Indian tribes, Institution of Higher
Education (IHE), or nonprofit organization that carries out a Federal award as a recipient or
subrecipient.

Infrastructure includes, at a minimum, the structures, facilities, and equipment for, in the
United States, roads, highways, and bridges; public transportation; dams, ports, harbors, and
other maritime facilities; intercity passenger and freight railroads; freight and intermodal
facilities; airports; water systems, including drinking water and wastewater systems; electrical
transmission facilities and systems; utilities; broadband infrastructure; and buildings and real
property. Infrastructure includes facilities that generate, transport, and distribute energy.

Produced in the United States means:

1. In the case of iron or steel products, that all manufacturing processes, from the initial
melting stage through the application of coatings, occurred in the United States.
2. In the case of manufactured products, that:
A. The manufactured product was manufactured in the United States; and
B. The cost of the components of the manufactured product that are mined, produced, or
manufactured in the United States is greater than 55 percent of the total cost of all
components of the manufactured product, unless another standard for determining the
minimum amount of domestic content of the manufactured product has been established
under applicable law or regulation; and
3. In the case of construction materials, that all manufacturing processes for the construction
material occurred in the United States.

5
IIJA § 70911(5)
Project means the construction, alteration, maintenance, or repair of infrastructure in the
United States.