23IN01 IGN REP WR 022.00 (Weekly Construction Report 230710 230716)

The weekly report for the Ignite Data Center Project from July 10 to July 16, 2023, highlights the completion of various construction milestones, including bored and spun pile installations and concrete casting for multiple structures. Key activities included pile cap construction, earthing system installation, and rectification work, with all planned piling progress achieved. The report also outlines ongoing quality and safety management efforts, along with a plan for continued work in the following week.

Uploaded by

Anto Dumilah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views29 pages

23IN01 IGN REP WR 022.00 (Weekly Construction Report 230710 230716)

The weekly report for the Ignite Data Center Project from July 10 to July 16, 2023, highlights the completion of various construction milestones, including bored and spun pile installations and concrete casting for multiple structures. Key activities included pile cap construction, earthing system installation, and rectification work, with all planned piling progress achieved. The report also outlines ongoing quality and safety management efforts, along with a plan for continued work in the following week.

Uploaded by

Anto Dumilah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

Date: 17-07-2023 No: 23IN01-IGN-REP-WR-022.

00 Rev:

IGNITE DATA CENTER PROJECT

CONSTRUCTION WEEKLY REPORT


Period: July 10 to July 16, 2023

Submitted : _______________________________

Checked : _______________________________

Approved : _______________________________
TABLE OF CONTENTS

1 MILESTONES COMPLETED ............................................................................................... 3


2 KEY EVENTS SUMMARY FOR THIS WEEK ................................................................... 3
3 SITE WORKS PROGRESS FOR THIS WEEK ..................................................................... 3
3.1 Works Progress ............................................................................................................ 3
3.2 Construction Quality Management .............................................................................. 4
3.3 Construction HSE Management................................................................................... 4
3.4 NCR List ...................................................................................................................... 5
3.5 Construction Weekly Performance .............................................................................. 6
4 ATTACHMENTS ................................................................................................................. 13
Ignite Data Center Project Construction Weekly Report

1 MILESTONES COMPLETED
• 100% bored pile construction is finished at Data Hall and Admin Building.
• 100% spun pile installation is finished in all areas.
• DC Building: already finished casting concrete of pile cap and tie beam, in the process of
backfilling and rectifying defect list.
• Admin Building: already finished casting concrete of pile cap and tie beam, in the process
of backfilling and rectifying defect list.
• MUW Tank: already finished casting concrete of raft foundation, in the process of
removing the formwork.
• Fire & Raw Water Tank, Fire & Domestic Pump Room, MUW Treatment Room, Bin
Center, and Guard House: already finished casting concrete for pile cap, in the process of
removing the formwork.
2 KEY EVENTS SUMMARY FOR THIS WEEK
• Pile cap construction at DC Block, Admin Building, MUW Tank, Fire and Raw Water Tank,
Fire & Raw Water Tank, and Guard House. Already finished casting concrete of pile cap
and tie beam in all area scope of Geotekindo.
• Earthing system installation.
• Rectification work for pile cap and tie beam in DC Block and Admin Block.
• Pile testing for spun pile diameter of 300 mm at Guard House.
• Pile cap works QC: work inspection (rebar, formwork, casting concrete), concrete
compressive strength test, and rebar tensile test.

3 SITE WORKS PROGRESS FOR THIS WEEK


3.1 Works Progress

Piling Progress Summary


PROJECT IGNITE - PILING PROGRESS SUMMARY
Progress Date: 17-Jun-23
Piles Number Planned Forecast Actual Rig %
Building Comment
Total Planned Completed Start Finish Finish Productivity Planned Actual Variant
DC Hall 386 386 386 1-Mar-23 12-Apr-23 16-Apr-23 1.9 100.00% 100.00% 0.00% Bore Pile
Admin Building 62 62 62 12-Apr-23 4-May-23 4-May-23 1.4 100.00% 100.00% 0.00% Bore Pile
Water Tank 232 232 232 30-Mar-23 31-May-23 24-May-23 3.6 100.00% 100.00% 0.00% Spun Pile
MUW Treatment & PLN 58 58 58 6-Apr-23 29-Apr-23 10-Jun-23 0.9 100.00% 100.00% 0.00% Spun Pile
Guard House & Bin Center 50 50 50 16-May-23 25-May-23 10-Jun-23 1.9 100.00% 100.00% 0.00% Spun Pile
Fire Domestic Facilities 363 363 363 7-Apr-23 20-May-23 15-May-23 8.3 100.00% 100.00% 0.00% Spun Pile
Bridge A, B, C, D, & E 46 46 46 25-May-23 29-May-23 17-Jun-23 1.9 100.00% 100.00% 0.00% Spun Pile
Fuel Tank A, B, C, D, & E 70 70 70 20-May-23 5-Jun-23 31-May-23 4.1 100.00% 100.00% 0.00% Spun Pile

Total bored pile 448 448 448 1-Mar-23 4-May-23 4-May-23 1.7 100.00% 100.00% 0.00% Bore Pile
Total spun pile 819 819 819 30-Mar-23 5-Jun-23 17-Jun-23 3.5 100.00% 100.00% 0.00% Spun Pile
TOTAL 1267 1267 1267 1-Mar-23 5-Jun-23 17-Jun-23 3.0 100.00% 100.00% 0.00%
Ignite Data Center Project Construction Weekly Report

Pile Diameter Completed in Completed Completion Completion


Pile Code Total Quantity Remarks
(mm) This Week Until Last Week Total Ratio (%)
DC Hall
P1 1200 183 0 183 183 100%
P2 800 189 0 189 189 100%
P3 800 14 0 14 14 100%
Total 386 0 386 386 100% Bore Pile
Admin Building
AP1 1200 55 0 55 55 100%
AP4 1200 7 0 7 7 100%
Total 62 0 62 62 100% Bore Pile
MUW Tank (Water Tank)
PW 600 232 15 217 232 100% Spun Pile
MUW Treatment & PLN
PM 300 46 13 33 46 100%
PP 300 12 12 0 12 100%
Total 58 25 33 58 100% Spun Pile
Guard House and Bin Center
PG 300 42 42 0 42 100%
PB 300 8 8 0 8 100%
Total 50 50 0 50 100% Spun Pile
Fire Domestic Facilities
PF 300 57 0 57 57 100%
PD 300 306 29 277 306 100%
Total 363 29 334 363 100% Spun Pile
Fuel Tank
All 300 70 26 44 70 100%
Bridge
All 300 46 24 22 46 100%
Total 46 24 22 46 100% Spun Pile

3.2 Construction Quality Management


Inspection records
Name Owner/Consultant Contractor
Inspection of Reinforcement Bar Cage Processing and Installation √ √
Daily Inspection of Bored Pile Construction √ √
Material Sampling √ √
Site Survey √ √
Concrete Compressive Strength Test √ √
Rebar Tensile and Bending Test √ √

3.3 Construction HSE Management


HSE Management includes:
• Provide safety education to workers and enhance the awareness of safety during construction.
• Daily inspection for heavy equipment has been executed strictly.
• Electrical cables have been rearranged to facilitate construction work on site.
• Tidy up the stock of materials, and clear solid waste on site.
• Control the risk during transporting reinforcement cages to prevent the machines and material
from hurting people.
Ignite Data Center Project Construction Weekly Report

• Housekeeping to keep the work area and road safe and clean.

3.4 NCR List

No. NCR List Status Remarks


Invalid Certificate and Improper
IGN-NCR-03-001 Closed
Equipment
IGN-NCR-03-002 Pouring Concrete Closed
IGN-NCR-03-003 Incomplete Temporary Facility Closed
The main rebar has broken at pile
IGN-NCR-03-004 Closed
P2-24
Crack structural at spun piles D 300
IGN-NCR-03-005 Closed
mm
IGN-NCR-03-006 PDA Monitoring Closed
IGN-NCR-03-007 Abnormal bend of the main rebar Closed
Spun pile diameter 300mm
IGN-NCR-03-008 Closed
misalignment
IGN-NCR-03-009 Lifting without flagman and rigger Closed
Using anti-termite unapproved
IGN-NCR-03-010 Closed
material
Pouring concrete using an
IGN-NCR-03-011 Closed
unapproved concrete vendor
IGN-NCR-03-012 Curved at bottom tie beam Closed
IGN-NCR-03-013 No Anti-termite spraying Closed
Rebar on the surface of the pile cap
IGN-NCR-03-014 Closed
and tie beam
Honeycomb after pouring concrete
IGN-NCR-03-015 Closed
at pile cap in DC
Bad water stop result after pouring
IGN-NCR-03-016 Open
concrete at MUW Tank
Tilted diameter 300 mm spun pile in
IGN-NCR-03-017 Open
the Fuel Tank area
IGN-NCR-03-018 Indiscipline using of PPE Closed
Lack of number of main rebar in the
IGN-NCR-03-019 Closed
column area
Ignite Data Center Project Construction Weekly Report

3.5 Construction Weekly Performance


Activities: Daily toolbox meeting Activities: PIT test spun pile dia. 300 mm GH
Date: 10.07.2023 PIC: AA Date: 10.07.2023 PIC: KSI

Activities: Rebar and formwork installation DC Activities: Backfilling works DC Building


Date: 10.07.2023 PIC: KSI Date: 10.07.2023 PIC: KSI

Activities: BC conductor installation DC Activities: Rebar and formwork installation GH


Date: 10.07.2023 PIC: AH Date: 10.07.2023 PIC: AF
Ignite Data Center Project Construction Weekly Report

Activities: Concrete pouring DC Building A9 Activities: Concrete pouring at Guard House


Date: 11.07.2023 PIC: KSI Date: 11.07.2023 PIC: AF

Activities: Rebar installation DC Building A9 Activities: Rebar installation Fire Dom. Pump
Date: 11.07.2023 PIC: KSI Date: 11.07.2023 PIC: KSY

Activities: BC conductor installation DC Activities: Formwork installation DC Building


Date: 11.07.2023 PIC: AH Date: 11.07.2023 PIC: KSI
Ignite Data Center Project Construction Weekly Report

Activities: Tie rod cutting tie beam DC Activities: Concrete surface finishing DC
Date: 12.07.2023 PIC: DS Date: 12.07.2023 PIC: DS

Activities: Concrete decking Activities: Rebar installation Fire Dom. Pump


Date: 12.07.2023 PIC: DC Date: 12.07.2023 PIC: KSY

Activities: Daily toolbox meeting Activities: Formwork installation Fire Dom


Date: 12.07.2023 PIC: AA Date: 12.07.2023 PIC: KSY
Ignite Data Center Project Construction Weekly Report

Activities: Earthing inspection by Aurecon Activities: As wall and column checking MUW
Date: 13.07.2023 PIC: AH Date: 13.07.2023 PIC: AH

Activities: Concrete decking Activities: Rebar installation Bin Center


Date: 13.07.2023 PIC: DC Date: 13.07.2023 PIC: KSY

Activities: PHT installation MUW Treatment Activities: Formwork installation Fire Dom.
Date: 13.07.2023 PIC: KSY Date: 13.07.2023 PIC: KSY
Ignite Data Center Project Construction Weekly Report

Activities: Sagging beam in Admin rectification Activities: Formwork installation Bin Center
Date: 14.07.2023 PIC: AF Date: 14.07.2023 PIC: KSY

Activities: Formwork installation MUW Treat. Activities: Formwork installation Fire Dom.
Date: 14.07.2023 PIC: KSY Date: 14.07.2023 PIC: KSY

Activities: Additional rebar installation column Activities: Earthing work excavation DC


Date: 15.07.2023 PIC: DS Date: 15.07.2023 PIC: KSI
Ignite Data Center Project Construction Weekly Report

Activities: Rebar installation MUW Treatment Activities: Formwork installation MUW Treat.
Date: 15.07.2023 PIC: AH Date: 15.07.2023 PIC: KSI

Activities: BC conductor for earthing works Activities: Rebar installation Fire Dom. Pump
Date: 15.07.2023 PIC: KSY Date: 15.07.2023 PIC: KSI

Activities: Formwork installation Fire Dom. Pump Activities: BC conductor installation DC


Date: 16.07.2023 PIC: KSY Date: 16.07.2023 PIC: AH
Ignite Data Center Project Construction Weekly Report

Activities: Rebar installation MUW Treatment Activities: Formwork installation MUW Treat.
Date: 16.07.2023 PIC: KSY Date: 16.07.2023 PIC: KSY
Ignite Data Center Project Construction Weekly Report

WORKING PLAN FOR NEXT WEEK


• Continue pile cap construction at DC Hall:
a. Removing formwork, backfilling soil between the pile caps and tie beams.
b. Rectifying the defect list.
c. Earthing system installation.
• Continue pile cap construction at Admin:
a. Removing formwork, backfilling soil between the pile caps and tie beams.
b. Rectifying the defect list.
• Continue pile cap construction at MUW Tank:
a. Removing formwork.
• Other small buildings (Guard House, Fire & Raw Water Tank, Fire & Domestic Water Tank
Pump Room, MUW Treatment Room, and Bin Center):
a. Removing formwork.
• Drainage system construction.

4 ATTACHMENTS

Work progress attachments are as follows.


(Updated Schedule for All Areas and Mapping progress for All Areas).
ID 任务名称 % Complete Predecessors Duration Baseline Start Baseline Finish Start Finish Resource Names 7 May '23 14 May '23 21 May '23 28 May '23 4 Jun '23 11 Jun '23 18 Jun '23 25 Jun '23 2 Jul '23 9 Jul '23 16 Jul '23 23 Jul '23
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
1 Pile Cap Construction at DC 99% 146.27 days Wed 1/3/23 Thu 15/6/23 Wed 1/3/23 Thu 20/7/23

2 Pilecap & Tiebeam Design 100% 72 days Wed 1/3/23 Tue 9/5/23 Wed 1/3/23 Tue 9/5/23 9/5
Approval
3 Pile Cap Area 1, 2, 3 100% 39.35 days Tue 9/5/23 Mon 5/6/23 Tue 9/5/23 Fri 16/6/23

4 Excavation for Pilecap & 100% 2 12 days Tue 9/5/23 Sun 21/5/23 Tue 9/5/23 Sat 10/6/23 9/5 12 days 10/6
Tiebeam
5 Cut Off Pile Head & Rectify 100% 4SS+1 day 12 days Thu 11/5/23 Mon 22/5/23 Thu 11/5/23 Sat 10/6/23 11/5 12 days 10/6

6 Cushion of Pilecap 100% 5SS+2 days 12 days Sat 13/5/23 Wed 24/5/23 Sat 13/5/23 Tue 13/6/23 13/5 12 days 13/6

7 Rebar Installation 100% 6SS+3 days 10.89 days Mon 15/5/23 Sat 27/5/23 Mon 15/5/23 Wed 14/6/23 15/5 10.89 days 14/6

8 Formwork Installation 100% 7SS+2 days 9.69 days Wed 17/5/23 Mon 29/5/23 Wed 17/5/23 Fri 16/6/23 17/5 9.69 days 16/6

9 Cast Concrete 100% 8SS+1 day 12 days Thu 18/5/23 Tue 30/5/23 Thu 18/5/23 Fri 16/6/23 18/5 12 days 16/6

10 Remove Formwork & 100% 9SS+1 day 12 days Mon 22/5/23 Mon 5/6/23 Thu 25/5/23 Fri 16/6/23 25/5 12 days 16/6
Backfilling
11 Pile Cap Area 6, 7 100% 39.8 days Wed 17/5/23 Fri 9/6/23 Wed 17/5/23 Sat 24/6/23

12 Excavation for Pilecap & 100% 12 days Wed 17/5/23 Fri 26/5/23 Wed 17/5/23 Mon 12/6/23 17/5 12 days 12/6
Tiebeam
13 Cut Off Pile Head & Rectify 100% 12SS+1 day 12 days Thu 18/5/23 Sat 27/5/23 Mon 22/5/23 Mon 12/6/23 22/5 12 days 12/6

14 Cushion of Pilecap 100% 13SS+2 days 9 days Sat 20/5/23 Mon 29/5/23 Fri 26/5/23 Fri 16/6/23 26/5 9 days 16/6

15 Rebar Installation 100% 14SS+3 days 9 days Mon 22/5/23 Thu 1/6/23 Mon 29/5/23 Wed 21/6/23 29/5 9 days 21/6

16 Formwork Installation 100% 15SS+2 days 9 days Wed 24/5/23 Sat 3/6/23 Sat 3/6/23 Fri 23/6/23 3/6 9 days 23/6

17 Cast Concrete 100% 16SS+1 day 7 days Thu 25/5/23 Sun 4/6/23 Sat 3/6/23 Fri 23/6/23 3/6 7 days 23/6

18 Remove Formwork & 100% 17SS+1 day 10 days Sat 27/5/23 Fri 9/6/23 Sun 4/6/23 Sat 24/6/23 4/6 10 days 24/6
Backfilling
19 Pile Cap Area 4, 5 100% 37.92 days Fri 19/5/23 Sun 11/6/23 Mon 22/5/23 Tue 27/6/23

20 Excavation for Pilecap & 100% 10 days Fri 19/5/23 Sun 28/5/23 Mon 22/5/23 Sat 10/6/23 22/5 10 days 10/6
Tiebeam
21 Cut Off Pile Head & Rectify 100% 20SS+1 day 10 days Sat 20/5/23 Tue 30/5/23 Wed 24/5/23 Sun 11/6/23 24/5 10 days 11/6

22 Cushion of Pilecap 100% 21SS+2 days 9 days Mon 22/5/23 Thu 1/6/23 Mon 29/5/23 Wed 14/6/23 29/5 9 days 14/6

23 Rebar Installation 100% 22SS+2 days 10 days Wed 24/5/23 Sat 3/6/23 Wed 31/5/23 Tue 20/6/23 31/5 10 days 20/6

24 Formwork Installation 100% 23SS+2 days 10 days Fri 26/5/23 Mon 5/6/23 Sat 3/6/23 Fri 23/6/23 3/6 10 days 23/6

25 Cast Concrete 100% 24SS+1 day 10 days Sat 27/5/23 Tue 6/6/23 Sat 3/6/23 Mon 26/6/23 3/6 10 days 26/6

26 Remove Formwork & 100% 25SS+1 day 10 days Mon 29/5/23 Sun 11/6/23 Mon 5/6/23 Tue 27/6/23 5/6 10 days 27/6
Backfilling
27 Pile Cap Area 8, 9 97% 54.15 days Sun 28/5/23 Wed 14/6/23 Sun 28/5/23 Wed 19/7/23

28 Excavation for Pilecap & 100% 12 days Sun 28/5/23 Wed 7/6/23 Sun 28/5/23 Sun 2/7/23 28/5 12 days 2/7
Tiebeam
29 Cut Off Pile Head & Rectify 100% 28SS+1 day 12 days Mon 29/5/23 Thu 8/6/23 Mon 29/5/23 Sat 8/7/23 29/5 12 days 8/7

30 Cushion of Pilecap 100% 29SS+1 day 10 days Wed 31/5/23 Sat 10/6/23 Wed 14/6/23 Sat 8/7/23 14/6 10 days 8/7

31 Rebar Installation 100% 30SS+1 day 9 days Fri 2/6/23 Sun 11/6/23 Fri 16/6/23 Mon 10/7/23 16/6 9 days 10/7

32 Formwork Installation 100% 31SS+1 day 8 days Sun 4/6/23 Tue 13/6/23 Sat 17/6/23 Mon 10/7/23 17/6 8 days 10/7

33 Cast Concrete 100% 32SS+1 day 8 days Mon 5/6/23 Wed 14/6/23 Tue 20/6/23 Mon 10/7/23 20/6 8 days 10/7

34 Remove Formwork & 80% 33SS+1 day 11.37 days Wed 7/6/23 Mon 19/6/23 Thu 22/6/23 Wed 19/7/23 22/6 11.37 days 19/7
Backfilling
35 Handover 0% 1 day Thu 15/6/23 Thu 15/6/23 Wed 19/7/23 Thu 20/7/23

36 Handover 0% 33FS-1 1 day Thu 15/6/23 Thu 15/6/23 Wed 19/7/23 Thu 20/7/23 19/7 1 day
20/7
day,10,18,26,34
Page 1
ID 任务名称 % Complete Duration Baseline Start Baseline Finish Start Finish 7 May '23 14 May '23 21 May '23 28 May '23 4 Jun '23 11 Jun '23 18 Jun '23 25 Jun '23 2 Jul '23 9 Jul '23 16 Jul '23 23 Jul '23
8 9 10111213141516171819202122232425262728293031 1 2 3 4 5 6 7 8 9 101112131415161718192021222324252627282930 1 2 3 4 5 6 7 8 9 1011121314151617181920212223
1 Pile Cap Construction at Admin 99% 145.75 days Wed 1/3/23 Thu 22/6/23 Wed 1/3/23 Wed 19/7/23

2 Pilecap & Tiebeam Design 100% 79 days Wed 1/3/23 Tue 16/5/23 Wed 1/3/23 Tue 16/5/23 16/5
Approval

3 Pile Cap Area 1 100% 43.05 days Tue 16/5/23 Thu 15/6/23 Tue 16/5/23 Mon 26/6/23

4 Excavation for Pilecap & 100% 5.2 days Tue 16/5/23 Sat 27/5/23 Tue 16/5/23 Thu 25/5/23 16/5 5.2 days 25/5
Tiebeam

5 Cut Off Pile Head & Rectify 100% 12 days Thu 18/5/23 Mon 29/5/23 Sat 20/5/23 Fri 2/6/23 20/5 12 days 2/6

6 Cushion of Pilecap 100% 12 days Sat 20/5/23 Wed 31/5/23 Thu 25/5/23 Thu 8/6/23 25/5 12 days 8/6

7 Rebar Installation 100% 12 days Tue 23/5/23 Sat 3/6/23 Mon 29/5/23 Tue 13/6/23 29/5 12 days 13/6

8 Formwork Installation 100% 12 days Fri 26/5/23 Tue 6/6/23 Sat 3/6/23 Sat 24/6/23 3/6 12 days 24/6

9 Cast Concrete 100% 10 days Sun 28/5/23 Fri 9/6/23 Mon 5/6/23 Mon 26/6/23 5/6 10 days 26/6

10 Remove Formwork & 100% 8 days Wed 31/5/23 Thu 15/6/23 Thu 8/6/23 Mon 26/6/23 8/6 8 days 26/6
Backfilling

11 Pile Cap Area 2 98% 54.75 days Tue 23/5/23 Wed 21/6/23 Sat 27/5/23 Tue 18/7/23

12 Excavation for Pilecap & 100% 14 days Tue 23/5/23 Tue 6/6/23 Sat 27/5/23 Sat 24/6/23 27/5 14 days 24/6
Tiebeam

13 Cut Off Pile Head & Rectify 100% 14 days Fri 26/5/23 Fri 9/6/23 Sat 27/5/23 Sat 24/6/23 27/5 14 days 24/6

14 Cushion of Pilecap 100% 13 days Sat 27/5/23 Sun 11/6/23 Tue 30/5/23 Sun 25/6/23 30/5 13 days 25/6

15 Rebar Installation 100% 13 days Tue 30/5/23 Wed 14/6/23 Mon 12/6/23 Tue 27/6/23 12/6 13 days 27/6

16 Formwork Installation 100% 11 days Fri 2/6/23 Sat 17/6/23 Wed 14/6/23 Sat 8/7/23 14/6 11 days 8/7

17 Cast Concrete 100% 5 days Sun 4/6/23 Sun 18/6/23 Wed 21/6/23 Sat 8/7/23 21/6 5 days 8/7

18 Remove Formwork & 80% 8.75 days Wed 7/6/23 Wed 21/6/23 Fri 23/6/23 Tue 18/7/23 23/6 8.75 days 18/7
Backfilling

19 Handover 0% 1 day Thu 22/6/23 Thu 22/6/23 Tue 18/7/23 Wed 19/7/23

20 Handover 0% 1 day Thu 22/6/23 Thu 22/6/23 Tue 18/7/23 Wed 19/7/23 18/7 1 day
19/7

Page 1
ID 任务名称 % Complete Duration Baseline Start Baseline Finish Start Finish 21 May '23 28 May '23 4 Jun '23 11 Jun '23 18 Jun '23 25 Jun '23 2 Jul '23 9 Jul '23 16 Jul '23
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 Pile Cap Construction at MUW 99% 130.46 days Wed 15/3/23 Fri 30/6/23 Wed 15/3/23 Tue 18/7/23
Tank
2 Spun Pile D600 Production 100% 64 days Wed 15/3/23 Mon 15/5/23 Wed 15/3/23 Mon 15/5/23
Spun pile production will be finished until 15th May.
3 Spun Pile D600 Installation 100% 66 days Sun 2/4/23 Sun 4/6/23 Sun 2/4/23 Sun 4/6/23 4/6

4 Cut Off Pile Head & Install Rebar 100% 35 days Sun 7/5/23 Fri 9/6/23 Sun 7/5/23 Fri 23/6/23 23/6
Cage
5 Pile Cap Area 1 100% 23 days Mon 29/5/23 Fri 9/6/23 Sat 27/5/23 Sun 18/6/23

6 Cushion of Pilecap 100% 3 days Mon 29/5/23 Wed 31/5/23 Sat 27/5/23 Mon 29/5/23 27/5 3 days29/5

7 Rebar Installation 100% 2 days Mon 5/6/23 Mon 5/6/23 Wed 7/6/23 Sat 10/6/23 7/6 2 days 10/6

8 Formwork Installation 100% 3 days Mon 5/6/23 Wed 7/6/23 Sat 10/6/23 Mon 12/6/23 10/6 3 days12/6

9 Cast Concrete 100% 1 day Thu 8/6/23 Thu 8/6/23 Mon 12/6/23 Fri 16/6/23 12/6 1 day 16/6

10 Remove Formwork 100% 2 days Fri 9/6/23 Fri 9/6/23 Fri 16/6/23 Sun 18/6/23 16/6 2 days
18/6

11 Pile Cap Area 2 100% 27.5 days Thu 1/6/23 Sat 17/6/23 Mon 29/5/23 Sun 25/6/23

12 Cushion of Pilecap 100% 3 days Thu 1/6/23 Sat 3/6/23 Mon 29/5/23 Fri 2/6/23 29/5 3 days 2/6

13 Rebar Installation 100% 3 days Thu 8/6/23 Mon 12/6/23 Sat 17/6/23 Tue 20/6/23 17/6 3 days 20/6

14 Formwork Installation 100% 1 day Sun 11/6/23 Wed 14/6/23 Wed 21/6/23 Thu 22/6/23 21/6 1 day
22/6

15 Cast Concrete 100% 1 day Wed 14/6/23 Thu 15/6/23 Thu 22/6/23 Fri 23/6/23 22/6 1 day
23/6

16 Remove Formwork & 100% 1 day Fri 16/6/23 Sat 17/6/23 Sat 24/6/23 Sun 25/6/23 24/6 1 day
25/6
Backfilling
17 Pile Cap Area 4 100% 26.38 days Sat 3/6/23 Sat 24/6/23 Sat 10/6/23 Wed 5/7/23

18 Cushion of Pilecap 100% 3 days Sat 10/6/23 Tue 6/6/23 Sat 10/6/23 Mon 12/6/23 10/6 3 days12/6

19 Rebar Installation 100% 6 days Wed 14/6/23 Mon 19/6/23 Sun 11/6/23 Tue 27/6/23 11/6 6 days 27/6

20 Formwork Installation 100% 4 days Sat 17/6/23 Wed 21/6/23 Wed 14/6/23 Mon 26/6/23 14/6 4 days 26/6

21 Cast Concrete 100% 1 day Wed 21/6/23 Thu 22/6/23 Mon 26/6/23 Sun 2/7/23 26/6 1 day 2/7

22 Remove Formwork 100% 2 days Fri 23/6/23 Sat 24/6/23 Mon 3/7/23 Wed 5/7/23 3/7 2 days
5/7

23 Pile Cap Area 3 94% 36.46 days Tue 6/6/23 Thu 29/6/23 Mon 12/6/23 Mon 17/7/23

24 Cushion of Pilecap 100% 3 days Tue 6/6/23 Fri 9/6/23 Mon 12/6/23 Thu 15/6/23 12/6 3 days 15/6

25 Rebar Installation 100% 4 days Wed 21/6/23 Mon 26/6/23 Tue 20/6/23 Sat 8/7/23 20/6 4 days 8/7

26 Formwork Installation 100% 3 days Sat 24/6/23 Tue 27/6/23 Fri 23/6/23 Sat 8/7/23 23/6 3 days 8/7

27 Cast Concrete 100% 1 day Tue 27/6/23 Wed 28/6/23 Sat 8/7/23 Sun 9/7/23 8/7 1 day
9/7

28 Remove Formwork 80% 4.8 days Wed 28/6/23 Thu 29/6/23 Sun 9/7/23 Mon 17/7/23 9/7 4.8 days 17/7

29 Handover 0% 1 day Thu 29/6/23 Fri 30/6/23 Mon 17/7/23 Tue 18/7/23

30 Handover 0% 1 day Thu 29/6/23 Fri 30/6/23 Mon 17/7/23 Tue 18/7/23 17/7 1 day
18/7

Page 1
ID Task Name % Complete Duration Baseline Start Baseline Finish Start Start Finish Predecessors June 2023 July 2023
28 30 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27
1 Pile Cap Construction at Fire 84% 48.7 days Fri 2/6/23 Fri 30/6/23 Fri 2/6/23 Fri 2/6/23 Thu 20/7/23 2/6 48.7 days 20/7
and Raw Water Tank
2 Cut-off Pile Head & Install 100% 14 days Fri 2/6/23 Thu 15/6/23 Fri 2/6/23 Fri 2/6/23 Thu 15/6/23 2/6 14 days 15/6
Rebar Cage
3 Pile Cap Area 1 78% 20.7 days Fri 16/6/23 Fri 23/6/23 Thu 29/6/23 Thu 29/6/23 Wed 19/7/23 29/6 20.7 days 19/7

4 Cushion of Pile Cap 100% 1 day Fri 16/6/23 Sun 18/6/23 Thu 29/6/23 Thu 29/6/23 Thu 29/6/23 2 29/6 1 29/6
day

5 Rebar Installation 100% 4 days Sun 18/6/23 Tue 20/6/23 Sat 1/7/23 Sat 1/7/23 Tue 4/7/23 4SS+2 days 1/7 4 days4/7

6 Formwork Installation 100% 3 days Tue 20/6/23 Wed 21/6/23 Thu 6/7/23 Thu 6/7/23 Sat 8/7/23 5SS+2 days 6/7 3 days
8/7

7 Cast Concrete 100% 1 day Thu 22/6/23 Thu 22/6/23 Sun 9/7/23 Sun 9/7/23 Sun 9/7/23 6 9/7 1 9/7
day

8 Remove Formwork 10% 3 days Fri 23/6/23 Fri 23/6/23 Tue 11/7/23 Tue 11/7/23 Wed 19/7/23 7 11/7 3 days 19/7

9 Pile Cap Area 2 78% 20.7 days Sat 24/6/23 Thu 29/6/23 Thu 29/6/23 Thu 29/6/23 Wed 19/7/23 29/6 20.7 days 19/7

10 Cushion of Pile Cap 100% 1 day Sat 24/6/23 Sun 25/6/23 Thu 29/6/23 Thu 29/6/23 Thu 29/6/23 8 29/6 1 29/6
day

11 Rebar Installation 100% 4 days Mon 26/6/23 Tue 27/6/23 Sat 1/7/23 Sat 1/7/23 Tue 4/7/23 10SS+2 days 1/7 4 days4/7

12 Formwork Installation 100% 3 days Tue 27/6/23 Tue 27/6/23 Thu 6/7/23 Thu 6/7/23 Sat 8/7/23 11SS+1 day 6/7 3 days
8/7

13 Cast Concrete 100% 1 day Wed 28/6/23 Wed 28/6/23 Sun 9/7/23 Sun 9/7/23 Sun 9/7/23 12 9/7 1 9/7
day

14 Remove Formwork 10% 3 days Thu 29/6/23 Thu 29/6/23 Tue 11/7/23 Tue 11/7/23 Wed 19/7/23 13 11/7 3 days 19/7

15 Handover 0% 1 day Fri 30/6/23 Fri 30/6/23 Wed 19/7/23 Wed 19/7/23 Thu 20/7/23 19/7 1 day
20/7

16 Handover 0% 1 day Fri 30/6/23 Fri 30/6/23 Wed 19/7/23 Wed 19/7/23 Thu 20/7/23 14 19/7 1 20/7
day

Task Inactive Task Manual Summary Rollup External Milestone Manual Progress

Split Inactive Milestone Manual Summary Deadline


Project: 4. Fire and Raw Water T
Milestone Inactive Summary Start-only Critical
Date: Mon 17/7/23
Summary Manual Task Finish-only Critical Split

Project Summary Duration-only External Tasks Progress

Page 1
ID Task Name % Complete Duration Baseline Start Baseline Finish Start Finish Predecessors July 2023
8 11 14 17 20 23 26 29 2 5 8 11 14 17 20 23
1 Pile Cap Constrcution Schedule at 69% 35 days Fri 16/6/23 Wed 28/6/23 Fri 16/6/23 Thu 20/7/23
Fire and Domestic Pump Room,
MUW Treatment Room, and Bin
Center
2 Pile Cap Constrcution at Fire 74% 33.85 days Fri 16/6/23 Fri 23/6/23 Fri 16/6/23 Wed 19/7/23
and Domestic Pump Room
3 Excavation for Pilecap 100% 1 day Fri 16/6/23 Fri 16/6/23 Fri 16/6/23 Fri 16/6/23 16/6 1 day
16/6

4 Cut Off Pile Head & Install 100% 2 days Sat 17/6/23 Sun 18/6/23 Mon 26/6/23 Tue 27/6/23 3 26/6 2 days27/6
Rebar Cage
5 Cushion of Pilecap 100% 1 day Sun 18/6/23 Sun 18/6/23 Wed 28/6/23 Wed 28/6/23 4SS+1 day 28/6 1 day
28/6

6 Rebar Installation 100% 3 days Mon 19/6/23 Wed 21/6/23 Tue 11/7/23 Thu 13/7/23 5 11/7 3 days 13/7

7 Cast Concrete 100% 1 day Thu 22/6/23 Thu 22/6/23 Fri 14/7/23 Fri 14/7/23 6 14/7 1 day
14/7

8 Remove Formwork 5% 3 days Fri 23/6/23 Fri 23/6/23 Sat 15/7/23 Wed 19/7/23 7 15/7 3 days 19/7

9 Pile Cap Constrcution at MUW 63% 33 days Sat 17/6/23 Mon 26/6/23 Sat 17/6/23 Wed 19/7/23
Treatment Room
10 Excavation for Pilecap 100% 1 day Sat 17/6/23 Sat 17/6/23 Sat 17/6/23 Sat 17/6/23 3 17/6 1 day
17/6

11 Cut Off Pile Head & Install 100% 2 days Mon 19/6/23 Tue 20/6/23 Mon 26/6/23 Tue 27/6/23 10,4 26/6 2 days27/6
Rebar Cage
12 Cushion of Pilecap 100% 1 day Wed 21/6/23 Wed 21/6/23 Wed 28/6/23 Wed 28/6/23 11 28/6 1 day
28/6

13 Rebar Installation 100% 0 days Thu 22/6/23 Sat 24/6/23 Sat 15/7/23 Sat 15/7/23 12 15/7

14 Cast Concrete 100% 1 day Sun 25/6/23 Sun 25/6/23 Sun 16/7/23 Sun 16/7/23 13 16/7 1 day
16/7

15 Remove Formwork & 0% 3 days Mon 26/6/23 Mon 26/6/23 Mon 17/7/23 Wed 19/7/23 14 17/7 3 days 19/7
Backfilling
16 Pile Cap Constrcution at Bin 74% 32 days Sun 18/6/23 Tue 27/6/23 Sun 18/6/23 Wed 19/7/23
Center
17 Excavation for Pilecap 100% 1 day Sun 18/6/23 Sun 18/6/23 Sun 18/6/23 Sun 18/6/23 10 18/6 1 day
18/6

18 Cut Off Pile Head & Install 100% 2 days Wed 21/6/23 Thu 22/6/23 Mon 26/6/23 Tue 27/6/23 17,11 26/6 2 days27/6
Rebar Cage
19 Cushion of Pilecap 100% 1 day Fri 23/6/23 Fri 23/6/23 Wed 28/6/23 Wed 28/6/23 18 28/6 1 day
28/6

20 Rebar Installation 100% 3 days Sat 24/6/23 Sun 25/6/23 Tue 11/7/23 Thu 13/7/23 19 11/7 3 days 13/7

21 Cast Concrete 100% 1 day Mon 26/6/23 Mon 26/6/23 Fri 14/7/23 Fri 14/7/23 20 14/7 1 day
14/7

22 Remove Formwork 5% 3 days Tue 27/6/23 Tue 27/6/23 Mon 17/7/23 Wed 19/7/23 21 17/7 3 days 19/7

23 Handover 0% 1 day Wed 28/6/23 Wed 28/6/23 Thu 20/7/23 Thu 20/7/23

24 Handover 0% 1 day Wed 28/6/23 Wed 28/6/23 Thu 20/7/23 Thu 20/7/23 22 20/7 1 day
20/7

Task Project Summary Manual Task Start-only Deadline Manual Progress

Project: 5. MUW Treatment Roo Split Inactive Task Duration-only Finish-only Critical
Date: Mon 17/7/23 Milestone Inactive Milestone Manual Summary Rollup External Tasks Critical Split

Summary Inactive Summary Manual Summary External Milestone Progress

Page 1
ID Task Task Name % Complete Duration Baseline Start Baseline Finish Start Finish 25 Jun '23 2 Jul '23 9 Jul '23 16 Jul '23 23 Jul '23
Mode T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S
1 Pile Cap 70% 17.85 days Fri 23/6/23 Fri 30/6/23 Mon 3/7/23 Thu 20/7/23 3/7 17.85 days 20/7
Construction at
2 Guardhouse
Excavation for 100% 1 day Fri 23/6/23 Fri 23/6/23 Mon 3/7/23 Mon 3/7/23 3/7 1 day
3/7
Pilecap &
3 Tiebeam
Cut Off Pile Head 100% 2 days Sat 24/6/23 Sun 25/6/23 Tue 4/7/23 Wed 5/7/23 4/7 2 days 5/7
& Rectify
4 Cushion of Pilecap 100% 1 day Sun 25/6/23 Mon 26/6/23 Thu 6/7/23 Thu 6/7/23 6/7 1 day
6/7

5 Rebar Installation 100% 4 days Mon 26/6/23 Tue 27/6/23 Fri 7/7/23 Tue 11/7/23 7/7 4 days 11/7

6 Cast Concrete 100% 1 day Wed 28/6/23 Wed 28/6/23 Tue 11/7/23 Wed 12/7/23 11/7 1 day
12/7

7 Removing 5% 3 days Thu 29/6/23 Thu 29/6/23 Thu 13/7/23 Wed 19/7/23 13/7 3 days 19/7
Formwork
8 Handover 0% 1 day Fri 30/6/23 Fri 30/6/23 Wed 19/7/23 Thu 20/7/23 19/7 1 day
20/7

Task Inactive Task Manual Summary Rollup External Milestone Manual Progress

Split Inactive Milestone Manual Summary Deadline


Project: 6. Guardhouse Pilecap
Milestone Inactive Summary Start-only Critical
Date: Mon 17/7/23
Summary Manual Task Finish-only Critical Split

Project Summary Duration-only External Tasks Progress

Page 1
GENERAL NOTES

4
3
2
1
NO REVISION /ISSUE DATE
KEY PLAN

F1 F2 F3
10525 11525 SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

5250 5275 5750

SECONDARY ENTRANCE
5775

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
TOPC : +32.500
32.20

32.7

32.20
0
Green Zone Area

32.20
9000

10000

BLOCK EE/2

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100

1200 1200
FGL 32.700

FGL 32.430
ADMIN BLOCK

940 940 940 940 FGL +33.10


6.1 6.2 FGL 32.05
10000
150 KV SUBSTATION
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3

F8-1
9.4 3.5
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700

F5-1
8000

F5-3
FGL 32.700
FGL 32.700 FGL 32.700

PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

fB1 fC1 fB1 fC1


fC1

FA
4525

fB1
IGNITE DATA CENTRE
fB1

fB1
F9
F6-1 F6-2
fB1 fB1
INFRASTRUCTURE
fC1
FINISHED LEAN CONCRETE
9050

fC1 fC1
4525

fB1
fB1

fB1
FIRE AND DOMESTIC PUMP
F8-2 ROOMS LEAN CONCRETE
F5-2 F5-4
fB1 fB1

FB fC1

fC1
fC1

CONTRACTOR

FIRE & DOMESTIC PUMP ROOMS - LEAN CONCRETE


1 : 150 DRAFTED RAYHAN T. H.

APPROVED WEI PING

OWNER

Note: FILE NAME


1. The dimensions in the drawing are in millimeters.
Fire and Domestic Pump Rooms
Mapping progress

DRAWING NO

PAGE 1
GENERAL NOTES

4
3
2
1
NO REVISION /ISSUE DATE
KEY PLAN

F1 F2 F3
10525 11525 SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

5250 5275 5750

SECONDARY ENTRANCE
5775

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
TOPC : +32.500
32.20

32.7

32.20
0
Green Zone Area

32.20
9000

10000

BLOCK EE/2

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100

1200 1200
FGL 32.700

FGL 32.430
ADMIN BLOCK

940 940 940 940 FGL +33.10


6.1 6.2 FGL 32.05
10000
150 KV SUBSTATION
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3

F8-1
9.4 3.5
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700

F5-1
8000

F5-3
FGL 32.700
FGL 32.700 FGL 32.700

PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

fB1 fC1 fB1 fC1


fC1

FA

PROGRESS DATE: 13-07-2023


4525

fB1
IGNITE DATA CENTRE
fB1

fB1
F9
F6-1 F6-2
fB1 fB1
INFRASTRUCTURE
fC1
INSTALL REBAR
9050

fC1 fC1
4525

fB1
fB1

fB1
FIRE AND DOMESTIC PUMP
F8-2 ROOMS INSTALL REBAR
F5-2 F5-4
fB1 fB1

FB fC1

fC1
fC1

CONTRACTOR

FIRE & DOMESTIC PUMP ROOMS - INSTALL REBAR


1 : 150 DRAFTED RAYHAN T. H.

TARGET FINISH 10-07-2023 APPROVED WEI PING


FORECAST FINISH 13-07-2023

OWNER

Note: FILE NAME


1. The dimensions in the drawing are in millimeters.
Fire and Domestic Pump Rooms
Mapping progress

DRAWING NO

PAGE 1
GENERAL NOTES

4
3
2
1
NO REVISION /ISSUE DATE
KEY PLAN

F1 F2 F3
10525 11525 SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

5250 5275 5750

SECONDARY ENTRANCE
5775

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
TOPC : +32.500
32.20

32.7

32.20
0
Green Zone Area

32.20
9000

10000

BLOCK EE/2

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100

1200 1200
FGL 32.700

FGL 32.430
ADMIN BLOCK

940 940 940 940 FGL +33.10


6.1 6.2 FGL 32.05
10000
150 KV SUBSTATION
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3

F8-1
9.4 3.5
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700

F5-1
8000

F5-3
FGL 32.700
FGL 32.700 FGL 32.700

PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

fB1 fC1 fB1 fC1


fC1

FA

PROGRESS DATE: 16-07-2023


4525

fB1
IGNITE DATA CENTRE
fB1

fB1
F9
F6-1 F6-2
fB1 fB1
INFRASTRUCTURE
fC1
FINISHED POURING CONCRETE
9050

fC1 fC1
4525

fB1
fB1

fB1
FIRE AND DOMESTIC PUMP
F8-2 ROOMS INSTALL REBAR
F5-2 F5-4
fB1 fB1

FB fC1

fC1
fC1

CONTRACTOR

FIRE & DOMESTIC PUMP ROOMS - FINISHED POURING CONCRETE


1 : 150 DRAFTED RAYHAN T. H.

TARGET FINISH 15-07-2023 APPROVED WEI PING


FORECAST FINISH 16-07-2023

OWNER

Note: FILE NAME


1. The dimensions in the drawing are in millimeters.
Fire and Domestic Pump Rooms
Mapping progress

DRAWING NO

PAGE 1
GENERAL NOTES

P1 P2
7100 4
3
TOPC : +32.500 2
1
F5-T1 NO REVISION /ISSUE DATE

tC1
F3-T1 tB3 tC1 KEY PLAN
PA

SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

SECONDARY ENTRANCE
5713
tB1

tB1

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
32.20

32.7

32.20
0
Green Zone Area

32.20
9000

10000

BLOCK EE/2

F6-T1

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100
FGL 32.700

FGL 32.430
ADMIN BLOCK

F4-T1 FGL +33.10


6.1 6.2 FGL 32.05
10000
150 KV SUBSTATION
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3 3.5
9.4
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700
8000
FGL 32.700
FGL 32.700 FGL 32.700

tC1 tB2 tC1

11500
PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

5788
tB1

tB1
IGNITE DATA CENTRE
F6-T2
F4-T2 INFRASTRUCTURE
FINISHED LEAN CONCRETE
tC1 tB2 tC1

PB

MAPPING PROGRESS
MUW TREATMENT ROOM

5838
tB1

tB1

F6-T3
F4-T3 CONTRACTOR
tC1 tB2 tC1

11600
5763
tB1

tB1

DRAFTED RAYHAN T. H.

F5-T2
APPROVED WEI PING
F3-T2 tB3

tC1 tC1
PC
OWNER

MUW TREATMENT ROOM - LEAN CONCRETE


1 : 150

Note: FILE NAME


1. The dimensions in the drawing are in millimeters.
MAPPING PROGRESS
MUW Treatment Room

DRAWING NO

PAGE 1
GENERAL NOTES

P1 P2
7100 4
3
TOPC : +32.500 2
1
F5-T1 NO REVISION /ISSUE DATE

tC1
F3-T1 tB3 tC1 KEY PLAN
PA

SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

SECONDARY ENTRANCE
5713
tB1

tB1

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
32.20

32.7

32.20
0
Green Zone Area

32.20
9000

10000

BLOCK EE/2

F6-T1

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100
FGL 32.700

FGL 32.430
ADMIN BLOCK

F4-T1 FGL +33.10


6.1 6.2 FGL 32.05
10000
150 KV SUBSTATION
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3 3.5
9.4
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700
8000
FGL 32.700
FGL 32.700 FGL 32.700

tC1 tB2 tC1

11500
PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

PROGRESS DATE: 16-07-2023

5788
tB1

tB1
IGNITE DATA CENTRE
F6-T2
F4-T2 INSTALL REBAR INFRASTRUCTURE
tC1 tB2 tC1

PB

MAPPING PROGRESS
MUW TREATMENT ROOM

5838
tB1

tB1

F6-T3
F4-T3 CONTRACTOR
tC1 tB2 tC1

11600
5763
tB1

tB1

DRAFTED RAYHAN T. H.

F5-T2
APPROVED WEI PING
F3-T2 tB3

tC1 tC1
PC
OWNER

MUW TREATMENT ROOM - INSTALL REBAR


1 : 150
TARGET FINISH 13-07-2023
FORECAST FINISH 16-07-2023

Note: FILE NAME


1. The dimensions in the drawing are in millimeters.
MAPPING PROGRESS
MUW Treatment Room

DRAWING NO

PAGE 1
GENERAL NOTES

P1 P2
7100 4
3
TOPC : +32.500 2
1
F5-T1 NO REVISION /ISSUE DATE

tC1
F3-T1 tB3 tC1 KEY PLAN
PA

SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

SECONDARY ENTRANCE
5713
tB1

tB1

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
32.20

32.7

32.20
0
Green Zone Area

32.20
9000

10000

BLOCK EE/2

F6-T1

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100
FGL 32.700

FGL 32.430
ADMIN BLOCK

F4-T1 FGL +33.10


6.1 6.2 FGL 32.05
10000
150 KV SUBSTATION
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3 3.5
9.4
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700
8000
FGL 32.700
FGL 32.700 FGL 32.700

tC1 tB2 tC1

11500
PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

PROGRESS DATE: 16-07-2023

5788
tB1

tB1
IGNITE DATA CENTRE
F6-T2
F4-T2 FINISHED POURING CONCRETE INFRASTRUCTURE
tC1 tB2 tC1

PB

MAPPING PROGRESS
MUW TREATMENT ROOM

5838
tB1

tB1

F6-T3
F4-T3 CONTRACTOR
tC1 tB2 tC1

11600
5763
tB1

tB1

DRAFTED RAYHAN T. H.

F5-T2
APPROVED WEI PING
F3-T2 tB3

tC1 tC1
PC
OWNER

MUW TREATMENT ROOM - FINISHED POURING CONCRETE


1 : 150
TARGET FINISH 16-07-2023
FORECAST FINISH 17-07-2023

Note: FILE NAME


1. The dimensions in the drawing are in millimeters.
MAPPING PROGRESS
MUW Treatment Room

DRAWING NO

PAGE 1
GENERAL NOTES

4
3
2
1
NO REVISION /ISSUE DATE
B1 B2 KEY PLAN
5600

TOPC : +32.500 SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

SECONDARY ENTRANCE

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
32.20

32.7

32.20
0
Green Zone Area

32.20
175 175
9000

125 125
10000

BLOCK EE/2

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100
FGL 32.700

FGL 32.430
ADMIN BLOCK 150 KV SUBSTATION
6.1 6.2 FGL 32.05
FGL +33.10 10000
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3

F2-B1 F2-B2
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3 3.5
9.4
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700
8000
FGL 32.700
FGL 32.700 FGL 32.700

PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

bB1
1

1
bC

bC
BA
IGNITE DATA CENTRE
INFRASTRUCTURE

FINISHED LEAN CONCRETE

bB1
bB1

BIN CENTER

4600
MAPPING PROGRESS

CONTRACTOR

F2-B3 F2-B4

bB1
1

1
bC

bC

BB DRAFTED RAYHAN T. H.

APPROVED WEI PING

OWNER

BIN CENTER - LEAN CONCRETE


1 : 50

FILE NAME
Bin Center Mapping Progress

DRAWING NO
23IN01-IGN-BS-FP-SD-01

PAGE 1
GENERAL NOTES

4
3
2
1
NO REVISION /ISSUE DATE
B1 B2 KEY PLAN
5600

TOPC : +32.500 SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

SECONDARY ENTRANCE

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
32.20

32.7

32.20
0
Green Zone Area

32.20
175 175
9000

125 125
10000

BLOCK EE/2

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100
FGL 32.700

FGL 32.430
ADMIN BLOCK 150 KV SUBSTATION
6.1 6.2 FGL 32.05
FGL +33.10 10000
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3

F2-B1 F2-B2
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3 3.5
9.4
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700
8000
FGL 32.700
FGL 32.700 FGL 32.700

PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

bB1
1

1
bC

bC
BA
IGNITE DATA CENTRE
PROGRESS DATE: 13-07-2023 INFRASTRUCTURE

INSTALL REBAR

bB1
bB1

BIN CENTER

4600
MAPPING PROGRESS

CONTRACTOR

F2-B3 F2-B4

bB1
1

1
bC

bC

BB DRAFTED RAYHAN T. H.

APPROVED WEI PING

OWNER

BIN CENTER - INSTALL REBAR


1 : 50
TARGET FINISH 13-07-2023
FORECAST FINISH 13-07-2023

FILE NAME
Bin Center Mapping Progress

DRAWING NO

PAGE 1
GENERAL NOTES

4
3
2
1
NO REVISION /ISSUE DATE
B1 B2 KEY PLAN
5600

TOPC : +32.500 SITE BOUNDARY

32.40

32.20
32.20

32.20

32.10
32.10

32.30
32.90

32.70
33.00

32.20
11000
32.50

31.90
BCL 32.350 32.80

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

FGL 32.430 1.2


1.1

SECONDARY ENTRANCE

FGL 32.430

FGL 32.430
FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
FGL +33.10

32.90

33.10
32.70

32.90

32.80
32.6

32.5

32.4
0

0
32.30

BCL 32.350
BCL 32.350
32.20

32.7

32.20
0
Green Zone Area

32.20
175 175
9000

125 125
10000

BLOCK EE/2

EXTERNAL ROAD
1.3
1.4 FGL 32.430

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

4.1 4.2
2.1 PL +32.75 FGL 32.430 2.2
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100 FGL 33.100
FGL 32.700

FGL 32.430
ADMIN BLOCK 150 KV SUBSTATION
6.1 6.2 FGL 32.05
FGL +33.10 10000
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.4 7.1 7.2 2.3

F2-B1 F2-B2
5.1 5.2 4.4 4.3

BCL 32.330

8000
CENTRE
PLN SUBSTATION BCL 32.350

BIN
6.4 6.3 3.5
9.4
7.4 7.3 5.4 5.3

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700
8000
FGL 32.700
FGL 32.700 FGL 32.700

PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD

bB1
1

1
bC

bC
BA
IGNITE DATA CENTRE
PROGRESS DATE: 16-07-2023 INFRASTRUCTURE

FINISHED POURING CONCRETE

bB1
bB1

BIN CENTER

4600
MAPPING PROGRESS

CONTRACTOR

F2-B3 F2-B4

bB1
1

1
bC

bC

BB DRAFTED RAYHAN T. H.

APPROVED WEI PING

OWNER

BIN CENTER - FINISHED POURING CONCRETE


1 : 50
TARGET FINISH 15-07-2023
FORECAST FINISH 16-07-2023

FILE NAME
Bin Center Mapping Progress

DRAWING NO

PAGE 1
GENERAL NOTES

86083
4
43304 10969 6000 6500 6500 6000 7870 = EARTH ROD (17mm DIAMETER, LENGTH 3000mm)
3
21400 11258 = BARE COPPER 70mm2
2
= LIGHTNING PROTECTION DOWN CONDUCTOR
D1 D2 D3 D4 D4A D5 D5A D6 D6A D7
COOPER TAPE 25x3 mm 1 A -
= LIGHTNING EARTH ROD (COPPER 50mm2, 2400mm LENGTH)
c/w 300 x300 INSPECTION BOX NO REVISION /ISSUE DATE
14840

TOP EL.+32.70 TOP EL.+32.70 TOP EL.+32.70 EARTH ROD TO BE BURIED 1000mm DEPT BELOW SOIL SURFACE
TOP EL.+32.70 MAX 10 OHM RESISTIVITY)
KEY PLAN
DA = EXOTHERMIC WELDING
TOP EL.\+32.75

= STRANDED BARE COPPER 300mm2

10075
1000 mm DEPTH BELOW SOIL SURFACE
8555

TOP EL.+32.75
= STRANDED BARE COPPER 70mm2
SITE BOUNDARY

500 mm DEPTH BELOW SOIL SURFACE

32.20
32.40
32.20

32.20

32.10
32.30
32.10

32.70
32.90

32.20
33.00

31.90
BCL 32.350 32.80 32.50

11000

32.60
U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL U/G FUEL
TANKS TANKS TANKS TANKS TANKS TANKS

TOP EL.+32.70
1.2

DA1
FGL 32.430

1.1

SECONDARY ENTRANCE
INSPECTION PIT WITH 300X300

7024
12452

FGL 32.430

FGL 32.430
TOP EL.\+32.75

FGL 33.100
FUTURE DEVELOPMENT AREA
DATA HALL

33.00
32.80
32.90
FGL +33.10 32.70

33.10

32.90

32.80

32.5
32.6

32.4
0

0
32.30

BCL 32.350
BCL 32.350
32.20

32.7

32.20
0
Green Zone Area

32.20
9000

10000

BLOCK EE/2

EXTERNAL ROAD
1.3
8360

FGL 32.430
1.4

DB

10000

10000
BCL 32.350 BCL 32.350 BCL 32.350

2.2 4.1 4.2


2.1 PL +32.75 FGL 32.430
3.1 FGL 32.430 3.2

SATELLITE ZONE
FGL 33.100

9900
FGL 32.700
FGL 33.100

FGL 32.430
ADMIN BLOCK 6.1 6.2 FGL 32.05 150 KV SUBSTATION
FGL +33.10 10000
FGL +33.10
FGL 32.700
MEP YARD

GUARD HOUSE /
ARM BARRIER
FGL +32.05 3.4

FCC
12000 3.3
2.3

TOP EL.+32.75
2.4 7.1 7.2
5.1 5.2 4.4 4.3

CENTRE
6000
BCL 32.350

BCL 32.330

8000
PLN SUBSTATION
42100

BIN
6.4 6.3 9.4 3.5
7.4 7.3 5.4 5.3

TOP EL.+32.70

6000
4500

FGL 32.700

10000
BCL 32.350

6800
FGL 32.700 BCL 32.350 BCL 32.350 FGL 32.700
8000
FGL 32.700
FGL 32.700 FGL 32.700

PLN ENTRANCE PRIMARY ENTRANCE EXTERNAL ROAD


TOP EL.\+32.75

DB1
TOP EL.+32.75

6500
12785

2100 9858 20142 DC PROGRESS DATE: 16-07-2023

FINISHED INSTALL BC
TOP EL.+32.70 IGNITE DATA CENTRE
FINISHED INSTALL EARTH ROD
DD INFRASTRUCTURE
TOP EL.\+32.75

FINISHED INSTALL LIGHTNING ROD


12100

TOP EL.+32.75 MAPPING PROGRESS


TOP EL.+32.70
DE EARTH MAT IN DC BUILDING
10200

TOP EL.\+32.75

TOP EL.+32.75
18800 2100 2100 20000 500
9500
107704

TOP EL.+32.70 CONTRACTOR


DF
TOP EL.\+32.75
10800

30000

TOP EL.+32.70
30000

DG
TOP EL.\+32.75

TOP EL.\+32.75

11811 DRAFTED RAYHAN T. H.


11370

APPROVED WEI PING


TOP EL.+32.75
TOP EL.+32.70
DH
OWNER
TOP EL.\+32.75

TOP EL.+32.75
10235

3000

TOP EL.+32.70
6880

DI
TOP EL.\+32.75

41000
12950

DJ
13620

TOP EL.+32.70
DK
TOP EL.\+32.75

FILE NAME
5241

TOP EL.+32.75 Mapping Progress Earth Mat


TOP EL.+32.75 TOP EL.+32.75

DRAWING NO

PAGE 1