INDUS 10X Revised Schedule Rev-05
INDUS 10X Revised Schedule Rev-05
Actual
Description Start Finish Completed
Remarks
SL NO
SHELL & CORE
12 SKYLIGHT ROOFING 7-Jun-25 27-Jun-25
11 AUDITORIUM 25-May-25 19-Jun-25
10 OHT & LMR 4-Jun-25 16-Jun-25
9 3RD FLOOR ROOF SLAB 16-May-25 3-Jun-25
8 2ND FLOOR ROOF SLAB ( POUR-02) 27-Apr-25 23-May-25
7 2ND FLOOR ROOF SLAB ( POUR-01) 14-Apr-25 3-May-25 13-May-25 Completed
6 1ST FLOOR ROOF SLAB (POUR-02) 27-Mar-25 25-Apr-25
5 1ST FLOOR ROOF SLAB (POUR-01) 13-Mar-25 12-Apr-25
4 GROUND FLOOR ROOF SLAB (POUR-02) 13-Feb-25 10-Mar-25
3 GROUND FLOOR ROOF SLAB (POUR-01) 7-Feb-25 28-Feb-25
2 GRADE SLAB PCC 5-Feb-25 12-Feb-25
1 PLINTH BEAM RCC 23-Jan-25 7-Feb-25
Finishes-Block Work
Actual
Level
Start Date End Date
5 Terrace parapet wall , OHT, LMR 12-Jun-25 22-Jun-25
4 Third Floor 15-Jun-25 30-Jun-25
3 Second Floor 25-May-25 9-Jun-25
2 First floor 5-May-25 20-May-25
1 Ground Floor 24-Mar-25 22-Apr-25 2-May-25 Completed
Finishes - Ceiling plaster
Actual
Level
Start Date End Date
5 Terrace parapet wall , OHT, LMR 19-Jun-25 25-Jun-25
4 Third Floor 27-Jun-25 9-Jul-25
3 Second Floor 6-Jun-25 18-Jun-25
2 First floor 17-May-25 29-May-25
1 Ground Floor 19-Apr-25 4-May-25 Completed
Finishes- Internal wall plastering ( inc Rough Plastering in toilets)
Actual
Level
Start Date End Date
5 Terrace parapet wall , OHT, LMR 22-Jun-25 28-Jun-25
4 Third Floor 6-Jul-25 16-Jul-25
3 Second Floor 15-Jun-25 25-Jun-25
2 First floor 26-May-25 5-Jun-25
1 Ground Floor 1-May-25 11-May-25 16-May-25 Completed
Finishes- flooring & wall dado
Actual
Level
Start Date End Date
4 Third Floor 14-Jul-25 24-Jul-25
3 Second Floor 23-Jun-25 3-Jul-25
2 First floor 3-Jun-25 13-Jun-25
1 Ground Floor 9-May-25 19-May-25
5 Flooring rest of the area
4 Third Floor 12-Jul-25 22-Jul-25
3 Second Floor 21-Jun-25 1-Jul-25
2 First floor 1-Jun-25 11-Jun-25
1 Ground Floor 7-May-25 17-May-25
Finishes-External wall plastering
Actual
Level
Start Date End Date
5 OTS ( Skylight ) 25-Jun-25 10-Jul-25
4 Third floor including Terrace parapet wall , OHT, LMR 3-Jul-25 18-Jul-25
3 Second floor 12-Jun-25 27-Jun-25
2 First floor 13-May-25 28-May-25
1 Ground floor 13-May-25 28-May-25
Finishes- Internal painting
Actual
Level
Start Date End Date
5 Terrace parapet wall , OHT, LMR 2-Jul-25 6-Jul-25
4 Third Floor 20-Jul-25 28-Jul-25
3 Second Floor 29-Jun-25 7-Jul-25
2 First floor 30-May-25 7-Jun-25
1 Ground Floor 15-May-25 23-May-25
Finishes- External painting
Actual
Level
Start Date End Date
5 OTS ( Skylight ) 10-Jul-25 16-Jul-25
4 West Face 18-Jul-25 26-Jul-25
3 East Face 18-Jul-25 26-Jul-25
2 South Face 18-Jul-25 23-Jul-25
1 North Face 18-Jul-25 23-Jul-25
Finishes - External Façade MS and Aluminium Rafters
Actual
Level
Start Date End Date
4 West Face 28-Jul-25 14-Aug-25
3 East Face 28-Jul-25 14-Aug-25
2 South Face 25-Jul-25 4-Aug-25
1 North Face 25-Jul-25 4-Aug-25
By June 15th, the handover date for interior fit-out work will be in the following area.
Actual
Level
Start Date End Date
4 External Development 31-May-25
Amphitheatre 28-Jul-25
3 AUDITORIUM 19-Jun-25
2 First floor 7-Jun-25
1 Ground floor 31-May-25
By July 15th, the handover date for interior fit-out work will be in the following area.
Actual
Level
Start Date End Date
2 Third floor 28-Jul-25
1 Second floor 7-Jul-25
14-Aug-25
PROJECT NAME : INDUS 10X SCHOOL MYSORE
TARGET SCHEDULE DATES Date : 22-03-2025
SHELL & CORE Remarks
8 AUDITORIUM 19-Jun-25
7 Terrace parapet wall , OHT, LMR 16-Jun-25
6 Terrace floor slab concrete 3-Jun-25
5 Third Floor Slab (Pour-02) 23-May-25
4 Third floor Slab (Pour-01) 3-May-25
3 Second Floor Slab (Pour-2) 23-Apr-25
2 First floor Completed
1 Ground Floor Completed
Finishes - up to 1st coat of painting
5 Terrace parapet wall , OHT, LMR 6-Jul-25
4 Third floor Slab 28-Jul-25
3 Second Floor 7-Jul-25
2 First floor 7-Jun-25
1 Ground Floor 23-May-25
Finishes - External Development
4 North face compound wall , Drive way & entry portal 23-May-25
3 west Face compound wall & Drive way 17-May-25
2 South Face compound wall & Drive way 30-Apr-25
1 Eest face compound wall , Drive way & exit portal 7-May-25
By June 15th will be handover date for interior fit-out work in the follwing area
4 External Development
3 AUDITORIUM
15-Jun-25
2 First floor
1 Ground floor
By August 13th will be handover date for interior fit-out work in the follwing area
3 Amphitheatre
2 Third floor 14-Aug-25
1 Second floor
Manpower Monitor
Sl. No. Type of Resource Unit Available at Site Actual at Site Variance Remarks
1 Painter Nos. 4 0 4
Critical
2 Helper's Nos. 4 0 4
Absent No's 4
168 102 66
1 Manpower required at the site 168
2 Manpower Available at the Site 102
3 Variance 66
Sl. No. Type of Resource Unit Required Manpower Actual at Site Variance
374000
42240
319000
365500
280500
18817.5
29112.5
196706.25
62500
38750
34000
56875
1818001.25
Sl.No. Item Unit Quantity Rate
Shuttering work , Concrete & Reinf work
1 Third floor slab & Beam Sqm 1700 220
2 Thrid floor columns shuttering Sqm 192 220
3 Terrace floor Slab & Beam Sqm 1450 220
4 Third floor columns, slab & beam reinf MT 43 8500
5 Terrace floor columns, Slab & Beam MT 33 8500
6 Stair case 1,2 & 3 up to terrace floor Cum 57.9 325
7 Columns Concrete Cum 46.58 625
8 Slab & Beam concrete Cum 605.25 325
374000
42240
319000
365500
280500
18817.5
29112.5
196706.25
1625876.25
Status Remarks
Productivity Required Total Manpower
Sl.No. Item Unit Quantity Norm's Manpower
5900
Sl.No. Item Unit Quantity
Ground floor
1 Flooring tiles SQM 980
2 Corridor wall dadoo SQM 200
3 Toilet flooring SQM 60
4 Toilet wall dadoo SQM 50
5 Door's frame & shutter instalattion No's 30
6 UPVC window installation along with MS grill's No's 27
7 Paininting up to 1st cost SQM 2500
8 Staircase MS railing RMT 32
9 CEO & Principle GLASS PARTITION RMT 7.1
10 Reception area GLASS PARTITION RMT 20
11 Waterproofing for toilet area SQM 55
12 External wall plastering SQM 850
First Floor
1 Block work SQM 1000
2 Ceiling plastering SQM 980
3 Internal Wall plastering SQM 1900
4 External wall plastering SQM 850
5 Flooring tiles SQM 1000
6 Corridor wall dadoo SQM 200
7 Toilet flooring SQM 60
8 Toilet wall dadoo SQM 50
9 Door's frame & shutter instalattion No's 30
10 UPVC window installation along with MS grill's No's 27
11 Paininting up to 1st cost SQM 2680
12 Waterproofing SQM 55
13 MS Staircase railing RMT 32
14 Corridor SS railing RMT 65
Please note that by the end of May'2025, all external work must be completed according to the GFC drawings. This includes finishing
all necessary PHE services and the driveway completion up to the sub-base preparation, in order to receive the WMM..
21-May-25
31-May-25
50 -10
14 -6
4 -4
0 -6
0 -12
0 -6
0 -6
0 -4
4 -2
0 -6
10 -10
0 -12
82 -84