The document contains detailed construction specifications, including elevations, coordinates, and dimensions for various structures and foundations. It emphasizes the importance of adhering to written dimensions, reporting discrepancies, and ensuring proper reinforcement and material quantities. Additionally, it includes notes on site adjustments and references to standard drawings for construction details.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

4240 Aa DC 01004000065 Is00

The document contains detailed construction specifications, including elevations, coordinates, and dimensions for various structures and foundations. It emphasizes the importance of adhering to written dimensions, reporting discrepancies, and ensuring proper reinforcement and material quantities. Additionally, it includes notes on site adjustments and references to standard drawings for construction details.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10

NOTES
1. ALL ELEVATIONS AND CO-ORDINATES ARE IN METERS.
I PAVING ANCHOR 2. ALL DIMENSIONS ARE IN MILLIMETERS. I
LOCAL THICKENING FOR ALL NEAREST PIPE SUPPORTS/PLATFORMS
PAVING THICKENING / FOUNDATION PEDESTAL SCHEDULE BOLT / INSERT
TO BE COMBINED TO SUITE AT SITE. PLATE FOUNDATION CONCRETE REFER NOTE - 11
3. EL .100.000 CORRESPONDS TO RL. 4.060 ABOVE IMSL.
4. THE DRAWING IS NOT TO BE SCALED. WRITTEN DIMENSIONS TO BE FOLLOWED.
5. ANY DISCREPANCY IN DRAWING TO BE REPORTED TO ENGINEERING IMMEDIATELY FOR CLARIFICATION.
ITEM TAG STRUCTURE NO.
NORTH
CO-ORDINATE
EAST
CO-ORDINATE
F/W TYPE R/F TYPE ANGLE L1 L2 W1 W2 W3 H J BOF ITEM TAG
PEDESTAL
R/F TYPE
A B TOC AP-DA REFERENCE ABJ / IP / PQ QUANTITY 6. FOR ALL STANDARD DETAILS 0F CONSTRUCTION FOR PILE CAP, PEDESTAL ETC. REFER CONCRETE WORK
STANDARD DRAWINGS IPPP-4240-8310-TN-050-0001_4240-AA-DX-00000000001 TO
MATERIAL TOTAL QUANTITY [Cu. M] IPPP-4240-8310-TN-050-0010_4240-AA-DX-00000000010
1004-SS001I-PA037A 1004-SS001I/1-A -1499.27 -407.07 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS001I-FP037A P7 450 600 100.57 4240-AP-DA-01003000029 ABJ003 1004 7. BAR BENDING SCHEDULE IS INDICATIVE CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING REBAR
QUANTITIES & DIMENSION ACCORDING TO DRAWINGS
1004-SS001I-PA038A 1004-SS001I/2-A -1499.27 -405.02 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS001I-FP038A P7 450 600 100.57 4240-AP-DA-01003000029 ABJ003 Foundation Concrete 26.06 8. DESIGN DOCUMENT NO. 4240-AA-CS-01004000008 / IPPP-4240-8310-CA-000-0012
1004-SS002I-PA035A 1004-SS002I/1-A -1499.90 -453.20 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS002I-FP035A P8 450 600 100.57 4240-AP-DA-01003000036 ABJ003
9. REINFORCEMENT TO BE ADJUSTED AT SITE TO AVOID FOULING AT REINFORCEMENT WITH ANCHOR BOLT (IF ANY).
1004-SS002I-PA036A 1004-SS002I/2-A -1499.90 -451.30 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS002I-FP036A P8 450 600 100.57 4240-AP-DA-01003000036 ABJ003 ANCHOR BOLT NOT TO BE ADJUSTED & IT'S POSITION & LOCATION SHOULD BE AS PER DRAWING.
H H
1004-SS003I-PA033A 1004-SS003I/1-A -1515.78 -457.37 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS003I-FP033A P7 600 450 100.57 4240-AP-DA-01002000036 ABJ004 10. THE SOIL BACKFILLING AT ALREADY EXCAVATED PORTION BELOW THE FOUNDATION SHALL BE DONE IN COMPACTED
1004-SS003I-PA034A 1004-SS003I/2-A -1512.73 -457.37 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS003I-FP034A P7 600 450 100.57 4240-AP-DA-01002000036 ABJ004 ANCHOR BOLTS QUANTITY LAYER OF 250MM, EACH LAYER BEING PROPERLY COMPLETED USING PLATE VIBRATOR/MANUAL TO ACHIEVE 90%
MODIFIED PROCTOR DENSITY.
1004-SS004I-PA029A 1004-SS004I/1-A -1606.89 -455.81 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS004I-FP029A P7 600 450 100.57 4240-AP-DA-01003000038 ABJ004
11. CONCRETE QUANTITY SHOWN IN TABLE IS ONLY FOR FOUNDATION PEDESTAL PAVING THICKNENING NOT INCLUDED
1004-SS004I-PA030A 1004-SS004I/2-A -1602.64 -455.81 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS004I-FP030A P7 600 450 100.57 4240-AP-DA-01003000038 ABJ004 DIA. OF ANCHOR BOLTS ANCHOR BOLT TYPE NO. OF ANCHOR BOLTS BOLT LENGTH [mm] IN TOTAL.
1004-SS005I-PA027A 1004-SS005I/1-A -1617.71 -455.79 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS005I-FP027A P7 600 450 100.57 4240-AP-DA-01003000038 ABJ004 M20 F 284 555
1004-SS005I-PA028A 1004-SS005I/2-A -1614.56 -455.79 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS005I-FP028A P7 600 450 100.57 4240-AP-DA-01003000038 ABJ004 LEGEND
1004-SS006I-PA018A 1004-SS006I/1-A -1668.92 -457.82 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS006I-FP018A P7 600 450 100.57 4240-AP-DA-01003000040 ABJ004
1004-SS006I-PA020A 1004-SS006I/2-A -1665.87 -457.82 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS006I-FP020A P7 600 450 100.57 4240-AP-DA-01003000040 ABJ004 PA- PAVING NUMBER HPP HIGH POINT OF PAVING
1004-SS007I-PA015A 1004-SS007I/1-A -1679.73 -457.74 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS007I-FP015A P7 600 450 100.57 4240-AP-DA-01003000040 ABJ004 TOC TOP OF CONCRETE
FN- FOUNDATION NUMBER
1004-SS007I-PA016A 1004-SS007I/2-A -1677.68 -457.74 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS007I-FP016A P7 600 450 100.57 4240-AP-DA-01003000040 ABJ004 RFJ FOUNDATION REINFORCEMENT TYPE
1004-SS008I-PA009A 1004-SS008I/1-A -1747.19 -456.91 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS008I-FP009A P7 600 450 100.57 4240-AP-DA-01003000042 ABJ004 GROUTING QUANTITY-FOUNDATIONS FNJ FOUNDATION FORMWORK TYPE
ABJ ANCHOR BOLT BASE PLATE TYPE
BOF BOTTOM OF FOUNDATION IP INSERT PLATE
1004-SS008I-PA010A 1004-SS008I/2-A -1744.14 -456.91 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS008I-FP010A P7 600 450 100.57 4240-AP-DA-01003000042 ABJ004
G 1004-SS009I-PA007A 1004-SS009I/1-A -1758.13 -456.65 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS009I-FP007A P7 600 450 100.57 4240-AP-DA-01003000044 ABJ004 G
MATERIAL TOTAL QUANTITY [Cu. M]
1004-SS009I-PA008A 1004-SS009I/2-A -1754.88 -456.65 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS009I-FP008A P7 600 450 100.57 4240-AP-DA-01003000044 ABJ004
NON-SHRINK GROUT(G1) 0.23
1004-SS010I/1-A -1491.02 -463.66 1004-SS010I-FN016A P7 450 600 100.72 4240-AP-DA-01003000029 ABJ001 APPROVED FOR CONSTRUCTION
1004-SS010I-FN016A FPJ016 RFJ006 - 750 750 225 225 1000 - 300 99.00
1004-SS010I/2-A -1491.02 -462.66 1004-SS010I-FN016A P7 450 600 100.72 4240-AP-DA-01003000029 ABJ001 DATE: 06.03.2023 SIGNATURE:
1004-SS011I/1-A -1572.66 -463.71 1004-SS011I-FN014A P7 450 600 100.72 4240-AP-DA-01003000038 ABJ001 INITIAL: P. JARIWALA
1004-SS011I-FN014A FPJ016 RFJ006 - 750 750 225 225 1000 - 300 99.00
1004-SS011I/2-A -1572.66 -462.71 1004-SS011I-FN014A P7 450 600 100.72 4240-AP-DA-01003000038 ABJ001
1004-SS012I/1-A -1611.40 -463.71 1004-SS012I-FN013A P7 450 600 100.72 4240-AP-DA-01003000038 ABJ001
-
1004-SS012I-FN013A
1004-SS012I/2-A -1611.40 -462.71
FPJ016 RFJ006 750 750 225 225 1000 - 300 99.00
1004-SS012I-FN013A P7 450 600 100.72 4240-AP-DA-01003000038 ABJ001 PRICE CODE REFERENCE DRAWINGS
1004-SS013I/1-A -1617.40 -463.71 1004-SS013I-FN012A P7 450 600 100.72 4240-AP-DA-01003000038 ABJ001 DRAWING NO. TITLE
1004-SS013I-FN012A FPJ016 RFJ006 - 750 750 225 225 1000 - 300 99.00 VAPOUR BARRIER HEAVY DUTY POLYETHYLENE SHEET ADA16AB11
1004-SS013I/2-A -1617.40 -462.71 1004-SS013I-FN012A P7 450 600 100.72 4240-AP-DA-01003000038 ABJ001 4240-AA-DC-01004000007 MISCELLANEOUS PLATFORM, CROSSOVERS & PIPE SUPPORTS FOUNDATION
LEAN CONCRETE ADA08AA01 IPPP-4240-8310-44-000-0022 STANDARD DETAILS PLAN & SECTIONS
1004-SS014I/1-A -1670.98 -463.71 RFJ006
1004-SS014I-FN009A P7 450 600 100.72 4240-AP-DA-01003000040 ABJ001 4240-AA-DC-01004000008 MISCELLANEOUS PLATFORM, CROSSOVERS & PIPE SUPPORT FOUNDATION
1004-SS014I-FN009A FPJ016 - 750 750 225 225 1000 - 300 99.00 IPPP-4240-8310-44-000-0023 STANDARD DETAILS PLAN & SECTIONS
1004-SS014I/2-A -1670.98 -462.71 1004-SS014I-FN009A P7 450 600 100.72 4240-AP-DA-01003000040 ABJ001 WATER PROOFING ADA16AA01
4240-AA-DC-0100400009 MISCELLANEOUS PLATFORM, CROSSOVERS & PIPE SUPPORT FOUNDATION
1004-SS015I/1-A -1734.32 -463.71 1004-SS015I-FN007A P7 450 600 100.72 4240-AP-DA-01003000042 ABJ001 FORMWORK FOR FOUNDATION ADA09AA01 IPPP-4240-8310-44-000-0024 STANDARD DETAILS - PLAN, SECTIONS & REINFORCEMENT DETAILS
F 1004-SS015I-FN007A FPJ016 RFJ006 - 750 750 225 225 1000 - 300 99.00 4240-AA-DC-0100400069 MISCELLANEOUS PLATFORM, CROSSOVERS & PIPE SUPPORT FOUNDATION F
1004-SS015I/2-A -1734.32 -462.71 1004-SS015I-FN007A P7 450 600 100.72 4240-AP-DA-01003000042 ABJ001 IPPP-4240-8310-44-000-0084 PEDESTAL REINFORCEMENT DETAILS
FOUNDATION CONCRETE ADA08AB03
1004-SS016I/1-A -1799.22 -463.71 1004-SS016I-FN006A P7 450 600 100.72 4240-AP-DA-01003000044 ABJ001 4240-AA-CS-01004000008 FOUNDATION CALCULATION REPORT FOR DESIGN OF
1004-SS016I-FN006A FPJ016 RFJ006 - 750 750 225 225 1000 - 300 99.00 IPPP-4240-8310-CA-000-0012 MISCELLANEOUS PLATFORMS & CROSSOVERS
1004-SS016I/2-A -1799.22 -462.71 1004-SS016I-FN006A P7 450 600 100.72 4240-AP-DA-01003000044 ABJ001
SUPPLY AND INSTALLATION OF STEEL REBARS ADA10AA02
4240-AA-DX-00000000001
CONCRETE WORKS GENERAL NOTES & LEGEND (PART-1)
1004-SS017I/1-A -1815.71 -448.86 1004-SS017I-FN001A P7 600 450 100.72 4240-AP-DA-01003000046 ABJ002 NON-SHRINK GROUT ADA12AB01 IPPP-4240-8310-TN-050-0001
1004-SS017I-FN001A FPJ015 RFJ008 - 750 750 225 225 1000 - 300 99.00
1004-SS017I/2-B -1814.71 -448.86 1004-SS017I-FN001A P7 600 450 100.72 4240-AP-DA-01003000046 ABJ002
4240-AA-DX-00000000002 CONCRETE WORKS GENERAL NOTES & LEGEND (PART-2)
SUPPLY AND INSTALLATION OF ANCHOR BOLTS ADA11AA01/ADA11EA01 IPPP-4240-8310-TN-050-0002
1004-SS018I/1-A -1815.71 -417.92 1004-SS018I-FN002A P7 600 450 100.72 4240-AP-DA-01003000046 ABJ002
4240-AA-DX-00000000003
1004-SS018I-FN002A FPJ015 RFJ008 - 750 750 225 225 1000 - 300 99.00 OVER PRICE FOR STEEL REBAR FOR SPECIAL PROTECTION ADA10OA01 STANDARD DETAILS OF ANCHOR BOLTS DRAWING
1004-SS018I/1-B -1814.71 -417.92 1004-SS018I-FN002A P7 600 450 100.72 4240-AP-DA-01003000046 ABJ002 IPPP-4240-8310-TN-050-0003
1004-SS019I-PA005A 1004-SS019I/1-A -1800.32 -366.78 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS019I-FP005A P7 450 600 100.57 4240-AP-DA-01002000010 ABJ003 4240-AP-DC-00000000001
IPPP-4240-8310-45-050-0231 UNDERGROUND WORKS CONCRETE PAVEMENT CONSTRUCTION & R/F DETAILS
1004-SS019I-PA006A 1004-SS019I/2-A -1800.32 -362.53 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS019I-FP006A P7 450 600 100.57 4240-AP-DA-01002000010 ABJ003
1004-SS020I-PA003A 1004-SS020I/1-A -1800.50 -355.50 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS020I-FP003A P7 450 600 100.57 4240-AP-DA-01002000010 ABJ003
1004-SS020I-PA004A 1004-SS020I/2-A -1800.50 -353.45 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS020I-FP004A P7 450 600 100.57 4240-AP-DA-01002000010 ABJ003 Document
Category
1004-SS021I-PA021A 1004-SS021I/1-A -1642.47 -325.61 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS021I-FP021A P7 600 450 100.57 4240-AP-DA-01002000015 ABJ004 Drawing / Document Review Status (By Owner / PMC)
E
(Submission E
1004-SS021I-PA023A 1004-SS021I/1-B -1642.47 -324.04 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS021I-FP023A P7 600 450 100.57 4240-AP-DA-01002000015 ABJ004 Purpose)
1004-SS021I-PA022A 1004-SS021I/2-A -1640.65 -325.61 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS021I-FP022A P7 600 450 100.57 4240-AP-DA-01002000015 ABJ004
1 Rejected Revised and resubmit
1004-SS021I-PA024A 1004-SS021I/2-B -1640.65 -324.04 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS021I-FP024A P7 600 450 100.57 4240-AP-DA-01002000015 ABJ004 Commented as Work may proceed subject to acceptance and
Approval 2 noted incorporation of comments
1004-SS022I-PA017A 1004-SS022I/1-A -1670.90 -325.14 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS022I-FP017A P7 600 450 100.57 4240-AP-DA-01002000017 ABJ004
1004-SS022I-PA019A 1004-SS022I/3-A -1668.75 -325.14 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS022I-FP019A P7 600 450 100.57 4240-AP-DA-01002000017 ABJ004 Acceptable with Incorporate comments if any. Resubmit as
3 minor comments certified final. Work may proceed
1004-SS023I/1-A -1815.70 -296.60 1004-SS023I-FN003A P7 600 450 100.72 4240-AP-DA-01003000048 ABJ002 Review
1004-SS023I-FN003A FPJ015 RFJ008 - 750 750 225 225 1000 - 300 99.00 Approved with No
1004-SS023I/1-B -1814.70 -296.60 1004-SS023I-FN003A P7 600 450 100.72 4240-AP-DA-01003000048 ABJ002 4 comments - Final
Work may proceed

1004-SS024I-PA031A 1004-SS024I/1-A -1545.49 -229.83 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS024I-FP031A P7 600 450 100.57 4240-AP-DA-01003000055 ABJ004 Information 5 Information only Accepted for information only. Work may proceed
1004-SS024I-PA032A 1004-SS024I/2-A -1541.04 -229.83 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS024I-FP032A P7 600 450 100.57 4240-AP-DA-01003000055 ABJ004
DATE TOYO Job No. 6417
1004-SS025I-PA025A 1004-SS025I/1-A -1636.42 -230.02 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS025I-FP025A P7 600 450 100.57 4240-AP-DA-01003000057 ABJ004
1004-SS025I-PA026A 1004-SS025I/2-A -1633.12 -230.02 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS025I-FP026A P7 600 450 100.57 4240-AP-DA-01003000057 ABJ004
SIGN AE LAE TM/DH
1004-SS026I/1-A -1815.70 -238.44 1004-SS026I-FN004A P7 600 450 100.57 4240-AP-DA-01003000067 ABJ002
1004-SS026I-FN004A FPJ015 RFJ008 - 750 750 225 225 1000 - 300 99.00 NOTE : This approval does not absolve the CONTRACTOR from meeting their
D 1004-SS026I/1-B -1814.70 -238.44 1004-SS026I-FN004A P7 600 450 100.57 4240-AP-DA-01003000067 ABJ002 contractual obligations of delivering a complete safe and efficiently operating unit D
1004-SS027I/1-A -1810.44 -230.33 1004-SS027I-FN005A P7 450 600 100.57 4240-AP-DA-01003000067 ABJ003 facilities meeting all requirements of the contract
1004-SS027I-FN005A FPJ016 RFJ005 45 750 750 500 500 1000 - 300 99.00
1004-SS027I/2-A -1809.74 -231.04 1004-SS027I-FN005A P7 450 600 100.57 4240-AP-DA-01003000067 ABJ003
1004-SS028I/1-A -1685.23 -225.48 1004-SS028I-FN008A P7 450 600 100.57 4240-AP-DA-01003000059 ABJ001
1004-SS028I-FN008A FPJ016 RFJ005 - 750 750 500 500 1000 - 300 99.00
1004-SS028I/2-A -1685.23 -224.48 1004-SS028I-FN008A P7 450 600 100.57 4240-AP-DA-01003000059 ABJ001
1004-SS029I/1-A -1639.27 -225.48 1004-SS029I-FN010A P7 450 600 100.57 4240-AP-DA-01003000057 ABJ001
1004-SS029I-FN010A FPJ016 RFJ005 - 750 750 500 500 1000 - 300 99.00
1004-SS029I/2-A -1639.27 -224.48 1004-SS029I-FN010A P7 450 600 100.57 4240-AP-DA-01003000057 ABJ001
1004-SS030I-PA013A 1004-SS030I/1-A -1686.68 -230.26 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS030I-FP013A P7 600 450 100.57 4240-AP-DA-01003000059 ABJ004
1004-SS030I-PA014A 1004-SS030I/2-A -1682.33 -230.26 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS030I-FP014A P7 600 450 100.57 4240-AP-DA-01003000059 ABJ004
1004-SS031I-PA011A 1004-SS031I/1-A -1719.54 -231.16 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS031I-FP011A P7 600 450 100.57 4240-AP-DA-01003000063 ABJ004
1004-SS031I-PA012A 1004-SS031I/2-A -1715.09 -231.16 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS031I-FP012A P7 600 450 100.57 4240-AP-DA-01003000063 ABJ004 00 Issued for Construction M.Pandit C.Govekar R.Tripathi 06.03.2023
1004-SS032I-PA001A 1004-SS032I/1-A -1808.56 -263.50 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS032I-FP001A P7 450 600 100.57 4240-AP-DA-01003000067 ABJ003 Rev. Description Drawn Chk'd App'd Date

1004-SS032I-PA002A 1004-SS032I/2-A -1808.56 -260.30 FPJ003 RFJ001 - 650 650 650 650 - 200 - - 1004-SS032I-FP002A P7 450 600 100.57 4240-AP-DA-01003000067 ABJ003 PROJECT :
C C
1004-SS033I/1-A -1627.30 -225.48 1004-SS033I-FN011A P7 450 600 100.57 4240-AP-DA-01003000057 ABJ001
1004-SS033I-FN011A FPJ016 RFJ005 - 750 750 500 500 1000 - 300 99.00 1.2 MMTPA PX-PTA PROJECT IOCL PARADIP
1004-SS033I/2-A -1627.30 -224.48 1004-SS033I-FN011A P7 450 600 100.57 4240-AP-DA-01003000057 ABJ001
1004-SS034I/1-A -1547.55 -225.48 1004-SS034I-FN015A P7 450 600 100.72 4240-AP-DA-01003000055 ABJ001 OWNER :
1004-SS034I-FN015A
1004-SS034I/2-A -1547.55 -224.48
FPJ016 RFJ006 - 750 750 225 225 1000 - 300 99.00
1004-SS034I-FN015A P7 450 600 100.72 4240-AP-DA-01003000055 ABJ001 KEY PLAN ●

THIS AREA INDIAN OIL CORPORATION LTD.


1004-SS035I-PA039A 1004-SS035I/1-A -1496.79 -225.00 FPJ003 RFJ001 - 1000 1000 415 785 - 200 - - 1004-SS035I-FP039A P7 450 600 100.72 4240-AP-DA-01003000055 ABJ004
Indian oil

All Right Reserved


This Drawing/Document is the property of INDIAN OIL CORPORATION LTD. and is lent without consideration other than
the contained in this drawing may be proprietary to INDIAN OIL CORPORATION LTD. and or LICENSORS and is subject to Borrower's
agreement than it shall not be reproduced, copied, lent or disclosed of directly or indirectly, nor used for any purpose other than that for

ANCHOR BOLTS LAYOUT SCHEDULE which it is specifically furnished. The apparatus shown in the drawing is covered by patents obligations of confidentiality.

PMC :
Toyo Engineering India Private Limited
ANCHOR BOLTS LAYOUT TYPE QUANTITY NO. OF BOLTS BOLTS IDENTIFICATION HORIZONTAL VERTICAL PROJECTION EMBEDDED
REMARKS TOYO
B
MARK. SPACING (C) SPACING (D) (P) LENGHT (E) ELECT. CABLE TRENCH B
TEIPL Job No : 6417 Work order No : 26703106
ABJ001 22 201 100 250 110 400 NO SHEAR KEY POCKET CONTRACTOR : Tecnimont Job No : 4240 Work order No : RHQ/PJ/PX PTA-PDR/EPCC-2/LOA
ABJ002 8 201 250 100 110 400 NO SHEAR KEY POCKET THIS DOCUMENT IS TECNIMONT'S PROPERTY AND CANNOT BE

ABJ003 12 201 150 300 110 400 NO SHEAR KEY POCKET Tecnimont Tecnimont USED BY OTHERS FOR ANY PURPOSE WITHOUT PRIOR WRITTEN CONSENT
Tecnimont Private Limited

MODEL NAME : 4240-AA3D-1004-SS001I


ABJ004 29 201 300 150 110 400 NO SHEAR KEY POCKET CONTRACTOR DOC NO.
Job EC Type N° Rev.

4240 AA DC 010045000065 00
TITLE

AREA 1004
MISCELLANEOUS PLATFORMS FOUNDATION SCHEDULE

A PLANT SHEET NO. A


SCALE: 1:100 0.8 MMTPA PARAXYLENE (PX) EPCC-02 01 OF 01

OWNER DOC NO.

A1 SHEET
Graphic Scale Unit N° Rev.
0 10 20 m
IPPP 4240 8310 44 000 0080 00
1 2 3 4 5 6 7 8 9 10