I PAVING ANCHOR 1. ALL ELEVATIONS AND CO-ORDINATES ARE IN METERS.
2. ALL DIMENSIONS ARE IN MILLIMETERS.
I
PAVING THICKENING / FOUNDATION LOCAL THICKENING FOR ALL NEAREST PIPE SUPPORT/ PAVING-PEDESTAL TYPE SCHEDULE BOLT / INSERT 3. EL .100.000 CORRESPONDS TO RL. 4.060 ABOVE IMSL.
4. THE DRAWING IS NOT TO BE SCALED. WRITTEN DIMENSIONS TO BE FOLLOWED.
PLATFORMS TO BE COMBINED TO SUITE AT SITE. 5. ANY DISCREPANCY IN DRAWING TO BE REPORTED TO ENGINEERING IMMEDIATELY FOR CLARIFICATION.
PLATE 6. FOR ALL STANDARD DETAILS 0F CONSTRUCTION FOR PILE CAP, PEDESTAL ETC. REFER CONCRETE WORK
STANDARD DRAWINGS IPPP-4240-8310-TN-050-0001_4240-AA-DX-00000000001 TO
NORTH EAST F/W TYPE R/F TYPE L1 L2 W1 W2 W3 H J TOF Item Tag PEDESTAL A B TOC AP-DA REFERENCE ABJ / IP / PQ IPPP-4240-8310-TN-050-0010_4240-AA-DX-00000000010
Item Tag STRUCTURE NO. UNIT NO: CO-ORDINATE CO-ORDINATE 7. BAR BENDING SCHEDULE IS INDICATIVE CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING REBAR
1006 R/F TYPE
QUANTITIES & DIMENSION ACCORDING TO DRAWINGS
1006-SS001I- 1006-SS001I/1-A -1652.305 -534.271 - 1006-SS001I-FP014A P7 600 450 100.570 4240-AP-DA-01003000039 ABJ002 8. DESIGN DOCUMENT NO. 4240-AA-CS-01004000008 / IPPP-4240-8310-CA-000-0012
30 FPJ004 RFJ003 750 750 330 330 3200 200 -
PA008A 1006-SS001I/1-B -1649.105 -534.271 1006-SS001I-FP015A P7 600 450 100.570 4240-AP-DA-01003000039 ABJ002 9. REINFORCEMENT TO BE ADJUSTED AT SITE TO AVOID FOULING AT REINFORCEMENT WITH ANCHOR BOLT (IF ANY).
ANCHOR BOLT NOT TO BE ADJUSTED & IT'S POSITION & LOCATION SHOULD BE AS PER DRAWING.
H 1006-SS002I- 1006-SS002I/1-A -1665.141 -534.271 1006-SS002I-FP012A P7 600 450 100.570 4240-AP-DA-01003000039 ABJ002 10. THE SOIL BACKFILLING AT ALREADY EXCAVATED PORTION BELOW THE FOUNDATION SHALL BE DONE IN COMPACTED H
30 FPJ004 RFJ003 3200 - -
PA007A 750 750 330 330 200 4240-AP-DA-01003000039 LAYER OF 250MM, EACH LAYER BEING PROPERLY COMPLETED USING PLATE VIBRATOR/MANUAL TO ACHIEVE 90%
1006-SS002I/1-B -1661.941 -534.271 1006-SS002I-FP013A P7 600 450 100.570 ABJ002
MODIFIED PROCTOR DENSITY.
1006-SS003I- 1006-SS003I/1-A -1641.435 -484.985 1006-SS003I-FP016A P7 600 450 100.570 4240-AP-DA-01003000040 ABJ002 11. CONCRETE QUANTITY SHOWN IN TABLE IS ONLY FOR FOUNDATION PEDESTAL PAVING THICKNENING NOT INCLUDED
30 FPJ004 RFJ003 750 750 330 330 3200 200 - -
PA009A 1006-SS003I/1-B -1638.235 -484.985 1006-SS003I-FP018A P7 600 450 100.570 4240-AP-DA-01003000040 ABJ002 IN TOTAL.
1006-SS004I- 1006-SS004I/1-A -1498.599 -197.972 - 1006-SS004I-FP021A P7 450 600 100.570 4240-AP-DA-01003000055 ABJ005
60 FPJ005 RFJ002 750 750 330 330 3400 200 -
PA011A 1006-SS004I/2-A -1498.599 -194.572 1006-SS004I-FP022A P7 450 600 100.570 4240-AP-DA-01003000055 ABJ005 LEGEND
1006-SS005I- 1006-SS005I/1-A -1619.341 -200.755 1006-SS005I-FP019A P7 600 450 100.570 4240-AP-DA-01003000056 ABJ002
60 FPJ004 RFJ003 750 750 330 330 2300 200 - - PA- PAVING NUMBER HPP HIGH POINT OF PAVING
PA010A 1006-SS005I/1-B -1617.041 -200.755 1006-SS005I-FP20A P7 600 450 100.570 4240-AP-DA-01003000056 ABJ002
TOC TOP OF CONCRETE
FN- FOUNDATION NUMBER
1006-SS006I- 1006-SS006I/1-A -1671.153 -195.295 1006-SS006I-FP010A P7 600 450 100.570 4240-AP-DA-01003000059 ABJ002 RFJ FOUNDATION REINFORCEMENT TYPE
70 FPJ004 RFJ003 750 750 330 330 3700 200 - -
PA006A FNJ FOUNDATION FORMWORK TYPE
1006-SS006I/1-B -1667.453 -195.295 1006-SS006I-FP011A P7 600 450 100.570 4240-AP-DA-01003000059 ABJ002 ABJ ANCHOR BOLT BASE PLATE TYPE
-1796.760 199.496 1006-SS007I-FP008A P7 600 450 100.570 4240-AP-DA-01003000067 ABJ002 BOF BOTTOM OF FOUNDATION IP INSERT PLATE
1006-SS007I- 1006-SS007I/1-A 750 750 200
70 FPJ004 RFJ003 330 330 1900 - -
G PA005A -1794.860 -199.496 1006-SS007I-FP009A P7 600 450 100.570 4240-AP-DA-01003000067 ABJ002 G
1006-SS007I/1-B
1006-SS008I- 1006-SS008I/1-A -1988.180 -68.979 1006-SS008I-FP008A P7 450 600 100.570 4240-AP-DA-01003000073 ABJ005
70 FPJ005 RFJ002 650 650 300 300 1400 200 - - APPROVED FOR CONSTRUCTION
PA003A 1006-SS008I/2-A -1988.180 -70.379 1006-SS008I-FP005A P7 450 600 100.570 4240-AP-DA-01003000073 ABJ005
DATE: 06.03.2023 SIGNATURE:
1006-SS009I- 1006-SS009I/1-A -1485.300 -569.795 1006-SS009I-FN009A P7 450 600 100.570 - ABJ001
70 FPJ016 RFJ005 600 600 600 600 1000 - 300 99.000 INITIAL: P. JARIWALA
FN009A 1006-SS009I/2-A -1485.300 -568.795 1006-SS009I-FN009A P7 450 600 100.570 - ABJ001
1006-SS018I- 1006-SS018I/1-A -1505.096 -552.854 1006-SS018I-FN008A P7 450 600 100.720 4240-AP-DA-01003000035 ABJ001 Document
70 FPJ016 RFJ006 750 750 225 225 1000 - 300 99.000
E FN008A 1006-SS018I/2-A -1505.096 -551.854 1006-SS018I-FN008A P7 450 600 100.720 4240-AP-DA-01003000035 ABJ001 Category E
Drawing / Document Review Status (By Owner / PMC)
1006-SS019I/1-A 4240-AP-DA-01003000039 ABJ001
(Submission
1006-SS019I- -1649.911 -552.914 1006-SS019I-FN006A P7 450 600 100.720
70 FPJ016 RFJ006 750 750 225 225 1000 - 300 99.000 Purpose)
FN006A 1006-SS019I/2-A -1646.911 -551.914 1006-SS019I-FN006A P7 450 600 100.720 4240-AP-DA-01003000039 ABJ001
1 Rejected Revised and resubmit
1006-SS020I- 1006-SS020I/1-A -1714.158 -552.933 1006-SS020I-FN005A P7 450 600 100.720 4240-AP-DA-01003000041 ABJ001 Commented as Work may proceed subject to acceptance and
70 FPJ016 RFJ006 750 750 225 225 1000 - 300 99.000 2
FN005A 1006-SS020I/2-A -1714.158 -551.933 1006-SS020I-FN005A P7 450 600 100.720 4240-AP-DA-01003000041 ABJ001 Approval noted incorporation of comments
Acceptable with Incorporate comments if any. Resubmit as
1006-SS021I- 1006-SS021I/1-A -1777.111 -552.933 1006-SS021I-FN004A P7 450 600 100.720 4240-AP-DA-01003000043 ABJ001 3 minor comments certified final. Work may proceed
70 FPJ016 RFJ006 750 750 225 225 1000 - 300 99.000 Review
FN004A 1006-SS021I/2-A -1777.111 -551.933 1006-SS021I-FN004A P7 450 600 100.720 4240-AP-DA-01003000043 ABJ001 Approved with No
4 comments - Final
Work may proceed
1006-SS022I- 1006-SS022I/1-A -1784.176 -552.933 1006-SS022I-FN002A P7 450 600 100.720 4240-AP-DA-01003000043 ABJ001
70 FPJ016 RFJ006 750 750 225 225 1000 - 300 99.000 Information 5 Information only Accepted for information only. Work may proceed
FN002A 1006-SS022I/2-A -1784.176 -551.933 1006-SS022I-FN002A P7 450 600 100.720 4240-AP-DA-01003000043 ABJ001
DATE TOYO Job No. 6417
1006-SS024I- 1006-SS024I/1-A -1782.593 -477.350 1006-SS024I-FN003A P7 600 450 100.720 4240-AP-DA-01003000044 ABJ004
70 FPJ015 RFJ008 750 750 225 225 1000 - 300 99.000
FN003A 1006-SS024I/1-B -1783.593 -477.350 1006-SS024I-FN003A P7 600 450 100.720 4240-AP-DA-01003000044 ABJ004
SIGN AE LAE TM/DH
D 1006-SS025I/1-A -1941.411 -65.439 1006-SS025I-FN001A P7 600 450 100.720 4240-AP-DA-01003000072 ABJ003 D
1006-SS025I- 70 FPJ015 RFJ008 750 750 225 225 1000 - 300 99.000 NOTE : This approval does not absolve the CONTRACTOR from meeting their
FN001A 1006-SS025I/1-B -1940.411 -65.439 1006-SS025I-FN001A P7 600 450 100.720 4240-AP-DA-01003000072 ABJ003 contractual obligations of delivering a complete safe and efficiently operating unit
facilities meeting all requirements of the contract
1006-SS026I- 1006-SS026I/1-A -1952.205 -47.761 1006-SS026I-FP006A P7 600 450 100.570 4240-AP-DA-01003000074 ABJ003
70 FPJ004 RFJ003 600 600 500 500 1000 200 - -
PA004A 1006-SS026I/1-B -1951.205 -47.761 1006-SS026I-FP007A P7 600 450 100.570 4240-AP-DA-01003000074 ABJ003
1006-SS027I-PA001A 1006-SS027I/1-A 70 -1993.776 -85.700 FPJ003 RFJ001 650 650 650 650 - 200 - - 1006-SS027I-FP002A P7 450 600 100.570 4240-AP-DA-01003000073 ABJ005
1006-SS027I-PA002A 1006-SS027I/2-A 70 -1993.776 -88.500 FPJ003 RFJ001 580 720 650 650 - 200 - - 1006-SS027I-FP003A P7 450 600 100.570 4240-AP-DA-01003000073 ABJ005
1006-SS028I- 1006-SS028I/1-A -1634.900 -58.929 1006-SS028I-FN007A P7 600 450 100.570 4240-AP-DA-01003000054 ABJ004
70 FPJ015 RFJ007 600 600 600 600 1000 - 300 99.000
FN007A 1006-SS028I/1-B -1633.900 -58.929 1006-SS028I-FN007A P7 600 450 100.570 4240-AP-DA-01003000054 ABJ004
C
FOUNDATION CONCRETE QUANTITY REFER NOTE - 11 PROJECT :
C
VAPOUR BARRIER HEAVY DUTY POLYETHYLENE SHEET ADA16AB11
1.2 MMTPA PX-PTA PROJECT IOCL PARADIP
MATERIAL TOTAL QUANTITY [Cu. M] LEAN CONCRETE ADA08AA01
1006 OWNER :
WATER PROOFING ADA16AA01 KEY PLAN
Foundation Concrete 27.32
●
FORMWORK FOR FOUNDATION ADA09AA01 THIS AREA INDIAN OIL CORPORATION LTD.
FOUNDATION CONCRETE ADA08AB03 Indian oil
M20 F 216 555 OVER PRICE FOR STEEL REBAR FOR SPECIAL PROTECTION ADA10OA01 PMC :
Toyo Engineering India Private Limited
B TOYO B
TEIPL Job No : 6417 Work order No : 26703106
ELECT. CABLE TRENCH
4240 AA DC 01004000019 00
TITLE
ANCHOR BOLTS LAYOUT SCHEDULE AREA 30,60&70
BOLTS IDENTIFICATION HORIZONTAL VERTICAL PROJECTION EMBEDDED MISCELLANEOUS PLATFORMS FOUNDATION
ANCHOR BOLTS LAYOUT TYPE QUANTITY NO. OF BOLTS REMARKS
MARK SPACING (C) SPACING (D) (P) LENGHT (E) SCHEDULE
ABJ001 16 64 201 100 250 110 400 NO SHEAR KEY POCKET
A PLANT SHEET NO. A
ABJ002 12 48 201 300 150 110 400 NO SHEAR KEY POCKET
SCALE: 1:100 0.8 MMTPA PARAXYLENE (PX) EPCC-02 01 OF 01
ABJ003 4 16 201 250 100 110 400 NO SHEAR KEY POCKET
ABJ004 14 56 201 250 100 110 400 NO SHEAR KEY POCKET OWNER DOC NO.
ABJ005 8 32 201 150 300 110 400 NO SHEAR KEY POCKET
A1 SHEET
Graphic Scale Unit N° Rev.
0 10 20 m
IPPP 4240 8310 44 000 0034 00