1.
FT01-0101 Cabinet
1.1.4.1.1 Cabinet Position 1.2. 4.1.2 Cabinet Installation
1.3. 4.1.3 Cabinet Condition 1.4. 4.1.4 Cabinet Bolt Installation
2. FT01-0102 Power Cables
2.1 4.2.1 The power cables are connected 2.2. Picture 4.2.2 The engineering diagram is ready
2.3. 4.2.3 Connection power cable 2.4. 4.2.4 Terminal connection
2.5. 4.2.5 Check power cable laying 2.6. 4.2.6 Grounding cable route & value
2.7. 4.2.7 Grounding screws and bolts 2.8. 4.2.8 Cable lug installed properly
2.9. 4.2.9 Grounding BOX Control 2.10. 4.2.10 Grounding - Busbar Upper
2.12. 4.2.12 View Routing Optic and Power Cable
2.11. 4.2.11 Grounding - Busbar Lower
Vertical Tray
2.13. 4.2.12A The Metal conduit end side
2.14. 4.2.13 View Routing Optic and Power Cable
waterproofing 1+3+3. Waterproofing end use cable
Horizontal Tray
ties
2.15. 4.2.14 Excess Optic Cable 1 2.16. 4.2.15 Excess Optic Cable 2
Penempatan kabel optik cadangan di Kaki tower belakang antenna, ketinggian di center ANT
Penempatan kabel optik cadangan di Kaki tower belakang antenna, ketinggian di center ANT
2.17. 4.2.16 Excess Optic Cable 3 2.18. 4.2.17 Excess Optic Cable 4
3. FT01-0103 Antennas and Feeders
3.1. 4.3.1.1 Installation Location Sector1 3.2. 4.3.1.2 Installation Location Sector2 3.3. 4.3.1.3 Installation Location Sector3
Periksa apakah lokasi pemasangan antena sesuai dengan persyaratan yang ditentukan dalam berkas desain. Selain itu, periksa apakah antena berada dalam
jangkauan proteksi penangkal petir.
3.4. 4.3.2.1 Azimuth Sector1 3.5. 4.3.2.2 Azimuth Sector2 3.6. 4.3.2.3 Azimuth Sector 3
Mengukur sudut azimuth antena
3.7. 4.3.2.4 View Azimuth Sector1 3.8. 4.3.2.5 View Azimuth Sector2 3.9. 4.3.2.6 View Azimuth Sector3
3.10. 4.3.3.1 Down tilt Mechanical - Sector1 3.11. 4.3.3.2 Down tilt Mechanical - Sector2 3.12. 4.3.3.3 Down tilt Mechanical - Sector3
Mengukur kemiringan antena ke bawah. Mechanical and electrical
4. Electrical
4.1. 4.3.3.4 Down tilt Electrical – Sector1 4.2. 4.3.3.5 Down tilt Electrical – Sector2 4.3. 4.3.3.6 Down tilt Electrical – Sector3
Mengukur kemiringan antena ke bawah. Mechanical and electrical
5. Measure all sectoral antennas height from ground level
5.1. 4.3.4.1 Height Sector1 5.2. 4.3.4.2 Height Sector2 5.3. 4.3.4.3 Height Sector3
6. Check is there any obstacles on the front of sectoral antennas
6.1. 4.3.5.1 Obstacles check Sector1 6.2. 4.3.5.2 Obstacles check Sector2 6.3. 4.3.5.3 Obstacles check Sector3
7. Check the waterproof treatment of joints and waterproof curves of all sectoral antennas
7.1. 4.3.6.1 Waterproof Sector1 7.2. 4.3.6.2 Waterproof Sector2 7.3. 4.3.6.3 Waterproof Sector3
8. Check the grounding positions and layout of CPRI cable, and measure the minimum bending radius of CPRI cable
8.1. 4.3.7.1 Grounding Sector1 8.2. 4.3.7.2 Grounding Sector2 8.3. 4.3.7.3 Grounding Sector3
Penempatan kabel optik cadangan (di dalam enklosur/baki horizontal/antena kaki menara belakang
9. Check the appearance of feeders and jumpers. In addition, check the labels of cables
9.1. 4.3.8.1 Appearance Sector1 9.2. 4.3.8.2 Appearance Sector2 9.3. 4.3.8.3 Appearance Sector3
10. Check the Waterproof label of all the sectoral antennas
10.1. 4.3.9.1 Waterproof Label Sector1 10.2. 4.3.9.2 Waterproof Label Sector2 10.3. 4.3.9.3 Waterproof Label Sector3
11. Check whether the antenna mountings are matched with the engineering requirements
11.1. 4.3.10.1 Mounting Sector1 11.2. 4.3.10.2 Mounting Sector2 11.3. 4.3.10.3 Mounting Sector3
12. Transport System (Existing)
12.1.6.1.1 Antenna MW Waterproof Label 12.2. 6.1.2 Antenna MW Position 12.3. 6.1.3 Antenna MW Grounding
12.4. 6.2.1 Access Router Position 12.5. 6.3.1 OTB Position
13. 7. ME & Power System
13.1. 7.1 Rectifier Load 13.2. 7.2 Rectifier overview 13.3. 7.3 RBS power cables routed properly
13.4. 7.4 Cable distribution meet with current carrying 13.5. 7.5 End cable termination connected to MCB 13.6. 7.6 ACPDB Condition (cable, MCB, Arrester,
capacity and XL specification must use ferrules grounding connections
13.8. 7.8 Genset Nameplate (Brand, Model, SN, Type, 13.9. 7.9 AMF Panel Condition (Contactor Magnetic,
13.7. 7.7 COS Box condition open and close
Capacity) & Unit Genset Arrester & MCB
13.10. 7.10 All rack equipment connected to
13.11. 7.11 V Grounding to N less than 5 V 13.12. 7.12 Seal and condition of KWH Meter
respective grounding bar
13.13. 7.13 Number of Battery installed(block) overall view 13.14. 7.14 Batteries physically undamaged 13.15. 7.15 Protective covers correctly installed batteries pole
13.16. 7.16 Temperature sensor installed properly 13.17. 7.17 Setting, Load LLVD 44.0 Vdc 13.18. 7.18 Setting, Battery LLVD 43.2 Vdc
13.19 7.19 Setting, Charging Current Limit set to 0.1C10 13.20. 7.20 Measurement Battery Bank 1 (Vdc) 13.21. 7.21 Measurement Battery Bank 2
13.22 7.22 Grounding for batteries lithium 13.23. 7.27 Room/shelter temperature 13.24. 7.28 Photo 4 side of indoor Per shelter
13.25. 7.29 Photo Transmission equipment router/otb/etc
14. 8. Asset Tagging
14.1. 8.1 Antenna RF Sector 1 14.2. 8.2 Antenna RF Sector 2 14.3. 8.3 Antenna RF Sector 3
14.4. 8.5 Rectifier 14.5. 8.6 Battery Block 1 14.6. 8.7 Battery Block 2
14.7. 8.8 Battery Block 3 14.8. 8.9 Battery Block 4 14.9. 8.10 Battery Block 5
14.11. 8.12 Battery Block 7 14.12. 8.13 Battery Block 8
15. Installation Photo Documentation
15.1. 10.1 BTS Closed 15.2. 10.2 BTS Open 15.3. 10.3 View Earthing Kit Power RRU with Waterproof
15.4. 10.4 View Earthing Kit Power RRU connected with to Busbar
15.5. 10.6 GPS Antenna as planned height 15.6. 10.6A GPS Antenna
15.9. 10.8 Overview RRU 1 # Sector 1
15.7. 10.6B GPS Antenna Type 15.8. 10.5 Connection Power Cable RRU at DCDU
15.10. 10.7 Jumper Feeder to Antenna Sector 1 15.11. 10.10 Overview RRU 2 15.12. 10.9 Grounding & Jumper Connection on RRU 1 # Sector
15.13. 10.12 Overview RRU 3 15.14. 10.11 Grounding & Jumper Connection on RRU 2 # Sector
15.15.
1 10.14 Jumper Feeder to Antenna Sector 2
15.16. 10.13 Grounding & Jumper Connection on RRU 3 # Sector
15.17.
1 10.15 Overview RRU 1 15.18. 10.16 Grounding & Jumper Connection on RRU 1 # Secto
15.19. 10.17 Overview RRU 2 # Sector 2 15.20. 10.18 Grounding & Jumper Connection on RRU 2 # Sector
15.21.
2 10.19 Overview RRU 3
15.22. 10.20 Grounding & Jumper Connection on RRU 3 # Sector
15.23.
2 10.21 Jumper Feeder to Antenna Sector 3 15.24. 10.22 Overview RRU 1 # Sector 3
15.25. 10.23 Grounding & Jumper Connection on RRU 1 # Sector
1.5.26.
3 10.24 Overview RRU 2 # Sector 3 15.27. 10.25 Grounding & Jumper Connection on RRU 2 # Secto
15.28. 10.26 Overview RRU 3 15.29. 10.27 Grounding & Jumper Connection on RRU 3 # Sector 3
16. AAU INSTALLATION
16.3. 3.4.6 Antenna mounting bracket installed with
16.1. 3.4.4 AAU Installation Sector 1 16.2. 3.4.5 Antenna and AAU is located height
washer, lock washer and double nut
16.4. 3.4.7 Mechanical Tilting Sector 1 16.5. 3.4.8 Measure Azimuth AAU Sector 1 16.6. 3.4.9 View Azimuth AAU Sector 1
16.7. 3.4.10 SN AAU Sector 1 16.8. 3.4.11 Grounding AAU Sector 1 16.9. 3.4.12 AAU Installation Sector 2
16.10. 3.4.13 Antenna and AAU is located height 16.11. 3.4.14 Antenna mounting bracket installed with
16.12. 3.4.15 Mechanical Tilting Sector 2
Sector 2 washer, lock washer and double nut
16.13. 3.4.16 Measure Azimuth AAU Sector 2 16.14. 3.4.17 View Azimuth AAU Sector 2 16.15. 3.4.18 SN AAU Sector 2
16.18. 3.4.21 Antenna and AAU is located height
16.16. 3.4.19 Grounding AAU Sector 2 16.17. 3.4.20 AAU Installation Sector 3
Sector 3
16.19. 3.4.22 Antenna mounting bracket installed with washer,
16.20.
lock3.4.23
washerMechanical
and doubleTilting
nut Sector 3 16.21. 3.4.24 Measure Azimuth AAU Sector 3
16.22. 3.4.25 View Azimuth AAU Sector 3 16.23. 3.4.26 SN AAU Sector 3 16.24. 3.4.27 Grounding AAU Sector 3
16.26. 3.4.29 Antenna and AAU is located height 16.27. 3.4.30 Antenna mounting bracket installed with
16.25. 3.4.28 AAU Installation Sector 4
Sector 4 washer, lock washer and double nut
16.28. 3.4.31 Mechanical Tilting Sector 4 16.29. 3.4.32 Measure Azimuth AAU Sector 4 16.30. 3.4.33 View Azimuth AAU Sector 4
16.31. 3.4.34 SN AAU Sector 4 16.32. 3.4.35 Grounding AAU Sector 4
17. Installation Photo Documentation PICO to Macro
17.1. 10.28 Photo Overview DPU & RRU 1 to 3 (check 17.3. 10.30 Photo Overview DPU & RRU 1 to 3 (check
17.2. 10.29 Photo connection power cable DPU at
pole bracket connection at (wall); check connector pole bracket connection at (wall); check connector
ACPD/KWH from 1 to 3
power cable – grounding power cable – grounding
17.4. 10.31 Overview Tower 17.5. 10.32 Overview Site