Ej SOM FROVECTS | pocess PLAN/IN PROCES INSPECTION REPORT | ea
Sanitary & Plumbing al
Dates 02 JoG/25 j
Client = pee Kein], j
Site = Ppl ad ot Bhose pina 1
location Grid = Sood ‘GIA U a
Drawing Reference. = GES¢’4q- “1p ~ PHE= 00-EVL- CARIN ~o1-Pal
SR.NO| [TEMS TOBE CHECKED [ACCEPTANCE CRITERIA OBSERVATIONS
1 [Study the drawing es |
i
Ensure marking of imetreTine
2 above Fr. Yes e3 |
Ensure the dia. of Gl piper at e ion
2 various places/ UPVC Pipe _|ASPeF rowing Absa aD eel
Line outon wall for dado by
4 lehalkforinfet & outer As per drawing yes
plumbing points =
5 |UneoutoF6..tines onwalls [As per drawing yes {
[Chasing the grooves for |
S |concealed pipes is Vi,
(Check fr aplication of coal
Peelers, ls yes |
Pipes
[Check plumbing points. 1. y |
8 _|trinal2, wash basin 3. Bib cock|as per drawing
ele We checlle.
\Conceaing of GI. pipes with
2 cement mortar done |
Sees vores ieee en
|Marking of vertical GL. /C.\.
ines oa external plaster. Ves
ICheck for slopes of drain lines |As per drawing Checke A
‘of joints (cement /lead ss WV
8 ere) techs As pep Lreeleths
14 [Finishing of holes den 2
Check the level postion of W.C ; ft t
15 |trops,nahanitraps spout & _ |Referrng finish level of tiles cheeyel Fare evel it
joutiet
pL pt
16 _|Fxing of sanitary & Cp wares, As per Specfiations Ax per fees bleadng
L ea _Approvedby | __ Approved by
QAE/ a PMC/ ClientPROCESS PLAN/IN PROCESS INSPECTION REPORT
‘a8/8.5,1/cP5/Cwil/0°-03
Date: 01/01/2024, Rev : 00
PEC WORKS
bates 03 [04 J 2025
lent GyeataraP “India.
sites Cre. pa OnEDC =
ltocation /Grid = Se curudy q ae = Sg tsrxo) DBOt
[Drawing Reference No. =
fis | tems To Be cHeckeD] ACCEPTANCE CRITERIA OBSERVATIONS REMARKS.
lorc brewing must be used with
2 fincewterrce —_foepr reson 43
2 rermworktine shouts be svaahe Show? de be shag
2 [ent spon tsuneo bee l shouldbe Tid
4 |sseotrce Jsperdcningts/25mm) | AS Pog drDLOHrg.
s |rriciness of cc las per drawing (4/-Smen) BS fer drug
6 |rade of concrete Jasper drawing PB m-)d
7 ffatetermive weatment Tp, vided / Not provided ae
6
JRequiced PCC Top Level |Asper drawing
— PS fer drawing} ose
|chete height should not be more
[Method OF Pouring Jean 3.5 metar from PCC TopSCON PROJECTS
faye PRIVATE WAWITED
PROCESS PLAN/IN PROCESS INSPECTION REPORT SE en:
Date : 01/01/2024, Rev :00
CONCRETE POUR CARD,
Dates 03 [04 225
[Drawing Reference No.
[Grade Of Concrete == yr) —10
SRNO| ITEMSTO BE CHECKED ‘SPECIFICATION (OBSERVATIONS
1 |concrete Grade las per Mix Design m-(2
2. |wicRatio \As per Mix Design AS per mix des {fn
3. [stump
las per Mix Design
AS fer mix design.
4 |cement Consumption
lAs per Mix Design
AS Per min des ig
5. |Machinery used
INeedle Vibrator
support
6 [oatching Plant/ Mixer Machine. [PME Plant or 12/3 P98 fame Plant
7 \vibrator |20,60MIM Needle no
& | Reinforcement steet Jas Per RCC drawing RHO
9 |laptength las Per RCC drawing alo
20. |insertplate/Anchorbott as Per Architectu drawing || ———
11. |einging wire vase 6/28 =
32. |cover / chair provided Jas Per RCC drawing —
|Dimension of shuttering / Rigidity}
las Per working drawing
AS Pey- Wo dhaxsing
o.
414 [Dosage of Admicure
las per Mix Design
PS por min deipnr
45 |conerete Cube taken
las per frequency
AS Per FrequencaA
gui
Process Plan approved by ‘checked by ‘Approved by ‘Approved by
et
\ ie pbs |e
Head-Quality_ Sr/ir Engg. QAE/ PM ‘PMC / Client
Page 1011‘Qa/e.s.t/ces/cluill
Dato 01/03/2024, Rev:
[Grade Of Concrete
Jsrno |
“ITEMS To BE CHecKED
oun Work
Line, level, plumb check &
internal Diagonal check
Piomnb Tor vertical
members
hs Per Oring Ves
Min 2 Sides to be taken ve
sie offeoting
as Per Drawing Ciyce 1y2o x Ye )
seating of Gap & other
seated (water tightness)
support, shuttering
should be tt & eld
Foundation Depth & St
Min, Depth,Type OF Soll (Ac Per
Drawing)
lodentaton Oi Fostng
Longer & Shorier Faces
ion/ Ratt
Diameter & No OF bars Horror
\frop Layer
Dowels
[concrete surface
Posen raaiiaes hire omg
Voting 4 de
Porter OF aon os wikin
ote 2 [Footing / Raft
;
PNG sould econ
2 conse Iivanes 5 er rave
fd lovee :
; Chik nag Sh ot ue nore
ose xt
oo han 5 meter om CC top yes
ior par Come Neate eaue root
Bs Ne cain sotegh 2 NeareRe NereR ee Gomn
Gr [resnnihot tons!
[As per requirement. y 28
Page 1012JGrade Of Concrete -
sino] wens Toe certo
SPECIFICATION
las ner Mix Design
las per Mix Design
eee
RM Plant or
cer
40,60NM Neda
las Per RCC Urawing
IAs Per Aechitecteul drawing
6/18
-|As Per RCC drawing
séoport
[Draven itoring 7 Rinidty
las Per working drawing’
lOosage of Adinintire
Jas per Mix Design
concrete cube inten
As per irequency
Ab Pel Mux
um
Oy
a
Process Plan uppraved WY"
Approved by”PROCESS PLAN/IN PROCESS INSPECTION REPORT
‘COLUMN,
Dates OG (04 [2025
Sent C23 ton P “Erdi a
sites
Lecation/Grd = Sec tou tina »€ bd:
wren &
Hod
[Drawing Reference No. = BERS IE Skree- en
[Grade OF Concrete = rA~
GAte—FDLO~V RO
BAZEO st
ow)
SRNO| ITEMSTOBE CHECKED SPECIFICATION
OBSERVATIONS
(8) [Formwork
[une Level, Plumb & Internat
a las per drawing
ts Por SahG
[agonal check
IMax6 noe required, Minimum 5 Nos Required
lpcovsion as below-
Ix 300mm
[2)750mm
fs) 230mm
la) 2800mm
1 2400mm from bottom of shuttering
2 Provision of chabbi
ASO pone
cee [Provided / Not provided
“lok! Prove 2.
4__|Seating of gaps and other seated / WoterTghtness
Tightness
(8), [Reinforcement
2 [longitudinal bars Joiameter & Wo Of Bars (As Per drawing)
2 [Placement of bars lcneckif slameter of earner barsis diferent
3 |lapwithiowercolumnbars _[Devlopment length
42 [Dowels forex itt Joeviopmentlenath
5 |Anyother dowels as per drawing
Boom 1roe]
6 |seeruns ltemeter& Spacing (As Per érawing)
| 7 |oteaning remove all dist wooden lee, phwoodpieces| Remove all oat
Be cover Thickness As per drawing (ty Testo
relat locks: aera UR corey
Ts [insert lates sz, anchorage & Location (As er Drawing) | —§ ——
(as per rawing) aa
[Foundation bots
[concrete
taking Of Pouring Scoop [Above 3.5 mtr scoop isto be implimented
28
, |Compaction properly done
DoneOBSERVATIONS ‘a
SANo]_meMstobe cnEcKeo SPECIFICATION va
{0) [Post conereting observations
[iment laos ps fen drom7irg
7 ati Iieetabowr ohputea
3 [surface Finish [Good /ratr/ Bad Gord,
4 [Honey combing neintorcement/ Metal exposed hilo honey combing
5 [emerterentoranent_ [srehfowanent exceed? WH vey”
6 [euhecriedout boas 3 Adoyd
Hacking
es oy after casting Mes
BH
Note.i~ Honeycombing -Major, Minor, Medium identity it (tobe finished with adding Fiy sh in cement 1: 2 ratio)
Note 2 Honeycombing should not be finished without informing to QA person or PM/SR engineer
ee ee roietby approved by
qs.
Head-Quality er ane/ oh PMC/ Client
xe
Page 20f2=
SCON PROJECTS
PRIVATE LIMITED
__ PROCESS PLAN/IN PROCESS INSPECTION REPORT
(A/a.53/cPs/cuil/pp-10
Date 01/03/2024, Rev -00
CONCRETE POUR CARD
ates OB [04 [2015
Hoabeb Lndio.
@ Bhs
ry
OTD
[Drawing Reference No. = C,€S¢35 —E*E
Secunhy —_ bkf.0
ain Laog Colburn Cas ny on |!
TRENT -Gpre FDO “Ro F
fa
[Grade Of Concrete == p>) -25—
Sano] HeMsTo we ciecneD SPEGFICATION OBSERVATIONS
1 |ConcreteGrade |As per Mix Design NL
2 fwcratio as per Me Design As Pet min design
3 [sump las per Mix Design PS Per men
4 [cement Consumption as per Me Design AS (ST
B 5 |Machinery used Needle Vibrator UZe New
anti rant/ ier tacine MERE eran | Rye Plow
7 (Vibrator |40,60MM Needle Llomm
8 | Reinforcement steel las Per RCC drawing Lorn d
3. laplenath laser Acc crewing
40 lnser plate /Anchor bok [as Perarehtecrulcrawing | ——
1 [Binding wire euage 6/38 | Duar
432 |Cover/ chair provided las Per RCC drawing UR Cove
a Pamenson of sre BBY sper warkng drawing As Por workity brani
14 [Dosage of Admicure ls per Mix Design Re Per mK gh
Dyas [concrete ce teken as pe frequency
Pe Qe per urn bn
aera
a
Head-Quality Sr/ir Engg,
PMc/ Client
One / ft
canna
Page tof 1PROCESS PLAN/IN PROCESS INSPECTION REPORT
enye.s.a/cos/civi/PP-06
(04/2024, fle 00
‘COLUMN,
‘OBSERVATIONS
in, Level, har & internat
as per drawing
PS Pe_dreuoirg:
loiagonal check
Max 6 nos required, Minimum 5 tos Required
bowels tor nextit
loeviopment length
provson as below:
200mm .
2 |rosionot ats 7am AES
3) 1300rm
x 2800
5 200m trom bottom of shuttering
ster provided / Not provide RProvi ded
seating of gaps andotner sealed /WoterTighiness ae Tignes?
eintrcement-
Longudna bars fismeter Wo OF ars (As rer eroing) =
Jpacementofbare [neck ameterofcormerbarsieierent | —
[Lap with tower column bars |Deviopment length Se
anyother dowels Jasper srairg =
= lmcctioo verveone’ || REDS ISOCICs
[ciesning emove all dust, wooden piece prwood ieces| ALEmeVe all dudt
ines par drawing gy eto
|coverbocks ee UR, Cover” ga.)
sce, anchorage & Location (As PerOrawing) | —
[{4s Per Drawing)
[above 25 mir scoop isto be Implimented
Yu
Properly done
DongOBSERVATIONS,
SRNO | ITEMSTO BE CHECKED
(0) _|Post concreting observations
SPECIFICATION
1 [Uine, Level, Plumb
[As per drawing
ws Per draucoTrg
2 |Deshuttering Period
116 to 20 hour
Do hsuNs
3 [Surface Finish
|Good /Fair /Bad
Goek
4 [Honey combing
Reinforcement/ Metal exposed
no honty Corrbing .
S_|Cover toreinforcement
Is reinforcement exposed ?
Un Cort
& [Curing carried out
7 Days
Hola.
7 {Hacking
Next day after casting
Note 1- Honeycombing - Major, Minor, Mediu
be yor
entity it (tobe finished with adding Fly ash in cement 1: ratio)
Note 2- Honeycombing should not be finished without informing to QA person or PM/SR engineer
Process Plan approved by
QB | Pradesbtenal,
q
Se/se Engg ne / py PMC/ client
JAVOUS Koug odesPROCESS PLAN/IN PROCESS INSPECTION REPORT. nue aaa
‘ap/as/cps/cilfep-10
CONCRETE POUR CARD,
ing Se No. = GESGSI9—
de Of Concrete :-
VOUERY:
Exe — Sree— ENT T—QATE—'
BLO -RO
ITEMS TO BE CHECKED
Mae
SPECIFICATION
‘OBSERVATIONS
moZs
concrete Grade las per Mix Design
l/c Ratio las per Mix Design As Por imix, de Signy
3 {stump Jas per Mix Design Ps Per Min desin.
4 |Cement Consumption las per Mix Design BAS fer mix designs
8] 5 [Machinery used Needle Vibrator us? Necd(Q
Ning manasa [MTR oHeE|VRIr Oo
7 |Vibrator |40,60MIM Needle Yom,
8 _| Reinforcement steel las Per RCC drawing tBrmmd
9 |Lap length JAs Per RCC drawing ae.
10 |Insert plate / Anchor bolt |As Per Architectrul drawing
11 [oinding wire guage 16/38 1 Emer
32. |Cover/ Chair provided las Per RCC drawing VEL Covet
2 eT HET TI carinesrwne | AL Per worting -
re Scie at adore ase ig eae AS per mit dea gn
|] a8 [concrete Cube taken las per frequency AS Per Fe jens
Head-Quality sr/it Engg ae / ppt PMc / client
“il
Page 1 of 1L/CPS/Civil/PP-53
1/01/24, Rev :00
TEs Scon proiccrs|
Pair owes
ba IO] 94/05
Client =
eS geen) Tpda, |
Bian? balan af Uhegapn- |
ia
Drawing Reference No.- pe eae exp =| pop 8 Be CABIN -
pen
PROCESS PLAN / IN PROCESS INSPECTION REPORT | 75
Granite Fixing work
Sr. No. Item to be checked oeptanee catene Bion
5 i 7)
_ 1 _|study of drawing/ Sample approval As per Client requirement As feb ches be
2 _ |Surface Prearation Remove loose material y eg
3 |Granite Size / Thickness las per Drawing As Per dhewlny|
4 _ |Any Defects to be observed in granite surface .}yes / No No U
5 _|Adhesive mortar to be use las per Client requirement ep Peh eflend newne,|
6 _|Check for plum, line and level heed
7 _|Grinding, Polishing and Finshing of granite —_|As per Client requirement oi eg
8 |Curing after fixing y eg
Process plan approved by SENG Approved By
AG ?
te
Head-Quality Sr/Jr Enge QAE /PM. PMc / Chent
goose ealge ptestcto mullinymeltiing felon.
(resem s polarsPROCESS PLAN/ IN PROCESS INSPECTION REPORT | sul gufarsrenltr 8,
Tile Flooring
ACCEPTANCE CRITERIA
4 _ [Study the drawing for
ps aon per dow Ag per shaving
2 lTypectfiooring >a Per drawing AZ per Boa
3 |Mitesize ls Per specifications Cc Geox boe )
4 lUnerfortnesisid —_|asverdraning ye g
IMortat proportion fr bling 3 .
5 |As Per specifications te dX
6 | Mortar Thickness |As Per specifications Some
|Thiyyas checked for base Zi 26
7 _| material and lope fs te ee - scheehed
2 [riesicinsitedup. [as perspectistions yes
Yex
z ls Per consultants
420 PoP Toppings on flooring [fs Percons
Head-Quality = Enge, QaE/ PPA PMC/ Client
aE== SCON PROJECTS
PROCESS PLAN/IN PROCESS INSPECTION REPORT
an/8.5.1/cPS/cwil/Pp-39
Date 01/01/2024, Rev :00
ReMi Limiren
DADO TILING WORK
ea [et] TS. 4
= ef: =: Lega
3 an Ld, x, at Dhoga pyre,
feat 7o EP Se cubby calm fel,
Prawing Reference no. - G,f149-/AkcH - EXB- MP = SEC -CARTN -00
[ISRNOT]Titenistowe cnecneo | — AccePraNce cireniA
(OBSERVATIONS
4 [Sty the drawing fr tile
pattern & colour
las per requirement.
6 Oyen Gheen medf|
2 Hype of tiles
spewing, hepa Boa
3 Milesize
las per drawing.
649X600
[Tiling Work.
4 _ |Sement paste proportion for As per specifications or
ldrawing.
el
S [Cement paste thickness _|as per drawing.
Qomm
[Thivyas checked for base
lgentie tapping
© |material and slope las per drawing. eS y
pee a es
Bes | orci yes
9 |Cteckforhotlow sound ater oy sound =
cheeke 4
20. |initiat curing
s/t Engg ne / enn
PMc/ Client
Page 4 of 1SEQHPROIECTS | process PLANIN PROCESS INSPECTION REPORT
a
an/a.s.1/cPs/cwifen.23
Date 01/03/2024, Rey 00,
Painting (External
3
ITEMS TO BE CHECKED
Study the drawing
[Check thesafety
Bee ecs 2s per safety standard
(Check for cleanitigof
By scraper or sand paper
surfaces ne B
[Check for nine of
masking tape all around
Jdoor and windows
ypc of apnreved paint to
_foeused,
[Colour shades approved
_ [by consultants
[check for even application!
of paintee z
SCON PRoJECTS
Date
Client =
ia
Site :-
bt
Location / Grid :-
Drawing Reference No.
PROCESS PLAN/IN PROCESS INSPECTION REPORT
ES eR :
be Geom Tn dad Lee
St 6 ge
Seewnty ¢
Qn/s.5.1/c05/civi/eP 22
ote : 01/01/2024, Rev 00
5 Painting (internal)
Aiken By 6
8 TRE —Mp-8 Le - ean tn -0
ey
SR.NO ITEMS TO BE CHECKED. ACCEPTANCE CRITERIA OBSERVATIONS
1 [study the drawing a
2 |heck the satery precautions [as Per Safety Norms Checke d
ls a ae
Me coesiutces (cutee all Presa
{Type of approved paints tobe |As per specification /
a
ed noorc ied Gypsum Pu.
5 [check or primer aplication As Per Speciesions
6 |ohece forputy appication [As Per Specifications checke ¢
JAS per specifications /
2 |eneck or 080/colou eee eee
B™ |No. of coats applied fas Per saeeeaions
check for even application of
3 eperi pelea |As Per Site Requirment
paint & s
fg) |eteanina of doorssnindows No a weteoncg
oor ete ioe
: sues 2
Process Plan Approved by checkga by Approved by Approved by
os 7
eee
Sr/ir Ege Qae/ PM. PMC/ Client
Page 1 ofyWoussueng|
Bun0) 2y3 99349}
Jann
so 1wawanowy 19) 49949}
‘uy Buy awejeas 404 ¥oauD|
peal
40 ssaujueap ayr 72249]
smopuim oui]
jo 2pis an
souolst
3)aissod se wnwnuiey
TTem pue smopurm|
uaamag sde8 ayn 92249]
tnoows|
‘598p9.1n9 104 99949|
06 Asexy
siequioul|,
tenb3 aq isn
Buivada|
y2 Jo jeuoderp 10) y2049|
Suymesp 10d sy
siuawesnseouu]
Buiuado y9349)
suoneayads|
7 umes 120 5¥|
‘une09 a2ejins|
Suonennads|
/Suumesp 120 su}
Anyrorp 27 FF
as jeuarery)
(dl09- WIV OFS -d LE 9K A= = 65
09 2 OFS -dN- LE =F eee 2
vyruaiiu> 39Nv1d309¥
93239 39 01 sau) | o}
SNolvawasao,
NPY
HOM smopulm INTENT
“ON 23u819)94 Sume
= PO //
Te 3
7a
¢ ®
00: n0u ‘vz0z/r
te-aa/viasa>,
4140434 NOIL93dSNI SS320¥d NI/NVTd $5390)
ud