0% found this document useful (0 votes)
98 views18 pages

Security Cabin Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
98 views18 pages

Security Cabin Checklist

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 18
Ej SOM FROVECTS | pocess PLAN/IN PROCES INSPECTION REPORT | ea Sanitary & Plumbing al Dates 02 JoG/25 j Client = pee Kein], j Site = Ppl ad ot Bhose pina 1 location Grid = Sood ‘GIA U a Drawing Reference. = GES¢’4q- “1p ~ PHE= 00-EVL- CARIN ~o1-Pal SR.NO| [TEMS TOBE CHECKED [ACCEPTANCE CRITERIA OBSERVATIONS 1 [Study the drawing es | i Ensure marking of imetreTine 2 above Fr. Yes e3 | Ensure the dia. of Gl piper at e ion 2 various places/ UPVC Pipe _|ASPeF rowing Absa aD eel Line outon wall for dado by 4 lehalkforinfet & outer As per drawing yes plumbing points = 5 |UneoutoF6..tines onwalls [As per drawing yes { [Chasing the grooves for | S |concealed pipes is Vi, (Check fr aplication of coal Peelers, ls yes | Pipes [Check plumbing points. 1. y | 8 _|trinal2, wash basin 3. Bib cock|as per drawing ele We checlle. \Conceaing of GI. pipes with 2 cement mortar done | Sees vores ieee en |Marking of vertical GL. /C.\. ines oa external plaster. Ves ICheck for slopes of drain lines |As per drawing Checke A ‘of joints (cement /lead ss WV 8 ere) techs As pep Lreeleths 14 [Finishing of holes den 2 Check the level postion of W.C ; ft t 15 |trops,nahanitraps spout & _ |Referrng finish level of tiles cheeyel Fare evel it joutiet pL pt 16 _|Fxing of sanitary & Cp wares, As per Specfiations Ax per fees bleadng L ea _Approvedby | __ Approved by QAE/ a PMC/ Client PROCESS PLAN/IN PROCESS INSPECTION REPORT ‘a8/8.5,1/cP5/Cwil/0°-03 Date: 01/01/2024, Rev : 00 PEC WORKS bates 03 [04 J 2025 lent GyeataraP “India. sites Cre. pa OnEDC = ltocation /Grid = Se curudy q ae = Sg tsrxo) DBOt [Drawing Reference No. = fis | tems To Be cHeckeD] ACCEPTANCE CRITERIA OBSERVATIONS REMARKS. lorc brewing must be used with 2 fincewterrce —_foepr reson 43 2 rermworktine shouts be svaahe Show? de be shag 2 [ent spon tsuneo bee l shouldbe Tid 4 |sseotrce Jsperdcningts/25mm) | AS Pog drDLOHrg. s |rriciness of cc las per drawing (4/-Smen) BS fer drug 6 |rade of concrete Jasper drawing PB m-)d 7 ffatetermive weatment Tp, vided / Not provided ae 6 JRequiced PCC Top Level |Asper drawing — PS fer drawing} ose |chete height should not be more [Method OF Pouring Jean 3.5 metar from PCC Top SCON PROJECTS faye PRIVATE WAWITED PROCESS PLAN/IN PROCESS INSPECTION REPORT SE en: Date : 01/01/2024, Rev :00 CONCRETE POUR CARD, Dates 03 [04 225 [Drawing Reference No. [Grade Of Concrete == yr) —10 SRNO| ITEMSTO BE CHECKED ‘SPECIFICATION (OBSERVATIONS 1 |concrete Grade las per Mix Design m-(2 2. |wicRatio \As per Mix Design AS per mix des {fn 3. [stump las per Mix Design AS fer mix design. 4 |cement Consumption lAs per Mix Design AS Per min des ig 5. |Machinery used INeedle Vibrator support 6 [oatching Plant/ Mixer Machine. [PME Plant or 12/3 P98 fame Plant 7 \vibrator |20,60MIM Needle no & | Reinforcement steet Jas Per RCC drawing RHO 9 |laptength las Per RCC drawing alo 20. |insertplate/Anchorbott as Per Architectu drawing || ——— 11. |einging wire vase 6/28 = 32. |cover / chair provided Jas Per RCC drawing — |Dimension of shuttering / Rigidity} las Per working drawing AS Pey- Wo dhaxsing o. 414 [Dosage of Admicure las per Mix Design PS por min deipnr 45 |conerete Cube taken las per frequency AS Per FrequencaA gui Process Plan approved by ‘checked by ‘Approved by ‘Approved by et \ ie pbs |e Head-Quality_ Sr/ir Engg. QAE/ PM ‘PMC / Client Page 1011 ‘Qa/e.s.t/ces/cluill Dato 01/03/2024, Rev: [Grade Of Concrete Jsrno | “ITEMS To BE CHecKED oun Work Line, level, plumb check & internal Diagonal check Piomnb Tor vertical members hs Per Oring Ves Min 2 Sides to be taken ve sie offeoting as Per Drawing Ciyce 1y2o x Ye ) seating of Gap & other seated (water tightness) support, shuttering should be tt & eld Foundation Depth & St Min, Depth,Type OF Soll (Ac Per Drawing) lodentaton Oi Fostng Longer & Shorier Faces ion/ Ratt Diameter & No OF bars Horror \frop Layer Dowels [concrete surface Posen raaiiaes hire omg Voting 4 de Porter OF aon os wikin ote 2 [Footing / Raft ; PNG sould econ 2 conse Iivanes 5 er rave fd lovee : ; Chik nag Sh ot ue nore ose xt oo han 5 meter om CC top yes ior par Come Neate eaue root Bs Ne cain sotegh 2 NeareRe NereR ee Gomn Gr [resnnihot tons! [As per requirement. y 28 Page 1012 JGrade Of Concrete - sino] wens Toe certo SPECIFICATION las ner Mix Design las per Mix Design eee RM Plant or cer 40,60NM Neda las Per RCC Urawing IAs Per Aechitecteul drawing 6/18 -|As Per RCC drawing séoport [Draven itoring 7 Rinidty las Per working drawing’ lOosage of Adinintire Jas per Mix Design concrete cube inten As per irequency Ab Pel Mux um Oy a Process Plan uppraved WY" Approved by” PROCESS PLAN/IN PROCESS INSPECTION REPORT ‘COLUMN, Dates OG (04 [2025 Sent C23 ton P “Erdi a sites Lecation/Grd = Sec tou tina »€ bd: wren & Hod [Drawing Reference No. = BERS IE Skree- en [Grade OF Concrete = rA~ GAte—FDLO~V RO BAZEO st ow) SRNO| ITEMSTOBE CHECKED SPECIFICATION OBSERVATIONS (8) [Formwork [une Level, Plumb & Internat a las per drawing ts Por SahG [agonal check IMax6 noe required, Minimum 5 Nos Required lpcovsion as below- Ix 300mm [2)750mm fs) 230mm la) 2800mm 1 2400mm from bottom of shuttering 2 Provision of chabbi ASO pone cee [Provided / Not provided “lok! Prove 2. 4__|Seating of gaps and other seated / WoterTghtness Tightness (8), [Reinforcement 2 [longitudinal bars Joiameter & Wo Of Bars (As Per drawing) 2 [Placement of bars lcneckif slameter of earner barsis diferent 3 |lapwithiowercolumnbars _[Devlopment length 42 [Dowels forex itt Joeviopmentlenath 5 |Anyother dowels as per drawing Boom 1roe] 6 |seeruns ltemeter& Spacing (As Per érawing) | 7 |oteaning remove all dist wooden lee, phwoodpieces| Remove all oat Be cover Thickness As per drawing (ty Testo relat locks: aera UR corey Ts [insert lates sz, anchorage & Location (As er Drawing) | —§ —— (as per rawing) aa [Foundation bots [concrete taking Of Pouring Scoop [Above 3.5 mtr scoop isto be implimented 28 , |Compaction properly done Done OBSERVATIONS ‘a SANo]_meMstobe cnEcKeo SPECIFICATION va {0) [Post conereting observations [iment laos ps fen drom7irg 7 ati Iieetabowr ohputea 3 [surface Finish [Good /ratr/ Bad Gord, 4 [Honey combing neintorcement/ Metal exposed hilo honey combing 5 [emerterentoranent_ [srehfowanent exceed? WH vey” 6 [euhecriedout boas 3 Adoyd Hacking es oy after casting Mes BH Note.i~ Honeycombing -Major, Minor, Medium identity it (tobe finished with adding Fiy sh in cement 1: 2 ratio) Note 2 Honeycombing should not be finished without informing to QA person or PM/SR engineer ee ee roietby approved by qs. Head-Quality er ane/ oh PMC/ Client xe Page 20f2 = SCON PROJECTS PRIVATE LIMITED __ PROCESS PLAN/IN PROCESS INSPECTION REPORT (A/a.53/cPs/cuil/pp-10 Date 01/03/2024, Rev -00 CONCRETE POUR CARD ates OB [04 [2015 Hoabeb Lndio. @ Bhs ry OTD [Drawing Reference No. = C,€S¢35 —E*E Secunhy —_ bkf.0 ain Laog Colburn Cas ny on |! TRENT -Gpre FDO “Ro F fa [Grade Of Concrete == p>) -25— Sano] HeMsTo we ciecneD SPEGFICATION OBSERVATIONS 1 |ConcreteGrade |As per Mix Design NL 2 fwcratio as per Me Design As Pet min design 3 [sump las per Mix Design PS Per men 4 [cement Consumption as per Me Design AS (ST B 5 |Machinery used Needle Vibrator UZe New anti rant/ ier tacine MERE eran | Rye Plow 7 (Vibrator |40,60MM Needle Llomm 8 | Reinforcement steel las Per RCC drawing Lorn d 3. laplenath laser Acc crewing 40 lnser plate /Anchor bok [as Perarehtecrulcrawing | —— 1 [Binding wire euage 6/38 | Duar 432 |Cover/ chair provided las Per RCC drawing UR Cove a Pamenson of sre BBY sper warkng drawing As Por workity brani 14 [Dosage of Admicure ls per Mix Design Re Per mK gh Dyas [concrete ce teken as pe frequency Pe Qe per urn bn aera a Head-Quality Sr/ir Engg, PMc/ Client One / ft canna Page tof 1 PROCESS PLAN/IN PROCESS INSPECTION REPORT enye.s.a/cos/civi/PP-06 (04/2024, fle 00 ‘COLUMN, ‘OBSERVATIONS in, Level, har & internat as per drawing PS Pe_dreuoirg: loiagonal check Max 6 nos required, Minimum 5 tos Required bowels tor nextit loeviopment length provson as below: 200mm . 2 |rosionot ats 7am AES 3) 1300rm x 2800 5 200m trom bottom of shuttering ster provided / Not provide RProvi ded seating of gaps andotner sealed /WoterTighiness ae Tignes? eintrcement- Longudna bars fismeter Wo OF ars (As rer eroing) = Jpacementofbare [neck ameterofcormerbarsieierent | — [Lap with tower column bars |Deviopment length Se anyother dowels Jasper srairg = = lmcctioo verveone’ || REDS ISOCICs [ciesning emove all dust, wooden piece prwood ieces| ALEmeVe all dudt ines par drawing gy eto |coverbocks ee UR, Cover” ga.) sce, anchorage & Location (As PerOrawing) | — [{4s Per Drawing) [above 25 mir scoop isto be Implimented Yu Properly done Dong OBSERVATIONS, SRNO | ITEMSTO BE CHECKED (0) _|Post concreting observations SPECIFICATION 1 [Uine, Level, Plumb [As per drawing ws Per draucoTrg 2 |Deshuttering Period 116 to 20 hour Do hsuNs 3 [Surface Finish |Good /Fair /Bad Goek 4 [Honey combing Reinforcement/ Metal exposed no honty Corrbing . S_|Cover toreinforcement Is reinforcement exposed ? Un Cort & [Curing carried out 7 Days Hola. 7 {Hacking Next day after casting Note 1- Honeycombing - Major, Minor, Mediu be yor entity it (tobe finished with adding Fly ash in cement 1: ratio) Note 2- Honeycombing should not be finished without informing to QA person or PM/SR engineer Process Plan approved by QB | Pradesbtenal, q Se/se Engg ne / py PMC/ client JAVOUS Koug odes PROCESS PLAN/IN PROCESS INSPECTION REPORT. nue aaa ‘ap/as/cps/cilfep-10 CONCRETE POUR CARD, ing Se No. = GESGSI9— de Of Concrete :- VOUERY: Exe — Sree— ENT T—QATE—' BLO -RO ITEMS TO BE CHECKED Mae SPECIFICATION ‘OBSERVATIONS moZs concrete Grade las per Mix Design l/c Ratio las per Mix Design As Por imix, de Signy 3 {stump Jas per Mix Design Ps Per Min desin. 4 |Cement Consumption las per Mix Design BAS fer mix designs 8] 5 [Machinery used Needle Vibrator us? Necd(Q Ning manasa [MTR oHeE|VRIr Oo 7 |Vibrator |40,60MIM Needle Yom, 8 _| Reinforcement steel las Per RCC drawing tBrmmd 9 |Lap length JAs Per RCC drawing ae. 10 |Insert plate / Anchor bolt |As Per Architectrul drawing 11 [oinding wire guage 16/38 1 Emer 32. |Cover/ Chair provided las Per RCC drawing VEL Covet 2 eT HET TI carinesrwne | AL Per worting - re Scie at adore ase ig eae AS per mit dea gn |] a8 [concrete Cube taken las per frequency AS Per Fe jens Head-Quality sr/it Engg ae / ppt PMc / client “il Page 1 of 1 L/CPS/Civil/PP-53 1/01/24, Rev :00 TEs Scon proiccrs| Pair owes ba IO] 94/05 Client = eS geen) Tpda, | Bian? balan af Uhegapn- | ia Drawing Reference No.- pe eae exp =| pop 8 Be CABIN - pen PROCESS PLAN / IN PROCESS INSPECTION REPORT | 75 Granite Fixing work Sr. No. Item to be checked oeptanee catene Bion 5 i 7) _ 1 _|study of drawing/ Sample approval As per Client requirement As feb ches be 2 _ |Surface Prearation Remove loose material y eg 3 |Granite Size / Thickness las per Drawing As Per dhewlny| 4 _ |Any Defects to be observed in granite surface .}yes / No No U 5 _|Adhesive mortar to be use las per Client requirement ep Peh eflend newne,| 6 _|Check for plum, line and level heed 7 _|Grinding, Polishing and Finshing of granite —_|As per Client requirement oi eg 8 |Curing after fixing y eg Process plan approved by SENG Approved By AG ? te Head-Quality Sr/Jr Enge QAE /PM. PMc / Chent goose ealge ptestcto mullinymeltiing felon. (resem s polars PROCESS PLAN/ IN PROCESS INSPECTION REPORT | sul gufarsrenltr 8, Tile Flooring ACCEPTANCE CRITERIA 4 _ [Study the drawing for ps aon per dow Ag per shaving 2 lTypectfiooring >a Per drawing AZ per Boa 3 |Mitesize ls Per specifications Cc Geox boe ) 4 lUnerfortnesisid —_|asverdraning ye g IMortat proportion fr bling 3 . 5 |As Per specifications te dX 6 | Mortar Thickness |As Per specifications Some |Thiyyas checked for base Zi 26 7 _| material and lope fs te ee - scheehed 2 [riesicinsitedup. [as perspectistions yes Yex z ls Per consultants 420 PoP Toppings on flooring [fs Percons Head-Quality = Enge, QaE/ PPA PMC/ Client a E== SCON PROJECTS PROCESS PLAN/IN PROCESS INSPECTION REPORT an/8.5.1/cPS/cwil/Pp-39 Date 01/01/2024, Rev :00 ReMi Limiren DADO TILING WORK ea [et] TS. 4 = ef: =: Lega 3 an Ld, x, at Dhoga pyre, feat 7o EP Se cubby calm fel, Prawing Reference no. - G,f149-/AkcH - EXB- MP = SEC -CARTN -00 [ISRNOT]Titenistowe cnecneo | — AccePraNce cireniA (OBSERVATIONS 4 [Sty the drawing fr tile pattern & colour las per requirement. 6 Oyen Gheen medf| 2 Hype of tiles spewing, hepa Boa 3 Milesize las per drawing. 649X600 [Tiling Work. 4 _ |Sement paste proportion for As per specifications or ldrawing. el S [Cement paste thickness _|as per drawing. Qomm [Thivyas checked for base lgentie tapping © |material and slope las per drawing. eS y pee a es Bes | orci yes 9 |Cteckforhotlow sound ater oy sound = cheeke 4 20. |initiat curing s/t Engg ne / enn PMc/ Client Page 4 of 1 SEQHPROIECTS | process PLANIN PROCESS INSPECTION REPORT a an/a.s.1/cPs/cwifen.23 Date 01/03/2024, Rey 00, Painting (External 3 ITEMS TO BE CHECKED Study the drawing [Check thesafety Bee ecs 2s per safety standard (Check for cleanitigof By scraper or sand paper surfaces ne B [Check for nine of masking tape all around Jdoor and windows ypc of apnreved paint to _foeused, [Colour shades approved _ [by consultants [check for even application! of paint ee z SCON PRoJECTS Date Client = ia Site :- bt Location / Grid :- Drawing Reference No. PROCESS PLAN/IN PROCESS INSPECTION REPORT ES eR : be Geom Tn dad Lee St 6 ge Seewnty ¢ Qn/s.5.1/c05/civi/eP 22 ote : 01/01/2024, Rev 00 5 Painting (internal) Aiken By 6 8 TRE —Mp-8 Le - ean tn -0 ey SR.NO ITEMS TO BE CHECKED. ACCEPTANCE CRITERIA OBSERVATIONS 1 [study the drawing a 2 |heck the satery precautions [as Per Safety Norms Checke d ls a ae Me coesiutces (cutee all Presa {Type of approved paints tobe |As per specification / a ed noorc ied Gypsum Pu. 5 [check or primer aplication As Per Speciesions 6 |ohece forputy appication [As Per Specifications checke ¢ JAS per specifications / 2 |eneck or 080/colou eee eee B™ |No. of coats applied fas Per saeeeaions check for even application of 3 eperi pelea |As Per Site Requirment paint & s fg) |eteanina of doorssnindows No a weteoncg oor ete ioe : sues 2 Process Plan Approved by checkga by Approved by Approved by os 7 eee Sr/ir Ege Qae/ PM. PMC/ Client Page 1 of yWoussueng| Bun0) 2y3 99349} Jann so 1wawanowy 19) 49949} ‘uy Buy awejeas 404 ¥oauD| peal 40 ssaujueap ayr 72249] smopuim oui] jo 2pis an souolst 3)aissod se wnwnuiey TTem pue smopurm| uaamag sde8 ayn 92249] tnoows| ‘598p9.1n9 104 99949| 06 Asexy siequioul|, tenb3 aq isn Buivada| y2 Jo jeuoderp 10) y2049| Suymesp 10d sy siuawesnseouu] Buiuado y9349) suoneayads| 7 umes 120 5¥| ‘une09 a2ejins| Suonennads| /Suumesp 120 su} Anyrorp 27 FF as jeuarery) (dl09- WIV OFS -d LE 9K A= = 65 09 2 OFS -dN- LE =F eee 2 vyruaiiu> 39Nv1d309¥ 93239 39 01 sau) | o} SNolvawasao, NPY HOM smopulm INTENT “ON 23u819)94 Sume = PO // Te 3 7a ¢ ® 00: n0u ‘vz0z/r te-aa/viasa>, 4140434 NOIL93dSNI SS320¥d NI/NVTd $5390) ud

You might also like