Reference Drawings: - Q 4400021172 1-2434056.03 NJN419 342108 SA B
Reference Drawings: - Q 4400021172 1-2434056.03 NJN419 342108 SA B
B 01 of 05
NJN419 SA-342108 Q 4400021172 1-2434056.03
NOTES NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
11.ALL THE SLEEVES SHALL BE CLOSED "OIL TIGHT" AFTER 1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS ARE IN
PASSING THE CONDUCTORS. METERS UNLESS OTHERWISE NOTED.
2.THE PROPOSED CROWN LEVEL OF THE SUBSTATION IS HIGHER
PN
12.CONTROLLED FILL MATERIAL THICKNESS OF 600mm SHALL BE THAN THE ADJACENT ACCESS ROAD LEVEL AS DETAILED BELOW:
PROVIDED BELOW THE FOUNDATION AS PER TCS-Q-113.02 HIGHEST POINT OF ADJACENT ROAD LEVEL: +1148.47 M
TN CROWN LEVEL OF THE SUBSTATION (CONSIDERING A 60 CM
CLAUSE 9.2
THICKNESS OF THE ASPHALT ROAD):
N
REFERENCE
MATERIAL. THE COATING APPLICATION SHALL EXTEND
CONTINUOUSLY 300MM BELOW GRADE AFTER CURING OF FIRST
AXIS
COAT OF COAL TAR EPOXY COATING.
10.TWO LAYERS OF WATERPROOFING MEMBRANE MIN. 4MM. THICK
SHALL BE PROVIDED FOR CATCH BASINS. THE WATERPROOFING
MEMBRANE PROVIDED ALONG THE WALLS SHALL BE PROTECTED
PE
SLO WITH 6mm THK. PROTECTION MEMBRANE AND THAT PROVIDED
BELOW THE BASE SLAB SHALL BE PROTECTED WITH A 50mm.
E=450475.2565
(-)0.300 N=1992803.3355 E=450529.1088 E=450544.0802 E=450559.0515
(-)0.300 THK. (SAND-CEMENT SCREED AND 2 LAYERS OF 150 MICRON
GRAVEL N=1992869.1429 GRAVEL N=1992887.4379 N=1992905.7329
(-)0.300 E=450484.0759
(-)0.300 (-)0.300 (-)0.300 EACH THK. POLYTHYLENE VAPOUR BARRIER BELOW
(TYP.) M.H N=1992811.1128 (TYP.)
M.H M.H
H.H H.H M.H M.H M.H M.H H.H H.H H.H H.H LEAN CONCRETE.)
MH
MH.
.C
COV
OVE
ER
R
MH
MH
MH.
MH.
MH.
MH.
MH
MH.
MH.
MH
.C
.C
.C
.C
COVE
CO
CO
CO
CO
CO
OV
OVER
OV
OV
VE
VER
VE
VE
VER
ER
ER
ER
R
R
KEY PLAN
(-)0.400
FIRE WALL
N N
FIRE EXIT
FIRE EXIT
POWER
6525
6525
T806 (FUTURE)
B Y R B Y R
ET304 ET303 ET302 ET301 TRANSFORMER
3318
(-)0.400
3318
3318
3318
3318
2
E-
TYP H
CM
C
L
2
E-
TYP H
CM
P
M
AD
U
P
P
C
L
P
M
AD
PU
P
1322
1322
1322
1322
1322
C C
C
L
L REACTOR-2 REACTOR-1 L C E=450574.0229
380kV CONTROL
380kV CONTROL
250 L
P
M
D
U
A
P
P
CABLE TUNNEL
CABLE TUNNEL
C
L
N=1992924.0279
PAD P
M
U
P
8092 4025 3925
5Mx3M (WxH)
5Mx3M (WxH)
CDP 7200
CONTAINER
CONTAINER
40
7200
61
2887 2887 2887 2887
40
2887
61
FIRE WALL
FIRE WALL
FIRE WALL
C
L
E=450529.0375 E=450573.9517
E=450544.0089
PUMP
E=450558.9803
D
A
P
HGIS
HGIS
E=450475.1852 N=1992858.752 N=1992913.6378
N=1992877.0478 N=1992895.3428
FIRE WALL
N=1992792.9455
GRAVEL
(TYP.)
44423
44423
250 L 250 C
L C C C
250 L 250 L 250 L
4153 12337 6901 (-)0.400 (-)0.300 (-)0.500
12340 7031 4019 12340 7029 4021 7370 4970 7029 4021 12340
12120 11520 11871 48871 24292 12120 11520 12120 11520 12120 11520 FOR GIB DETAILS REFER TO GIB
FOUNDATION SUBMITTAL
B REFERENCE DRAWINGS
GRAVEL DRAWING TITLE DRAWING NO.
(TYP.) MH
DRAWING CONTROL SHEET (NEW) SE-0339800
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO.
4M WIDE CLEAR ACCESS 4M WIDE CLEAR ACCESS
SITE TOPOGRAPHY LAYOUT SA-0339801
REFERENCE REFERENCE
AXIS AXIS
380kV GIS BUILDING
ASPHALT ROAD 5M WIDE
EL(+)0.000
FFL
BASE DESIGN
(-)0.300
ELP HVAC-CP-2 DCP-03 OLP DCP-01 ILP SDB HVAC-CP-1 DCP-02
APPROVAL
(-)0.300 CONSTRUCTION
15.06.2025 M.M
DATE BY
MH
(-)0.300
B
LAYOUT AND LOCATION PLAN OF 500MVA POWER TRANSFORMER 02 04.05.25 DAR REVISED AS PER SEC COMMENTS M.E R.I M.M
SCALE 1:300
01 18.02.25 DAR REVISED AS PER SEC COMMENTS M.E R.I A.B
-
DATE STARTED DATE COMPLETED