The document outlines the process for estimating and costing domestic wiring installations, including detailed steps for creating layout plans for wiring, sockets, and lighting. It provides calculations for load requirements, conduit lengths, and wire lengths needed for the installation. Additionally, it includes diagrams and specifications for various electrical components and their ratings.

Uploaded by

T MaungLwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views19 pages

Estimating (Job Sheet)

The document outlines the process for estimating and costing domestic wiring installations, including detailed steps for creating layout plans for wiring, sockets, and lighting. It provides calculations for load requirements, conduit lengths, and wire lengths needed for the installation. Additionally, it includes diagrams and specifications for various electrical components and their ratings.

Uploaded by

T MaungLwin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 19

ESTIMATING AND COSTING OF

DOMESTIC WIRING INSTALLATION

BY
Sr.Lahpai GumSan Awng (Level III,EP, VTC , MJY)
SEQUENCE TO BE CARRIED OUT FOR ESTIMATE.
• Wires Instalation Layout Plan/ Myihprapwan hkyen shajin lam Layout Plan hpe sumla

hkrang soi gran ai lam.

• Ampere hte Jailang Wan shadang ni hpe tawt sawn ai lam.

• Main Switch hte Sub Main Switch ni a Rating masat ai lam hte lata ai lam.

• Myihprapwan dat lam Maind Board hpe Rating masat ai lam hte lata ai lam.

• PVC Conduit / Trunking a galu shadang ni hpe tawt maram lam.

• Line hte Neutral Wires sumri ni a galu shadang ni hpe tawt maram lam.

• Earth Wires Sumri ni a galu shadang ni hpe tawt maram lam.

• Jailang ra ai Rung-rai hkyen shajin lam.

• Namtak hkrat-ang manu hpe tawt maram lam.


Wiring Layout Plan Sample
GROUND FLOOR LAYOUT PLAN

22m
385.9mm 385.9mm 385.9mm 12233.6mm
385.9mm 385.9mm 385.9mm 385.9mm
2099.6mm

2110.3mm
2110.4mm

2110.4mm

2110.3mm
2110.4mm

2110.3mm
2110.4mm

2110.3mm
2110.4mm

4m

277.6mm
385.8mm 385.8mm 385.8mm 11430.1mm
627.4mm 385.8mm 385.8mm 385.8mm
377mm

385.8mm
2570.3mm

1799.7mm

1756.4mm
385.9mm

522.6mm
9351.9mm
471.3mm

11m

1904.8mm
2204.7mm

1975.2mm
385.9mm

0.2mm
3593.8mm
3704.5mm

1686.3mm
2146.6mm
385.8mm 7m

385.9mm 385.9mm
2211.8mm

1785.4mm
1778.3mm
4m

2217.5mm 2142.5mm
685.5mm

mm
8m 471.4 4m
Ground Floor Layout Plan
SOCKET LAYOUT PLAN

450.3mm 450.3mm 450.3mm 14275mm


450.3mm 450.3mm 450.3mm 450.3mm
2449.9mm

2462.4mm
2462.5mm

2462.5mm

2462.5mm
2462.5mm

2462.5mm

2462.5mm323.9mm
2462.5mm

2462.5mm
450.2mm 450.2mm 450.2mm 13337.5mm
732.2mm 450.2mm 450.2mm 450.2mm
439.9mm

450.2mm
3100mm
450.3mm 10912.5mm

2049.5mm
2100mm

609.9mm
549.9mm

2222.7mm
2572.6mm

2486.8mm
4322.7mm450.3mm

600.8mm
4210mm

1967.7mm
450.2mm2505.1mm

450.3mm 450.3mm
2580.9mm

799.9mm
2075mm

2075mm
2587.6mm 2500mm
799.9mm

537.5mm

DB Box Power Socket Socket

Socket Layout Plan


LIGHTING LAYOUT PLAN

412.5mm 412.5mm 412.5mm 13076.2mm


412.5mm 412.5mm 412.5mm 412.5mm
2449.9mm

2462.4mm
2462.5mm

2462.5mm323.9mm
2462.5mm
2462.5mm

2462.5mm

2462.5mm
2462.5mm

2462.5mm
412.4mm 412.4mm 412.4mm 12217.4mm
670.7mm 412.4mm 412.4mm 412.4mm
439.9mm

450.2mm
2604.9mm

2049.4mm
412.5mm 9996.1mm

2049.5mm
609.9mm
549.9mm

2222.7mm
2451.9mm

2232.4mm
4322.7mm450.3mm

600.8mm
4322.7mm

1868mm
412.4mm2294.7mm

412.5mm 412.5mm
2357.5mm

2075mm
2075mm
2862.6mm 2290.1mm
732.7mm

DB Box Down Light Light One Gang Two Two


Gang Wire
Way
Lighting Circuit Layout Plan
STORE ROOMS, BATHROOM AND TOILET GROUND FLOORLATOUT PLAN

9m 3.5m
4825.5mm 5829.4mm

2400mm
1.5m

2700mm
6m
2700mm

2700mm

3600.1mm
3358.5mm
696.3mm

687.5mm
431.4mm 362.8mm 487.6mm Bathroom

6975.5mm
Store Rooms 1612.5mm 2430mm 4m

4m
3094.1mm

Toilet
3300mm

3174.9mm
2700mm

762.8mm
4m

2393.8mm

1.5m

Groung Floor Layout Plan


STORE ROOMS, BATHROOM, TOILET SOCKET ANDLIGHTINGLAYOUT PLAN
Store Rooms Bathroom Toilet
4825.5mm 5729.4mm

2137.5mm
2750mm
2750mm

2950mm

3600.1mm
702mm3433.9mm

437.6mm 437.6mm 437.6mm

6975mm
2916.7mm 1912.5mm 2297.8mm
2000mm

600mm3174.9mm
3300mm
First Floor
2297.8mm

Light One Gang Socket Wire


Lighting And Socket Layout Plan
Single Line Diagram Of Electrical Installation

Three Phase
Enegry Meter

Cut Out
Consumers Distribution
Main Switch Box Sub To Circuits
Incoming Cable
Earth Busbar Terminal

Kitchin Room

C32
Socket-4

1p
Socket-10

C16

1p
Room (1)

C16
Aircon-1

1p
C40

Room (2) Aircon-1

C16

All Rooms
1p

All Rooms
2p

Room (3) Aircon-1


C16

1p
Lighting
C10
1p
LINE-1

Neutral Bar

Lighting,
Store Rooms
C16

Socket-3
1p
C16

Socket-9
1p
C40

Aircon-1
C16

Room (4)
1p
2p
4p

Aircon-1
C16
MCB

Room (5)
1p
L1 L2 L3 N

All Rooms
All Rooms

Aircon-1
C16

Room (6)
1p
Three Phase AC 380V

Lighting
C10
LINE-2

1p
Neutral Bar

Batch Room
First Floor
Socket-15
C16
1p
C40

Master Room
House Wiring Single Diagram

Aircon-1
C16

1p

Master
2p

Living Room Aircon-1


C16
1p

Living Room Aircon-1


C16

All Rooms
All Rooms
1p

Lighting
C10
LINE-3

1p
Neutral Bar
ELECTRICAL LAYOUT PLAN SAMPLE
CALCULATION OF LOADS
❖Lamp point - 20x25 = 500 watt
❖Lamp point - 52×14 = 728 watt
❖Lamp point – 3x50 = 150 watt
❖Aircon point - 8x 3200 = 25600 watt
❖5 amp socket – 42 x 110= 46200 watt
❖Total load in amperes = 73178/220 = 332.6A

❖Selection of main switch – Here a D.P.I.C Main


switch of 5.Amp
❖Rating 250 volt grade is selected.
ASSUMING
❖Ga hte Numgaw lapran na tsaw shadang = 3.5 mt.

❖ Ga hte nda bat a tsaw shadang = 3.0 mt.

❖ Ga ntsa hte switch board a tsaw de = 1.5 mt.

❖Numgaw kaw na Wan pu lapran gang shadang = 0.5 mt.

❖ HR = Horizontal run ngu ai gaw, Numgaw npu hte maren shabung


galaw da ai Conduit Pipe.

❖VR= Dingdung Sang hku shinggrup da ai. Ga shadawn:- Wan sumri ni


(sh) Hpaw-pat makawp hte HR lapran matut na matu galaw da ai

Conduit.
CALCULATION FOR LENGTH OF CONDUIT PIPE OF20MM DIAMETER

• Gawk langai a sang hku = 2.5mt × gawk-9 = 22.5mt.


• Gawk langai a nda de = 7mt × gawk-9 = 63mt.
• Shatgawk a sang hku = 2.5mt × 2 = 5mt.
• Shatgawk a nda de = 1× 6mt = 6mt.
• Panel Box de shang na a sang hku = 8 × 1mt = 8mt.
• Kaga Numgaw hkan lang na yawng = 6omt.

• Total length of conduit pipe yawng rai yang = 164.5mts.


• Taking 10% wastage a matu = 164.5 × 10 ÷ 100 = 16.45 mt.
• Wan Sumri bang na Lang ra ai conduit pipe ra mara yawng
pawng = 164.5mt + 16.45mt = 180.9mt. Say 181mt.
CALCULATIONS FOR LENGTH OF PHASE WIRE
• Wan Shadaw hte Panel Box / DB lapran lang ra ai Wanla 3 a matu 10
mmsq Wan Sumri = 3× 30mt = 90mt.
• Panel Box hte Yupgawk, Shatgawk, Dawdap, Store Room, Namdum,
Hkashin Gawk, Ntsa htap ni a Hpaw-pat lapran Wanpu a matu lang
ra ai 1.5 mmsq Wan Sumri yawng = 242mt.
• Panel Box hte Aircon Socket lapran Yupgawk ni yawng a matu lang
ra ai 4mmsq Wan Sumri yawng = 142mt.
• Hpaw-pat hte Wanpu lapran shara shagu na lang ra ai 1.5 mmsq
Wan Sumri yawng = 300mt.
• Panel Box hte Socket lapran shara shagu na lang ra ai 2.5 mmsq
Wan Sumri yawng = 300mt.
• Lang ra ai phase wire yawng = 10 mmsq = 90 mts.
4 mmsq = 142mts.
2.5 mmsq = 200mts.
1.5 mmsq = 542mts.
CALCULATION FOR LENGTH OF NEUTRAL WIRE
• Wan Shadaw hte Panel Box lapran lang ra ai 10 mmsq Wan
Sumri yawng = 30mt.
• Panel Box hte Yupgawk shagu na Aircon Socket lapran na
lang ra ai 4 mmsq Wan Sumri yawng = 142mt.
• Panel Box hte Shara shagu na Socket ni a lapran lang ra ai
2.5 mmsq Wan Sumri yawng = 300mt.
• Panel Box hte shara shagu na Hpaw-pat ni a lapran lang ra
ai 1.5 mmsq Wan Sumri yawng = 242mt.
• Shara shagu na Hpaw-pat hte Wanpu ni a lapran lang ra ai
1.5 mmsq Wan Sumri yawng = 300mt.
• Lang ra ai neutral wire yawng = 10 mmsq = 30 mts.
4 mmsq = 142mts.
2.5 mmsq = 300mts.
1.5 mmsq = 542mts.
TOTAL LENGTH OF WIRE
• Lang ra ai 10 mmsq Wan Sumri yawng,(phase + neutral) =
30mt. + 30mt. = 60mts. Taking15% wastage a matu = 9mt.
-Yawng, 60mt + 9mt = 69mts. Say 70mts.
• Lang ra ai 4 mmsq Wan Sumri yawng, (phase + neutral) =
142mt + 142mt = 284mts. Taking 15%4.6mt wastage a matu =
42.6mts.
- Yawng, 284mts + 42.6mts = 326.6mts. Say 327mts.
• Lang ra ai 2.5 mmsq Wire yawng, (phase + neutral) = 300mt +
300mt = 600mts. Taking 15% wastage a matu = 60mts.
- Yawng, 600mts + 60mts = 660mts.
• Lang ra ai 1.2 mmsq Wire yawng, (phase + neutral) = 542mt +
542mt = 1084mts. Taking 10% wastage a matu = 108.4mts.
- Yawng, 1084mts + 108.4mts = 1192.4mts. Say 1193mts.
CALCULATION FOR LENGTH OF EARTH WIRE
❖ Socket shagu hte kaga shara shagu na lang ra ai Earth
Wire 4 mmsq = 884mts. Taking 15% wastage a matu=
132.6mts.
❖Yawng, 884mts + 132.6mts = 1016.6mts.
❖Earth wire of 1016.6mts (Say 1016.7 mts) will serve the
purpose.
LIST OF MATERIALS
(Electrical Wiring Installation Materials List)
Srl No. Description Unit Qty Brand/Type Price Total Amount Remark
1 Lamp 30W No. 10 china ¥ 35 ¥ 350
2 Lamp24W No. 15 china ¥ 45 ¥ 675
3 Lamp15W No. 60 china ¥ 35 ¥ 2,100
4 Multi Socket 13A No. 40 china ¥ 25 ¥ 1,000
5 Power Socket 16A No. 8 china ¥ 35 ¥ 280
6 MCB 4p C100A No. 1 china ¥ 85 ¥ 85
7 MCB 4p C63A No. 2 china ¥ 60 ¥ 120
8 MCB 2p C40A No. 3 china ¥ 35 ¥ 105
9 MCB 1p C32A No. 1 china ¥ 25 ¥ 25
10 MCB 1p (B16) No. 12 china ¥ 20 ¥ 240
11 MCB 1p C10A No. 4 china ¥ 20 ¥ 80
12 Panel Box No. 1 china ¥ 300 ¥ 300
13 DB No. 2 china ¥ 120 ¥ 240
14 Wire 16mmsq Cupper meter 2 china ¥ 800 ¥ 1,600
15 Wire 10sqmm Cuppe) meter 2 china ¥ 580 ¥ 1,160
16 Wire 6sqmm Cupper meter 4 china ¥ 450 ¥ 1,800
17 Wire 4sqmm Cupper meter 8 china ¥ 380 ¥ 3,040
18 Wire 2.5sqmm Cupper meter 10 china ¥ 270 ¥ 2,700
19 Wire 1.5sqmm Cupper meter 12 china ¥ 150 ¥ 1,800
20 PVC Pite 25mm Nos 40 china ¥ 15 ¥ 600
21 PVC Pite 25mm (L) Nos 40 china ¥ 2 ¥ 80
22 PVC Pite 25mm (2way socket) Nos 30 china ¥ 2 ¥ 60
23 PVC Pite 25mm (3way socket) Nos 30 china ¥ 2 ¥ 60
24 PVC Pite 20mm Nos 20 china ¥ 10 ¥ 200
25 PVC Pite 20mm ( I- Socket) Nos 20 china ¥ 2 ¥ 40
26 PVC Pite 20mm ( L- Socket) Nos 25 china ¥ 2 ¥ 50
27 Switch Five Gang (230) Nos 1 china ¥ 35 ¥ 35
28 Switch Three Gang (230) Nos 10 china ¥ 35 ¥ 350 Matsing;- Ndai May Shata laman na namtak sha
29 Switch Two Gang (230V) Nos 4 china ¥ 35 ¥ 140 rai nga ai. Masa hta hkan nna, manu ni tsaw wa,
30 Switch One Gang (230V) Nos 2 china ¥ 35 ¥ 70 nyem wa mai ai.
31 Wire tape (Red) Color 5 china ¥ 5 ¥ 25
32 Wire tape (Yellow) Color 5 china ¥ 5 ¥ 25
33 Wire tape (Blue) Color 5 china ¥ 5 ¥ 25
34 Wire tape (Black) Color 5 china ¥ 5 ¥ 25
35 Cable Lug 10sqmm Nos 10 china ¥ 25 ¥ 250
36 Cable Lug 6sqmm (Male) Nos 20 china ¥ 20 ¥ 400
37 Cable Lug 4sqmm (Male) Nos 20 china ¥ 15 ¥ 300
38 Cable Lug 2.5sqmm (Male) Nos 20 china ¥ 10 ¥ 200
39 Cable Lug 1.5sqmm (Male) Nos 20 china ¥ 8 ¥ 160
40 Cable Tie (White) Inch 3 china ¥ 15 ¥ 45
41 Screw (2") Inch 4 china ¥ 15 ¥ 60
42 Screw (1") Inch 3 china ¥ 15 ¥ 45
43 Volt Meter 230V Color 3 china ¥ 40 ¥ 120
44 Polit Lamp (Red)230V Color 1 china ¥ 20 ¥ 20
45 Polit Lamp (Yellow)230V Color 1 china ¥ 20 ¥ 20
46 Polit Lamp (Blue)230V Color 1 china ¥ 20 ¥ 20
47 Solor PV (43.7W) Plate 12 china ¥ 1,000 ¥ 12,000
48 Battery 300Ah Nos 1 china ¥ 13,500 ¥ 13,500
49 Barjer Pite Nos 1 china ¥ 85 ¥ 85
50 Lamp Holder Nos 2 china ¥ 10 ¥ 20
51 Hybrid Inverter Nos 1 Taland ¥ 4,000 ¥ 4,000
52 SPD Nos 2 Taland ¥ 80 ¥ 160
53 Power meter Nos 2 Taland ¥ 100 ¥ 200
54 Fuse Breaker Nos 4 Taland ¥ 35 ¥ 140
55 DC Breaker Nos 4 Taland ¥ 50 ¥ 200
56 (Wiring Instalation) Ta Jahpu Nos 1 No ¥ 15,000 ¥ 15,000
Total ¥ 66,430