0% found this document useful (0 votes)
11 views32 pages

Abdul Rahman Jan 01st To 31st Present

The document outlines the work performed by contractor Abdul Rahman for Tower A and Tower E from January 1 to January 31, 2025, detailing various tasks such as plastering, grinding, and material shifting. It includes a breakdown of labor, rates, and total amounts for each task, with a total amount of 99,680.00 Rupees. The document also specifies the work locations and the number of masons and helpers involved in each task.

Uploaded by

animillasekhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views32 pages

Abdul Rahman Jan 01st To 31st Present

The document outlines the work performed by contractor Abdul Rahman for Tower A and Tower E from January 1 to January 31, 2025, detailing various tasks such as plastering, grinding, and material shifting. It includes a breakdown of labor, rates, and total amounts for each task, with a total amount of 99,680.00 Rupees. The document also specifies the work locations and the number of masons and helpers involved in each task.

Uploaded by

animillasekhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 32

Tower A

Contractor Name: Abdul Rahman Bill Duration : 01-01-2025 to 31-01-2025 Work: Plastering, Haking, Grinding, Material Shiffting

No of Actual Actual Actual Rate of Amount of


No of No of Grinder / Full / Half Rate of Rate of Grinder / Amount Amount Grinder /
S.No Date of Work Masons Helpers Buffering / Work Location Details Day Buffering / of Mason of Helper Buffering / Total Amount Debit to
Chipping Mason Helper Chipping Chipping

1 04.01.2025 0 1 1 T-A insert plate chiiping at 45th floor Full 850 560 1000 0 560 1000 1560 KLC

2 04.01.2025 1 1 0 Tower -B lift door frint bond making Full 850 560 1000 850 560 0 1410 Company work

3 04.01.2025 3 0 0 Grade slab concrete fox TD B4 level Full 850 560 1000 2550 0 0 2550 KLC

4 04.01.2025 2 2 0 Tower -B lift door front bond making Full 850 560 1000 1700 1120 0 2820 Company work

5 05.01.2025 3 11 0 For rampp 2column casing from b1 topodium Full 850 560 1000 2550 6160 0 8710 Company work

6 06.01.2025 3 5 0 By level grade slab concrete is cleaning work Full 850 560 1000 2550 2800 0 5350 KLC

Tower B lift door front bond making 75mm night


7 06.01.2025 2 2 0 work Full 850 560 1000 1700 1120 0 2820 KLC

8 07.01.2025 0 0 1.5 Shafts chipping in flat 374 works Full 850 560 1000 0 0 1500 1500 KLC

9 07.01.2025 1 1 0 Tower B lift door front bond area making Full 850 560 1000 850 560 0 1410 SNR

10 07.01.2025 5 11 1 for construction joint cleaning Full 850 560 1000 4250 6160 1000 11410 Company work

Tower B lift door front bond making 75mm night


11 08.01.2025 2 2 0 work Full 850 560 1000 1700 1120 0 2820 Company work

12 09.01.2025 0 0 1 Basement 4 slab sail motor line chipping tower E Full 850 560 1000 0 0 1000 1000 KLC

Basement 4 slab sail tune motor line chipping


13 10.01.2025 0 0 1 tower A,B tune Full 850 560 1000 0 0 1000 1000 KLC

14 10.01.2025 2 2 0 Tower B lift dooor front bond making Full 850 560 1000 1700 1120 0 2820 Company work

15 11.01.2025 0 0 1 miss matching dowell cutting at B1 to podium ramp Full 850 560 1000 0 0 1000 1000 KLC

16 12.01.2025 0 1 1 Rafugee floor bracket concrete chipping Full 850 560 1000 0 560 1000 1560 KLC
Ventilation shaft behind club house dressing for
17 18.01.2025 0 4 0 raftpcc purpose Full 850 560 1000 0 2240 0 2240 Company work

18 18.01.2025 3 4 0 ventilation shaft ratpcc casting Full 850 560 1000 2550 2240 0 4790 Company work

Tower D lift door front 50mm bond making for lift


19 20.01.2025 2 2 0 inner water protection Full 850 560 1000 1700 1120 0 2820 Company work

20 20.01.2025 0 0 1 Tower D ramp drain to tranch Full 850 560 1000 0 0 1000 1000 KLC

21 21.01.2025 2 2 0 Tower D lift door front 50mm bond making Full 850 560 1000 1700 1120 0 2820 KLC

22 21.01.2025 0 1 1 Tower C club house ramp to trunch chipping Full 850 560 1000 0 560 1000 1560 Company work

23 25.01.2025 1 1 0 Tower D LMR room touch up work Full 850 560 1000 850 560 0 1410 KLC

Tower D service lift cutout packing


25 25.01.2025 4 8 0 26,18,16,14,10,8,6,4,3 floor Full 850 560 1000 3400 4480 0 7880 SNR

shittering board remove joint chipping joint touch


26 26.01.2025 2 2 1 up 40,32,26,18,16 floor Full 850 560 1000 1700 1120 1000 3820 SNR

27 27.01.2025 2 2 1 B1 concrete chipping joint touch up 14,10,8 6,4,2 Full 850 560 1000 1700 1120 1000 3820 SNR

Tower B service lift hole packing cutout concrete


28 27.01.2025 4 5 1 touch up cutout packing cutting Full 850 560 1000 3400 2800 1000 7200 SNR

Tower B service lift touch up work of door front


29 28.01.2025 1 1 1 dead mortar chippong Full 850 560 1000 850 560 1000 2410 SNR

Tower B passenger lift touch up work painting B1


30 29.01.2025 1 1 0 lintel plaster Full 850 560 1000 850 560 0 1410 Company work

31 30.01.2025 1 1 0 Tower B B4 Block work 300mm height door Full 850 560 1000 850 560 0 1410 Company work

Time= 8:00 am to 7:00 pm work= block work fer


32 30.01.2025 1 1 0 compound wall Full 850 560 1000 850 560 0 1410 KLC

Work Block work & olcolumn footing casting


33 30.01.2025 1 3 0 company work Full 850 560 1000 850 1680 0 2530 Company work

34 31.01.2025 1 1 0 Tower B B4 lift lobby concrete 14m Full 850 560 1000 850 560 0 1410 Company work

Total Amount 99680.00


Amount In Words: Fiftty Nine Thousand Three Hundred Nintey Rupees only
Accepted By Approved By Authorised By
Tower E
Contractor Name: Abdul Rahaman Work: Plastering, Haking, Grinding, Material Shiffting
Bill Duration : 01-01-2025 to 31-01-2025

Actual Rate of Amount of


No of Grinder
No of No of Full / Half Actual Rate Actual Rate Grinder / Amount of Grinder /
S.No Date of Work / Buffering / Work Location Details Amount of Mason Total Amount Debit to
Masons Helpers Day of Mason of Helper Buffering / Helper Buffering /
Chipping
Chipping Chipping

For tower e hose keeping work falt in side dead woork flat
1 02.01.2025 0 2 0 concrete jally balcony area utility and bedrrom and house Full 850 560 1000 0 1120 0 1120 KLC
keeping work L-3

For Tower E Corridor L-7 Dead Concrete Full Cleaning Work


2 03.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
For Amin Floorings Corridor Area Tles Work Purpose .

For Tower E Level 4 Unit 1,2,3,4,5 Dead Concrete Jally housin


3 04.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
Keeping ork flat In Side Aerea And balcony Utility.

Level 8 Corridor Area full Concrete Dead Maortex Cleaning


4 05.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
Work Fro Corridor Area Main Flooring tiles Work Purpose.

Level5 Flat Inside Area Full dead Comcrete House Keeing


5 06.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
Work Uni 1,2.3.4.5

Level 6 flat Inside Unit1,2.,34,5 Balcony UtilityBedroom Area


6 07.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
Full Dead concrete Jally Housin Keeping work.

Level 9 Corridor Area Full Concrete Dead Mortex Removing


7 08.01.2025 0 1 0 Full 850 560 1000 0 560 0 560 KLC
work For Main Fooring Corridor Area tile Work Purose

Level7 Flat Inside 1,2,3,4,5, Utility Balcony Bederoom Area


8 09.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
Full Dead Concrete House Keeping Work.

Level 22 Corrior Area Full Dead Mortex Concrete cleaning


9 10.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
work For tils Work Cleaning Wrk For ties work .

Level 22 Corriodr rea Dead Mortex for Man Chipping Work


10 10.01.2025 0 1 0 Full 850 560 1000 0 560 0 560 KLC
For Main Flooring tiles Work Purpose.

Level33 Corriodr Area Full dubcase Dead Mortex concrete


11 11.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
Cleanign Work For TILS Work Purpose .

corriodr Area full Debirs Dead Main cocrete Chipping Work


12 11.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
For Min Fooring Tiles Work Purpose.

Level33 Corriodr Area Full eabris Dead Mortex concrete For


13 12.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
Corridor Area Maun Flooring Tiles work Purpoe.

level24 Corridor Area Full deabris Chipping Work For Main


14 12.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Chiping Work for Main Flooirng Tiles Work Purpse .

Level24 Full debaris dead Mortex For main Concrete


15 13.01.2025 0 5 0 Full 850 560 1000 0 2800 0 2800 KLC
Cleaning Flooring tiles Work Purpose.

Level27 Corriodr Rea full Debaris Dead Mortex concrete


16 13.01.2025 0 1 0 Chipping work Mortex concrete Chippping work For Main Full 850 560 1000 0 560 0 560 KLC
Flooring Ties Work Purpose.
Level27 Corriodr Area Full Deabris ead Mortex Concrete
17 14.01.2025 0 3 0 Full 850 560 1000 0 1680 0 1680 KLC
Cleaning work For Main Flooroing tiles work Purpose.

Level26 Corridor Area Full Debaris Dead Mortex Concret


18 14.01.2025 0 1 0 Full 850 560 1000 0 560 0 560 KLC
Chipping Work .

Level29 Unit 1,2,3,4,5 Utility Area Full Concrete Chipping


19 15.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Work For Utiluity Flooring And Wall iles Flooring Purpose.

Unit1,2,3,4,5, Utility Areea Full Dead Clenaing Work Chippig


Claning Concrete Chipping Cleaning Work For Utility Area
20 15.01.2025 0 5 0 Flooring Tiles Work Purpose Full 850 560 1000 0 2800 0 2800 KLC
And L-18 Falt In Site House Keeping Cocrete Dead Mortex

Chipping Machine With Labour For Tower E Leel 29 floor


21 16.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Corrodr dead Cocrete Chipping work.

Level29 Floor Corruiodr Debris Concrete Dead Morter House


22 16.01.2025 0 3 0 Full 850 560 1000 0 1680 0 1680 KLC
Kepping Work.

Chipping Machine With Labour For Tower E Leel 29 floor


23 17.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Corrodr dead Cocrete Chipping work.

Level30 floor Corriuodr Debris Concrete House Keeping Work


24 17.01.2025 0 5 0 And Level 9 Unit 1,2 balcony Utility Debris Concrtete Full 850 560 1000 0 2800 0 2800 KLC
housekeeping Work.

Chipping Machine With Labour For Tower E Level 30 floor


25 18.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Corrodr dead Cocrete Chipping work.

Level22 to 30 Floor Electricl Shaft Debris Concrete


26 18.01.2025 0 3 0 Full 850 560 1000 0 1680 0 1680 KLC
Housekeeping Work.

Chiping Machine with Labour For Tower E Levek30 th floor


27 19.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Corrodr Ded Motor Chipping work.

28 19.01.2025 0 3 0 Level31h Floor Corridor Debris Concrete Housekeeping Work. Full 850 560 1000 0 1680 0 1680 KLC

Level 32th Floor Unit 2,3,5 Utility Dead Morter Concrete


29 20.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Sullury Chipping work.

Level32th floor Unit 2,3,5 Utility Balcny Debris Comcrete


30 20.01.2025 0 3 0 Full 850 560 1000 0 1680 0 1680 KLC
Dead Concrete Housekeeping Work.

31 21.01.2025 0 0 1 Level31th Floor corriodr Dead Morter Chipping work. Full 850 560 1000 0 0 1000 1000 KLC

Level18th Floor UNIT 1,2,3 Flat nside Debris Concrete Sullury


32 21.01.2025 0 3 0 Full 850 560 1000 0 1680 0 1680 KLC
Balcony Housekeeping Work.

Chipping Machine With Labour 3th Floor corriodr Dead


33 22.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Morter Chipping Work.

Level18Unit 1,2,3,4 Inside Flat Debris Concrete And Balocny


34 22.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
Utility Concrete Sullury Housekeeping Work.

Level 20th Floor Corriodr Undulation Plumbout Wall Chipping


35 23.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Work.
Level14,15 Corriodor Concrete Sulury And Debris Concrete
36 23.01.2025 0 5 0 And debris Concrete And Level18 Unit 5 Inside Flat 18 unit Full 850 560 1000 0 2800 0 2800 KLC
Inside Flat Debris Concrete Housekeeping work.

Chipping Level 20th Floor Corrior Plumbout Undulation Wall


37 24.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Chipping Work.

Level19 Unit1,2,3,4 Inside Flat Debirs concrete utilty Abd


38 24.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
Concrete Sullury Balcoy Utiltyy Housekeeping Work.

Level22th Floor Corrior Wall Chippig Undultoon Wqll


39 25.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Chipping Work.

Level17th Floor Corriodr Debris Concrete And Level 19 Unit 5


40 25.01.2025 0 4 0 Inside Flat Balony Utility Concrete Sulluryu Housekeeping Full 850 560 1000 0 2240 0 2240 KLC
Work.

Level18th Floor Corridor Debris Concrete And Level 20 Uni


41 26.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
1,2,3 Inside Flat Balcony Utilty Sullury Housekeeping Work.

Level18th Unit 5 Pooja rom Wall Chipping Pooja room Wall


42 26.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Chipping Work.

Level20th Unit Unit 4,5 And Level 22unit 3,4,5 Inside Flat
43 27.01.2025 0 3 0 Full 850 560 1000 0 1680 0 1680 KLC
Balcony Uilty Concrete Sulury Housekeeping Work.

Level22 Unit 3,4,5 Utilty And Full Concrete Dead Morter


44 27.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Concrete Sulllury Chipping Work.

LEvel23 Unit 3,4,5 Inside Flat balcony Utility Concrete Sullury


45 28.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
Housekeeping Work.

Level23 unit3,4,5, Utiluity Area Full Concrete dead Morter


46 28.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Concrete Sulury Chipping Work.

Level21 unit1, 2 and Level 21 Unit 3 4 5 inside flat balcony


47 29.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
utility concrete and house keeping work

Level 24 unit 3 4 5 utility area full concrete sullury morter


48 29.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
cement chipping work

Level 21 unit3,4,5, Utiluity Area Full Concrete dead Morter


49 30.01.2025 0 4 0 Full 850 560 1000 0 2240 0 2240 KLC
Concrete Sulury Chipping Work.

Level 25 unit3,4,5 Utiluity Area Full Concrete dead Morter


50 30.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
Concrete Sulury Chipping Work.

Level 25 unit 3 4 5 inside flat balcony utility concrete sullary


51 31.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 KLC
chipping work

Level 26 unit 3 4 5 utility area full concrete dead morter


52 31.01.2025 0 0 1 Full 850 560 1000 0 0 1000 1000 KLC
cement sullary chipping work

Total 74440
Amount In Words: Fiftty Five Thousand Rupees only

Accepted By Approved By Authorised By


Basement
Contractor Name: Abdul Rahaman Bill Duration : 01-05-2024 to

No of Grinder /
No of
S.No Date of Work No of Helpers Buffering /
Masons
Chipping

1 02.01.2025 0 0 1

2 03.01.2025 0 0 1

3 04.01.2025 0 0 1

4 05.01.2025 0 0 1

5 06.01.2025 0 0 1

6 07.01.2025 0 0 1

7 08.01.2025 0 0 1

6 09.01.2025 0 0 1

7 10.01.2025 0 0 1

9 10.01.2025 0 0 2

10 11.01.2025 0 0 1
11 21.01.2025 0 0 1

12 13.01.2025 0 0 1

13 14.01.2025 0 0 1

14 15.01.2025 0 0 1

15 16.01.2025 0 0 1

16 17.01.2025 0 0 1

17 18.01.2025 0 0 1

18 19.01.2025 0 0 1

19 20.01.2025 0 0 1

20 21.01.2025 0 0 1

21 22.01.2025 0 0 1

22 23.01.2025 0 0 1

23 24.01.2025 0 0 1

24 25.01.2025 0 0 1
Amount In Words: One Lakh Fiftty One Thousand Eight Hundread Fiftty Rupees Only

Accepted By
Basement
Bill Duration : 01-05-2024 to 15-05-2024 Work: Plastering, Haking, Grin

Actual Actual
Full /
Work Location Details Rate of Rate of
Half Day
Mason Helper

B 3 Level T B North side areas dead concrete chipping work Full 850 560

B 3 Level T B North side areas dead concrete chipping work Full 850 560

B 3 Level T B North side areas dead concrete chipping work Full 850 560

B 4 level T D inside areas dead concrete chipping work Full 850 560

B 4 level T D inside areas dead concrete chipping work Full 850 560

B 4 level T E beside Ramp 1 areas dead concrete chipping


Full 850 560
work

B 4 level Ramp 1 areas dead concrete chipping work Full 850 560

B 4 level T E beside Ramp 1 areas dead concrete chipping


Full 850 560
work

B4 level T E inside areas dead concrete chipping work Full 850 560

B4 Level surp areas walls chipping work due to trench to


Full 850 560
tank inside concreteing cutout making purpose

B4 level T E 5th series inside floor areas dead concrete


Full 850 560
chipping work
B1 Level T B lift lobby areas dead concrete chipping work Full 850 560

B1 Level T A lift lobby areas dead concrete chipping work Full 850 560

Working on the T B lift lobby areas dead concrete chipping


Full 850 560
work at B1 level

B 1 Level T B lift lobby areas dead concrete chipping work Full 850 560

B2 Level T B north side areas floor lrvrl dead concrete


Full 850 560
chipping work

B2 Level T B north side NT floor areas dead concrete chipping


Full 850 560
work

B2 Level T B East tank button areas dead concrete chipping


Full 850 560
work

B2 Level T B North / East cornner tank butform floor level


Full 850 560
dead concrete chipping work

B 3 Level T E west side floor level dead concrete chipping


Full 850 560
work

B 3 Level T E west side floor level dead concrete chipping


Full 850 560
work due to IPS flooring work purpose

B3 Level T B north side areas dead concrete chipping work Full 850 560

B3 Level T B north side areas dead concrete chipping work Full 850 560

B3 Level T E south side NT floor areas dead concrete


Full 850 560
chipping work

B3 Level T D and C NT floor areas dead concrete chipping


Full 850 560
work
Total Amount
read Fiftty Rupees Only

Approved By
Work: Plastering, Haking, Grinding, Material Shiffting

Actual Rate of
Amount Amount Amount of Grinder
Grinder / Total
of of / Buffering / Debit to
Buffering / Amount
Mason Helper Chipping
Chipping

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 KLC

1000 0 0 2000 2000 KLC

1000 0 0 1000 1000 KLC


1000 0 0 1000 1000 KLC

Company
1000 0 0 1000 1000
Work

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 SNR

1000 0 0 1000 1000 KLC

1000 0 0 1000 1000 KLC


26000

Authorised By
Basement
Contractor Name: Abdul Rahaman Bill Duration : 01-01-2025 to 31-01-2025 Work: Plastering, Haking, Grinding, Material Shiffting

No of Actual Rate of Amount of


Amount Amount
No of No of Grinder / Full / Half Actual Rate Actual Rate of Grinder / Grinder / Total
S.No Date of Work Work Location Details of of Debit to
Masons Helpers Buffering / Day of Mason Helper Buffering / Buffering / Amount
Mason Helper
Chipping Chipping Chipping

level Tower E ramp 1 Area Portion Wals


1 02.01.2025 1 6 0 Full 850 560 1000 850 3360 0 4210 KLC
Connecting With manually shifting & Mixing

working On The b2 Level tower B The Shift Side


2 02.01.2025 0 12 0 Full 850 560 1000 0 6720 0 6720 SNR
Floor Level housekeeping Work.

Working On the B4 Level Portin Wall At Ramp


3 03.01.2025 3 8 0 Areas Concreting Work & Reas Cloumns Uoset Full 850 560 1000 2550 4480 0 7030 KLC
Areas touch up Work.

Working on The B1 Level Tower E East Side Nt


4 04.01.2025 2 8 0 Areas Celaing Constrution Finishing And Level Full 850 560 1000 1700 4480 0 6180 KLC
Debris RemainWork.

Working On The B1 Level Tower E Ramp 4 areas


5 04.01.2025 0 9 0 Full 850 560 1000 0 5040 0 5040 KLC
Debris Remaining Shifting work Purpose

Working On The B-3 LevelTower-B Level reas


6 05.01.2025 3 9 0 Celings Upset of Construction Joints Finishings & Full 850 560 1000 2550 5040 0 7590 SNR
Flooring Areas Debris Remaining Work

Working On The B3 Level Tower B Nort Side


Bottom & Walls Upset Areas Finishing 7 Walls
7 06.01.2025 3 6 0 Full 850 560 1000 2550 3360 0 5910 KLC
And Debris & UnConstrcted Shifting Material
Removing work.

B4 Level Beam Areas PCC Laying With Cememnt


8 07.01.2025 3 8 0 From Godown To Working Areas Laying & Full 850 560 1000 2550 4480 0 7030 KLC
finishings Works.

Working on The B1 Level Tower C,D,E Electrical


9 07.01.2025 0 13 0 Room Frentrs Areas Due to Electrical Room Full 850 560 1000 0 7280 0 7280 KLC
Clearance Purpose

Working On the B1 Level Coloumns Lift Walls


10 08.01.2025 3 8 0 Joints Chipped Areas Finishing Works And Floor Full 850 560 1000 2550 4480 0 7030 RR
Level Shuiftiing Material Remaining Works.

Working On The B1 Rower c Bend Rmp 4 Areas


11 08.01.2025 0 8 0 Debris Remaining Due To Beam BATHROOM Full 850 560 1000 0 4480 0 4480 KLC
Fixing Purpose

Working On The B4 Level Areas Upset &


12 09.01.2025 3 10 0 Construction Joints Finishing & Ramp Areas Full 850 560 1000 2550 5600 0 8150 SNR
Beams Areas Sail Cutting Leveling Works.
Working On The B4 Level 02 Nos Colmns With
13 10.01.2025 3 10 0 Concert Shifting Ramps Areas Back Finising Full 850 560 1000 2550 5600 0 8150 KLC
Works

Working On The B2 Level Club House Back Walls


Ceilings & Rotating Walls ceilimgs Chipped Upset
14 11.01.2025 3 10 0 Full 850 560 1000 2550 5600 0 8150 SNR
Areas Finishing And Flou Level House Keeping
Due To Flooring Worka Purpose.

Working On The B1 Level Tower C,D,E Tower


15 11.01.2025 0 10 0 Electrical Rooms Front& Lift Loby Areas Cleaning Full 850 560 1000 0 5600 0 5600 SNR
& Debris Removing Works.

Working On the B4 Level Areas Tpers East Face


16 12.01.2025 3 10 0 Ramp Areas Raft Shiftting Fxing Load Sail Filing Full 850 560 1000 2550 5600 0 8150 KLC
Works .

Working On The B2 Level Areas Beams


17 13.01.2025 3 10 0 Concrenoney Diflour Level Debris Remaining Full 850 560 1000 2550 5600 0 8150 SNR
Works.

working On The B2 Level areas MateriAL Company


18 14.01.2025 3 8 0 Full 850 560 1000 2550 4480 0 7030
Remaining And Walls AREAS Touc Up Works. Work

B3 Level Tower D East Side Nt Areas Cleaning And


19 15.01.2025 3 13 0 Tower D & Shear Walls Joints Chipped Walls Full 850 560 1000 2550 7280 0 9830 KLC
Joints Chipped Areas Finishing.

B4 Level Beams Concreteing Works Beams With


20 16.01.2025 0 8 0 Full 850 560 1000 0 4480 0 4480 KLC
MAnuallyShiftting & Hand Mix Concrete.

B3 Level Tower West Side Floor Level Cleaning


21 16.01.2025 3 10 0 For PPS Flooring & Coloumns Captial Areas Full 850 560 1000 2550 5600 0 8150 KLC
Finishing

B2 Level Tower E 3rd Areas Cleaning Due To Lift


22 17.01.2025 0 6 0 Full 850 560 1000 0 3360 0 3360 KLC
Materual Stacks And Pupose

Working On the B3 Level Towe E West Side Areas


23 17.01.2025 3 10 0 concrete & debirs Removing And 05 nos Full 850 560 1000 2550 5600 0 8150 KLC
Coloumns Caotial Corner Finishing.

Working On The B1 Level Tower D Corriodr Store


24 18.01.2025 0 9 0 Front Debris Remaining Works Due To Vehicle Full 850 560 1000 0 5040 0 5040 KLC
Movement Purpose.

Working On The Towere D East Face Areas


Columns & Captial Corner Finishing And Floor
25 18.01.2025 3 10 0 Full 850 560 1000 2550 5600 0 8150 KLC
Lelvel Clening Due To PPs Flooring Cleaning Due
To PPs Flooring Purpose.

Working On The B4 Level Tower E Westside


Ramp Areas Back Filling compaction By mAnually
26 19.01.2025 3 15 0 Full 850 560 1000 2550 8400 0 10950 KLC
& B3 Level Tower D East Face Columns Captial
Corner Finishing Work.
Working on The B4 Level Tower E Besdie Ramp 1
27 20.01.2025 3 9 0 Areas Pss Alyng Works With Hand Mixing Full 850 560 1000 2550 5040 0 7590 KLC
Concrete .

Working On the B 4 Levele Tower Tower E Gutter


28 21.01.2025 3 11 0 Full 850 560 1000 2550 6160 0 8710 KLC
Beams & Side Beams Cincrete By Tractor.

Working On The By Level Tower E Beside Ramp 1


29 22.01.2025 4 10 0 Full 850 560 1000 3400 5600 0 9000 KLC
Areas Concrete work& Beams & Columns

Working On TheB3 Level Tower B West Side


30 22.01.2025 0 13 0 Areas Debris Shiftiing Material Remaining To B3 Full 850 560 1000 0 7280 0 7280 SNR
Level Ramp-1

Working On the B3Level Tower B west cPTl


31 23.01.2025 3 8 0 corner Finishing And Floor level Clenaing Lift Wall Full 850 560 1000 2550 4480 0 7030 SNR
Case At concreteing Works.

Working On The B2 Level Areas Ceelings


32 24.01.2025 4 13 0 Constryuction Joints Finishing & Floor Level Full 850 560 1000 3400 7280 0 10680 SNR
Debris Removuing Works .

Working UnderDue To S fore material Shifting


33 26.01.2025 0 2 0 Full 850 560 1000 0 1120 0 1120 SNR
Purpose

Company
34 27.01.2025 0 2 0 Working On Tower A Sfor works Under Baloyisr Full 850 560 1000 0 1120 0 1120
Work

Working On The B2 Level Tower B east Face


35 28.01.2025 2 7 0 Areas Construction Joints Finishing joints Of Floor Full 850 560 1000 1700 3920 0 5620 SNR
Level Cleaning

Working On The B2 Level Tower Side Areas


Ceelings Construction Jaints Finishing Floor Level
36 28.01.2025 4 12 0 Full 850 560 1000 3400 6720 0 10120 SNR
Debris Remains Lift Walls Cut Out Concreteing
Works

Working On The B1 Level Tower b South Side Nt


37 29.01.2025 0 8 0 Areas Debris & Lift Loby Areas Debris Removing Full 850 560 1000 0 4480 0 4480 SNR
Works

Working On The B2 Level Tower E Last Sde Areas


38 29.01.2025 2 6 0 Upset And Construcyion Jains finishing And Floor Full 850 560 1000 1700 3360 0 5060 SNR
Level Cleaning Work

Working On the B1 Level Finishing Works And


39 30.01.2025 2 12 0 Floor Level Series & Lift Loby Areas Cleaning Full 850 560 1000 1700 6720 0 8420 SNR
Works

Working On The B1 Level Tower B Upset Chipped


40 31.01.2025 2 12 0 Areas Walls Finishing OF Floor Level Cleaning Full 850 560 1000 1700 6720 0 8420 SNR
Work.
Total Amount 274640
Amount In Words: One Lakh Fiftty One Thousand Eight Hundread Fiftty Rupees Only
Accepted By Approved By Authorised By
Base
Contractor Name: Abdul Rahaman Bill Duration : 01-01

No of Grinder /
No of
S.No Date of Work No of Masons Buffering /
Helpers
Chipping

1 02.01.2025 2 4 0

2 03.01.2025 2 4 0

3 04.01.2025 2 3 0

4 05.01.2025 2 3 2

5 06.01.2025 2 2 2

6 06.01.2025 1 1 0

7 07.01.2025 1 1 2

6 08.01.2025 1 1 6

7 09.01.2025 2 2 1

9 10.01.2025 2 3 1

10 11.01.2025 2 3 1

11 12.01.2025 2 3 1
12 13.01.2025 2 3 1

13 14.01.2025 2 3 1

14 15.01.2025 2 3 1

15 16.01.2025 2 4 1

16 17.01.2025 2 4 1

17 18.01.2025 2 4 1

18 19.01.2025 2 3 1

19 20.01.2025 2 5 1

20 21.01.2025 2 3 1

21 22.01.2025 1 5 1

22 23.01.2025 2 5 1

23 24.01.2025 2 4 1

24 25.01.2025 2 4 1

25 26.01.2025 2 11 1

26 27.01.2025 2 4 1
27 28.01.2025 1 1 1

28 29.01.2025 2 4 0

29 30.01.2025 2 7 1

30 31.01.2025 1 7 1

Amount In Words: One Lakh Fiftty One Thousand Eight Hundread Fiftty Rupees Only

Accepted By
Basement
Bill Duration : 01-01-2025 to 31-01-2025

Actual Rate of
Work Location Details Full / Half Day
Mason

B 4 Level Tower North side Trench wall casting


Full 850
manually hand mixing 15mt

B 4 Level Tower West side Trench raft casting 10 mt


Full 850
hand mixing

B4 level tower E west side travel wall casting and


Full 850
trend wall side icc hand mixing

B4 level tower B east side travel raft and soil dressing


Full 850
dead concrete chipping grade slab

B4 level tower C and D between dead concrete


Full 850
chipping work

Cutting hending of corrspond wall footing street F1


Full 850
type 2nos

B4 level tower E west side floor near by pcc and dead


Full 850
concrete chipping grade slab

B4 level tower A east side soil dressing and dead


Full 850
concrete chipping grade slab

B4 level tower B east side ternch raft casting and dead


Full 850
concrete chipping for grade slab

B4 level tower B east side trench raft casting and dead


Full 850
concrete chipping for grade slab

B4 level tower B east side trench raft casting front


hand mixing and dead concrete chipping for grade slab Full 850

B4 level tower Bb east side ternch wall casting


manually hand mixing and dead concrete chipping for Full 850
grade slab
B4 level tower B east side trench wall casting front
manually hand mixing and dead concrete chipping for Full 850
grade slab
B4 level tower B east side trench wall casting front
manually hand mixing dead concrete chipping for Full 850
grade slab
B4 level tower E and club house between trench wall
side pcc and tower B north side concrete chipping Full 850
work

B4 level tower d and E between pcc work and tower D


Full 850
inner area dead concrete chipping work

B4 level tower east side trench raft casting


10mtmanually hand mixing and dead concrete Full 850
chipping worek grade slab

B4 level tower B east side travel wall casting 10m


Full 850
hand mixing and daed concrete for grade slab

B4 level tower C and D between pc work hands


Full 850
mixing and dead concrete chipping for grade slab

B4 level tower C and d between pcc worjkm hand


mixing and soil leveling fofr pcc and daed concrete Full 850
chipping for grade slab

B4 level to club house area trench wall side pcc work


Full 850
and dead concrete for grade slab

B4 level towert C and D between pcc work hand


Full 850
mixinfg and dead concrete chipping fort grade slab

B4 level tower A eastv side trench pcc workj 10mt


Full 850
and dead concrete chipping for grade slab

B4 level club house area pcc work and dead concrete


Full 850
chipping grader slab

B4 level club house area trench wall side pcc work


hand mixing and dead concrete chipping for grade slab Full 850
purpose
B4 level tower B side travel wall side soil dressinfg
and pcc work and dead concrete chipping for pcc work Full 850
and dead concrete chipping for grade slab purpiose

Tower B 4 level maually concrete mixing pcc concently


Full 850
club house concrete manually mixing
B4 level tower B east side ternch raft casting hand
Full 850
mixing 10m and dead concrete chipping for grade slab

B4 level tower B east side ternch raft casting hand


Full 850
mixing

B4 level tower B NORTH side soil dressing and pcc


Full 850
work mixing 40mt

B4 level tower B east side ternch raft casting hand


Full 850
mixing 10m and dead concrete chipping for grade slab

Total Amount
iftty Rupees Only

Approved By
Work: Plastering, Haking, Grinding, Material Shiffting

Amount of
Actual Rate of
Actual Rate of Amount of Amount of Grinder /
Grinder / Buffering /
Helper Mason Helper Buffering /
Chipping
Chipping

560 1000 1700 2240 0

560 1000 1700 2240 0

560 1000 1700 1680 0

560 1000 1700 1680 2000

560 1000 1700 1120 2000

560 1000 850 560 0

560 1000 850 560 2000

560 1000 850 560 6000

560 1000 1700 1120 1000

560 1000 1700 1680 1000

560 1000 1700 1680 1000

560 1000 1700 1680 1000


560 1000 1700 1680 1000

560 1000 1700 1680 1000

560 1000 1700 1680 1000

560 1000 1700 2240 1000

560 1000 1700 2240 1000

560 1000 1700 2240 1000

560 1000 1700 1680 1000

560 1000 1700 2800 1000

560 1000 1700 1680 1000

560 1000 850 2800 1000

560 1000 1700 2800 1000

560 1000 1700 2240 1000

560 1000 1700 2240 1000

560 1000 1700 6160 1000

560 1000 1700 2240 1000


560 1000 850 560 1000

560 1000 1700 2240 0

560 1000 1700 3920 1000

560 1000 850 3920 1000

Authorised By
Total Amount Debit to

3940 SNR

3940 SNR

3380 SNR

5380 SNR

4820 KLC

1410

3410 KLC

7410 SNR

3820 SNR

4380 SNR

4380 SNR

4380 SNR
4380 SNR

4380 SNR

4380 SNR

4940 SNR

4940 SNR

4940 SNR

4380 KLC

5500 KLC

4380 SNR

4650 KLC

5500 SNR

4940 SNR

4940 SNR

8860 SNR

4940 SNR
2410 SNR

3940 SNR

6620 SNR

5770 SNR
Abstract
Contractor Name: Gulam Mortuja Ahammed Bill Duration : 01-01-2025 to 31-01-2025

S.No Description Total Amount


1

5
Total Amount

Amount In Words: Two Lakhs Seventy Thousand Five Hundread Seventy Rupees Only