Mughal Energy Progress Review Presentation 18-Jun-2025
Mughal Energy Progress Review Presentation 18-Jun-2025
1
CIVIL CONSTRUCTION WORKS OF 36.5 MW CFPP POWER PLANT
MUGHAL ENERGY LIMITED, 17KM LAHORE- SHEIKHUPRA ROAD-LAHORE
PROGRESS REVIEW
PRESENTATION 18-Jun-2025
3
RCC Slab at +10.400 m level Raft concrete
Cooling Water Fire Tile Work In poured, finishing works done poured at
Biological Waste
Fighting Pumping Station Progress At First control basin,
Master Layout Plan
Switchyard &
columns till L beam
poured, L beams poured,
Master Layout Plan Construction Area
Floor
Water Treatment
Plant (On Hold) RCC Walls In
Prog.
In Progress
On Hold
Electrical pump foundations
Switchgear poured)
Control Building Chemical
Drawings
(Paint works, Water
treatment
Awaited
plant
waterproofing (Structure
Completed ,
flooring works in Flooring Works
TG-6 (RCC slab) shall be released to MEL/IEPL for the further mechanical Done
1. erections and placement by 30-Apr-2025 (complete in all respects) ICPL
4. Plumbing works (rates/B.O.Q) shared with Civil & Urban Engineers, shall be MEL Done
issued to ICPL for further execution after due discussions by 15-Apr-2025.
5
5
Work Stoppages/Bottlenecks
Sr. Structure Awaited Decision / Hold Point Pending Since Planned Completion
No.
2. Cooling Water & Fire Water proofing works over precast double T 16-Mar-2025 28-Sep-2024
Fighting Pumping planks on hold.
Station
3. Flue Gas Treatment Masonry Works On Hold (from +12 m to +24 10-Feb-2025 25-Nov-2024
m levels due to mechanical materials and
crane placement around the building.
4. Raw Water Storage Pump room foundations drawings awaited. 10-Mar-2025 14-Oct-2024
& Pumping Station 6
6
Work Stoppages/Bottlenecks
Sr. Structure Awaited Decision / Hold Point Pending Since Planned
No. Completion
5. Light Fuel Oil Storage Pump foundations on hold due to design 25-Nov-2024 15-Nov-2024
(LFO) revisions.
6. Road & Container placement at multiple locations 30-Jan-2025 31-Dec-2024
Infrastructure Works hindering road works.
7. Mixing Center Area clearance awaited 13-Jun-2025 23-Sep-2024
8. Retention & Control Precast pipes36” & 42” laying works pending 8-May-2025 28-Sep-2024
Basin from control basin to cooling tower. Rate
analysis already submitted (with reminders)
9. Boiler House Deck slabs at +15200 , +19500 and +23000 20-Mar-2025 23-Sep-2024
put on hold due to mechanical non-clarities.
10. Switchyard & Finishing works on hold due to the arrival / 30-Jun-2024 28-Sep-2024
Electrical Switchgear installation of electrical panels.
11. Fan Cooling Tower Mechanical erections / installations awaited 30-Jan-2025 21-Sep-2024
Completed with excessive
efforts/resources in 5
months. 7
7
Bottlenecks / Hinderances
Awaited Drawings
1. Auxiliary Boiler House • Drawings awaited
8
8
Awaited Drawings / Pending Decisions
1. Installation of power DB’s and power Variation orders for power DB’s for Switchyard/Central
synchronization awaited at switchyard and central Maintenance buildings submitted.
maintenance workshop.
2. Internal Plumbing works of switchyard, Rates for the plumbing B.O.Q submitted.
maintenance workshop and chemical water
treatment plant awaited.
3. AC systems installation awaited at switchyard Rate analysis for revised capacities of air-conditioning systems
building. submitted
9
9
Minutes Continued From Last Meeting (25-Feb-2025)
5.
Following awaited IFC drawings required by ICPL on extreme priority basis to catchup with the intended cash flows and physical progress at
the project and also these drawings are critical for installation and energizing the installed power generation capacity.
Sr. Structures Priority I Structures Priority II Cost (As Per B.O.Q) Drawings From PES Completion
no.
(Millions) Form ICPL
Total 239.0
10
10
Detailed Physical Progress % Age Of Structures
Updated 18-Jun-2025
Actual
Planned Dur. Actual Planned
STRUCTURE NAME Planned Start Planned Finish Actual Start % Remarks
(Days) Finish % Comp.
Comp.
Actual
Planned Planned Actual Planned
STRUCTURE NAME Planned Start Actual Start % Remarks
Finish Dur. Finish % Comp.
Comp.
20-Mar-
Cool Down Pit 18-Nov-2023 28-Apr-2024 162 22-Nov-2023 100% 100% -
2024
Not Started
Auxiliary Boiler House 25-Mar-2024 15-Sep-2024 174 - 100.00 % 0% • IFC Drawings Awaited
Yet
Not Started
Operations & Office Building 20-Apr-2024 24-Dec-2024 248 - 100.00% 0% • IFC Drawings Awaited
Yet
Not Started
Fuel Pumping Station 8-Jun-2024 22-Oct-2024 136 - 100.0 % 0% • IFC Drawings Awaited
Yet
15
15
Detailed Physical Progress % Age Of Structures
Updated 18-Jun-2025
14-Mar- -
Coal Handling Systems 20-May-2024 31-Oct-2024 164 100.0 % 55 % • IFC Drawings received on 5-Mar-2025
2025
16
16
Planned W.D V/s Actual Gross W.D
Planned G.W.D Actual G.W.D
Month Planned %age Actual %age Remarks
Amount (Rs.) Amount (Rs.)
Nov-23 24,715,659 2% 9,069,006 0.6%
2. Coal Handling Systems (From Coal Storage To Crusher Building) 15-May-2025 In progress (Design changes)
Tunnel Completed.
3. Coal Handling Systems (Conveyor From Crusher To Boiler 30-May-2025 In progress (Design changes
House) in padestals)
4. Coal Crusher (Crusher Building) 30-Jun-2025 In progress (Containers
removed from location 15-
days after drawings release.)
5. Machine Hall (RCC beams / gantry brackets at +15 m level) In progress (Double T
placement on hold due to
6. Machine Hall (RCC beams / gantry brackets at +18 m level) generator placement delays)
30-May-2025
7. Machine hall (RCC Cable Tunnel)
21
Machine Hall
22
Machine Hall
PCC / RCC Works on hold
due to foundations
designs unavailability
23
Cooling Water & Fire Fighting
Pumping Station
Water proofing works on
hold due to gantry
placement in hall area.
24
FLUE GAS TREATMENT
Brick Masonry +Plaster
works on hold due to
mechanical erections and
area clearance
25
BOILER HOUSE
26
26
BOILER HOUSE
27
27
Chemical Water Treatment Plant
28
28
Fan Cooling Tower
Structure Completed
Since 30-Jan-2025.
29
29
Pipe Rack Pedestals
30
30
Coal Handling & Crusher
31
31
Coal Handling Tunnel
32
32
Coal Storage & Accessories
33
33
Road Works
34
34
Road Works
Material Container
Placement around road
network.
35
35
Road Works
36
36
Light Fuel Oil Storage
37
37
38
38