FCM25117 FCKJ350 Feed Plant
FCM25117 FCKJ350 Feed Plant
SUMMARY
I RAW MATERIALS INTAKE SECTION
II GRINDING SECTION
III MIXING SECTION
IV PELLETING SECTION
V ELECTRIC CONTROL
VI MISCELLANEOUS
VII SUPERVISION
II GRINDING SECTION
106 1 BIN ( Capacity: 350KG )
107 1 SCREW FEEDER, TWLL20
With Germany SEW VS gear motor
108 1 HAMMER MILL, SFSP65×45B
109 1 HOPPER
110 1 VENTILATOR, 9-26-4A
111 1 CYCLONE
112 1 AIRLOCK, TGFY7
113 1 SCREW CONVEYOR, TWLL20
with Germany SEW gear motor
114 1 ELEVATOR, TDTG 40/18
with Germany SEW gear motor
Subtotal
IV PELLETING SECTION
120 1 BIN ( Capacity: 500KG )
121 1 LEVEL INDICATOR, PADDLE TYPE
122-1 1 SCREW FEEDER TLSS20
122-2 1 ONE STRONG CONDITIONER SC350
122-3 1 PELLET MILL, FCPM350
122-4 1 set STEAM PIPELINE ACCESSORIES
123 1 ELEVATOR, TDTG 40/18 ( Stainless Steel )
With Germany SEW gear motor
124 1 COUNTERFLOW COOLER, SKLN16×16
125 1 VIBRATING SIEVE
V ELECTRIC CONTROL
129 1 set ELECTRIC CONTROL CABINET
130 1 set ELECTRIC INSTALLATION MATERIALS
Subtotal
VI MISCELLANEOUS
131 1 set BOILER, STEAM PIPING AND PIPES ACCESSORIES
Steam generating capacity: 350 kg/h
*** To be purchased by customer ***
132 1 set INSTALLATION MATERIALS
133 1 set STEEL STRUCTURE
Subtotal
102-2 1 DEDUSTER
for bag emptying
II GRINDING SECTION
106 1 BIN
in steel sheet construction
with cover connecting flanges
* Conic hopper made of 3mm/Q235 steel plate
* Straight body made of 3mm/Q235 steel plate
* Streamline anti-arch type
Capacity: 350KG
109 1 HOPPER
111 1 CYCLONE
with top part including inlet sleeve for
dusty air and outlet flange for clean
air, bottom part.
with cleaning flap, and lock fitting piece.
IV PELLETING SECTION
120 1 BIN
in steel sheet construction
127 1 CYCLONE
with top part including inlet sleeve for
dusty air and outlet flange for clean
air, bottom part.
with cleaning flap, and lock fitting piece.
V ELECTRIC CONTROL
129 1 set ELECTRIC CONTROL CABINET
Consist of:
* Motor Control Center (MCC)
1)MCC cabinets are placed in the HV power
room of workshop. The technological process
of feed plant consists of raw materials intake
VI MISCELLANEOUS
131 1 set BOILER, STEAM PIPING AND PIPES ACCESSORIES
Include the valves to connect our pellet mill
Steam generating capacity: 350 kg/h
*** To be purchased by customer ***
VII SUPERVISION
Supervision of Equipment Installation and Commissioning
price for 1 supervisor/day:
Scope of Services:
Training
The following people are to be trained free of
charge on site during installation and commissioning:
* 1 mechanical engineer for operation and maintenance
* 1 electrical engineer for operation and maintenance
Obligation of Buyer
Site is cleared, levelled and prepared to receive
equipment.
Buyer has to provide free of charge:
* All site lifting equipment such as mobile crane,
terrain forklift and labour for unloading of containers,
packages, boxes, etc.
* Tool container equipped with erection tools, erection
consumables according to specified tool list to be
CAR Insurance
Purchaser is requested to effect a Construction-All-Risk
insurance for the erection and for the erection period,
also on behalf of the Contractor and the eventual
sub-contractors, project designers and advisers.
The costs of such an insurance are for purchaser's
account and the condition stated in the policy has
to be approved beforehand by seller.
Price Validity:
Our prices shall be valid for 3 months.
After this period, we reserve the right to revise
our prices.
Terms of Supply:
All specifications of elevators, conveyors and other
equipment as mentioned in this quotation have to
be considered as preliminary and subject to the
final project design.
Unless stated otherwise in this quotation, our supply
Time of Delivery:
Three months after receipt of L/C provided that
all technical and commercial details have been
agreed upon. We reserve the right to revise the
date of delivery at the time of placing of order.
Price Basis:
FOB Shanghai including seaworthy packing in
compliance with INCOTERMS 2000.
Transportation and Insurance:
At the expense of the Buyer. Insurance will be
effected at Buyer's explicit request only.
Terms of Payment:
By means of irrevocable Letter of Credit at sight
to be opened in our favor and payable against
presentation of shipping documents.
Guarantee:
We guarantee the delivered equipment for a period
of one year after putting into operation/commissioning
based on working days of 8 hours, but no longer than
18 months after shipment from Shanghai, China.
There is under no circumstance, guarantee provided
for defects caused entirely or partly due to the
following:
* Non-compliance with the operation and maintenance
instructions or with normal usage.
* Normal wearing
* Assembly/installation or repair being carried out
by a third party or by client.
* Application of non-original parts.
No.: FCM25117
Date:June 2, 2025
8450.00
20800.00
10850.00
44900.00
15000.00
12000.00
USD 112000.00
USD (33600.00)
USD 8400.00
USD 86800.0
158.77
600.00
2.20 450.00
1200.00
3000.00
1.50 600.00
0.75 1600.00
300.00
1.50 1800.00
1.10 700.00
55.00 9300.00
300.00
5.50 650.00
1200.00
1.10 550.00
1800.00
1.50 600.00
3000.00
1.50 600.00
20800.00
300.00
550.00
400.00
11.00 6000.00
3000.00
1.50 600.00
10850.00
400.00
300.00
1.50 1000.00
3.00 4000.00
55.00 17000.00
3500.00
6200.00
1.50 600.00
1.65 6500.00
0.22 1000.00
10000.00
5000.00
15000.00
3000.00
9000.00
12000.00