Item Fire Alarm WORKS
1 Installation Works
1.1 Laying works of FA cables 2*1.5
Installation works of ¾’’ EMT
1.2 metal conduits c/w all accessories
needed. (Per length meter)
Installation works of ¾’’ EMT
1.3 metal flexible c/w all accessories
needed. (Per length meter)
Installation and cable connection
of indoor Devices (Smoke
Detector, Heat detector, Isolator
Relay Module, LED Indicators,
1.4
Manual call point, Serine,
Pressure switch, solenoid) Include
(Commissioning, startup, Tag
number, ferrule, cable lugs).
2 FACP Works
Installation and Cable Connection
2.1
works of FACP
النافوره
Previuos Current Total
450 0 450
210 0 210
75 0 75
36 0 36
1 0 1
Unit
EA
EA
H3
Item Fire Alarm WORKS
1 Installation Works
1.1 Laying works of FA cables 2*1.5
Installation works of ¾’’ EMT
1.2 metal conduits c/w all accessories
needed. (Per length meter)
Installation works of ¾’’ EMT
1.3 metal flexible c/w all accessories
needed. (Per length meter)
Installation and cable connection
of indoor Devices (Smoke
Detector, Heat detector, Isolator
Relay Module, LED Indicators,
1.4
Manual call point, Serine,
Pressure switch, solenoid) Include
(Commissioning, startup, Tag
number, ferrule, cable lugs).
2 FACP Works
Installation and Cable Connection
2.1
works of FACP
H3
Previuos Current Total
350 0 350
105 0 105
75 0 75
26 0 26
1 0 1
Unit
EA
EA
H2
Item Fire Alarm WORKS
1 Installation Works
1.1 Laying works of FA cables 2*1.5
Installation works of ¾’’ EMT
1.2 metal conduits c/w all accessories
needed. (Per length meter)
Installation works of ¾’’ EMT
1.3 metal flexible c/w all accessories
needed. (Per length meter)
Installation and cable connection
of indoor Devices (Smoke
Detector, Heat detector, Isolator
Relay Module, LED Indicators,
1.4
Manual call point, Serine,
Pressure switch, solenoid) Include
(Commissioning, startup, Tag
number, ferrule, cable lugs).
2 FACP Works
Installation and Cable Connection
2.1
works of FACP
H2
Previuos Current Total
300 0 300
90 0 90
75 0 75
0 0 0
1 0 1
Unit
EA
EA
مسعود
Item Fire Alarm WORKS
1 Installation Works
1.1 Laying works of FA cables 2*1.5
Installation works of ¾’’ EMT
1.2 metal conduits c/w all accessories
needed. (Per length meter)
Installation works of ¾’’ EMT
1.3 metal flexible c/w all accessories
needed. (Per length meter)
Installation and cable connection
of indoor Devices (Smoke
Detector, Heat detector, Isolator
Relay Module, LED Indicators,
1.4
Manual call point, Serine,
Pressure switch, solenoid) Include
(Commissioning, startup, Tag
number, ferrule, cable lugs).
2 FACP Works
Installation and Cable Connection
2.1
works of FACP
اشرف مسعود
Previuos Current Total
800 0 800
360 0 360
75 0 75
0 0 0
1 0 1
Unit
EA
EA
كالة
Item Fire Alarm WORKS
1 Installation Works
1.1 Laying works of FA cables 2*1.5
Installation works of ¾’’ EMT
1.2 metal conduits c/w all accessories
needed. (Per length meter)
Installation works of ¾’’ EMT
1.3 metal flexible c/w all accessories
needed. (Per length meter)
Installation and cable connection
of indoor Devices (Smoke
Detector, Heat detector, Isolator
Relay Module, LED Indicators,
1.4
Manual call point, Serine,
Pressure switch, solenoid) Include
(Commissioning, startup, Tag
number, ferrule, cable lugs).
2 FACP Works
Installation and Cable Connection
2.1
works of FACP
NOTE: ور الثاني الخاص بالوكالة
الوكالة
Previuos Current Total
500 0 500
450 0 450
75 0 75
0 0 0
1 0 1
متبقي سحب السلك كامال في الدور الثاني الخاص
Unit
EA
EA
متبقي سحب
(ج
Item Fire Alarm WORKS
1 Installation Works
1.1 Laying works of FA cables 2*1.5
Installation works of ¾’’ EMT
1.2 metal conduits c/w all accessories
needed. (Per length meter)
Installation works of ¾’’ EMT
1.3 metal flexible c/w all accessories
needed. (Per length meter)
Installation and cable connection
of indoor Devices (Smoke
Detector, Heat detector, Isolator
Relay Module, LED Indicators,
1.4
Manual call point, Serine,
Pressure switch, solenoid) Include
(Commissioning, startup, Tag
number, ferrule, cable lugs).
2 FACP Works
Installation and Cable Connection
2.1
works of FACP
()ج
Previuos Current Total
1,500 0 1,500
810 0 810
75 0 75
0 0 0
1 0 1
Unit
EA
EA
OVER
Item Fire Alarm WORKS
1 Mobilization of office caravan
Providing a pick-up car at site
1.1
(per month)
2 Installation Works
2.1 Laying works of FA cables 2*1.5
Installation works of ¾’’ EMT
2.2 metal conduits c/w all accessories
needed. (Per length meter)
Installation works of ¾’’ EMT
2.3 metal flexible c/w all accessories
needed. (Per length meter)
Installation and cable connection
of indoor Devices (Smoke
Detector, Heat detector, Isolator
Relay Module, LED Indicators,
2.4
Manual call point, Serine,
Pressure switch, solenoid) Include
(Commissioning, startup, Tag
number, ferrule, cable lugs).
3 FACP Works
Installation and Cable Connection
3.1
works of FACP
NOTE: تركيب لوحة فاير خاصة ببوابه االمن+
OVERALL
Previuos Current Total
0 0 0
3,900 0 3,900
2,025 0 2,025
440 0 440
0 0 0
6 0 6